Ω Observatory 2 Nov 2026 edition

Space compute register

Computers in space that run general workloads, for their operator or as a service. Edition 2 Nov 2026.

1 Summary

IndicatorValue
Systems tracked53, of which 48 shown (name and stage checked)
Stage: operating13
Stage: launched6
Stage: filed4
Stage: announced24
Stage: cancelled1
Operating systems with a stated power figure for the hardware in orbit0 of 13. No power figure in the sources we hold.
Largest satellite count requested from the US FCCSpaceX, up to one million satellites (Pending Review, 30 Jan 2026)
Operators by countryUnited States 17 · China 15 · United Arab Emirates 2 · Switzerland 2 · India 2 · Japan 2 · Canada 1 · Finland 1 · France 1 · Israel 1 · Italy 1 · South Korea 1 · no checked country 2
Systems with a checked Canadian link1 Canadian, 2 linked to Canada
Dated filing events15

Systems tracked counts every system in the downloads. Counts marked no checked country or not yet checked are of shown systems without a checked value. Every other number is our count of values that passed their check. Counts are never added across systems.

2 Scale

2.1 Satellite counts requested from the US FCC

One bar per application, longest first. Each count is the most the filer asks for. Counts are never added up.

  • SpaceX pending review · 30 Jan 2026

    up to one million satellites
    Filing FCC SAT-LOA-20260108-00016 and sources
    Filer
    Space Exploration Holdings, LLC (SpaceX)
    System
    SpaceX Orbital Data Center System
    Satellites
    up to one million satellites
    Filing
    FCC SAT-LOA-20260108-00016 (call sign S00798), 'SpaceX Orbital Data Center System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing by Public Notice DA 26-113 released 2026-02-04 (comments due 2026-03-06), dated 2026-01-30

    fccprod.servicenowservices.com, undated (live record; Status Date 2026-01-30); api-prod.fcc.gov, 2026-01-30; api-prod.fcc.gov, 2026-02-04

  • Orbital Compute Inc. pending review · 24 Jun 2026

    up to 100,000 satellites
    Filing FCC SAT-LOA-20260624-00251 and sources
    Filer
    Orbital Compute Inc.
    System
    Orbital Datacenter System (Orbital Compute Inc.; first satellite Orbital-1)
    Satellites
    up to 100,000 satellites (7 shells; nominal 14,300 per shell in S1-S6 and 14,200 in S7, max 25,000 per shell, system cap 100,000)
    Filing
    FCC SAT-LOA-20260624-00251 (call sign S00867), 'Orbital Compute Inc. — Orbital Datacenter System (LOA)' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02024 (2026-07-31); Space Bureau request 2026-08-28; Orbital response 2026-09-11 (filed 2026-09-10) requesting until 2026-12-10 for remaining items, dated 2026-06-24

    fccprod.servicenowservices.com, undated (live record; Status Date 2026-07-15); docs.fcc.gov, 2026-07-31; api-prod.fcc.gov, 2026-09-11; api-prod.fcc.gov, 2026-09-11

  • Starcloud pending review · 4 Feb 2026

    up to 88,000 satellites
    Filing FCC SAT-LOA-20260202-00073 and sources
    Filer
    Starcloud, Inc.
    System
    Starcloud Orbital Datacenter System (Starcloud-1, Starcloud-2 and successors)
    Satellites
    up to 88,000 satellites
    Filing
    FCC SAT-LOA-20260202-00073 (call sign S00803), 'Starcloud Orbital Datacenter System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing PN 2026-03-13 (Report SAT-01982); Space Bureau information request 2026-08-28, response deadline extended to 2026-09-18 (letter of 2026-09-11); Starcloud response dated 2026-09-16; Part 100 supplement 2026-10-20, dated 2026-02-04

    fccprod.servicenowservices.com, undated (live record; Status Date 2026-02-05); api-prod.fcc.gov, 2026-02-04; api-prod.fcc.gov, 2026-09-16; api-prod.fcc.gov, 2026-09-11; api-prod.fcc.gov, 2026-10-20

  • Blue Origin pending payment (status date 2026-03-19)

    up to 51,600 satellites
    Filing FCC SAT-LOA-20260310-00118 and sources
    Filer
    Blue Origin, LLC
    System
    Project Sunrise (Blue Origin Orbital Data Center System)
    Satellites
    up to 51,600 satellites
    Filing
    FCC SAT-LOA-20260310-00118 (call sign S00830), 'Project Sunrise' (application (launch and operating authority, NGSO)), status Pending Payment (status date 2026-03-19); accepted for filing PN 2026-04-17; Space Bureau information request of 2026-08-28; Blue Origin response 2026-09-18, dated 2026-03-19

    fccprod.servicenowservices.com, undated (live record; Status Date 2026-03-19); api-prod.fcc.gov, 2026-03-19; api-prod.fcc.gov, 2026-09-18

  • Cowboy Space Corp. pending review · 11 May 2026

    up to 20,000 satellites
    Filing FCC SAT-LOA-20260323-00135 and sources
    Filer
    Cowboy Space Corp.
    System
    Stampede Data Center System
    Satellites
    up to 20,000 satellites
    Filing
    FCC SAT-LOA-20260323-00135 (call sign S00851), 'Stampede Data Center System Application' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02007 (2026-06-12); Space Bureau request 2026-08-28; Cowboy response 2026-09-18; bond/milestone waiver supplement 2026-10-28, dated 2026-05-11

    fccprod.servicenowservices.com, undated (live record; Status Date 2026-05-19); docs.fcc.gov, 2026-06-12; api-prod.fcc.gov, 2026-05-11; api-prod.fcc.gov, 2026-09-18

2.2 Computer power where stated

Each mark is one figure from its operator or a report, at its own value. Figures are never added up. Each major step on the scale is 1,000 times larger.

Hardware in orbit now

No power figure in the sources we hold for the hardware in orbit of the 13 operating systems shown.

Plans and next satellites

Computer power, per satellite

  • Orbital Datacenter System filed ≤ 250 kW

    250 kW (planned peak, 'approaching', per satellite (Orbital-1)) · www.reflexaerospace.com, 2026-09-10 · all values

  • Space String launched, next satellite 11.5 kW

    11.5 kW (compute, per satellite) · eu.36kr.com, 2026-09-30 · all values

    This figure is for a satellite that has not launched yet. Next step: G1 verification satellite launch expected Q4 2027 (36Kr says '2027').

Computer power, per structure

  • Sophia Space TILE announced 1 MW

    1 MW (computing power of an envisioned 2030s 50 m x 50 m structure (company hope, relayed by TechCrunch), per structure) · techcrunch.com, 2026-02-26 · all values

Computer power, whole system

Power the source does not define, per storefront plan

  • ODC.Space announced 105 kW

    105 kW ('Power, kW' column of the storefront, not defined by the site, per plan: 42U Sovereign) · odc.space, undated (documents linked are dated 2026-04) · all values

  • ODC.Space announced 10 kW

    10 kW ('Power, kW' column of the storefront, not defined by the site, per plan: 4U Sovereign) · odc.space, undated (documents linked are dated 2026-04) · all values

  • ODC.Space announced 2.5 kW

    2.5 kW ('Power, kW' column of the storefront, not defined by the site, per plan: 1U Collocated) · odc.space, undated (documents linked are dated 2026-04) · all values

Electricity generation, per satellite

  • Adagio-XL announced 200 kW

    200 kW (power generation on later iterations of Adagio-XL, per satellite) · payloadspace.com, 2026-06-10 · all values

  • Adagio-XL announced 100 kW

    100 kW (power generation (Adagio-XL, launch aimed for late 2029), per satellite) · payloadspace.com, 2026-06-10 · all values

  • Xingshu Plan announced 15 kW

    15 kW (solar array, per satellite) · finance.sina.com.cn, 2026-07-18 · all values

Bus capacity, per satellite

  • Aethero operating, next satellite ≤ 3.4 kW

    3.4 kW (peak power capacity of the EnduroSat FRAME-15 bus, per satellite (Titan)) · www.aethero.com, 2026-04-16 · all values

    This figure is for a satellite that has not launched yet. Next step: Titan launch: February 2027 on SpaceX Transporter 19 from Vandenberg (ODAR, 2026-09-25); operator page says Bandwagon-6, no earlier than Q2 2027 (undated update).

2 more give power only as a class
  • CASC gigawatt-class (吉瓦级), no figure stated (planned infrastructure (太空数智基础设施), per system)
  • Mingzhu Constellation Plan gigawatt-class (吉瓦级), no figure stated (long-term goal for the planned constellation, per system)

3 Systems

AetheroUnited Statesoperatingnext satellite 3.4 kW bus capacity
Power
3.4 kW (peak power capacity of the EnduroSat FRAME-15 bus, per satellite (Titan)) [2] next satellite
Full name
Aethero compute-as-a-service (Deimos, Phobos, Titan) [0, 1]
Operator
Aethero Space Inc [8]
Operator's country
US [12]
Partners
EnduroSat: bus/platform builder (Deimos and Phobos per GCAT manufacturer ENDUR; Titan on EnduroSat FRAME-15) [6, 2]
NVIDIA: chip supplier (Jetson Orin on Deimos and Phobos; Jetson Thor on Titan) [0, 1, 5]
SpaceX: launch (Transporter-11, Transporter-16) [7]
Star Catcher: power purchase agreement for beamed power [13]
Stage
operating (as of 2026-04-16) [3, 0]
Satellites flying
2 (as of 2026-10-29) [our sum of launches (1 + 1: Deimos 2024-08-16, Phobos 2026-03-30); no source states the total] [6]
Computers on board
Deimos: 1x NxN-ECM on COTS NVIDIA Jetson Orin, 100 TOPS; Phobos: 1x NxN-ECM on NVIDIA Jetson Orin NX (Super Mode), up to 157 TOPS; Titan (planned): clustered NxA-ECM modules on NVIDIA Jetson Thor, over 4,000 TFLOPS each, up to 16,000 TFLOPS for the mission [5, 0, 1, 2]
Physical facts
mass: Titan: ~184.045 kg total at launch [10]
array dimensions: Titan with deployable solar panels: 2900 mm x 775 mm x 793 mm (bus ~775 x 500 x 793 mm) [10]
Orbit
Deimos 504 x 516 km, 97.45 deg; Phobos 511 x 512 km, 97.45 deg (GCAT); Titan planned SSO 500 km, ~97.4 deg (FCC filing) [6, 9]
Filings
FCC 0780-EX-CN-2025 (call sign WQ2XDL) (experimental licence), status Grant Expired Due to New License, dated 2026-03-05 [8]
FCC 0077-EX-CM-2026 (call sign WQ2XDL) (experimental licence modification), status Granted, dated 2026-04-02 [8]
FCC 0517-EX-CN-2026 (call sign WQ2XNL, Titan) (experimental licence), status Grant Expired Due to New License, dated 2026-07-23 [8, 9]
FCC 0169-EX-CM-2026 (call sign WQ2XNL, Titan) (experimental licence modification), status Granted, dated 2026-10-14 [8, 9]
ITU TITAN (network name as written in the ODAR header; not checked at ITU) (ITU filing referenced by operator), status not verified, dated 2026-09-25 [10]
Registered by
Deimos (2024-149BL): USA, ST/SG/SER.E/1227; Phobos (2026-067BD): not found in the UNOOSA Online Index (search by designator, 2026-11-01) [11]
Launch state
US (Vandenberg SLC-4E, both flown objects) [7]
Canadian link
none found in the aethero.com/news index (Mar 2024 to Aug 2026 titles), the Phobos, Deimos, EnduroSat, Star Catcher and Titan pages, or the FCC ELS Aethero files [0, 1, 4, 5, 8, 13]
Next step
Titan launch: February 2027 on SpaceX Transporter 19 from Vandenberg (ODAR, 2026-09-25); operator page says Bandwagon-6, no earlier than Q2 2027 (undated update) [10, 4]

1 more item on this system has not passed a check yet. It is in the claims ledger.

Axiom SpaceUnited Statesoperatingnot found
Power
not found
Full name
Axiom Space Orbital Data Center (ODC) / Axiom Resilient Compute (ARC) nodes [0, 1]
Operator
Axiom Space, Inc. [0, 6]
Operator's country
US [6]
Partners
Kepler Communications: host satellites and optical relay network for ARC 1 and ARC 2 [two compute nodes hosted on Kepler satellites; host count not stated] [0, 1]
Texas Space Commission: grant funding for the ARCs [0]
Red Hat: software (Red Hat Device Edge on AxDCU-1) [1, 3]
Spacebilt (servers), Skyloom (optical terminal), Phison (SSDs), Microchip (PIC64-HPSC): AxODC Node ISS [4]
Stage
operating (as of 2026-10-06) [Axiom release 2026-10-06: two operational on-orbit nodes; ARC-to-ARC and ARC-to-ground communications confirmed; launched 2026-01-11] [0, 1]
Satellites planned
a multitude of free-flyer ODC nodes in LEO (no number stated) [2] plan
Orbit
hosted on Kepler Tranche 1 (low-Earth orbit); AxDCU-1 on the ISS [1]
Registered by
Host satellites registered by Canada (Kepler ÆTHER-3 to -12, ST/SG/SER.E/1367); which two carry ARC 1/2 is not stated [5]
Launch state
US (Kepler Tranche 1, Falcon 9 from Vandenberg, 2026-01-11; GCAT launch 2026-004) [5, 7, 8]
Canadian link
ARC 1 and ARC 2 are hosted on Canadian-operated, Canada-registered Kepler satellites [0, 5]
Next step
On-orbit demonstration of ARC's post-quantum cryptography capability (no date stated); AxODC Node ISS planned for the ISS in 2027 [0, 4]
ClustergateSwitzerlandoperatingnot found
Power
not found
Full name
Clustergate (Clustergate-2 on-orbit compute platform; OmniSat planned) [0, 1]
Operator
DPhi Space [0]
Operator's country
CH [0]
Partners
Momentus: host satellite (Vigoride 7) for Clustergate-2 [0, 3]
EDGX: NVIDIA GPU supplier for Clustergate-2 [0]
Liquid AI: model supplier (LFM2-3b run in orbit) and hackathon co-organiser [0]
D-Orbit: ION Satellite Carrier host for Clustergate-1 [2]
Stage
operating (as of 2026-04-29) [0]
Satellites planned
'a constellation equipped with compute infrastructure' (no number stated) [0] plan
Satellites flying
1 (as of 2026-10-29) [0, 4]
Computers on board
Clustergate-2: 'a heterogenous processing cluster' including 'an NVIDIA GPU provided by EDGX' (model and count not stated) [0]
Physical facts
mass: host Vigoride-7: 363 kg (GCAT Mass), dry 292 kg; span 6.5 m (GCAT; host vehicle, not the payload) [4]
Orbit
host Vigoride-7: 512 x 518 km, 97.44 deg (GCAT, LLEO/S) [4]
Registered by
not found in UNOOSA Online Index: search '2026-067' returned 0 objects; search 'Vigoride' returned Vigoride 3, 5, 6 (USA) but not Vigoride 7 (queried 2026-10-31) [5]
Launch state
US (Vandenberg SFB SLC-4E, Falcon 9 Transporter-16, 2026-03-30) [4, 6]
Canadian link
none found in the DPhi pages read (homepage, Clustergate-2 release, Clustergate-1 news items) [0, 1, 2]
Next step
OmniSat: 'Shared satellite with compute servers onboard to host hardware payloads and software workloads' (no date on the homepage) [1]

1 more item on this system has not passed a check yet. It is in the claims ledger.

D-OrbitItalyoperatingnot found
Power
not found
Full name
D-Orbit Space Cloud Services (on ION Satellite Carrier) [0]
Operator
D-Orbit S.p.A. [0, 6]
Operator's country
IT [6]
Partners
AWS: customer/partner, ran AWS compute and ML software on ION SCV004 (2022) [1]
Planetek Italia and AIKO: AIX in-orbit AI lab, ESA-backed (Skytrail mission) [4]
SpaceX: launch (Transporter rideshares) [3, 7]
Stage
operating (as of 2022-11-29) [1]
Satellites flying
4 (as of 2026-10-29) [our count of four carriers from four launches (SCV004 2022-01-13, SCV014 2025-01-14, SCV-020 2025-06-23, the 2026-10-01 carrier; SCV003 reentered 2024-12-08 per GCAT); no source states the total] [8, 3, 7, 11]
Computers on board
Unibap SpaceCloud iX5-100 (ION SCV003, SCV004): 4 TOPS over AMD CPU and GPU, Microsemi FPGA, Intel Movidius Myriad X VPU; Unibap iX5-106 (SCV014 'Ascend', SCV020 Skytrail); Unibap iX20 (ION launched 2026-10-01) [2, 1, 4, 5, 12]
Orbit
Sun-synchronous LEO, about 500-540 km, 97.4-97.5 deg (ASI register entries for ION SCV 003, 004, 014, 020) [6]
Registered by
Italy: ION SCV 003, 004, 014 and 020 are in the Italian national register (ASI, edition 01-07-2026) with D-Orbit as operator; UN registration column 'Si' for SCV 003/004, 'No' for SCV-014/020; UNOOSA Online Index shows ION SCV-004 Elysian Eleonora (2022-002K) under Italy in ST/SG/SER.E/1228 [6, 9]
Canadian link
none found in D-Orbit advanced-services page, AWS blog, Unibap mission pages, ASI register entries for these carriers [0, 1, 6]

3 more items on this system have not passed a check yet. They are in the claims ledger.

FeatherEdge GEN-2United Statesoperatingnot found
Power
not found
Full name
FeatherEdge GEN-2 / Orlaith AI on LizzieSat-3 (third-party algorithm integration) [0, 1]
Operator
Sidus Space, Inc. [0]
Operator's country
US [7]
Partners
NVIDIA: Jetson Orin NX module (chip supplier) [2]
SpaceX: launch (Transporter-13) [4]
Stage
operating (as of 2025-05-16) [3]
Satellites planned
not stated for the compute service [0] plan
Satellites flying
1 (as of 2026-10-29) [3, 6]
Computers on board
1x FeatherEdge GEN-2 edge computer (NVIDIA Jetson Orin NX), 100 TOPS as stated [1, 2]
Orbit
512 x 520 km, 97.45 deg (GCAT, LizzieSat-3) [8]
Launch state
US (Vandenberg Space Force Base, California) [4]
Canadian link
none found in the sources read (Sidus releases of 2025-03-17, 2025-05-16, 2026-09-28) [0, 4, 5]
Next step
LizzieSat-4 and LizzieSat-5 on SpaceX Bandwagon-6, no earlier than April 2027 (the release does not say whether they carry FeatherEdge or offer third-party compute) [5]
Kepler ComputeCanadaoperatingnot found
Power
not found
Full name
Kepler Compute (on-orbit compute on Kepler's Tranche 1 optical data relay constellation) [0]
Operator
Kepler Communications Inc. [0, 1]
Operator's country
CA [1, 10]
Partners
NVIDIA: chip supplier (Jetson Orin modules) [0]
Axiom Space: customer/hosted compute payloads (ARC 1 and ARC 2) [3]
SpaceX: launch (Falcon 9, Tranche 1) [1]
Rocket Lab: launch (Neutron, first dedicated launch, NET 2028) [2]
Canadian Space Agency: contribution funding ('Orbital Cloud Infrastructure') [10]
Sophia Space (Pasadena, US): customer/software partner under a commercial agreement announced 2026-04-13; deploys its Orbital Data Center software and operates NVIDIA-powered edge compute nodes on Kepler satellites from Q4 2026, and uses the Kepler network for optical and RF data relay [12]
Stage
operating (as of 2026-03-16) [0, 2]
Satellites flying
10 (as of 2026-10-29) [4]
Computers on board
40x NVIDIA Jetson Orin modules across 10 satellites (introductory capability); release of 2026-01-11 says 'multi-GPU on-orbit compute modules with terabytes of storage' [0, 1]
Physical facts
mass: each approximately 300 kilograms (operator); GCAT Mass 300 kg [1, 4]
bus: Kepler Gen2B (GCAT); GCAT Span 6.0 m flagged '?' (uncertain) [4]
Orbit
GCAT: perigee 601-602 km, apogee 606-612 km, inclination 97.79-97.80 deg, OpOrbit LEO/S (sun-synchronous) [4]
Filings
ITU D-ISIPELE-C (ITU coordination request (notice type N, provision 9.6) and Res.49 due-diligence notice), status CR notice received 21.01.2020; RES49 notice received 09.09.2026; notifying administration D (Germany), dated 2020-01-21 [9]
ISED ISIPELE / D-ISIPELE-C (foreign satellite approved to provide FSS in Canada (CPC-2-6-04 list)), status listed, NGSO, downlink 10.7-12.2 and 12.7-13.25 GHz, uplink 13.75-14.5 GHz, dated 2026-08-19 [8]
ISED call sign XJ436 (Inuvik Sat. Station Facility); VF885 (Inuvik CSGI) (earth station radio authorizations naming network D-ISIPELE-C), status in SMS extract; dated 2026-05-28 (XJ436) and 2025-05-12 (VF885), dated 2026-05-28 [7]
CSA 25STDPZ09 (contribution agreement 'Orbital Cloud Infrastructure'), status value CAD 429,262 after amendment 1 of 2026-04-01 (original CAD 500,000); agreement value, not amount paid, dated 2025-09-09 [10]
Registered by
Canada (ÆTHER-3 to ÆTHER-12, 2026-004M to 2026-004W, ST/SG/SER.E/1367) [6]
Launch state
US (Falcon 9 from Vandenberg SFB, SLC-4E) [1, 5]
Ground stations
Canada: Inuvik, NT (Inuvik Sat. Station Facility, call sign XJ436; and Inuvik CSGI site, VF885), Kepler Communications Inc. as licensee [7]
Canadian link
Canadian operator (Toronto); UN registry state Canada; CSA contribution 25STDPZ09; ISED earth-station authorizations at Inuvik; ITU network notified by Germany and approved in Canada as a foreign FSS satellite; not found in ISED's 'Authorized and Approved Canadian Satellites' table (page dated 2026-08-19) [1, 6, 10, 7, 9, 8, 11]
Next step
First dedicated launch on Rocket Lab Neutron, 'scheduled no earlier than 2028', one of several launches planned for 2028 adding on-orbit compute [2]
LEOcloud Space EdgeUnited Statesoperatingnot found
Power
not found
Full name
LEOcloud Space Edge [0, 2]
Operator
Voyager Technologies, Inc. (LEOcloud unit) [0, 1]
Operator's country
US [3]
Partners
Red Hat: operating system and container software (Podman; RHEL 10.1, UBI) [1, 2]
ISS: host station [0]
Stage
operating (as of 2026-05-11) [2]
Orbit
International Space Station (hosted) [0]
Registered by
not determined: hosted on the ISS; module not stated in the releases read [0]
Launch state
US (Cape Canaveral LC-40; inferred delivery flight Cygnus NG-23) [4]
Canadian link
none found in the Voyager 2025-09-15 release or the Red Hat 2026-05-11 release [0, 2]
Loft OrbitalUnited Statesoperatingnot found
Power
not found
Full name
Loft Orbital Virtual Missions / on-orbit AI (Ultimate Edge) [0, 1]
Operator
Loft Orbital [0]
Operator's country
US [2]
Partners
NASA Jet Propulsion Laboratory: deployed a vision-language model on Loft infrastructure (per Loft page headline) [0]
Stage
operating (as of 2026-08-20) [0]
Computers on board
'High-powered CPUs and GPUs' across Loft's fleet (each satellite 'a unique combination of ... CPUs, GPUs'), unspecified; YAM-6 payloads 'paired with a powerful robust set of CPU and GPU compute options' with 'GPU acceleration' (models and counts not stated) [0, 1]
Orbit
YAM-6: 508 x 524 km, 97.46 deg (GCAT) [2]
Filings
FCC SAT-LOA-20260513-00196 (YAM-30), SAT-MOD-20260519-00203 (YAC-1, ten satellites) (application / modification), status Pending Review (ICFS, 2026-10-31), dated 2026-07-09 (filed date shown in ICFS for -00196) [3]
Canadian link
none found in the two Loft pages read [0, 1]
Next step
'a marketplace of AI agents and software applications will allow users to task satellites directly' (no date stated) [0]

1 more item on this system has not passed a check yet. It is in the claims ledger.

NOVI smart satellites with SP240 on-board computers: partner and customer software run in orbitUnited Statesoperatingnot found
Power
not found
Full name
NOVI smart satellites with SP240 on-board computers: partner and customer software run in orbit (GENIE satellites, Missions-as-a-Service) [0, 1]
Operator
NOVI Space, Inc. [5]
Operator's country
US [5]
Partners
Syntiant Corp.: customer AI models run on an SP240 in orbit (demonstration announced 2026-03-26) [4]
AMD: Versal adaptive SoC in the SP240 (chip supplier) [3, 4]
SpaceX: launch (Transporter-12 for LIME; Falcon 9 rideshares for N1-Atlas and N2-P-Body) [2, 8]
Stage
operating (as of 2026-03-26) [4, 2]
Satellites planned
two (2) identical satellites (FCC application) [6] plan
Satellites flying
3 (as of 2026-10-29) [1, 2, 7]
Computers on board
SP240 on-board computer on each NOVI smart satellite (AMD Versal adaptive SoC with dual-core ARM Cortex-A72 per press); SP240 datasheet states 12 TOPS ML performance; count per satellite not stated (100 TOPS is the SP360G) [1, 3, 4, 9]
Physical facts
mass: approximately thirteen (13) kilograms per satellite (FCC application) [6]
Orbit
FCC application: 580 km plus or minus 20 km; GCAT: LIME 511 x 514 km 97.44 deg, N1-Atlas 589 x 594 km 97.76 deg, N2-P-Body 583 x 597 km 97.76 deg [6, 7]
Filings
FCC SAT-LOA-20250609-00140 (call sign S3234) (application), status granted with conditions 2025-12-11 (Space Bureau public notice DA 25-1053, Report SAT-01959, 2025-12-12), dated 2025-06-09 [10, 6]
Launch state
US (Vandenberg Space Force Base, per GCAT launch site VSFBS for all three) [8]
Ground stations
United States: NOVI mission control centre, Arlington, Virginia; commercial ground stations in and outside the US (countries not named in the narrative read) [5]
Canadian link
none found in the sources read (novillc.com home, mission summary, on-board computers pages; FCC application narrative) [0, 2, 3, 6]
Next step
Cyber-Hardened 3U CubeSat on SpaceX Transporter 21, Q2 2027 [2]
Star-Compute ProjectChinaoperatingnot found
Power
not found
Full name
Star-Compute Project (星算计划) [0, 2]
Operator
Adaspace Technology Co., Ltd. (成都国星宇航科技股份有限公司, ADA Space), Chengdu [0, 7]
Operator's country
CN [7]
Partners
Zhejiang Lab: Three-Body Computing Constellation; the 2025-05-14 launch was the first of both programs [4]
a Zhejiang research institution (unnamed): strategic framework agreement July 2024; ordered two AI computing satellites and payload services for ten [0]
LandSpace Zhuque-2E Y4: launch of the 02 group [2, 5]
108 universities, institutes, listed companies and investors: co-builders as stated [2]
Stage
operating (as of 2026-05-14) [0, 1]
Satellites planned
up to 2,800 AI computing satellites (2,400 inference, 400 training); first 100 by 2028; thousand-satellite scale and commercial use before 2030; full network before 2035 [0, 2] plan
Satellites flying
20 (as of 2026-10-14) [our sum of launches (12 + 8); no source states the total] [1, 2]
Computers on board
01 group: 12 satellites with aggregate onboard computing up to five POPS (per Frost & Sullivan, in the prospectus); seventh-generation AI payload no less than 10 POPS, for AI satellites launching in 2026; network target 'hundred-thousand-P' (十万P级) inference and 'million-P' (百万P级) training compute [0, 2]
Physical facts
thermal (02 group, to be verified in orbit): 万瓦级液冷流体回路 (10-kW-class liquid-cooling fluid loop) [2]
radiator (02 group, to be verified in orbit): 超大尺寸展开式辐冷翼 (extra-large deployable radiative cooling wing), no dimensions stated [2]
Orbit
01 group: single orbital plane; 02 group: dawn-dusk orbit; network planned in 500-1000 km dawn-dusk, sun-synchronous and low-inclination orbits [0, 2, 3]
Filings
ITU (via China's administration) network names not stated (ITU filings (stated as 'ITU approval')), status operator states ITU approval of 3,156 satellites, dated 2026-05-04 [0]
NDRC not stated (project approval), status approval for development and launch of 60 additional satellites, obtained February 2025 (operator states), dated 2025-02 [0]
MIIT not stated (radio frequency use permit and radio station licence (per satellite)), status operator states requisite permits obtained, including for five pre-December 2023 satellites that lacked the relevant national ministry's pre-production approval (reported to the NDRC), dated 2026-05-04 [7]
Registered by
not found in UNOOSA Online Index: newest China-registered object there launched 2024-12-19 (all 1086 'China' hits read, 2026-11-01) [6]
Launch state
China (Jiuquan Satellite Launch Center 2025-05-14; Dongfeng commercial space innovation test zone 2026-10-14) [4, 2, 5]
Canadian link
none found in ADA Space Application Proof sections read (summary, business, regulatory; no 'Canad' string) or the stdaily 2026-10-14 and jiemian 2026-01-26 articles [0, 7, 2, 3]
Next step
03 group in production with orbital deployment planned in 2026 (stated 2026-01-26); first 100 Star-Compute satellites by 2028 [3, 0]
StarcloudUnited Statesoperatingnot found
Power
not found
Solar arrays: array dimensions: two deployable photovoltaic solar arrays per spacecraft, each approximately 5.0 m by 107.0 m flat plate, 535 kg each (up to 88,000-satellite system design) [2, 1]
array dimensions: gross footprint of the whole satellite approximately 6 x 220 m (up to 88,000-satellite system design) [2, 1]
Full name
Starcloud Orbital Datacenter System (Starcloud-1, Starcloud-2 and successors) [0, 1]
Operator
Starcloud, Inc. [0]
Operator's country
US [0]
Partners
NVIDIA: chip supplier (H100 on Starcloud-1) [6]
Astro Digital: bus (Corvus platform) [5, 9]
SpaceX: launch (Bandwagon-4 for Starcloud-1; Transporter-19 planned for Starcloud-2) and two Plaser optical terminals on Starcloud-2 [5, 10]
Mynaric: Condor Mk3 optical terminal on Starcloud-2 [5]
Firefly Aerospace: host spacecraft (Elytra orbiter) for Starcloud's SC-1L compute payload in lunar orbit, on Firefly's third lunar mission, launch targeted no earlier than 2028 (commercial payload agreement announced 2026-09-30) [16]
Stage
operating (as of 2025-12-10) [7]
Satellites planned
up to 88,000 satellites [1, 3] plan
Satellites flying
1 (as of 2026-10-29) [9]
Computers on board
Starcloud-1: 1x NVIDIA H100 (pre-launch statement); Starcloud-2: 'a GPU cluster' (no count stated by Starcloud) [6, 8]
Physical facts
mass: Starcloud-1: 60 kg (NVIDIA, pre-launch); GCAT Mass 50 kg [6, 9]
Orbit
System: narrow shells between 600 km and 850 km, sun-synchronous, nominal 06:00 crossing time; Starcloud-1: 508 x 512 km, 45.40 deg (GCAT); Starcloud-2 planned: 561 km +/- 25 km, 97.5 deg, then 06:00 LTAN SSO [1, 9, 5]
Filings
FCC SAT-LOA-20260202-00073 (call sign S00803), 'Starcloud Orbital Datacenter System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing PN 2026-03-13 (Report SAT-01982); Space Bureau information request 2026-08-28, response deadline extended to 2026-09-18 (letter of 2026-09-11); Starcloud response dated 2026-09-16; Part 100 supplement 2026-10-20, dated 2026-02-04 [0, 2, 3, 4]
FCC (OET ELS) 0290-EX-CN-2026 (call sign WQ2XLC), Starcloud-2 (experimental licence application), status Pending (status date 03/12/2026), dated 2026-03-12 [11]
FCC (OET ELS) 1019-EX-CN-2024 (call sign WP2XJD), Lumen Orbit, Inc. (experimental licence (Starcloud-1 / Lumen-1 demonstration)), status Grant Expired Due to New License (06/02/2025); successor licence file not identified in this run, dated 2024-11-08 [12]
Registered by
USA (Starcloud-1, 2025-248L, ST/SG/SER.E/1327; UN remark: submission 'presently being processed') [13]
Launch state
US (Starcloud-1: Falcon 9 Bandwagon-4 from Cape Canaveral LC-40) [10]
Ground stations
Planned Starcloud-2 TT&C stations: South Africa (Pretoria, RBC), Portugal (Azores, Leaf), Bulgaria (Kaspichan, Leaf), USA (Deadhorse and Fairbanks AK, RBC), Norway (Tromsø, KSAT) [5]
System: Ka-band backup TT&C only (18.8-19.3 GHz down, 28.6-29.1 GHz up); primary communication via optical links to third-party constellations [1]
Canadian link
Kepler Communications (the Canadian operator in row kepler-compute) is named in Starcloud's FCC narrative (2026-02-04) among optical relay networks its links may use, 'subject to commercial arrangements' (a stated possibility, not an agreement); no Canadian licence, gateway, funding or customer found in ISED TAFL_LTAF_Satellite extract (2026-10-05 build), ISED foreign FSS list and authorized Canadian satellites (both 2026-08-19), Starcloud-2 ground-station list [14, 5, 15]
Next step
Starcloud-2 on a SpaceX Falcon 9 Transporter-19 mission; 'fully operational in sun-synchronous orbit by 2027' [5, 8]

3 more items on this system have not passed a check yet. They are in the claims ledger.

Three-BodyChinaoperatingnot found
Power
not found
Full name
Three-Body Computing Constellation (三体计算星座) [0, 3]
Operator
Zhejiang Lab (之江实验室), Hangzhou [0, 1, 5]
Operator's country
CN [0]
Partners
ADA Space (国星宇航, Adaspace Technology Co., Ltd.): satellite platform and whole-satellite build for the first launch; same launch is the first of its Star-Compute plan [2, 0]
氦星光联: laser communication terminals (24 sets on the first-launch satellites) [1]
Fudan University and Shanghai Academy of AI for Science (Fuxi, Dayu models) and Hangzhou Mita (Puyun model): weather models on Xiguang-2 03 [4]
Stage
operating (as of 2026-07-28) [5, 3]
Satellites planned
千星规模 (thousand-satellite scale); Zhejiang Lab expects thousand-satellite scale by 2032 (per CLS); 2026 target: more than 50 computing satellites with several satellite firms [0, 6, 1] plan
Satellites flying
14 (as of 2026-07-24) [our sum of launches (12 + 2); no source states the total] [3, 4]
Computers on board
first 12 satellites: up to 744 TOPS per satellite, 5 POPS aggregate, 30 TB storage; 8-billion-parameter space-based model on board; built-out target 1000 POPS [2]
Orbit
about 488-491 x 503-506 km, 97.4 deg (sun-synchronous) per GCAT; 12 satellites in a single orbital plane per ADA Space [7, 10]
Registered by
not found in UNOOSA Online Index: newest China-registered object there launched 2024-12-19 (all 1086 'China' hits read, 2026-11-01); China's latest UN submission listed is ST/SG/SER.E/1315 (2026) [9]
Launch state
China (Jiuquan Satellite Launch Center 2025-05-14; Dongfeng commercial space innovation test zone 2026-07-24) [0, 4, 8]
Ground stations
China: Three-Body Computing Constellation command centre at Zhejiang Lab, Hangzhou [1]
Canadian link
none found in the Xinhua (2025-05-14, 2025-12-31, 2026-02-13, 2026-07-28), Chinanews 2026-07-24 and CLS 2026-07-30 articles read [0, 1, 3, 4, 5, 6]
Next step
2026: complete a constellation layout of more than 50 computing satellites with several satellite firms (stated 2025-12-31); AI models on the July satellites in on-orbit verification, stage results expected in about three months (stated 2026-07-30) [1, 6]

2 more items on this system have not passed a check yet. They are in the claims ledger.

Show all 48Show fewer
Tiansuan ConstellationChinaoperatingnot found
Power
not found
Full name
Tiansuan Constellation (天算星座) [0, 1]
Operator
Beijing University of Posts and Telecommunications (北京邮电大学, BUPT), Star Network and Intelligent Computing Laboratory (星网与智能计算实验室) [0, 1]
Operator's country
CN [1]
Partners
Changsha Tianyi Research Institute (长沙天仪研究院, Spacety): co-developer of BUPT-2 and BUPT-3 [2]
more than 60 institutions supported in orbital tests [1]
Stage
operating (as of 2026-09-01) [1]
Satellites planned
phase 1: 6 satellites; phase 2: 24 satellites; phase 3: 300 satellites [0, 2] plan
Computers on board
BUPT-2 and BUPT-3 carry a 'space server' (太空服务器) among their payloads; no aggregate figure stated in sources read [2]
Orbit
BUPT-2/BUPT-3: about 517 x 524 km, 97.42 deg (sun-synchronous) per GCAT [5]
Registered by
BUPT-1 (2023-007) registered by China, ST/SG/SER.E/1237; BUPT-2/BUPT-3 (2025-103E/F) not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01) [6]
Launch state
China (BUPT-2/3: Dongfeng commercial space innovation test zone, Jiuquan, 2025-05-17) [3, 7]
Ground stations
seven ground stations (countries not stated) [1]
Canadian link
none found in Beijing Review/Xinhua 2026-09-01, China Daily 2025-05-19, The Paper 2025-05-17 or the tiansuan.org.cn bundle text [1, 2, 3, 0]
Next step
phase 2 to total 24 satellites (no date stated) [2]

1 more item on this system has not passed a check yet. It is in the claims ledger.

AltairUnited Arab Emirateslaunchednot found
Power
not found
Full name
Altair [0, 3]
Operator
Orbitworks Satellites Manufacturing L.L.C. S.P.C. (joint venture of Marlan Space and Loft Orbital) [0]
Operator's country
AE [0]
Partners
Loft Orbital: JV partner, satellite integrator [0]
Marlan Space (IHC subsidiary): JV partner [0]
NVIDIA: onboard GPUs (chip supplier) [0]
SpaceX: launch (Transporter-18) [0]
Mistral, BlackSky, MaiaSpace: Altair-Next Gen consortium members (MaiaSpace preferred launch partner) [1]
Stage
launched (as of 2026-10-01) [0, 4]
Satellites planned
10 (Altair); initial phase of fifty satellites for Altair-Next Gen [0, 1] plan
Satellites flying
1 (as of 2026-10-02) [0]
Computers on board
Onboard NVIDIA GPUs (model and count not stated) [0]
Registered by
not found in UNOOSA Online Index (exact-name queries 'Altair-1', 'ALTAIR-1'; UAE state-of-registry list, first page of 35) on 2026-11-01; launch post-dates the index's latest entries (about 2026-09-16) [5]
Launch state
US (Vandenberg Space Force Base, California) [0]
Canadian link
none found in Orbitworks press releases of 2026-09-09 and 2026-10-02 and the Altair page [0, 1, 3]
Next step
The other nine satellites will follow through 2027 [0]
Mingzhu Constellation PlanChinalaunchedplan gigawatt-class
Power
gigawatt-class (吉瓦级), no figure stated (long-term goal for the planned constellation, per system) [0, 2] plan
Full name
Mingzhu Constellation Plan (明珠星座计划), Shanghai [0, 1]
Operator
Shanghai Dongfang Tiansuan Technology Co., Ltd. (上海东方天算科技有限公司), 'chain leader', with Shanghai Jiao Tong University and partners [0, 1]
Operator's country
CN [0]
Partners
Shanghai Jiao Tong University: research partner [0]
27 partners incl. CAS Innovation Academy for Microsatellites, Shanghai Institute of Space Power Sources, Shanghai Institute of Satellite Engineering, Alibaba Cloud, iFlytek, Biren, Iluvatar CoreX: industry cooperation agreements [2]
ADA Space: host satellites (Star-Compute 02 group, incl. XSD-44 'Dongfang Tiansuan') [1]
Stage
launched (as of 2026-10-14) [1, 3]
Satellites planned
long-term goal: gigawatt (GW)-class space-based computing constellation; global coverage by 2030 (no satellite count stated) [0, 2] plan
Computers on board
payload computing core peak about 2 PFLOPS per payload set, 16 TB local storage; carried on six satellites of the 2026-10-14 batch [1]
Orbit
dawn-dusk orbit (host Star-Compute 02 group) [1]
Registered by
not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01) [4]
Launch state
China (Dongfeng commercial space innovation test zone, Jiuquan; Zhuque-2E Y4) [1, 3]
Canadian link
none found in the China Securities Journal (2026-09-22), Jiemian (2026-09-13) and Securities Daily (2026-10-15) articles read [0, 1, 2]
Next step
continued in-orbit verification of domestic compute payloads, optical computing payloads and new energy systems, then first-batch deployment and constellation networking; built out by 2030 [0]
Project SuncatcherUnited Stateslaunchednot found
Power
not found
Full name
Project Suncatcher [0, 1]
Operator
Google (Google Research, 'Paradigms of Intelligence') [0]
Operator's country
US [3]
Partners
Planet: satellite builder/partner for the prototype [0, 1]
SpaceX: launch (Transporter-18 rideshare) [0, 2]
Stage
launched (as of 2026-10-01) [0, 2]
Satellites planned
illustrative 81-satellite constellation configuration (design study); 'two prototype satellites by early 2027' (Nov 2025 plan) [1] plan
Satellites flying
1 (as of 2026-10-01) [0]
Computers on board
Google TPUs (count not stated); Trillium (v6e Cloud TPU) radiation-tested on the ground [0, 1]
Orbit
planned constellation 'likely operating in a dawn–dusk sun-synchronous low earth orbit'; prototype orbit not stated [1]
Launch state
US (Transporter-18: Falcon 9 from Vandenberg SFB SLC-4E, 2026-10-01) [2]
Next step
'a learning mission in partnership with Planet, slated to launch two prototype satellites by early 2027' (stated 2025-11-04; on 2026-10-01 one prototype launched) [1, 0]
Space StringChinalaunchednext satellite 11.5 kW
Power
11.5 kW (compute, per satellite) [2] next satellite
Full name
Space String computing constellation (太空之弦计算星座) [0, 1]
Operator
Dongfang Xinglian Spatiotemporal Intelligence (Shandong) Technology Development Co. (东方星链时空智能(山东)技术发展有限公司): overall design and operation; STAR.VISION (地卫二空间技术(杭州)有限公司): AI capability and international market [0, 1]
Operator's country
CN [0]
Partners
Hangzhou Tianji Zhinao Aerospace Technology (杭州天基智脑航天科技): joint development of computing satellites [0]
Galactic Energy (星河动力, Ceres-2) and Orienspace (东方空间, Gravity-1): dedicated launch cooperation agreements [0]
Agricultural Bank of China and ICBC: strategic credit agreements of RMB 5 billion each (first tranche RMB 0.5 billion each) [0]
Indonesia's National Research and Innovation Agency and Uzcosmos (Uzbekistan): owners of the two first inference verification satellites, bought from STAR.VISION [3]
Stage
launched (as of 2026-08-05) [2, 3, 6]
Satellites planned
more than 1,000 (超千颗 / 一千颗以上); one account: 720+ data (inference) satellites in a business layer and 360+ computing (training) satellites in dawn-dusk orbits [0, 1, 4] plan
Satellites flying
2 (as of 2026-08-05) [2, 3]
Computers on board
first two satellites: STAR.VISION 'Xian' (弦) AI onboard computing platform; G1 design peak about 40-60 PFLOPS FP8, G2 160-310 PFLOPS, G3 460-1000 PFLOPS (design estimates from a reference configuration) [2, 5]
Physical facts
mass: 300 kg each (Lampung-1 / Samarqand-2028, also Dongfang Xinglian 05/06) [3]
Orbit
first two satellites: sun-synchronous; computing layer planned in dawn-dusk orbits [3, 4]
Registered by
not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01); state of registry for the two satellites owned by Indonesian and Uzbek agencies not established [7]
Launch state
China (sea launch from the Yellow Sea near Haiyang, Shandong; Jielong-3 Y12) [3, 6]
Canadian link
none found in the Yicai (2026-09-26), Tide News (2026-09-25), 36Kr (2026-09-30), ifeng (2026-09-27), NBD (2026-09-29) and China in Space (2026-08-05) articles read [0, 1, 2, 3, 4, 5]
Next step
G1 verification satellite launch expected Q4 2027 (36Kr says '2027') [4, 2]
SupersmartcomputeChinalaunchednot found
Power
not found
Full name
Supersmartcompute intelligent-computing constellation (超智算·智算星座), first satellite Super Intelligent Computing-1 (超智算一号) [0, 1]
Operator
Supersmartcompute (Beijing) Technology Co., Ltd. (超智算(北京)科技有限公司) [1]
Operator's country
CN [1]
Partners
CAS Space (北京中科宇航技术有限公司): Lijian-1 Y18 launch, rocket named '超智算号'; co-organiser of the May 2026 event [0, 1]
Shanghai Xuntian Qianhe Space Technology and Shanghai Institute of Aerospace Electronic Technology: co-organisers of the May 2026 event (role in the satellite not stated) [1]
Zhongguancun Shijingshan Park administration / Shijingshan district science commission: co-host [1]
Stage
launched (as of 2026-09-20) [0, 2]
Satellites planned
千颗级 (thousand-satellite-class) LEO computing constellation [1] plan
Satellites flying
1 (as of 2026-09-20) [0]
Registered by
not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01) [3]
Launch state
China (Jiuquan Satellite Launch Center; Lijian-1 Y18) [0, 2]
Canadian link
none found in the Science and Technology Daily articles of 2026-05-31 and 2026-09-22 [0, 1]
Next step
steady roll-out of a thousand-satellite LEO computing constellation (no date stated) [1]
YaotaiChinalaunchednot found
Power
not found
Full name
瑶台 (Yaotai) space computing satellites / 太空算力中心 (space AI computing centre) [0, 1]
Operator
芯际穿越 (Xinji Chuanyue), an 'ecosystem company' (生态企业) of 追觅科技 (Dreame Technology) [0]
Operator's country
CN [0, 1]
Partners
追觅科技 (Dreame Technology): parent ecosystem; announced the plan at its AWE 2026 chip forum [0]
Stage
launched (as of 2026-03-16) [1, 2]
Satellites planned
最终目标是构建一个由 200 万颗卫星组成的庞大网络 (ultimate goal: a network of 2,000,000 satellites) [0] plan
Satellites flying
1 (as of 2026-03-18) [1]
Computers on board
'瑶台系列太空算力盒' (Yaotai space computing box); chip type and count not stated [0]
Orbit
约561千米的太阳同步轨道 (about 561 km sun-synchronous orbit) per 36Kr; GCAT launch.tsv gives 528 x 545 km, 97.5 deg for launch 2026-052 (GCAT satcat: seven of eight payloads at 528 x 540-545 km, 97.54 deg) (conflict noted) [1, 2]
Launch state
CN (Jiuquan, Kuaizhou-11 Y7, 2026-03-16) [1, 2]
Canadian link
none found in the ITHome (2026-03-11) and 36Kr (2026-03-18) articles [0, 1]
Orbital Datacenter SystemUnited Statesfiledplan 250 kW
Power
250 kW (planned peak, 'approaching', per satellite (Orbital-1)) [3] plan
Full name
Orbital Datacenter System (Orbital Compute Inc.; first satellite Orbital-1) [0, 3]
Operator
Orbital Compute Inc. [0, 1]
Operator's country
US [0, 3]
Partners
Reflex Aerospace (Germany): satellite bus platform designer and space-system integrator for Orbital-1 and the constellation, exclusive for orbital compute [3]
Stage
filed (as of 2026-06-24) [0, 1]
Satellites planned
up to 100,000 satellites (7 shells; nominal 14,300 per shell in S1-S6 and 14,200 in S7, max 25,000 per shell, system cap 100,000) [1, 5] plan
Satellites flying
0 (as of 2026-10-29) [6]
Physical facts
solar array area: ~260 m² (two wings), preliminary [4]
radiator area: ~100 m², preliminary [4]
mass: dry mass ~2,000 kg, preliminary [4]
Orbit
sun-synchronous circular orbits at 500-850 km, nominal 06:00 LTAN; shells S1-S7 at 525-825 km, inclinations 97.50-98.71 deg [2, 5]
Filings
FCC SAT-LOA-20260624-00251 (call sign S00867), 'Orbital Compute Inc. — Orbital Datacenter System (LOA)' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02024 (2026-07-31); Space Bureau request 2026-08-28; Orbital response 2026-09-11 (filed 2026-09-10) requesting until 2026-12-10 for remaining items, dated 2026-06-24 [0, 1, 4]
FCC Public Notice Report No. SAT-02024 (SAT-LOA-20260624-00251, S00867) (public notice: application accepted for filing), status accepted for filing, dated 2026-07-31 [same application as filings#1; not a separate filing] [7]
Ground stations
back-up TT&C only (18.8-19.3 GHz down, 28.6-29.1 GHz up); traffic via optical inter-satellite links with other commercial LEO systems; gateway locations not stated in the PN [1]
Canadian link
none found in the FCC public notice, narrative and 2026-09-11 response [1, 2, 4]
Next step
File the compatibility analysis and NASA DAS demonstrations with the FCC by the requested date of 2026-12-10 [4]

6 more items on this system have not passed a check yet. They are in the claims ledger.

Project SunriseUnited Statesfilednot found
Power
not found
Solar arrays: array dimensions: not provided: asked by the FCC for physical dimensions incl. solar panels, Blue Origin answered that its 'space station design is maturing' and dimensions will come in a future orbital debris assessment report [2]
Full name
Project Sunrise (Blue Origin Orbital Data Center System) [0, 1]
Operator
Blue Origin, LLC [0]
Operator's country
US [0]
Stage
filed (as of 2026-03-19) [0, 1]
Satellites planned
up to 51,600 satellites [1] plan
Satellites flying
0 (as of 2026-10-29) [3]
Orbit
circular, sun-synchronous orbits from 500-1,800 km altitude, inclinations between 97 and 104 degrees; up to 131 altitudes, one plane per altitude band, maximum 450 satellites per altitude (2026-09-18 response; the 2026-03-19 narrative had said approximately 300-1,000 satellites per orbital plane) [1, 4]
Filings
FCC SAT-LOA-20260310-00118 (call sign S00830), 'Project Sunrise' (application (launch and operating authority, NGSO)), status Pending Payment (status date 2026-03-19); accepted for filing PN 2026-04-17; Space Bureau information request of 2026-08-28; Blue Origin response 2026-09-18, dated 2026-03-19 [0, 2]
Ground stations
No gateway locations stated in the narrative: traffic routed 'through its TeraWave system and other mesh backhaul networks to transmit to the ground'; Ka-band TT&C for early, post-mission and emergency phases [1]

1 more item on this system has not passed a check yet. It is in the claims ledger.

SpaceXUnited Statesfilednot found
Power
not found
Full name
SpaceX Orbital Data Center System [0, 2]
Operator
Space Exploration Holdings, LLC (SpaceX) [0, 2]
Operator's country
US [0, 4]
Stage
filed (as of 2026-01-30) [0, 2]
Satellites planned
up to one million satellites [1, 2] plan
Satellites flying
0 (as of 2026-10-29) [5]
Orbit
narrow orbital shells spanning up to 50 km each, between 500 km and 2,000 km altitude, 30 degrees and sun-synchronous inclinations [1, 2]
Filings
FCC SAT-LOA-20260108-00016 (call sign S00798), 'SpaceX Orbital Data Center System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing by Public Notice DA 26-113 released 2026-02-04 (comments due 2026-03-06), dated 2026-01-30 [0, 2]
Ground stations
No dedicated gateways stated: traffic routed over optical links to Starlink, 'which in turn will transmit traffic to authorized earth stations on the ground'; Ka-band TT&C requested: 18.8-19.3 GHz down and 28.6-29.1 GHz up per SpaceX's narrative (2026-01-30); 18.3-19.3 GHz down and 28.6-29.1 GHz up per the FCC's public notice DA 26-113 (2026-02-04) [1, 2, 6, 7]

1 more item on this system has not passed a check yet. It is in the claims ledger.

Stampede Data Center SystemUnited Statesfilednot found
Power
not found
Solar arrays: array dimensions: each solar panel array approximately 57 m by 30 m, two arrays of equal size ('system is still under active design') [4]
Full name
Stampede Data Center System [0, 1]
Operator
Cowboy Space Corp. [0]
Operator's country
US [0]
Partners
NVIDIA: planned chip supplier (Space-1 Vera Rubin Module) [2]
Stage
filed (as of 2026-05-11) [0, 1]
Satellites planned
up to 20,000 satellites [3] plan
Satellites flying
0 (as of 2026-10-29) [3]
Computers on board
NVIDIA Space-1 Vera Rubin Module (partnership stated; count not stated) [2]
Orbit
dawn-dusk sun-synchronous orbits in shells between 700 and 1000 km altitude [3, 1]
Filings
FCC SAT-LOA-20260323-00135 (call sign S00851), 'Stampede Data Center System Application' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02007 (2026-06-12); Space Bureau request 2026-08-28; Cowboy response 2026-09-18; bond/milestone waiver supplement 2026-10-28, dated 2026-05-11 [0, 1, 4]
Ground stations
Ka-band TT&C requested (18.8-19.3 GHz down, 28.6-29.1 GHz up); gateway locations not read [1]
Next step
'Launch of the first data center satellite in Stampede is targeted for 2028' [3]

4 more items on this system have not passed a check yet. They are in the claims ledger.

Adagio-XLUnited Statesannouncedplan 100 kW power generation · plan 200 kW power generation
Power
100 kW (power generation (Adagio-XL, launch aimed for late 2029), per satellite) [0] plan
200 kW (power generation on later iterations of Adagio-XL, per satellite) [0] plan
Full name
Adagio-XL [0]
Operator
Symphony Space [0]
Operator's country
US [0]
Partners
Catalyst Data Centers: terrestrial data-centre developer, agreement (May 2026) for customer pipeline and data-centre design expertise [0]
Stage
announced (as of 2026-06-10) [0]
Satellites flying
0 (as of 2026-06-10) [0]
Physical facts
payload capacity: 1,200 kg (same as Adagio) [0]
design life: 15 years on orbit; up to eight GPU-generation upgrades via robotic arm [0]
Canadian link
none found in the Payload article (2026-06-10) [0]
Next step
launch targeted for late 2029 [0]
ASCENDFranceannouncedplan 1 GW
Power
1 GW (planned constellation, per system) [0] plan
Full name
ASCEND (Advanced Space Cloud for European Net zero emission and Data sovereignty) [0]
Operator
Thales Alenia Space (study coordinator; no operator named for a deployed system) [0, 1]
Operator's country
FR [1]
Partners
Carbone 4, VITO: environmental aspects [0]
Orange Business, CloudFerro, Hewlett Packard Enterprise: cloud computing [0]
ArianeGroup: launchers [0]
DLR, Airbus Defence & Space: orbital systems [0]
European Commission (Horizon Europe): funder of the feasibility study, EUR 2,047,882 EU contribution [0, 1]
Stage
announced (as of 2024-06-27) [0]
Satellites planned
one gigawatt before 2050 (capacity target; no satellite count stated) [0] plan
Satellites flying
0 (as of 2024-06-27) [0]
Registered by
not applicable (study) [1]
Canadian link
none found in the Thales Alenia Space PR of 2024-06-27 or the CORDIS project page [0, 1]
Next step
Thales Alenia Space and its partners now intend to pursue the ASCEND feasibility study to consolidate and optimize its results (undated) [0]

1 more item on this system has not passed a check yet. It is in the claims ledger.

CASCChinaannouncedplan gigawatt-class
Power
gigawatt-class (吉瓦级), no figure stated (planned infrastructure (太空数智基础设施), per system) [0] plan
Full name
CASC gigawatt-class space digital-intelligence infrastructure (吉瓦级太空数智基础设施), 15th Five-Year Plan new-domain goal [0]
Operator
China Aerospace Science and Technology Corporation (中国航天科技集团, CASC) [0]
Operator's country
CN [0]
Stage
announced (as of 2026-01-29) [0]
Satellites flying
0 (as of 2026-01-29) [0]
Registered by
not applicable: no object announced [0]
Canadian link
none found in the CCTV text carried by Huanqiu 2026-01-29 [0]
CNSA-led special feasibility study of a 'space intelligent computing constellation'Chinaannouncednot found
Power
not found
Full name
太空智能算力星座专项论证 (CNSA-led special feasibility study of a 'space intelligent computing constellation') [0]
Operator
China National Space Administration (国家航天局, CNSA), lead of the study [0]
Operator's country
CN [0]
Stage
announced (as of 2026-04-07) [0]
Satellites planned
not stated [0] plan
Computers on board
not stated [0]
Orbit
not stated [0]
Canadian link
none found in the source read (Xinhua, 2026-04-07) [0]
Next step
not stated [0]
ComospaceChinaannouncednot found
Power
not found
Full name
Comospace (中科天算) 'Tiansuan Plan' (天算计划) space supercomputing network, with the Hangsheng/Comospace/Yanhe two-satellite compute demo [1, 0]
Operator
Comospace (中科天算), with Hangsheng Satellite (航升卫星) as satellite integrator for the demo [1, 0]
Operator's country
CN [1]
Partners
Hangsheng Satellite (航升卫星): satellite platform and integrated design; build, integration, launch and in-orbit verification of two computing satellites [0]
Yanhe Technology (炎和科技): dedicated perovskite solar wings [0, 1]
Stage
announced (as of 2026-04-21) [0]
Satellites planned
two computing satellites launched and verified before March 2027; a commercial space computing constellation (no count stated) [0] plan
Satellites flying
0 (as of 2026-04-22) [0]
Computers on board
supercomputing-node prototype on a multi-card full-size GPU architecture using domestic high-performance GPUs; 2030 target: 10,000-card-class space supercomputing centre [1]
Physical facts
solar array: dedicated perovskite solar wings from Yanhe Technology (no dimensions stated) [0]
Registered by
not applicable: no launch found [0]
Canadian link
none found in the Shanghai Securities News (2026-04-22) and 36Kr (2026-03-12) articles read [0, 1]
Next step
prototype supercomputing node to launch in H2 2026 (stated 2026-03-12); two computing satellites launched and verified in orbit before March 2027 (stated 2026-04-22) [1, 0]
Hanwha SystemsSouth Koreaannouncednot found
Power
not found
Full name
Hanwha Systems orbiting AI data center (AI data center in space) [0]
Operator
Hanwha Systems (Hanwha Group) [0]
Operator's country
KR [0]
Partners
Hanwha Aerospace: launch vehicles (group company) [0]
Stage
announced (as of 2026-07-03) [0]
Satellites flying
0 (as of 2026-07-03) [0]
Physical facts
solar array: 'new high-efficiency solar panels' (no size stated) [0]
Orbit
400 kilometers [0]
Registered by
not applicable (not launched) [0]
Ground stations
KR: defense AI data center in Changwon, South Gyeongsang (integrates information collected across space, land, sea and air; 45 MW initially, 135 MW by 2032 per press) [0]
Canadian link
none found in Korea JoongAng Daily 2026-07-03 [0]
Next step
no date stated for the data center; Hanwha Systems plans to launch and operate 64 SAR satellites by 2031 (data source for it); group investment horizon 2040 [0]
Madari SpaceUnited Arab Emiratesannouncednot found
Power
not found
Full name
Madari Space orbital data centre (pilot) [0]
Operator
Madari Space [0, 1]
Operator's country
AE [1]
Partners
INNOSPACE (Korea): MoU on joint development and commercialisation of space data centres, launch and satellite-operation services [1]
Mohammed Bin Rashid Innovation Fund (UAE Ministry of Finance): support [1]
Stage
announced (as of 2025-08-04) [0]
Satellites planned
pilot data centre in LEO; later phase envisioned in cislunar space (no count stated) [0] plan
Satellites flying
0 (as of 2026-10-29) [2]
Orbit
Low Earth Orbit (pilot) [0]
Registered by
not applicable (no launch found) [2]
Canadian link
none found in RCR Wireless 2025-08-04 or SmallSat News 2025-11-19 [0, 1]
Next step
launch a data center into Low Earth Orbit (LEO) in the third quarter of 2026 (stated 2025; passed with no launch found) [0, 2]
NeevCloudIndiaannouncednot found
Power
not found
Full name
NeevCloud AI Data Centre in Space (with Agnikul Cosmos) [0]
Operator
NeevCloud (RackBank Datacenters Private Limited) [0]
Operator's country
IN [0]
Partners
Agnikul Cosmos Private Limited (Chennai): launch vehicle and orbital hosting platform on its extendable upper stage [0]
Stage
announced (as of 2026-02-12) [0]
Satellites planned
first pilot, then '600+ orbital edge data centers over the next three years' after validation [0] plan
Satellites flying
0 (as of 2026-11-01) [2]
Computers on board
high-performance AI inference nodes (chips and counts not stated) [0]
Physical facts
bus: Agnikul rocket upper stage 'including the top nozzle will remain in low Earth orbit and be repurposed as a fully functional space-based data centre' [0]
Orbit
Low Earth Orbit (LEO) [0]
Canadian link
none found in the 2026-02-12 announcement or India TV 2026-03-04 [0, 1]
Next step
The first pilot is scheduled for launch before the end of this year (2026); commercialisation from 2027 per Agnikul co-founder [0, 1]

1 more item on this system has not passed a check yet. It is in the claims ledger.

ODC.SpaceUnited Statesannouncedplan 2.5 kW power the source does not define · plan 10 kW power the source does not define · plan 105 kW power the source does not define
Power
2.5 kW ('Power, kW' column of the storefront, not defined by the site, per plan: 1U Collocated) [0] plan
10 kW ('Power, kW' column of the storefront, not defined by the site, per plan: 4U Sovereign) [0] plan
105 kW ('Power, kW' column of the storefront, not defined by the site, per plan: 42U Sovereign) [0] plan
Full name
ODC.Space (powered by Atomic-6) [0]
Operator
Atomic-6 (ODC.Space) [0, 1]
Operator's country
US [3, 2]
Stage
announced (as of 2026-04-13) [3, 0]
Satellites flying
0 (as of 2026-04-13) [3]
Computers on board
customer-furnished hardware in racks (1U, 4U or 42U plans) [1, 0]
Physical facts
solar array area: not stated; arrays are Atomic-6 Light Wing, radiators Atomic-6 Hot Wing [1]
Next step
delivery to customers 'as soon as 2029' (press) [3]

1 more item on this system has not passed a check yet. It is in the claims ledger.

  • [0] odc.space, undated (documents linked are dated 2026-04), operator says
  • [1] odc.space, 2026-04-12, operator says
  • [2] odc.space, 2026-04-12, operator says
  • [3] www.ajc.com, 2026-04-13, press report
Open-Source Computing ConstellationChinaannouncednot found
Power
not found
Full name
开源计算星座 (Open-Source Computing Constellation), part of the OpenSpace 开源太空生态 (OpenSpace open-source space ecosystem) [0]
Operator
not stated as a single operator: OpenSpace was jointly initiated by 北京开运联合信息技术集团股份有限公司 (Beijing Kaiyun Lianhe Information Technology Group) with 东方空间 (Orienspace), 银河航天 (GalaxySpace), 北京航空航天大学 (Beihang University) and others [0]
Operator's country
CN [0]
Partners
东方空间技术(北京)有限公司 (Orienspace): co-initiator of the OpenSpace ecosystem and community [0]
银河航天(北京)科技集团股份有限公司 (GalaxySpace): co-initiator of the OpenSpace ecosystem and community [0]
北京航空航天大学 (Beihang University): co-initiator [0]
Stage
announced (as of 2026-10-17) [0]
Satellites planned
首期规划发射2600颗卫星 (first phase: 2,600 satellites: 1,000 general-computing, 1,000 intelligent/supercomputing, 500 edge-computing, 100 quantum-computing) [0] plan
Canadian link
none found in the Science and Technology Daily article (2026-10-18) [0]
Orbital Cloud–announcednot found
Power
not found
Full name
Orbital Cloud (Orbit AI / Smartlink AI: DeStarlink and DeStarAI), with PowerBank [0]
Operator
Smartlink AI ("Orbit AI") [0]
Partners
PowerBank Corporation (Toronto): solar energy systems and adaptive thermal control; public-company partner relaying the program [0]
Stage
announced (as of 2025-12-11) [PowerBank states a launch of DeStarlink Genesis-1 on 2025-12-10; no matching object in GCAT (2026-10-29)] [0, 1]
Satellites planned
'2026: Expansion to 5–8 orbital nodes integrating compute and connectivity'; 'larger-scale deployments anticipated through 2028–2030' [0] plan
Computers on board
'initial AI inference payload' on Genesis-1 (no chip stated in the release read) [0]
Registered by
not found in GCAT satcat/auxcat/ftocat/tmpcat (2026-10-29 builds) under Genesis, DeStar, Orbit AI or Smartlink; UN Online Index not searched by name [1]
Canadian link
PowerBank Corporation, Toronto (Cboe Canada-listed), is the named partner that intends to contribute solar and thermal systems; PowerBank 6-K and 20-F filings with the SEC mention Orbit AI and Smartlink (index hits only, not read) [0, 2]
Next step
'2026: Expansion to 5–8 orbital nodes integrating compute and connectivity'; '2027–2028: Full constellation rollout and commercialization of Orbital Cloud services' [0]
orbital data centre built on highly reliable edge computingJapanannouncednot found
Power
not found
Full name
高信頼性エッジコンピューティングによる軌道上データセンターの構築 (orbital data centre built on highly reliable edge computing), JAXA Space Strategy Fund theme 'orbital data center construction technology' [0]
Operator
株式会社SpaceBlast (SpaceBlast Inc.), implementing organisation [0, 2]
Operator's country
JP [2]
Partners
JAXA (Space Strategy Fund): funder, theme owner [0, 4]
Development partners (連携機関) named at the 2026-06-16 kickoff: DigitalBlast, Institute of Science Tokyo (東京科学大学), テックラボ, KEK, モルゲンロット [5]
Stage
announced (as of 2026-01-26) [2]
Satellites planned
not stated (to use existing assets such as space stations and satellites) [1] plan
Satellites flying
0 (as of 2026-11-01) [1]
Computers on board
non-rad-hard commercial (COTS) high-performance, power-efficient computers; no chip, count or performance stated [1]
Orbit
inside commercial space stations or on satellites (low Earth orbit implied by the post-ISS framing; altitude not stated) [3]
Canadian link
none found in the sources read (JAXA selection PDF, JAXA theme page, SpaceBlast release) [0, 2, 4]
Next step
not stated with a date in sources read [0, 2]
OrbitsEdgeUnited Statesannouncednot found
Power
not found
Full name
OrbitsEdge orbital edge compute (commercial mission led by OrbitsEdge and Copernic Space) [0, 1]
Operator
OrbitsEdge [0]
Operator's country
US [2]
Partners
Copernic Space: co-lead of the first commercial mission [1]
Syntilay: customer (AI agent onboard to design a shoe) [1]
Stage
announced (as of 2025-06-25) [1]
Orbit
low Earth orbit (Syntilay mission as reported) [1]
Canadian link
none found in orbitsedge.com (home, mission, contact) or the 2025-06-25 Space.com article [0, 1, 2]
Next step
first commercial mission with Copernic Space, stated for 2026 (Syntilay shoe design 'in 2026'); no launch found [1]
PathfinderIndiaannouncednot found
Power
not found
Full name
Pathfinder (Pixxel orbital data centre satellite, with Sarvam) [0]
Operator
Pixxel [0]
Operator's country
IN [0, 2]
Partners
Sarvam: AI backbone, models and inference platform (training and inference) [0]
Stage
announced (as of 2026-05-04) [0]
Satellites planned
1 (Pathfinder demonstrator) [0] plan
Satellites flying
0 (as of 2026-09-07) [0, 1]
Computers on board
datacentre-class GPUs (make, model and count not stated) [0]
Physical facts
mass: 200 kg-class satellite [0]
Canadian link
none found in the Pixxel PRs of 2026-05-04 and 2026-09-07 [0, 1]
Next step
scheduled to reach orbit as early as Q4 2026 [0]

1 more item on this system has not passed a check yet. It is in the claims ledger.

Quantum Spatial Orbital CloudSwitzerlandannouncednot found
Power
not found
Full name
Quantum Spatial Orbital Cloud (QSOC) [0, 1]
Operator
SEALSQ Corp (cloud service owner and operator); WISeSat.Space (space segment owner and operator); both WISeKey group companies [0, 1]
Operator's country
CH [1]
Partners
WISeSat.Space Corp.: owner and operator of the QSOC space segment (satellites, ground segment, frequency licences, mission control), sells dedicated capacity to SEALSQ [0]
Stage
announced (as of 2026-03-18) [0]
Satellites planned
up to 100 (Sept 2026 release); '100-satellite constellation' with FOC in 2033 (March 2026 release) [0, 1] plan
Canadian link
none found in the two SEALSQ releases read (2026-03-18, 2026-09-09) [0, 1]
Next step
binding letter of intent (2026-10-26) for SEALSQ to acquire capacity of an initial 12 WISeSat.Space satellites plus mission control and ground segment, about $15 million, as QSOC's initial infrastructure; no date stated; broader roadmap up to 100 satellites through 2033 [2, 1]
Ramon.SpaceIsraelannouncednot found
Power
not found
Full name
Ramon.Space in-orbit data centers (with Ingrasys) [0, 1]
Operator
Ramon.Space [0, 1]
Operator's country
IL [1]
Partners
Ingrasys (Foxconn subsidiary): manufacturing partner for the space product line; investor [0, 2]
Stage
announced (as of 2026-03-24) [1]
Satellites planned
prototype; 'early samples' in 2026, 'initial launches in 2027 and 2028' (no count) [1] plan
Satellites flying
0 (as of 2026-03-24) [1]
Computers on board
Ramon.Space computing, storage and communications platforms (NuComm processors per Payload); no ODC chip counts stated [0, 1]
Registered by
not applicable (not launched) [1]
Canadian link
none found in Ramon.Space press listing (page 1) or Payload 2026-03-24 [0, 1]
Next step
fly 'early samples' in 2026; 'initial launches in 2027 and 2028' [1]
Relay Data CenterUnited Statesannouncednot found
Power
not found
Full name
Relay Data Center (Relativity Space Interplanetary Sciences Program, first Mars science orbiter) [0]
Operator
Relativity Space [0, 3]
Operator's country
US [6]
Partners
NASA (Ames Research Center): Aeolus instrument payload suite; NASA supports instrument operations [3]
Stage
announced (as of 2026-06) [5, 3]
Satellites planned
a Mars science orbiter (the program's first mission) [1] plan
Satellites flying
0 (as of 2026-11-01) [1]
Computers on board
Server-class compute (no chip, count or performance stated) [2]
Orbit
Mars orbit (orbit parameters not stated) [1]
Canadian link
none found in the sources read (relativityspace.com/interplanetary, NASA release 2026-06-17) [0, 3]
Next step
Launch in 2028 [1, 4]
SenseTimeChinaannouncednot found
Power
not found
Full name
SenseTime compute constellation (商汤算力星座 / 商汤太空算力星座), 'SenseTime' (商汤号) computing satellites [0]
Operator
Joint: Adaspace Technology (成都国星宇航科技股份有限公司) and Shanghai SenseTime Technology Development (上海商汤科技开发有限公司) [0]
Operator's country
CN [0]
Partners
ADA Space and SenseTime: joint builders of the constellation, jointly developing a 10,000-card space-ground AI compute scheduling platform (role split not stated) [0]
Stage
announced (as of 2026-07-18) [0]
Satellites planned
千颗级 (thousand-class) computing satellites by 2030, total compute over 万P (10,000 P) [0] plan
Satellites flying
0 (as of 2026-10-14) [0, 1]
Computers on board
first 'SenseTime' satellites: high-performance autonomous on-board computing platform (no figure); constellation total over 10,000 P by 2030 [0]
Registered by
not applicable: no launch found [0]
Canadian link
none found in the Science and Technology Daily article of 2026-07-18 [0]
Next step
first 'SenseTime' computing satellites networked within 2026; space-ground hybrid-cloud commercial compute backbone by 2028 [0]
Sophia Space TILEUnited Statesannouncedplan 1 MW
Power
1 MW (computing power of an envisioned 2030s 50 m x 50 m structure (company hope, relayed by TechCrunch), per structure) [4] plan
Full name
Sophia Space TILE orbital compute (Athena demo; planned 10-satellite constellation) [0, 2]
Operator
Sophia Space Inc. [1]
Operator's country
US [1]
Partners
Kepler Communications: host for Sophia software and NVIDIA-powered compute nodes on Kepler satellites; optical relay [1]
Apex: Nova bus for the demo mission [3]
Spherical (Netherlands): electrical power system for Athena [2]
SLI (Libra Group): $300 million (USD) non-binding asset-financing framework, buys and leases the satellites [0]
Stage
announced (as of 2026-09-13) [0]
Satellites planned
10 (planned constellation, under a non-binding letter of support) [0] plan
Satellites flying
0 (as of 2026-08-24) [2]
Computers on board
constellation: aggregate capacity 'equivalent to 240 state-of-the-art edge servers'; Kepler demo: NVIDIA-powered edge compute nodes [0, 1]
Physical facts
array dimensions: TILE modules 1 m x 1 m, a few centimetres deep, with integrated solar panels (press); envisioned 2030s structure 50 m x 50 m [4]
Canadian link
Kepler Communications (headquartered in Toronto): commercial agreement for Sophia to operate edge compute nodes and software on Kepler satellites from Q4 2026, and to explore joint Optical Data Center Nodes [1, 5]
Next step
Sophia software and NVIDIA-powered compute nodes on Kepler satellites, 'beginning in Q4 2026'; Athena TILE demo planned Q4 2027; constellation launches 'as early as 2028' [1, 2, 0]
Space CloudFinlandannouncednot found
Power
not found
Full name
Space Cloud [0]
Operator
ReOrbit [0]
Operator's country
FI [0]
Partners
Google Cloud: collaboration on AI and cloud-orchestration expertise (not an operator) [0]
Stage
announced (as of 2026-02-05) [0]
Computers on board
'localised AI compute' on each data-processing satellite; no chip stated [0]
Canadian link
none found in the ReOrbit release (2026-02-05) [0]
Space Integrated Computing NetworkJapanannouncednot found
Power
not found
Full name
Space Integrated Computing Network (Space Compass) [0, 1]
Operator
Space Compass Corporation (joint venture of NTT and SKY Perfect JSAT) [0, 1]
Operator's country
JP [0, 1]
Partners
NTT: JV parent [0]
SKY Perfect JSAT: JV parent [0]
Microsoft: co-engineering on Azure Orbital Space SDK, in-orbit AI demo [0]
SWISSto12: procurement contract for the first GEO optical data relay satellite (HummingSat platform) [2]
JAXA: Space Strategy Fund selection for optical data relay R&D and demonstration [1]
Stage
announced (as of 2025-04-14) [0]
Satellites planned
first GEO optical data relay satellite (procured 2026-03-23); multi-orbit network, no count stated [2, 1] plan
Satellites flying
0 (as of 2026-04-28) [2, 3]
Orbit
GEO (first optical data relay satellite) [2]
Registered by
not applicable (relay satellite not launched) [2]
Canadian link
none found in Space Compass English releases of 2025-04-14, 2026-03-23, 2026-04-22, 2026-04-28 [0, 1, 2, 3]
Xinghuan PlanChinaannouncednot found
Power
not found
Full name
Xinghuan Plan (星环计划), Shenkong Juzhen (深空矩阵) [0]
Operator
Shenkong Juzhen (深空矩阵), Beijing [0]
Operator's country
CN [0]
Stage
announced (as of 2026-07-19) [0]
Satellites planned
phase 1: about 210 satellites (low-orbit remote-sensing and computing integrated verification constellation); later thousands to tens of thousands [0] plan
Satellites flying
0 (as of 2026-07-19) [0]
Orbit
LEO; later dawn-dusk computing orbits [0]
Registered by
not applicable: no launch found [0]
Canadian link
none found in the IT Home article of 2026-07-19 [0]
Xingshu PlanChinaannouncedplan 15 kW power generation
Power
15 kW (solar array, per satellite) [0] plan
Full name
Xingshu Plan (星枢计划) space computing constellation, Shanghai [0]
Operator
Shanghai Xingshu Tiansuan (上海星枢天算) with Fudan University, which lead development and operation; Xingshu Tiansuan is 74% held by Xuntian Qianhe (巡天千河), a controlled subsidiary of Junda (钧达股份) [0]
Operator's country
CN [0]
Partners
Fudan University: space-based large-model technology; chief scientists Jin Yaqiu, Wang Jianyu, Chu Junhao, Li Jun [0]
Shanghai Institute of Technical Physics (CAS), Wang Jianyu team: payload engineering support for the central computing satellite [0]
Shanghai Academy of AI for Science, Fudan, Xuntian Qianhe: Fuxi weather satellite [0]
太驿微行航天科技: lead developer of the very-low-orbit instant remote-sensing satellite [0]
星算未来, 星遥光宇: co-founders of Shanghai Xingshu Tiansuan [0]
Stage
announced (as of 2026-07-18) [0]
Satellites planned
engineering verification: 2 computing + 12 edge-computing satellites; commercial deployment: 50 computing + 100 edge-computing; commercial operation: thousand-satellite deployment. Xinhua Finance: 1,000 satellites; 2-12 launched in 2027, 200 by 2030, 800 launched by 2032 [0, 1] plan
Satellites flying
0 (as of 2026-07-20) [0, 1]
Computers on board
central computing satellite: customised domestic space-grade GPU chips, 32P in-orbit compute; instant remote-sensing satellite: 2 POPS edge compute [0]
Orbit
instant remote-sensing satellite in very low Earth orbit (超低轨); no altitudes stated [0]
Registered by
not applicable: no launch found [0]
Ground stations
ground optical phased-array reception planned for 400 Gbps optical links (location not stated) [0]
Canadian link
none found in the Shanghai Securities News (2026-07-18) and Xinhua Finance (2026-07-20) articles read [0, 1]
Next step
2-12 satellites launched in 2027 (Xinhua Finance) [1]

1 more item on this system has not passed a check yet. It is in the claims ledger.

Yiwei Aerospace space computing service platformChinaannouncednot found
Power
not found
Full name
太空算力服务平台 (Yiwei Aerospace space computing service platform) [0]
Operator
一苇宇航(北京)科技有限公司 (Yiwei Aerospace (Beijing) Technology Co., Ltd.) [3]
Operator's country
CN [3]
Partners
浩瀚深度 (Haohan Deep): investor and joint-laboratory partner for space-ground integration and space computing R&D [8]
Stage
announced (as of 2026-06-29) [service platform released 2026-06-29; an internal beta (内测版) online since 2026-06 per Huxiu; no satellite named and no task run in orbit reported] [0, 4, 5]
Satellites planned
not stated [0, 4] plan
Computers on board
全国产太空服务器 (all-domestic space servers) with its own onboard real-time OS RROS; no chip, count or performance stated [6]
Orbit
not stated [0]
Canadian link
none found in the sources read (Beijing News 2026-07-01, Huxiu 2026-09-06, Sina 2026-09-03) [0, 4, 6]
Next step
Funding directed to data-centre-class very-large-scale compute payloads and the compute service platform; no date stated [5]
Exodus Orbitalsnot yet checkedcancellednot found
Power
not found
Full name
Exodus Orbitals ('Launch your code in space'; NOVA cubesat) [0, 1]
Operator
Exodus Orbitals [0]
Partners
Open Cosmos: listed as organisation for the NOVA cubesat in the Nanosats directory (role not stated) [1]
Stage
cancelled (as of 2024-12-29) [Nanosats record (last modified 2024-12-29) shows status 'cancelled'; archived operator site 2022-12-06] [1]
Satellites planned
NOVA, 3U cubesat [1] plan
Satellites flying
0 (as of 2026-11-01) [1]

3 more items on this system have not passed a check yet. They are in the claims ledger.

What the cells mean

Every value shown has passed an independent check against its cited sources. “Not yet checked” means a value is in the downloads but has not passed. “–” means no value is recorded. “Not found” means no power figure in the sources we hold. Our estimated upper limits come from a stated physical fact. They are never measurements. Power = area x 1,361 W/m2 x cell efficiency 0.28-0.32 x packing 0.85-1.0. Heat = area x emissivity 0.85-0.92 x σ x (T⁴ - T_sink⁴) x sides, with T 300-330 K and T_sink 250 K down to 0 K. method.txt gives the details in its section 6.

4 Jurisdiction

4.1 By country

Each line is one way a country's law can reach a system. The number is how many systems it reaches that way. We read each from checked facts. A system counts here only with a checked line for that way, so these numbers can be lower than the Summary's count of operators by country.

How the law reachesCountries, with the number of systems
UN registration of the satellitesCanada 2, United States 2, China 1, Italy 1
Licence for the space activity, granted or applied forUnited States 14, China 13, United Arab Emirates 2, Switzerland 2, India 2, Finland 1, Israel 1, Italy 1, Japan 1, South Korea 1
Radio network filing at the ITUUnited States 6, China 2, Germany 2
Ground stations, built or plannedCanada 2, Bulgaria 1, China 1, Norway 1, Portugal 1, United States 1, South Africa 1
Export control of the hardwareUnited States 9
The operator's home countryUnited States 14, China 13, United Arab Emirates 2, Switzerland 2, India 2, Canada 1, Finland 1, France 1, Israel 1, Italy 1, Japan 1, South Korea 1

4.2 Canada

Canadian (1)

  • Kepler Compute: Canadian operator (Toronto). Details

Linked to Canada (2)

  • Axiom Space: ARC 1 and ARC 2 are hosted on Canadian-operated, Canada-registered Kepler satellites. Details
  • Sophia Space TILE: Kepler Communications (headquartered in Toronto): commercial agreement for Sophia to operate edge compute nodes and software on Kepler satellites from Q4 2026. Details

Not counted, because the link is only a stated intention or possibility: Orbital Cloud, Starcloud.

4.3 By system

Full table: each system, country by country

Take Kepler Compute. Its operator is in Canada. Its satellites are registered by Canada. They were launched from the United States. So the laws of several countries reach one system.

Star-Compute Project–CNCN––CN–
Full name
Star-Compute Project (星算计划)
State of registry
not found in UNOOSA Online Index: newest China-registered object there launched 2024-12-19 (all 1086 'China' hits read, 2026-11-01)
Launch state
China (Jiuquan Satellite Launch Center 2025-05-14; Dongfeng commercial space innovation test zone 2026-10-14)
Licensing filings
ITU (via China's administration) network names not stated (ITU filings (stated as 'ITU approval')), status operator states ITU approval of 3,156 satellites, dated 2026-05-04
NDRC not stated (project approval), status approval for development and launch of 60 additional satellites, obtained February 2025 (operator states), dated 2025-02
MIIT not stated (radio frequency use permit and radio station licence (per satellite)), status operator states requisite permits obtained, including for five pre-December 2023 satellites that lacked the relevant national ministry's pre-production approval (reported to the NDRC), dated 2026-05-04
  • Authorization: CN. Based on: NDRC not stated (project approval), status approval for development and launch of 60 additional satellites, obtained February 2025 (operator states), dated 2025-02
    MIIT not stated (radio frequency use permit and radio station licence (per satellite)), status operator states requisite permits obtained, including for five pre-December 2023 satellites that lacked the relevant national ministry's pre-production approval (reported to the NDRC), dated 2026-05-04
  • Radio: CN. Based on: ITU (via China's administration) network names not stated (ITU filings (stated as 'ITU approval')), status operator states ITU approval of 3,156 satellites, dated 2026-05-04
  • Home country: CN. Based on: CN
AetheroUSUS––USUS–
Full name
Aethero compute-as-a-service (Deimos, Phobos, Titan)
State of registry
Deimos (2024-149BL): USA, ST/SG/SER.E/1227; Phobos (2026-067BD): not found in the UNOOSA Online Index (search by designator, 2026-11-01)
Launch state
US (Vandenberg SLC-4E, both flown objects)
Licensing filings
FCC 0780-EX-CN-2025 (call sign WQ2XDL) (experimental licence), status Grant Expired Due to New License, dated 2026-03-05
FCC 0077-EX-CM-2026 (call sign WQ2XDL) (experimental licence modification), status Granted, dated 2026-04-02
FCC 0517-EX-CN-2026 (call sign WQ2XNL, Titan) (experimental licence), status Grant Expired Due to New License, dated 2026-07-23
FCC 0169-EX-CM-2026 (call sign WQ2XNL, Titan) (experimental licence modification), status Granted, dated 2026-10-14
ITU TITAN (network name as written in the ODAR header; not checked at ITU) (ITU filing referenced by operator), status not verified, dated 2026-09-25
  • Registration: US. Based on: Deimos (2024-149BL): USA, ST/SG/SER.E/1227; Phobos (2026-067BD): not found in the UNOOSA Online Index (search by designator, 2026-11-01)
  • Authorization: US. Based on: FCC 0780-EX-CN-2025 (call sign WQ2XDL) (experimental licence), status Grant Expired Due to New License, dated 2026-03-05
    FCC 0077-EX-CM-2026 (call sign WQ2XDL) (experimental licence modification), status Granted, dated 2026-04-02
    FCC 0517-EX-CN-2026 (call sign WQ2XNL, Titan) (experimental licence), status Grant Expired Due to New License, dated 2026-07-23
    FCC 0169-EX-CM-2026 (call sign WQ2XNL, Titan) (experimental licence modification), status Granted, dated 2026-10-14
  • Export control: US, our inference. Based on: Deimos: 1x NxN-ECM on COTS NVIDIA Jetson Orin, 100 TOPS; Phobos: 1x NxN-ECM on NVIDIA Jetson Orin NX (Super Mode), up to 157 TOPS; Titan (planned): clustered NxA-ECM modules on NVIDIA Jetson Thor, over 4,000 TFLOPS each, up to 16,000 TFLOPS for the mission
  • Home country: US. Based on: US
NeevCloud–IN–––IN–
Full name
NeevCloud AI Data Centre in Space (with Agnikul Cosmos)
  • Authorization: IN, our inference. Based on: IN
  • Home country: IN. Based on: IN
Altair–AE––USAE–
Full name
Altair
State of registry
not found in UNOOSA Online Index (exact-name queries 'Altair-1', 'ALTAIR-1'; UAE state-of-registry list, first page of 35) on 2026-11-01; launch post-dates the index's latest entries (about 2026-09-16)
Launch state
US (Vandenberg Space Force Base, California)
  • Authorization: AE, our inference. Based on: AE
  • Export control: US, our inference. Based on: Onboard NVIDIA GPUs (model and count not stated)
  • Home country: AE. Based on: AE
ASCEND–––––FR–
Full name
ASCEND (Advanced Space Cloud for European Net zero emission and Data sovereignty)
State of registry
not applicable (study)
  • Home country: FR. Based on: FR
ODC.Space–US–––US–
Full name
ODC.Space (powered by Atomic-6)
  • Authorization: US, our inference. Based on: US
  • Home country: US. Based on: US
Axiom SpaceCAUSDECA–US–
Full name
Axiom Space Orbital Data Center (ODC) / Axiom Resilient Compute (ARC) nodes
State of registry
Host satellites registered by Canada (Kepler ÆTHER-3 to -12, ST/SG/SER.E/1367); which two carry ARC 1/2 is not stated
Launch state
US (Kepler Tranche 1, Falcon 9 from Vandenberg, 2026-01-11; GCAT launch 2026-004)
  • Registration: CA. Based on: Host satellites registered by Canada (Kepler ÆTHER-3 to -12, ST/SG/SER.E/1367); which two carry ARC 1/2 is not stated
  • Authorization: US, our inference. Based on: US
  • Radio: DE, our inference. Based on: ARC 1 and ARC 2 are hosted on Canadian-operated, Canada-registered Kepler satellites
    ITU D-ISIPELE-C (ITU coordination request (notice type N, provision 9.6) and Res.49 due-diligence notice), status CR notice received 21.01.2020; RES49 notice received 09.09.2026; notifying administration D (Germany), dated 2020-01-21
  • Ground stations: CA, our inference. Based on: ARC 1 and ARC 2 are hosted on Canadian-operated, Canada-registered Kepler satellites
    Canada: Inuvik, NT (Inuvik Sat. Station Facility, call sign XJ436; and Inuvik CSGI site, VF885), Kepler Communications Inc. as licensee
  • Home country: US. Based on: US
Project Sunrise–USUS––US–
Full name
Project Sunrise (Blue Origin Orbital Data Center System)
Licensing filings
FCC SAT-LOA-20260310-00118 (call sign S00830), 'Project Sunrise' (application (launch and operating authority, NGSO)), status Pending Payment (status date 2026-03-19); accepted for filing PN 2026-04-17; Space Bureau information request of 2026-08-28; Blue Origin response 2026-09-18, dated 2026-03-19
Ground segment
No gateway locations stated in the narrative: traffic routed 'through its TeraWave system and other mesh backhaul networks to transmit to the ground'; Ka-band TT&C for early, post-mission and emergency phases
  • Authorization: US. Based on: FCC SAT-LOA-20260310-00118 (call sign S00830), 'Project Sunrise' (application (launch and operating authority, NGSO)), status Pending Payment (status date 2026-03-19); accepted for filing PN 2026-04-17; Space Bureau information request of 2026-08-28; Blue Origin response 2026-09-18, dated 2026-03-19
  • Radio: US, our inference. Based on: FCC SAT-LOA-20260310-00118 (call sign S00830), 'Project Sunrise' (application (launch and operating authority, NGSO)), status Pending Payment (status date 2026-03-19); accepted for filing PN 2026-04-17; Space Bureau information request of 2026-08-28; Blue Origin response 2026-09-18, dated 2026-03-19
  • Home country: US. Based on: US
Tiansuan ConstellationCNCN–––CN–
Full name
Tiansuan Constellation (天算星座)
State of registry
BUPT-1 (2023-007) registered by China, ST/SG/SER.E/1237; BUPT-2/BUPT-3 (2025-103E/F) not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01)
Launch state
China (BUPT-2/3: Dongfeng commercial space innovation test zone, Jiuquan, 2025-05-17)
Ground segment
seven ground stations (countries not stated)
  • Registration: CN. Based on: BUPT-1 (2023-007) registered by China, ST/SG/SER.E/1237; BUPT-2/BUPT-3 (2025-103E/F) not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01)
  • Authorization: CN, our inference. Based on: CN
  • Home country: CN. Based on: CN
CASC–CN–––CN–
Full name
CASC gigawatt-class space digital-intelligence infrastructure (吉瓦级太空数智基础设施), 15th Five-Year Plan new-domain goal
State of registry
not applicable: no object announced
  • Authorization: CN, our inference. Based on: CN
  • Home country: CN. Based on: CN
Comospace–CN–––CN–
Full name
Comospace (中科天算) 'Tiansuan Plan' (天算计划) space supercomputing network, with the Hangsheng/Comospace/Yanhe two-satellite compute demo
State of registry
not applicable: no launch found
  • Authorization: CN, our inference. Based on: CN
  • Home country: CN. Based on: CN
Stampede Data Center System–USUS–USUS–
Full name
Stampede Data Center System
Licensing filings
FCC SAT-LOA-20260323-00135 (call sign S00851), 'Stampede Data Center System Application' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02007 (2026-06-12); Space Bureau request 2026-08-28; Cowboy response 2026-09-18; bond/milestone waiver supplement 2026-10-28, dated 2026-05-11
Ground segment
Ka-band TT&C requested (18.8-19.3 GHz down, 28.6-29.1 GHz up); gateway locations not read
  • Authorization: US. Based on: FCC SAT-LOA-20260323-00135 (call sign S00851), 'Stampede Data Center System Application' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02007 (2026-06-12); Space Bureau request 2026-08-28; Cowboy response 2026-09-18; bond/milestone waiver supplement 2026-10-28, dated 2026-05-11
  • Radio: US, our inference. Based on: FCC SAT-LOA-20260323-00135 (call sign S00851), 'Stampede Data Center System Application' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02007 (2026-06-12); Space Bureau request 2026-08-28; Cowboy response 2026-09-18; bond/milestone waiver supplement 2026-10-28, dated 2026-05-11
  • Export control: US, our inference. Based on: NVIDIA Space-1 Vera Rubin Module (partnership stated; count not stated)
  • Home country: US. Based on: US
D-OrbitITIT––USIT–
Full name
D-Orbit Space Cloud Services (on ION Satellite Carrier)
State of registry
Italy: ION SCV 003, 004, 014 and 020 are in the Italian national register (ASI, edition 01-07-2026) with D-Orbit as operator; UN registration column 'Si' for SCV 003/004, 'No' for SCV-014/020; UNOOSA Online Index shows ION SCV-004 Elysian Eleonora (2022-002K) under Italy in ST/SG/SER.E/1228
  • Registration: IT. Based on: Italy: ION SCV 003, 004, 014 and 020 are in the Italian national register (ASI, edition 01-07-2026) with D-Orbit as operator; UN registration column 'Si' for SCV 003/004, 'No' for SCV-014/020; UNOOSA Online Index shows ION SCV-004 Elysian Eleonora (2022-002K) under Italy in ST/SG/SER.E/1228
  • Authorization: IT, our inference. Based on: IT
  • Export control: US, our inference. Based on: Unibap SpaceCloud iX5-100 (ION SCV003, SCV004): 4 TOPS over AMD CPU and GPU, Microsemi FPGA, Intel Movidius Myriad X VPU; Unibap iX5-106 (SCV014 'Ascend', SCV020 Skytrail); Unibap iX20 (ION launched 2026-10-01)
  • Home country: IT. Based on: IT
Mingzhu Constellation Plan–CNCN––CN–
Full name
Mingzhu Constellation Plan (明珠星座计划), Shanghai
State of registry
not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01)
Launch state
China (Dongfeng commercial space innovation test zone, Jiuquan; Zhuque-2E Y4)
  • Authorization: CN, our inference. Based on: CN
  • Radio: CN, our inference. Based on: ADA Space: host satellites (Star-Compute 02 group, incl. XSD-44 'Dongfang Tiansuan')
    ITU (via China's administration) network names not stated (ITU filings (stated as 'ITU approval')), status operator states ITU approval of 3,156 satellites, dated 2026-05-04
  • Home country: CN. Based on: CN
Clustergate–CH––USCH–
Full name
Clustergate (Clustergate-2 on-orbit compute platform; OmniSat planned)
State of registry
not found in UNOOSA Online Index: search '2026-067' returned 0 objects; search 'Vigoride' returned Vigoride 3, 5, 6 (USA) but not Vigoride 7 (queried 2026-10-31)
Launch state
US (Vandenberg SFB SLC-4E, Falcon 9 Transporter-16, 2026-03-30)
  • Authorization: CH, our inference. Based on: CH
  • Export control: US, our inference. Based on: Clustergate-2: 'a heterogenous processing cluster' including 'an NVIDIA GPU provided by EDGX' (model and count not stated)
  • Home country: CH. Based on: CH
Project Suncatcher–US––USUS–
Full name
Project Suncatcher
Launch state
US (Transporter-18: Falcon 9 from Vandenberg SFB SLC-4E, 2026-10-01)
  • Authorization: US, our inference. Based on: US
  • Export control: US, our inference. Based on: Google TPUs (count not stated); Trillium (v6e Cloud TPU) radiation-tested on the ground
  • Home country: US. Based on: US
Hanwha Systems–KR–––KR–
Full name
Hanwha Systems orbiting AI data center (AI data center in space)
State of registry
not applicable (not launched)
Ground segment
KR: defense AI data center in Changwon, South Gyeongsang (integrates information collected across space, land, sea and air; 45 MW initially, 135 MW by 2032 per press)
  • Authorization: KR, our inference. Based on: KR
  • Home country: KR. Based on: KR
Kepler ComputeCA–DECAUSCA–
Full name
Kepler Compute (on-orbit compute on Kepler's Tranche 1 optical data relay constellation)
State of registry
Canada (ÆTHER-3 to ÆTHER-12, 2026-004M to 2026-004W, ST/SG/SER.E/1367)
Launch state
US (Falcon 9 from Vandenberg SFB, SLC-4E)
Licensing filings
ITU D-ISIPELE-C (ITU coordination request (notice type N, provision 9.6) and Res.49 due-diligence notice), status CR notice received 21.01.2020; RES49 notice received 09.09.2026; notifying administration D (Germany), dated 2020-01-21
ISED ISIPELE / D-ISIPELE-C (foreign satellite approved to provide FSS in Canada (CPC-2-6-04 list)), status listed, NGSO, downlink 10.7-12.2 and 12.7-13.25 GHz, uplink 13.75-14.5 GHz, dated 2026-08-19
ISED call sign XJ436 (Inuvik Sat. Station Facility); VF885 (Inuvik CSGI) (earth station radio authorizations naming network D-ISIPELE-C), status in SMS extract; dated 2026-05-28 (XJ436) and 2025-05-12 (VF885), dated 2026-05-28
CSA 25STDPZ09 (contribution agreement 'Orbital Cloud Infrastructure'), status value CAD 429,262 after amendment 1 of 2026-04-01 (original CAD 500,000); agreement value, not amount paid, dated 2025-09-09
Ground segment
Canada: Inuvik, NT (Inuvik Sat. Station Facility, call sign XJ436; and Inuvik CSGI site, VF885), Kepler Communications Inc. as licensee
  • Registration: CA. Based on: Canada (ÆTHER-3 to ÆTHER-12, 2026-004M to 2026-004W, ST/SG/SER.E/1367)
  • Radio: DE, our inference. Based on: ITU D-ISIPELE-C (ITU coordination request (notice type N, provision 9.6) and Res.49 due-diligence notice), status CR notice received 21.01.2020; RES49 notice received 09.09.2026; notifying administration D (Germany), dated 2020-01-21
    ISED call sign XJ436 (Inuvik Sat. Station Facility); VF885 (Inuvik CSGI) (earth station radio authorizations naming network D-ISIPELE-C), status in SMS extract; dated 2026-05-28 (XJ436) and 2025-05-12 (VF885), dated 2026-05-28
  • Ground stations: CA, our inference. Based on: Canada: Inuvik, NT (Inuvik Sat. Station Facility, call sign XJ436; and Inuvik CSGI site, VF885), Kepler Communications Inc. as licensee
    ISED ISIPELE / D-ISIPELE-C (foreign satellite approved to provide FSS in Canada (CPC-2-6-04 list)), status listed, NGSO, downlink 10.7-12.2 and 12.7-13.25 GHz, uplink 13.75-14.5 GHz, dated 2026-08-19
    ISED call sign XJ436 (Inuvik Sat. Station Facility); VF885 (Inuvik CSGI) (earth station radio authorizations naming network D-ISIPELE-C), status in SMS extract; dated 2026-05-28 (XJ436) and 2025-05-12 (VF885), dated 2026-05-28
  • Export control: US, our inference. Based on: 40x NVIDIA Jetson Orin modules across 10 satellites (introductory capability); release of 2026-01-11 says 'multi-GPU on-orbit compute modules with terabytes of storage'
  • Home country: CA. Based on: CA
Loft Orbital–USUS––US–
Full name
Loft Orbital Virtual Missions / on-orbit AI (Ultimate Edge)
Licensing filings
FCC SAT-LOA-20260513-00196 (YAM-30), SAT-MOD-20260519-00203 (YAC-1, ten satellites) (application / modification), status Pending Review (ICFS, 2026-10-31), dated 2026-07-09 (filed date shown in ICFS for -00196)
  • Authorization: US. Based on: FCC SAT-LOA-20260513-00196 (YAM-30), SAT-MOD-20260519-00203 (YAC-1, ten satellites) (application / modification), status Pending Review (ICFS, 2026-10-31), dated 2026-07-09 (filed date shown in ICFS for -00196)
  • Radio: US, our inference. Based on: FCC SAT-LOA-20260513-00196 (YAM-30), SAT-MOD-20260519-00203 (YAC-1, ten satellites) (application / modification), status Pending Review (ICFS, 2026-10-31), dated 2026-07-09 (filed date shown in ICFS for -00196)
  • Home country: US. Based on: US
Madari Space–AE–––AE–
Full name
Madari Space orbital data centre (pilot)
State of registry
not applicable (no launch found)
  • Authorization: AE, our inference. Based on: AE
  • Home country: AE. Based on: AE
NOVI smart satellites with SP240 on-board computers: partner and customer software run in orbit–––––––
Full name
NOVI smart satellites with SP240 on-board computers: partner and customer software run in orbit (GENIE satellites, Missions-as-a-Service)
Launch state
US (Vandenberg Space Force Base, per GCAT launch site VSFBS for all three)
Licensing filings
FCC SAT-LOA-20250609-00140 (call sign S3234) (application), status granted with conditions 2025-12-11 (Space Bureau public notice DA 25-1053, Report SAT-01959, 2025-12-12), dated 2025-06-09
Ground segment
United States: NOVI mission control centre, Arlington, Virginia; commercial ground stations in and outside the US (countries not named in the narrative read)
Open-Source Computing Constellation–CN–––CN–
Full name
开源计算星座 (Open-Source Computing Constellation), part of the OpenSpace 开源太空生态 (OpenSpace open-source space ecosystem)
  • Authorization: CN, our inference. Based on: CN
  • Home country: CN. Based on: CN
Orbital Datacenter System–USUS––US–
Full name
Orbital Datacenter System (Orbital Compute Inc.; first satellite Orbital-1)
Licensing filings
FCC SAT-LOA-20260624-00251 (call sign S00867), 'Orbital Compute Inc. — Orbital Datacenter System (LOA)' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02024 (2026-07-31); Space Bureau request 2026-08-28; Orbital response 2026-09-11 (filed 2026-09-10) requesting until 2026-12-10 for remaining items, dated 2026-06-24
FCC Public Notice Report No. SAT-02024 (SAT-LOA-20260624-00251, S00867) (public notice: application accepted for filing), status accepted for filing, dated 2026-07-31 [same application as filings#1; not a separate filing]
Ground segment
back-up TT&C only (18.8-19.3 GHz down, 28.6-29.1 GHz up); traffic via optical inter-satellite links with other commercial LEO systems; gateway locations not stated in the PN
  • Authorization: US. Based on: FCC SAT-LOA-20260624-00251 (call sign S00867), 'Orbital Compute Inc. — Orbital Datacenter System (LOA)' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02024 (2026-07-31); Space Bureau request 2026-08-28; Orbital response 2026-09-11 (filed 2026-09-10) requesting until 2026-12-10 for remaining items, dated 2026-06-24
  • Radio: US, our inference. Based on: FCC SAT-LOA-20260624-00251 (call sign S00867), 'Orbital Compute Inc. — Orbital Datacenter System (LOA)' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02024 (2026-07-31); Space Bureau request 2026-08-28; Orbital response 2026-09-11 (filed 2026-09-10) requesting until 2026-12-10 for remaining items, dated 2026-06-24
  • Home country: US. Based on: US
OrbitsEdge–US–––US–
Full name
OrbitsEdge orbital edge compute (commercial mission led by OrbitsEdge and Copernic Space)
  • Authorization: US, our inference. Based on: US
  • Home country: US. Based on: US
Pathfinder–IN–––IN–
Full name
Pathfinder (Pixxel orbital data centre satellite, with Sarvam)
  • Authorization: IN, our inference. Based on: IN
  • Home country: IN. Based on: IN
Orbital Cloud–––––––
Full name
Orbital Cloud (Orbit AI / Smartlink AI: DeStarlink and DeStarAI), with PowerBank
State of registry
not found in GCAT satcat/auxcat/ftocat/tmpcat (2026-10-29 builds) under Genesis, DeStar, Orbit AI or Smartlink; UN Online Index not searched by name
Ramon.Space–IL–––IL–
Full name
Ramon.Space in-orbit data centers (with Ingrasys)
State of registry
not applicable (not launched)
  • Authorization: IL, our inference. Based on: IL
  • Home country: IL. Based on: IL
Space Cloud–FI–––FI–
Full name
Space Cloud
  • Authorization: FI, our inference. Based on: FI
  • Home country: FI. Based on: FI
Quantum Spatial Orbital Cloud–CH–––CH–
Full name
Quantum Spatial Orbital Cloud (QSOC)
  • Authorization: CH, our inference. Based on: CH
  • Home country: CH. Based on: CH
SenseTime–CN–––CN–
Full name
SenseTime compute constellation (商汤算力星座 / 商汤太空算力星座), 'SenseTime' (商汤号) computing satellites
State of registry
not applicable: no launch found
  • Authorization: CN, our inference. Based on: CN
  • Home country: CN. Based on: CN
Xinghuan Plan–CN–––CN–
Full name
Xinghuan Plan (星环计划), Shenkong Juzhen (深空矩阵)
State of registry
not applicable: no launch found
  • Authorization: CN, our inference. Based on: CN
  • Home country: CN. Based on: CN
FeatherEdge GEN-2–––––––
Full name
FeatherEdge GEN-2 / Orlaith AI on LizzieSat-3 (third-party algorithm integration)
Launch state
US (Vandenberg Space Force Base, California)
Sophia Space TILE–US––USUS–
Full name
Sophia Space TILE orbital compute (Athena demo; planned 10-satellite constellation)
  • Authorization: US, our inference. Based on: US
  • Export control: US, our inference. Based on: constellation: aggregate capacity 'equivalent to 240 state-of-the-art edge servers'; Kepler demo: NVIDIA-powered edge compute nodes
  • Home country: US. Based on: US
Space Integrated Computing Network–JP–––JP–
Full name
Space Integrated Computing Network (Space Compass)
State of registry
not applicable (relay satellite not launched)
  • Authorization: JP, our inference. Based on: JP
  • Home country: JP. Based on: JP
Space String–CN–––CN–
Full name
Space String computing constellation (太空之弦计算星座)
State of registry
not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01); state of registry for the two satellites owned by Indonesian and Uzbek agencies not established
Launch state
China (sea launch from the Yellow Sea near Haiyang, Shandong; Jielong-3 Y12)
  • Authorization: CN, our inference. Based on: CN
  • Home country: CN. Based on: CN
SpaceX–USUS––US–
Full name
SpaceX Orbital Data Center System
Licensing filings
FCC SAT-LOA-20260108-00016 (call sign S00798), 'SpaceX Orbital Data Center System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing by Public Notice DA 26-113 released 2026-02-04 (comments due 2026-03-06), dated 2026-01-30
Ground segment
No dedicated gateways stated: traffic routed over optical links to Starlink, 'which in turn will transmit traffic to authorized earth stations on the ground'; Ka-band TT&C requested: 18.8-19.3 GHz down and 28.6-29.1 GHz up per SpaceX's narrative (2026-01-30); 18.3-19.3 GHz down and 28.6-29.1 GHz up per the FCC's public notice DA 26-113 (2026-02-04)
  • Authorization: US. Based on: FCC SAT-LOA-20260108-00016 (call sign S00798), 'SpaceX Orbital Data Center System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing by Public Notice DA 26-113 released 2026-02-04 (comments due 2026-03-06), dated 2026-01-30
  • Radio: US, our inference. Based on: FCC SAT-LOA-20260108-00016 (call sign S00798), 'SpaceX Orbital Data Center System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing by Public Notice DA 26-113 released 2026-02-04 (comments due 2026-03-06), dated 2026-01-30
  • Home country: US. Based on: US
StarcloudUSUSUSZA, PT, BG, US, NOUSUS–
Full name
Starcloud Orbital Datacenter System (Starcloud-1, Starcloud-2 and successors)
State of registry
USA (Starcloud-1, 2025-248L, ST/SG/SER.E/1327; UN remark: submission 'presently being processed')
Launch state
US (Starcloud-1: Falcon 9 Bandwagon-4 from Cape Canaveral LC-40)
Licensing filings
FCC SAT-LOA-20260202-00073 (call sign S00803), 'Starcloud Orbital Datacenter System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing PN 2026-03-13 (Report SAT-01982); Space Bureau information request 2026-08-28, response deadline extended to 2026-09-18 (letter of 2026-09-11); Starcloud response dated 2026-09-16; Part 100 supplement 2026-10-20, dated 2026-02-04
FCC (OET ELS) 0290-EX-CN-2026 (call sign WQ2XLC), Starcloud-2 (experimental licence application), status Pending (status date 03/12/2026), dated 2026-03-12
FCC (OET ELS) 1019-EX-CN-2024 (call sign WP2XJD), Lumen Orbit, Inc. (experimental licence (Starcloud-1 / Lumen-1 demonstration)), status Grant Expired Due to New License (06/02/2025); successor licence file not identified in this run, dated 2024-11-08
Ground segment
Planned Starcloud-2 TT&C stations: South Africa (Pretoria, RBC), Portugal (Azores, Leaf), Bulgaria (Kaspichan, Leaf), USA (Deadhorse and Fairbanks AK, RBC), Norway (Tromsø, KSAT)
System: Ka-band backup TT&C only (18.8-19.3 GHz down, 28.6-29.1 GHz up); primary communication via optical links to third-party constellations
  • Registration: US. Based on: USA (Starcloud-1, 2025-248L, ST/SG/SER.E/1327; UN remark: submission 'presently being processed')
  • Authorization: US. Based on: FCC SAT-LOA-20260202-00073 (call sign S00803), 'Starcloud Orbital Datacenter System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing PN 2026-03-13 (Report SAT-01982); Space Bureau information request 2026-08-28, response deadline extended to 2026-09-18 (letter of 2026-09-11); Starcloud response dated 2026-09-16; Part 100 supplement 2026-10-20, dated 2026-02-04
    FCC (OET ELS) 0290-EX-CN-2026 (call sign WQ2XLC), Starcloud-2 (experimental licence application), status Pending (status date 03/12/2026), dated 2026-03-12
    FCC (OET ELS) 1019-EX-CN-2024 (call sign WP2XJD), Lumen Orbit, Inc. (experimental licence (Starcloud-1 / Lumen-1 demonstration)), status Grant Expired Due to New License (06/02/2025); successor licence file not identified in this run, dated 2024-11-08
  • Radio: US, our inference. Based on: FCC SAT-LOA-20260202-00073 (call sign S00803), 'Starcloud Orbital Datacenter System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing PN 2026-03-13 (Report SAT-01982); Space Bureau information request 2026-08-28, response deadline extended to 2026-09-18 (letter of 2026-09-11); Starcloud response dated 2026-09-16; Part 100 supplement 2026-10-20, dated 2026-02-04
  • Ground stations: ZA, PT, BG, US, NO. Based on: Planned Starcloud-2 TT&C stations: South Africa (Pretoria, RBC), Portugal (Azores, Leaf), Bulgaria (Kaspichan, Leaf), USA (Deadhorse and Fairbanks AK, RBC), Norway (Tromsø, KSAT)
    System: Ka-band backup TT&C only (18.8-19.3 GHz down, 28.6-29.1 GHz up); primary communication via optical links to third-party constellations
  • Export control: US, our inference. Based on: Starcloud-1: 1x NVIDIA H100 (pre-launch statement); Starcloud-2: 'a GPU cluster' (no count stated by Starcloud)
  • Home country: US. Based on: US
Supersmartcompute–CN–––CN–
Full name
Supersmartcompute intelligent-computing constellation (超智算·智算星座), first satellite Super Intelligent Computing-1 (超智算一号)
State of registry
not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01)
Launch state
China (Jiuquan Satellite Launch Center; Lijian-1 Y18)
  • Authorization: CN, our inference. Based on: CN
  • Home country: CN. Based on: CN
Adagio-XL–US–––US–
Full name
Adagio-XL
  • Authorization: US, our inference. Based on: US
  • Home country: US. Based on: US
LEOcloud Space Edge–US–––US–
Full name
LEOcloud Space Edge
State of registry
not determined: hosted on the ISS; module not stated in the releases read
Launch state
US (Cape Canaveral LC-40; inferred delivery flight Cygnus NG-23)
  • Authorization: US, our inference. Based on: US
  • Home country: US. Based on: US
Xingshu Plan–CN–––CN–
Full name
Xingshu Plan (星枢计划) space computing constellation, Shanghai
State of registry
not applicable: no launch found
Ground segment
ground optical phased-array reception planned for 400 Gbps optical links (location not stated)
  • Authorization: CN, our inference. Based on: CN
  • Home country: CN. Based on: CN
Yaotai–CN–––CN–
Full name
瑶台 (Yaotai) space computing satellites / 太空算力中心 (space AI computing centre)
Launch state
CN (Jiuquan, Kuaizhou-11 Y7, 2026-03-16)
  • Authorization: CN, our inference. Based on: CN
  • Home country: CN. Based on: CN
Three-Body–CN–CN–CN–
Full name
Three-Body Computing Constellation (三体计算星座)
State of registry
not found in UNOOSA Online Index: newest China-registered object there launched 2024-12-19 (all 1086 'China' hits read, 2026-11-01); China's latest UN submission listed is ST/SG/SER.E/1315 (2026)
Launch state
China (Jiuquan Satellite Launch Center 2025-05-14; Dongfeng commercial space innovation test zone 2026-07-24)
Ground segment
China: Three-Body Computing Constellation command centre at Zhejiang Lab, Hangzhou
  • Authorization: CN, our inference. Based on: CN
  • Ground stations: CN. Based on: China: Three-Body Computing Constellation command centre at Zhejiang Lab, Hangzhou
  • Home country: CN. Based on: CN
How to read this grid

Each row is a system with at least one checked fact about registration, launch, filings or ground stations. Each column is a lever a country may hold over it. A cell names the country. Plain text means a source we read says so. Italics mean we inferred it from a rule and a checked fact. A cell appears only when every value behind it has passed its check. Open a row to see those values. All levers, shown or not, are in levers.csv.

4.4 National space rules

Rules by country

For each country, what its law reaches on five levers, with the instrument and section. On paper means a rule's text reaches it. Present means an authority has applied it to a system in this register. Tested means it was challenged, enforced or reviewed.

  • Space activity authorisation: a national space licence for operators that covers a compute payload.
  • Ground segment: earth-station or landing-rights authorisation, and whether it can carry conditions.
  • Export and remote access: controls on transferring control of compute in orbit, or on remote access to it.
  • Service and market rules: AI, data or cloud rules that attach to services offered to residents.
  • Disclosure: any public register or filing that would reveal compute or power of space objects.
CountrySpace activity authorisationGround segmentExport and remote accessService and market rulesDisclosure
United Arab Emirateson paper (Federal Decree by Law No. (46) of 2023 Concerning the Regulation of the Space Sector (repeals Federal Law No. 12 of 2019); Cabinet resolutions on authorisations (not read), Art. 3 scope; Art. 4(1)(e) regulated activities; Art. 5(1) permits)on paper (TDRA General Space Services Licence (telecom licensing under the UAE telecommunications law, not read); Decree-Law 46/2023 Art. 5(8) (satellite communications need a UAE Space Agency NOC and a final TDRA permit), DL 46/2023 Art. 5(8); WAM report of TDRA licence grant)on paper (Federal Decree by Law No. (46) of 2023, Art. 5(7) (assignment of space-activity permit needs Agency approval); export control law Federal Decree-Law No. 43 of 2021 on goods subject to non-proliferation not read, DL 46/2023 Art. 5(7))on paper (Federal Decree by Law No. (45) of 2021 Concerning the Protection of Personal Data (PDPL), Art. 2(1)(c) scope)not yet checked
Australiaon paper (Space (Launches and Returns) Act 2018 Part 3 Div 5 overseas payload permit (s.46B, s.46C), applied in the Australian Space Agency 'Decisions about space activities' table, s.46B(1)(b), s.46C; decision of 15/04/2025 (Akula Tech Pty Ltd))not yet checkedon paper (Defence Trade Controls Act 2012 s.10B (re-supply outside Australia of DSGL goods or technology first exported from Australia) and s.5 definition of 'supply', s.10B(1)(d)(i), (e); s.5 'supply')on paper (Privacy Act 1988 s.5B (extra-territorial operation, 'Australian link'), s.5B(1A), (3))on paper (Space (Launches and Returns) Act 2018 s.76 Register of Space Objects (public), s.76(2)(e), s.76(5); Register entry 04/2025 'Espresso and Nexus-01')
Canadaon paper (Radiocommunication Act (R.S.C. 1985, c. R-2) s.5(1)(a)(i.1) spectrum licence for space stations, procedure ISED CPC-2-6-02 issue 7, Act s.5(1); CPC-2-6-02 s.1 and s.5.1.1)on paper (Radiocommunication Act s.5; ISED earth station spectrum licences (SMS/TAFL satellite extract) and CPC-2-6-04 issue 3 foreign-licensed satellite approval, Act s.5(1)(a); CPC-2-6-04 s.7.5 and Annex B; earth station call signs XJ436 and VF885 naming network D-ISIPELE-C)on paper (ISED CPC-2-6-02 (Issue 7), s.5.1.3)on paper (Personal Information Protection and Electronic Documents Act (S.C. 2000, c. 5) Part 1, s.4(1))not yet checked
Chinaon paper (PRC Radio Regulations (中华人民共和国无线电管理条例, State Council/CMC Order No. 672) Art. 30: space radio station licence by MIIT (national radio administration); enforcement in MIIT Radio Administration Bureau 2025 space-service 'double random' inspection results, Art. 27, Art. 30 para 2; MIIT notice 2026-02-12)on paper (PRC Radio Regulations Art. 30 (gateway and international earth stations licensed by MIIT; other fixed stations by provincial radio administrations) and Art. 32 (licence content); MIIT 2025 inspection of satellite earth stations, Art. 30, Art. 32; MIIT notice 2026-02-12)on paper (Regulations on Export Control of Dual-Use Items (两用物项出口管制条例, State Council Order No. 792), under the Export Control Law (2020), Art. 2)on paper (Interim Measures for the Management of Generative AI Services (生成式人工智能服务管理暂行办法), CAC with NDRC, MOE, MOST, MIIT, MPS, NRTA, Art. 2, Art. 20)not yet checked
Finlandon paper (Laki avaruustoiminnasta / Act on Space Activities 63/2018, s.5 (authorisation) with s.4(1) definition and s.1 scope, s.4(1), s.5(1))on paper (Laki sähköisen viestinnän palveluista / Act on Electronic Communications Services 917/2014, s.39 (radio licence) and s.42 (licence conditions), Traficom, s.39(1), s.42(1))on paper (Act on Space Activities 63/2018, s.11 (transfer of space objects and space activities), s.11(1)-(2))on paper (Regulation (EU) 2024/1689 (AI Act) Art. 2(1); Regulation (EU) 2016/679 (GDPR) Art. 3(2), directly applicable in Finland, AI Act Art. 2(1)(a),(c); GDPR Art. 3(2))on paper (Act on Space Activities 63/2018, s.6 public registry of space objects (TEM), s.6(1)-(2), item 4)
United Kingdomon paper (Space Industry Act 2018 (c. 5) s.1(4) and s.3(1) operator licence; Outer Space Act 1986 (c. 38) s.1 and s.3 for UK persons' activities outside the UK, SIA 2018 s.1(4) 'space activity', s.3(1); OSA 1986 s.1)on paper (Wireless Telegraphy Act 2006 (c. 36) s.8 and s.9; Ofcom Satellite (Non-Geostationary Earth Station) gateway and network licences, WTA 2006 s.9(1))on paper (Space Industry Act 2018 s.15 (transfer of licence); Outer Space Act 1986 s.5(2)(e)(iv) (licence conditions), SIA s.15(1)-(2); OSA s.5(2)(e)(iv))on paper (UK GDPR (retained Regulation (EU) 2016/679 as amended), Art. 3(2)(a))on paper (UK register of space objects and launches, CAA CAP 2207 (SIA 2018 s.61, OSA 1986 s.7), CAP 2207 entry fields)
Malaysiaon paper (Malaysian Space Board Act 2022 (Act 834), Part IV licensing; Malaysian Space Board Regulations 2024 (not read), s.16(1) licence; s.17 launch permit; s.18(1) launch certificate)on paper (Communications and Multimedia Act 1998 (Act 588) s.157 and Communications and Multimedia (Spectrum) Regulations 2000: apparatus assignment for earth stations; MCMC Register of Apparatus Assignments (Earth Station), CMA 1998 s.157 (as summarised on MCMC page))absent (Strategic Trade Act 2010 (Act 708), definitions as restated in MITI Intangible Technology Transfer (ITT) Guideline, s.2 'export' (via MITI ITT Guideline p.1))on paper (Online Safety Act 2025 (Act 866), s.3 Territorial and extra-territorial application, subss.(1)-(3); s.2(1) scope)not yet checked
Netherlandson paper (Wet ruimtevaartactiviteiten (Space Activities Act, BWBR0021418) art. 1(b), 2(1), 3(1), art. 1(b), art. 3(1); art. 3(3) conditions)on paper (Telecommunicatiewet (BWBR0009950) art. 3.13 (frequency-use licence) and art. 3.14 (restrictions and conditions), Rijksinspectie Digitale Infrastructuur, art. 3.13(1), art. 3.14(1)-(4))on paper (Wet ruimtevaartactiviteiten art. 8 (licence not transferable) with art. 3(1), art. 8(1)-(2))on paper (Regulation (EU) 2024/1689 (AI Act) Art. 2(1); Regulation (EU) 2016/679 (GDPR) Art. 3(2), directly applicable in the Netherlands, AI Act Art. 2(1)(a),(c); GDPR Art. 3(2))on paper (Wet ruimtevaartactiviteiten art. 11 (register of space objects), RDI Nationaal Register Ruimtevoorwerpen, art. 11(1)-(2); register column 'Omschrijving/functie ruimtevoorwerp')
Norwayon paper (Lov om aktiviteter i verdensrommet (romloven), LOV-2025-12-22-128, §§ 2, 3, 5, 6, § 2(c), § 5)on paper (Forskrift om etablering, drift og bruk av jordstasjon for satellitt på Svalbard, FOR-2017-04-21-493 (Nkom); ekomloven LOV-2024-12-13-76 § 11-2 and § 11-5 (frequency licence conditions), Svalbard reg. §§ 3, 4, 7; ekomloven § 11-5)on paper (Romloven LOV-2025-12-22-128 § 7 (Overdragelser), § 7(1)(a)-(c), § 7(2))on paper (Personopplysningsloven LOV-2018-06-15-38 § 1 (GDPR as Norwegian law via the EEA Agreement) and § 4 (territorial scope), § 4(2))not yet checked
Singaporeon paper (IMDA Licence for the Use of Satellite Orbital Slot (granted under the Telecommunications Act 1999 framework; procedure in IMDA 'Guidelines on the Submission of Application for the Grant of Licence for the Use of Satellite Orbital Slot'), Guidelines paras 2.1, 2.2, 2.5)on paper (IMDA Satellite Communication Station Licence (Telecommunications Act 1999), Application Guidelines with licence conditions, Requirements para 1; Licence Conditions; cancellation under s.10 of the Act)absent (Strategic Goods (Control) Act 2002, s.2 definitions of 'export' and 'transmit'; s.5(1))on paper (Personal Data Protection Act 2012, s.2(1) definition of 'organisation')not public (NSAS national registry of space objects, under the non-binding Guidelines for Singapore-related Space Activities, Guidelines para 2.1; Registration Form Sections F-G)
United Statesnot yet checkedon paper (FCC earth station licensing, 47 CFR 25.115(a) and 25.102(a); applied in FCC 18-184 (Swarm consent decree, unauthorised earth-station transmissions), 47 CFR 25.115(a)(1)(i); FCC 18-184 para 3)on paper (Export Administration Regulations 15 CFR 734.13(a)(3) (control transfer of spacecraft); ITAR 22 CFR 120.50(a)(3); remote-access licence condition in Supp. No. 2 to Part 748 para (dd) added by FR 2026-00789 (91 FR 1684), 15 CFR 734.13(a)(3) [81 FR 35603, 2016-06-03]; 734.18(a)(1); 22 CFR 120.50(a)(3); 15 CFR Part 748 Supp. 2 (dd)(1)(v)-(vii))on paper (Children's Online Privacy Protection Act (15 USC 6501-6506) and FTC COPPA Rule, 16 CFR Part 312, 16 CFR 312.2 definition of Operator)present (FCC public notice and public filing of space station applications, 47 CFR 25.151 (ICFS); applied in DA 26-113 (SpaceX Orbital Data Center system), 47 CFR 25.151(a)(1); DA 26-113)

5 Launch cost and cadence

SpaceX mass to orbit and launch counts, by quarter. Each row is checked against its cited source. Rows marked our estimate are derived from SpaceX's filings by subtraction. The download gives the method. The full series, with prices, revenue per kg and each row's verdict, is in launch-series.csv.

FigureBasisSource
launches_starship: Q1 2025: 2; Q4 2025: 1; Q1 2026: 0; FY2023: 2; FY2024: 4; FY2025: 5 launches (filing definition: successful orbital and flight tests) (2023-2026-Q1, Starship)our estimatewww.sec.gov · www.sec.gov
mass_to_orbit_total: 450 metric tons (2025-Q1, all SpaceX)SpaceX's SEC filingswww.sec.gov
launches_falcon_total: 41 launches (2025-Q4, Falcon (F9 + FH))our estimatewww.sec.gov · www.sec.gov
mass_to_orbit_total: 586 metric tons (2025-Q4, all SpaceX)our estimatewww.sec.gov · www.sec.gov
mass_to_orbit_total: 556 metric tons (2026-Q1, all SpaceX)SpaceX's SEC filingswww.sec.gov
launches_falcon_total: 37 launches (2026-Q2, Falcon (F9 + FH combined))SpaceX's SEC filingswww.sec.gov
launches_starship: 1 launches (2026-Q2, Starship)SpaceX's SEC filingswww.sec.gov
mass_to_orbit_customer: 87 metric tons (2026-Q2, all SpaceX)SpaceX's SEC filingswww.sec.gov
mass_to_orbit_internal: 397 metric tons (2026-Q2, all SpaceX)SpaceX's SEC filingswww.sec.gov
mass_to_orbit_total: 485 metric tons (2026-Q2, all SpaceX)SpaceX's SEC filingswww.sec.gov
launches_falcon_customer: 12 launches (2026-Q3, Falcon)SpaceX's SEC filingswww.sec.gov
launches_falcon_internal: 21 launches (2026-Q3, Falcon)SpaceX's SEC filingswww.sec.gov
launches_falcon_total: 33 launches (2026-Q3, Falcon (Falcon 9 and Falcon Heavy combined))SpaceX's SEC filingswww.sec.gov
launches_starship: 2 launches (2026-Q3, Starship)SpaceX's SEC filingswww.sec.gov
mass_to_orbit_customer: 119 metric tons (2026-Q3, all SpaceX)SpaceX's SEC filingswww.sec.gov
mass_to_orbit_internal: 358 metric tons (2026-Q3, all SpaceX)SpaceX's SEC filingswww.sec.gov
mass_to_orbit_total: 476 metric tons (2026-Q3, all SpaceX (Falcon + Starship))SpaceX's SEC filingswww.sec.gov

6 What the forms do not ask for

No filing form, register or catalogue we found asks for computing power, chip type, heat, tenants or customer checks.

What we checked

We read FCC Schedule S and ITU Appendix 4. We read UN registration under Article IV of the Registration Convention. We read the public satellite catalogues Space-Track, CelesTrak and GCAT. The last open power column was in the UCS Satellite Database. It stopped in May 2023. So this register records what operators say. Where it can, it adds an upper limit from physics.

Seen from the ground

Brightness data could one day show how big a satellite's arrays are. We searched the public databases on 2026-11-01. The IAU CPS SCORE database has no brightness data for any of the 55 flown objects we looked up. The Mini-MegaTORTORA survey (Karpov et al. 2016) has 60 tracks of 20 of them. That is too little to bound anything yet. Counts and links per object are in observation.csv. We do not republish magnitudes.

7 Dated events

Each filing of a system shown here that has a date and a status in the record, newest first. The date is the one the record gives for the filing. The status is the one the record gives, in its own words, and may be later than that date.

DateSystemFilingStatus in the recordSource
14 Oct 2026AetheroFCCGrantedapps.fcc.gov, undated (live database); apps.fcc.gov, 2026-09-03
19 Aug 2026Kepler ComputeISEDlistedised-isde.canada.ca, 2026-08-19
23 Jul 2026AetheroFCCGrant Expired Due to New Licenseapps.fcc.gov, undated (live database); apps.fcc.gov, 2026-09-03
24 Jun 2026Orbital Datacenter SystemFCC SAT-LOA-20260624-00251Pending Reviewfccprod.servicenowservices.com, undated (live record; Status Date 2026-07-15); docs.fcc.gov, 2026-07-31; api-prod.fcc.gov, 2026-09-11
28 May 2026Kepler ComputeISEDin SMS extractwww.ic.gc.ca, 2026-10-05
11 May 2026Stampede Data Center SystemFCC SAT-LOA-20260323-00135Pending Reviewfccprod.servicenowservices.com, undated (live record; Status Date 2026-05-19); docs.fcc.gov, 2026-06-12; api-prod.fcc.gov, 2026-09-18
2 Apr 2026AetheroFCCGrantedapps.fcc.gov, undated (live database)
19 Mar 2026Project SunriseFCC SAT-LOA-20260310-00118Pending Payment (status date 2026-03-19)fccprod.servicenowservices.com, undated (live record; Status Date 2026-03-19); api-prod.fcc.gov, 2026-09-18
12 Mar 2026StarcloudFCCPending (status date 03/12/2026)apps.fcc.gov, 2026-03-12
5 Mar 2026AetheroFCCGrant Expired Due to New Licenseapps.fcc.gov, undated (live database)
4 Feb 2026StarcloudFCC SAT-LOA-20260202-00073Pending Reviewfccprod.servicenowservices.com, undated (live record; Status Date 2026-02-05); api-prod.fcc.gov, 2026-09-16; api-prod.fcc.gov, 2026-09-11; api-prod.fcc.gov, 2026-10-20
30 Jan 2026SpaceXFCC SAT-LOA-20260108-00016Pending Reviewfccprod.servicenowservices.com, undated (live record; Status Date 2026-01-30); api-prod.fcc.gov, 2026-02-04
9 Jun 2025NOVI smart satellites with SP240 on-board computers: partner and customer software run in orbitFCC SAT-LOA-20250609-00140granted with conditions 2025-12-11api-prod.fcc.gov, 2025-06 (application narrative); docs.fcc.gov, 2025-12-12
8 Nov 2024StarcloudFCCGrant Expired Due to New Licenseapps.fcc.gov, 2025-06-02
21 Jan 2020Kepler ComputeITUCR notice received 21.01.2020www.itu.int, 2026-10-27

8 Method, sources, citation, downloads

Cite

Space compute register, Ω Observatory, Horizon Omega, edition of 2 Nov 2026. https://observatory.horizonomega.org/space-compute/. CC BY 4.0.

Published by Horizon Omega under CC BY 4.0. Send corrections to observatory@horizonomega.org.

What counts, and how values are checked

A system is in this register when it offers general-purpose computing in space. That covers space data centres, orbital cloud and edge compute, hosted compute payloads, and AI in orbit. The computing can serve the operator or its customers. Processing that serves only a satellite's own payload is left out. Each system is recorded from its first announcement. Every value cites a source. A value appears here only after someone other than its author has checked it against those sources. The stage of a launched system, and every physical estimate, also need a second, independent check. Solar array area gives an upper limit on power. Radiator area gives one on heat. Where a size is stated, we show the upper limit it implies. Programs left out under an earlier, narrower rule (computing offered as a service to others) were screened again under the rule above.

The numbers on this page are our counts. They use each system's checked stage. We track 53 systems. This page shows the 48 whose name and stage passed a check. The other 5 are in the downloads, marked unverified.

Full method: method.txt.

Downloads

The downloads hold every system and value. Each value carries its check verdict. Values that have not passed are unverified.