1 Summary
| Indicator | Value |
|---|---|
| Systems tracked | 53, of which 48 shown (name and stage checked) |
| Stage: operating | 13 |
| Stage: launched | 6 |
| Stage: filed | 4 |
| Stage: announced | 24 |
| Stage: cancelled | 1 |
| Operating systems with a stated power figure for the hardware in orbit | 0 of 13. No power figure in the sources we hold. |
| Largest satellite count requested from the US FCC | SpaceX, up to one million satellites (Pending Review, 30 Jan 2026) |
| Operators by country | United States 17 · China 15 · United Arab Emirates 2 · Switzerland 2 · India 2 · Japan 2 · Canada 1 · Finland 1 · France 1 · Israel 1 · Italy 1 · South Korea 1 · no checked country 2 |
| Systems with a checked Canadian link | 1 Canadian, 2 linked to Canada |
| Dated filing events | 15 |
Systems tracked counts every system in the downloads. Counts marked no checked country or not yet checked are of shown systems without a checked value. Every other number is our count of values that passed their check. Counts are never added across systems.
2 Scale
2.1 Satellite counts requested from the US FCC
One bar per application, longest first. Each count is the most the filer asks for. Counts are never added up.
2.2 Computer power where stated
Each mark is one figure from its operator or a report, at its own value. Figures are never added up. Each major step on the scale is 1,000 times larger.
Hardware in orbit now
No power figure in the sources we hold for the hardware in orbit of the 13 operating systems shown.
Plans and next satellites
Computer power, per satellite
Orbital Datacenter System filed ≤ 250 kW
250 kW (planned peak, 'approaching', per satellite (Orbital-1)) · www.reflexaerospace.com, 2026-09-10 · all values
Space String launched, next satellite 11.5 kW
11.5 kW (compute, per satellite) · eu.36kr.com, 2026-09-30 · all values
This figure is for a satellite that has not launched yet. Next step: G1 verification satellite launch expected Q4 2027 (36Kr says '2027').
Computer power, per structure
Sophia Space TILE announced 1 MW
1 MW (computing power of an envisioned 2030s 50 m x 50 m structure (company hope, relayed by TechCrunch), per structure) · techcrunch.com, 2026-02-26 · all values
Computer power, whole system
ASCEND announced 1 GW
1 GW (planned constellation, per system) · www.thalesaleniaspace.com, 2024-06-27 · all values
Power the source does not define, per storefront plan
ODC.Space announced 105 kW
105 kW ('Power, kW' column of the storefront, not defined by the site, per plan: 42U Sovereign) · odc.space, undated (documents linked are dated 2026-04) · all values
ODC.Space announced 10 kW
10 kW ('Power, kW' column of the storefront, not defined by the site, per plan: 4U Sovereign) · odc.space, undated (documents linked are dated 2026-04) · all values
ODC.Space announced 2.5 kW
2.5 kW ('Power, kW' column of the storefront, not defined by the site, per plan: 1U Collocated) · odc.space, undated (documents linked are dated 2026-04) · all values
Electricity generation, per satellite
Adagio-XL announced 200 kW
200 kW (power generation on later iterations of Adagio-XL, per satellite) · payloadspace.com, 2026-06-10 · all values
Adagio-XL announced 100 kW
100 kW (power generation (Adagio-XL, launch aimed for late 2029), per satellite) · payloadspace.com, 2026-06-10 · all values
Xingshu Plan announced 15 kW
15 kW (solar array, per satellite) · finance.sina.com.cn, 2026-07-18 · all values
Bus capacity, per satellite
Aethero operating, next satellite ≤ 3.4 kW
3.4 kW (peak power capacity of the EnduroSat FRAME-15 bus, per satellite (Titan)) · www.aethero.com, 2026-04-16 · all values
This figure is for a satellite that has not launched yet. Next step: Titan launch: February 2027 on SpaceX Transporter 19 from Vandenberg (ODAR, 2026-09-25); operator page says Bandwagon-6, no earlier than Q2 2027 (undated update).
2 more give power only as a class
- CASC gigawatt-class (吉瓦级), no figure stated (planned infrastructure (太空数智基础设施), per system)
- Mingzhu Constellation Plan gigawatt-class (吉瓦级), no figure stated (long-term goal for the planned constellation, per system)
3 Systems
AetheroUnited Statesoperatingnext satellite 3.4 kW bus capacity
- Power
- 3.4 kW (peak power capacity of the EnduroSat FRAME-15 bus, per satellite (Titan)) [2] next satellite
- Full name
- Aethero compute-as-a-service (Deimos, Phobos, Titan) [0, 1]
- Operator
- Aethero Space Inc [8]
- Operator's country
- US [12]
- Partners
- EnduroSat: bus/platform builder (Deimos and Phobos per GCAT manufacturer ENDUR; Titan on EnduroSat FRAME-15) [6, 2]
NVIDIA: chip supplier (Jetson Orin on Deimos and Phobos; Jetson Thor on Titan) [0, 1, 5]
SpaceX: launch (Transporter-11, Transporter-16) [7]
Star Catcher: power purchase agreement for beamed power [13] - Stage
- operating (as of 2026-04-16) [3, 0]
- Satellites flying
- 2 (as of 2026-10-29) [our sum of launches (1 + 1: Deimos 2024-08-16, Phobos 2026-03-30); no source states the total] [6]
- Computers on board
- Deimos: 1x NxN-ECM on COTS NVIDIA Jetson Orin, 100 TOPS; Phobos: 1x NxN-ECM on NVIDIA Jetson Orin NX (Super Mode), up to 157 TOPS; Titan (planned): clustered NxA-ECM modules on NVIDIA Jetson Thor, over 4,000 TFLOPS each, up to 16,000 TFLOPS for the mission [5, 0, 1, 2]
- Physical facts
- mass: Titan: ~184.045 kg total at launch [10]
array dimensions: Titan with deployable solar panels: 2900 mm x 775 mm x 793 mm (bus ~775 x 500 x 793 mm) [10] - Orbit
- Deimos 504 x 516 km, 97.45 deg; Phobos 511 x 512 km, 97.45 deg (GCAT); Titan planned SSO 500 km, ~97.4 deg (FCC filing) [6, 9]
- Filings
- FCC 0780-EX-CN-2025 (call sign WQ2XDL) (experimental licence), status Grant Expired Due to New License, dated 2026-03-05 [8]
FCC 0077-EX-CM-2026 (call sign WQ2XDL) (experimental licence modification), status Granted, dated 2026-04-02 [8]
FCC 0517-EX-CN-2026 (call sign WQ2XNL, Titan) (experimental licence), status Grant Expired Due to New License, dated 2026-07-23 [8, 9]
FCC 0169-EX-CM-2026 (call sign WQ2XNL, Titan) (experimental licence modification), status Granted, dated 2026-10-14 [8, 9]
ITU TITAN (network name as written in the ODAR header; not checked at ITU) (ITU filing referenced by operator), status not verified, dated 2026-09-25 [10] - Registered by
- Deimos (2024-149BL): USA, ST/SG/SER.E/1227; Phobos (2026-067BD): not found in the UNOOSA Online Index (search by designator, 2026-11-01) [11]
- Launch state
- US (Vandenberg SLC-4E, both flown objects) [7]
- Canadian link
- none found in the aethero.com/news index (Mar 2024 to Aug 2026 titles), the Phobos, Deimos, EnduroSat, Star Catcher and Titan pages, or the FCC ELS Aethero files [0, 1, 4, 5, 8, 13]
- Next step
- Titan launch: February 2027 on SpaceX Transporter 19 from Vandenberg (ODAR, 2026-09-25); operator page says Bandwagon-6, no earlier than Q2 2027 (undated update) [10, 4]
1 more item on this system has not passed a check yet. It is in the claims ledger.
- [0] www.aethero.com, 2026-03-30, operator says
- [1] www.aethero.com, 2026-04-16, operator says
- [2] www.aethero.com, 2026-04-16, operator says
- [3] www.aethero.com, 2026-04-16, operator says
- [4] www.aethero.com, undated (update note on a page indexed 2026-04-16), operator says
- [5] www.aethero.com, 2024-08-16, operator says
- [6] planet4589.org, 2026-10-29, directory lists it
- [7] planet4589.org, 2026-10-29, directory lists it
- [8] apps.fcc.gov, undated (live database), authority's own record
- [9] apps.fcc.gov, 2026-09-03, operator says
- [10] apps.fcc.gov, 2026-09-25, operator says
- [11] www.unoosa.org, undated (live index), authority's own record
- [12] www.aethero.com, undated (site footer), operator says
- [13] www.aethero.com, 2026-08-24, operator says
Axiom SpaceUnited Statesoperatingnot found
- Power
- not found
- Full name
- Axiom Space Orbital Data Center (ODC) / Axiom Resilient Compute (ARC) nodes [0, 1]
- Operator
- Axiom Space, Inc. [0, 6]
- Operator's country
- US [6]
- Partners
- Kepler Communications: host satellites and optical relay network for ARC 1 and ARC 2 [two compute nodes hosted on Kepler satellites; host count not stated] [0, 1]
Texas Space Commission: grant funding for the ARCs [0]
Red Hat: software (Red Hat Device Edge on AxDCU-1) [1, 3]
Spacebilt (servers), Skyloom (optical terminal), Phison (SSDs), Microchip (PIC64-HPSC): AxODC Node ISS [4] - Stage
- operating (as of 2026-10-06) [Axiom release 2026-10-06: two operational on-orbit nodes; ARC-to-ARC and ARC-to-ground communications confirmed; launched 2026-01-11] [0, 1]
- Satellites planned
- a multitude of free-flyer ODC nodes in LEO (no number stated) [2] plan
- Orbit
- hosted on Kepler Tranche 1 (low-Earth orbit); AxDCU-1 on the ISS [1]
- Registered by
- Host satellites registered by Canada (Kepler ÆTHER-3 to -12, ST/SG/SER.E/1367); which two carry ARC 1/2 is not stated [5]
- Launch state
- US (Kepler Tranche 1, Falcon 9 from Vandenberg, 2026-01-11; GCAT launch 2026-004) [5, 7, 8]
- Canadian link
- ARC 1 and ARC 2 are hosted on Canadian-operated, Canada-registered Kepler satellites [0, 5]
- Next step
- On-orbit demonstration of ARC's post-quantum cryptography capability (no date stated); AxODC Node ISS planned for the ISS in 2027 [0, 4]
- [0] www.axiomspace.com, 2026-10-06, operator says
- [1] www.axiomspace.com, undated, operator says
- [2] www.axiomspace.com, 2025-04-07, operator says
- [3] www.axiomspace.com, 2025-03-06, operator says
- [4] www.axiomspace.com, 2025-09-16, operator says
- [5] www.unoosa.org, undated, authority's own record
- [6] planet4589.org, 2026-10-29, directory lists it
- [7] kepler.space, 2026-01-11, operator says
- [8] planet4589.org, 2026-10-29, directory lists it
ClustergateSwitzerlandoperatingnot found
- Power
- not found
- Full name
- Clustergate (Clustergate-2 on-orbit compute platform; OmniSat planned) [0, 1]
- Operator
- DPhi Space [0]
- Operator's country
- CH [0]
- Partners
- Momentus: host satellite (Vigoride 7) for Clustergate-2 [0, 3]
EDGX: NVIDIA GPU supplier for Clustergate-2 [0]
Liquid AI: model supplier (LFM2-3b run in orbit) and hackathon co-organiser [0]
D-Orbit: ION Satellite Carrier host for Clustergate-1 [2] - Stage
- operating (as of 2026-04-29) [0]
- Satellites planned
- 'a constellation equipped with compute infrastructure' (no number stated) [0] plan
- Satellites flying
- 1 (as of 2026-10-29) [0, 4]
- Computers on board
- Clustergate-2: 'a heterogenous processing cluster' including 'an NVIDIA GPU provided by EDGX' (model and count not stated) [0]
- Physical facts
- mass: host Vigoride-7: 363 kg (GCAT Mass), dry 292 kg; span 6.5 m (GCAT; host vehicle, not the payload) [4]
- Orbit
- host Vigoride-7: 512 x 518 km, 97.44 deg (GCAT, LLEO/S) [4]
- Registered by
- not found in UNOOSA Online Index: search '2026-067' returned 0 objects; search 'Vigoride' returned Vigoride 3, 5, 6 (USA) but not Vigoride 7 (queried 2026-10-31) [5]
- Launch state
- US (Vandenberg SFB SLC-4E, Falcon 9 Transporter-16, 2026-03-30) [4, 6]
- Canadian link
- none found in the DPhi pages read (homepage, Clustergate-2 release, Clustergate-1 news items) [0, 1, 2]
- Next step
- OmniSat: 'Shared satellite with compute servers onboard to host hardware payloads and software workloads' (no date on the homepage) [1]
1 more item on this system has not passed a check yet. It is in the claims ledger.
- [0] www.dphispace.com, 2026-04-29, operator says
- [1] www.dphispace.com, undated (footer © 2025; news list to 2026-04-29), operator says
- [2] www.dphispace.com, 2024-02-09, operator says
- [3] www.sec.gov, 2026-05-05, operator says
- [4] planet4589.org, 2026-10-29, authority's own record
- [5] www.unoosa.org, queried 2026-10-31, authority's own record
- [6] planet4589.org, 2026-10 (file retrieved 2026-10-31), authority's own record
D-OrbitItalyoperatingnot found
- Power
- not found
- Full name
- D-Orbit Space Cloud Services (on ION Satellite Carrier) [0]
- Operator
- D-Orbit S.p.A. [0, 6]
- Operator's country
- IT [6]
- Partners
- AWS: customer/partner, ran AWS compute and ML software on ION SCV004 (2022) [1]
Planetek Italia and AIKO: AIX in-orbit AI lab, ESA-backed (Skytrail mission) [4]
SpaceX: launch (Transporter rideshares) [3, 7] - Stage
- operating (as of 2022-11-29) [1]
- Satellites flying
- 4 (as of 2026-10-29) [our count of four carriers from four launches (SCV004 2022-01-13, SCV014 2025-01-14, SCV-020 2025-06-23, the 2026-10-01 carrier; SCV003 reentered 2024-12-08 per GCAT); no source states the total] [8, 3, 7, 11]
- Computers on board
- Unibap SpaceCloud iX5-100 (ION SCV003, SCV004): 4 TOPS over AMD CPU and GPU, Microsemi FPGA, Intel Movidius Myriad X VPU; Unibap iX5-106 (SCV014 'Ascend', SCV020 Skytrail); Unibap iX20 (ION launched 2026-10-01) [2, 1, 4, 5, 12]
- Orbit
- Sun-synchronous LEO, about 500-540 km, 97.4-97.5 deg (ASI register entries for ION SCV 003, 004, 014, 020) [6]
- Registered by
- Italy: ION SCV 003, 004, 014 and 020 are in the Italian national register (ASI, edition 01-07-2026) with D-Orbit as operator; UN registration column 'Si' for SCV 003/004, 'No' for SCV-014/020; UNOOSA Online Index shows ION SCV-004 Elysian Eleonora (2022-002K) under Italy in ST/SG/SER.E/1228 [6, 9]
- Canadian link
- none found in D-Orbit advanced-services page, AWS blog, Unibap mission pages, ASI register entries for these carriers [0, 1, 6]
3 more items on this system have not passed a check yet. They are in the claims ledger.
- [0] dorbit.space, undated (footer © 2026), operator says
- [1] aws.amazon.com, 2022-11-29, press report
- [2] unibap.com, undated, operator says
- [3] unibap.com, undated, operator says
- [4] unibap.com, undated, operator says
- [5] unibap.com, undated (mission 2026-10-01), operator says
- [6] www.asi.it, 2026-07-01, authority's own record
- [7] dorbit.space, 2026-10-01, operator says
- [8] planet4589.org, 2026-10-29, directory lists it
- [9] www.unoosa.org, undated (query 2026-11-01), authority's own record
- [11] unibap.com, undated (mission launch date 2025-01-14), operator says
- [12] unibap.com, undated (mission launch date 2025-01-14), operator says
FeatherEdge GEN-2United Statesoperatingnot found
- Power
- not found
- Full name
- FeatherEdge GEN-2 / Orlaith AI on LizzieSat-3 (third-party algorithm integration) [0, 1]
- Operator
- Sidus Space, Inc. [0]
- Operator's country
- US [7]
- Partners
- NVIDIA: Jetson Orin NX module (chip supplier) [2]
SpaceX: launch (Transporter-13) [4] - Stage
- operating (as of 2025-05-16) [3]
- Satellites planned
- not stated for the compute service [0] plan
- Satellites flying
- 1 (as of 2026-10-29) [3, 6]
- Computers on board
- 1x FeatherEdge GEN-2 edge computer (NVIDIA Jetson Orin NX), 100 TOPS as stated [1, 2]
- Orbit
- 512 x 520 km, 97.45 deg (GCAT, LizzieSat-3) [8]
- Launch state
- US (Vandenberg Space Force Base, California) [4]
- Canadian link
- none found in the sources read (Sidus releases of 2025-03-17, 2025-05-16, 2026-09-28) [0, 4, 5]
- Next step
- LizzieSat-4 and LizzieSat-5 on SpaceX Bandwagon-6, no earlier than April 2027 (the release does not say whether they carry FeatherEdge or offer third-party compute) [5]
- [0] sidusspace.com, 2025-05-16, operator says
- [1] sidusspace.com, 2025-05-16, operator says
- [2] sidusspace.com, 2025-05-16, operator says
- [3] sidusspace.com, 2025-05-16, operator says
- [4] investors.sidusspace.com, 2025-03-17, operator says
- [5] investors.sidusspace.com, 2026-09-28, operator says
- [6] planet4589.org, 2026-10-29 (file header 'Updated 2026 Oct 29'), directory lists it
- [7] sidusspace.com, 2025-05-16, operator says
- [8] planet4589.org, 2026-10-29 (file header 'Updated 2026 Oct 29'), directory lists it
Kepler ComputeCanadaoperatingnot found
- Power
- not found
- Full name
- Kepler Compute (on-orbit compute on Kepler's Tranche 1 optical data relay constellation) [0]
- Operator
- Kepler Communications Inc. [0, 1]
- Operator's country
- CA [1, 10]
- Partners
- NVIDIA: chip supplier (Jetson Orin modules) [0]
Axiom Space: customer/hosted compute payloads (ARC 1 and ARC 2) [3]
SpaceX: launch (Falcon 9, Tranche 1) [1]
Rocket Lab: launch (Neutron, first dedicated launch, NET 2028) [2]
Canadian Space Agency: contribution funding ('Orbital Cloud Infrastructure') [10]
Sophia Space (Pasadena, US): customer/software partner under a commercial agreement announced 2026-04-13; deploys its Orbital Data Center software and operates NVIDIA-powered edge compute nodes on Kepler satellites from Q4 2026, and uses the Kepler network for optical and RF data relay [12] - Stage
- operating (as of 2026-03-16) [0, 2]
- Satellites flying
- 10 (as of 2026-10-29) [4]
- Computers on board
- 40x NVIDIA Jetson Orin modules across 10 satellites (introductory capability); release of 2026-01-11 says 'multi-GPU on-orbit compute modules with terabytes of storage' [0, 1]
- Physical facts
- mass: each approximately 300 kilograms (operator); GCAT Mass 300 kg [1, 4]
bus: Kepler Gen2B (GCAT); GCAT Span 6.0 m flagged '?' (uncertain) [4] - Orbit
- GCAT: perigee 601-602 km, apogee 606-612 km, inclination 97.79-97.80 deg, OpOrbit LEO/S (sun-synchronous) [4]
- Filings
- ITU D-ISIPELE-C (ITU coordination request (notice type N, provision 9.6) and Res.49 due-diligence notice), status CR notice received 21.01.2020; RES49 notice received 09.09.2026; notifying administration D (Germany), dated 2020-01-21 [9]
ISED ISIPELE / D-ISIPELE-C (foreign satellite approved to provide FSS in Canada (CPC-2-6-04 list)), status listed, NGSO, downlink 10.7-12.2 and 12.7-13.25 GHz, uplink 13.75-14.5 GHz, dated 2026-08-19 [8]
ISED call sign XJ436 (Inuvik Sat. Station Facility); VF885 (Inuvik CSGI) (earth station radio authorizations naming network D-ISIPELE-C), status in SMS extract; dated 2026-05-28 (XJ436) and 2025-05-12 (VF885), dated 2026-05-28 [7]
CSA 25STDPZ09 (contribution agreement 'Orbital Cloud Infrastructure'), status value CAD 429,262 after amendment 1 of 2026-04-01 (original CAD 500,000); agreement value, not amount paid, dated 2025-09-09 [10] - Registered by
- Canada (ÆTHER-3 to ÆTHER-12, 2026-004M to 2026-004W, ST/SG/SER.E/1367) [6]
- Launch state
- US (Falcon 9 from Vandenberg SFB, SLC-4E) [1, 5]
- Ground stations
- Canada: Inuvik, NT (Inuvik Sat. Station Facility, call sign XJ436; and Inuvik CSGI site, VF885), Kepler Communications Inc. as licensee [7]
- Canadian link
- Canadian operator (Toronto); UN registry state Canada; CSA contribution 25STDPZ09; ISED earth-station authorizations at Inuvik; ITU network notified by Germany and approved in Canada as a foreign FSS satellite; not found in ISED's 'Authorized and Approved Canadian Satellites' table (page dated 2026-08-19) [1, 6, 10, 7, 9, 8, 11]
- Next step
- First dedicated launch on Rocket Lab Neutron, 'scheduled no earlier than 2028', one of several launches planned for 2028 adding on-orbit compute [2]
- [0] kepler.space, 2026-03-16, operator says
- [1] kepler.space, 2026-01-11, operator says
- [2] kepler.space, 2026-08-10, operator says
- [3] kepler.space, 2026-10-06, operator says
- [4] planet4589.org, 2026-10-29, directory lists it
- [5] planet4589.org, 2026-10-29, directory lists it
- [6] www.unoosa.org, undated, authority's own record
- [7] www.ic.gc.ca, 2026-10-05, authority's own record
- [8] ised-isde.canada.ca, 2026-08-19, authority's own record
- [9] www.itu.int, 2026-10-27, authority's own record
- [10] open.canada.ca, 2026-04-01, authority's own record
- [11] ised-isde.canada.ca, 2026-08-19, authority's own record
- [12] www.sophia.space, 2026-04-13, operator says
LEOcloud Space EdgeUnited Statesoperatingnot found
- Power
- not found
- Full name
- LEOcloud Space Edge [0, 2]
- Operator
- Voyager Technologies, Inc. (LEOcloud unit) [0, 1]
- Operator's country
- US [3]
- Partners
- Red Hat: operating system and container software (Podman; RHEL 10.1, UBI) [1, 2]
ISS: host station [0] - Stage
- operating (as of 2026-05-11) [2]
- Orbit
- International Space Station (hosted) [0]
- Registered by
- not determined: hosted on the ISS; module not stated in the releases read [0]
- Launch state
- US (Cape Canaveral LC-40; inferred delivery flight Cygnus NG-23) [4]
- Canadian link
- none found in the Voyager 2025-09-15 release or the Red Hat 2026-05-11 release [0, 2]
- [0] voyagertechnologies.com, 2025-09-15, operator says
- [1] voyagertechnologies.com, 2025-09-15, operator says
- [2] www.redhat.com, 2026-05-11, operator says
- [3] data.sec.gov, 2026-10-27 (latest filing in the record), authority's own record
- [4] planet4589.org, 2026-10-29, directory lists it
Loft OrbitalUnited Statesoperatingnot found
- Power
- not found
- Full name
- Loft Orbital Virtual Missions / on-orbit AI (Ultimate Edge) [0, 1]
- Operator
- Loft Orbital [0]
- Operator's country
- US [2]
- Partners
- NASA Jet Propulsion Laboratory: deployed a vision-language model on Loft infrastructure (per Loft page headline) [0]
- Stage
- operating (as of 2026-08-20) [0]
- Computers on board
- 'High-powered CPUs and GPUs' across Loft's fleet (each satellite 'a unique combination of ... CPUs, GPUs'), unspecified; YAM-6 payloads 'paired with a powerful robust set of CPU and GPU compute options' with 'GPU acceleration' (models and counts not stated) [0, 1]
- Orbit
- YAM-6: 508 x 524 km, 97.46 deg (GCAT) [2]
- Filings
- FCC SAT-LOA-20260513-00196 (YAM-30), SAT-MOD-20260519-00203 (YAC-1, ten satellites) (application / modification), status Pending Review (ICFS, 2026-10-31), dated 2026-07-09 (filed date shown in ICFS for -00196) [3]
- Canadian link
- none found in the two Loft pages read [0, 1]
- Next step
- 'a marketplace of AI agents and software applications will allow users to task satellites directly' (no date stated) [0]
1 more item on this system has not passed a check yet. It is in the claims ledger.
- [0] loftorbital.com, 2026-08-20 (dateModified in page JSON-LD; datePublished 2024-05-16), operator says
- [1] loftorbital.com, undated in text read (pre-launch of Transporter-10, i.e. before 2024-03-04), operator says
- [2] planet4589.org, 2026-10-29, authority's own record
- [3] fccprod.servicenowservices.com, queried 2026-10-31, authority's own record
NOVI smart satellites with SP240 on-board computers: partner and customer software run in orbitUnited Statesoperatingnot found
- Power
- not found
- Full name
- NOVI smart satellites with SP240 on-board computers: partner and customer software run in orbit (GENIE satellites, Missions-as-a-Service) [0, 1]
- Operator
- NOVI Space, Inc. [5]
- Operator's country
- US [5]
- Partners
- Syntiant Corp.: customer AI models run on an SP240 in orbit (demonstration announced 2026-03-26) [4]
AMD: Versal adaptive SoC in the SP240 (chip supplier) [3, 4]
SpaceX: launch (Transporter-12 for LIME; Falcon 9 rideshares for N1-Atlas and N2-P-Body) [2, 8] - Stage
- operating (as of 2026-03-26) [4, 2]
- Satellites planned
- two (2) identical satellites (FCC application) [6] plan
- Satellites flying
- 3 (as of 2026-10-29) [1, 2, 7]
- Computers on board
- SP240 on-board computer on each NOVI smart satellite (AMD Versal adaptive SoC with dual-core ARM Cortex-A72 per press); SP240 datasheet states 12 TOPS ML performance; count per satellite not stated (100 TOPS is the SP360G) [1, 3, 4, 9]
- Physical facts
- mass: approximately thirteen (13) kilograms per satellite (FCC application) [6]
- Orbit
- FCC application: 580 km plus or minus 20 km; GCAT: LIME 511 x 514 km 97.44 deg, N1-Atlas 589 x 594 km 97.76 deg, N2-P-Body 583 x 597 km 97.76 deg [6, 7]
- Filings
- FCC SAT-LOA-20250609-00140 (call sign S3234) (application), status granted with conditions 2025-12-11 (Space Bureau public notice DA 25-1053, Report SAT-01959, 2025-12-12), dated 2025-06-09 [10, 6]
- Launch state
- US (Vandenberg Space Force Base, per GCAT launch site VSFBS for all three) [8]
- Ground stations
- United States: NOVI mission control centre, Arlington, Virginia; commercial ground stations in and outside the US (countries not named in the narrative read) [5]
- Canadian link
- none found in the sources read (novillc.com home, mission summary, on-board computers pages; FCC application narrative) [0, 2, 3, 6]
- Next step
- Cyber-Hardened 3U CubeSat on SpaceX Transporter 21, Q2 2027 [2]
- [0] novillc.com, undated (footer © 2026), operator says
- [1] novillc.com, undated (footer © 2026), operator says
- [2] www.novispace.ai, undated, operator says
- [3] www.novispace.ai, undated, operator says
- [4] smallsatnews.com, 2026-03-27, press report
- [5] api-prod.fcc.gov, 2025-06 (application narrative), operator says
- [6] api-prod.fcc.gov, 2025-06 (application narrative), operator says
- [7] planet4589.org, 2026-10-29 (file header 'Updated 2026 Oct 29'), directory lists it
- [8] planet4589.org, 2026-10-29 (file header 'Updated 2026 Oct 29'), directory lists it
- [9] www.novispace.ai, undated (SP240 datasheet), operator says
- [10] docs.fcc.gov, 2025-12-12, authority's own record
Star-Compute ProjectChinaoperatingnot found
- Power
- not found
- Full name
- Star-Compute Project (星算计划) [0, 2]
- Operator
- Adaspace Technology Co., Ltd. (成都国星宇航科技股份有限公司, ADA Space), Chengdu [0, 7]
- Operator's country
- CN [7]
- Partners
- Zhejiang Lab: Three-Body Computing Constellation; the 2025-05-14 launch was the first of both programs [4]
a Zhejiang research institution (unnamed): strategic framework agreement July 2024; ordered two AI computing satellites and payload services for ten [0]
LandSpace Zhuque-2E Y4: launch of the 02 group [2, 5]
108 universities, institutes, listed companies and investors: co-builders as stated [2] - Stage
- operating (as of 2026-05-14) [0, 1]
- Satellites planned
- up to 2,800 AI computing satellites (2,400 inference, 400 training); first 100 by 2028; thousand-satellite scale and commercial use before 2030; full network before 2035 [0, 2] plan
- Satellites flying
- 20 (as of 2026-10-14) [our sum of launches (12 + 8); no source states the total] [1, 2]
- Computers on board
- 01 group: 12 satellites with aggregate onboard computing up to five POPS (per Frost & Sullivan, in the prospectus); seventh-generation AI payload no less than 10 POPS, for AI satellites launching in 2026; network target 'hundred-thousand-P' (十万P级) inference and 'million-P' (百万P级) training compute [0, 2]
- Physical facts
- thermal (02 group, to be verified in orbit): 万瓦级液冷流体回路 (10-kW-class liquid-cooling fluid loop) [2]
radiator (02 group, to be verified in orbit): 超大尺寸展开式辐冷翼 (extra-large deployable radiative cooling wing), no dimensions stated [2] - Orbit
- 01 group: single orbital plane; 02 group: dawn-dusk orbit; network planned in 500-1000 km dawn-dusk, sun-synchronous and low-inclination orbits [0, 2, 3]
- Filings
- ITU (via China's administration) network names not stated (ITU filings (stated as 'ITU approval')), status operator states ITU approval of 3,156 satellites, dated 2026-05-04 [0]
NDRC not stated (project approval), status approval for development and launch of 60 additional satellites, obtained February 2025 (operator states), dated 2025-02 [0]
MIIT not stated (radio frequency use permit and radio station licence (per satellite)), status operator states requisite permits obtained, including for five pre-December 2023 satellites that lacked the relevant national ministry's pre-production approval (reported to the NDRC), dated 2026-05-04 [7] - Registered by
- not found in UNOOSA Online Index: newest China-registered object there launched 2024-12-19 (all 1086 'China' hits read, 2026-11-01) [6]
- Launch state
- China (Jiuquan Satellite Launch Center 2025-05-14; Dongfeng commercial space innovation test zone 2026-10-14) [4, 2, 5]
- Canadian link
- none found in ADA Space Application Proof sections read (summary, business, regulatory; no 'Canad' string) or the stdaily 2026-10-14 and jiemian 2026-01-26 articles [0, 7, 2, 3]
- Next step
- 03 group in production with orbital deployment planned in 2026 (stated 2026-01-26); first 100 Star-Compute satellites by 2028 [3, 0]
- [0] www1.hkexnews.hk, 2026-05-14, operator says
- [1] cj.sina.com.cn, 2026-05-15, press report
- [2] www.stdaily.com, 2026-10-14, operator says
- [3] m.jiemian.com, 2026-01-26, press report
- [4] www.news.cn, 2025-05-14, operator says
- [5] planet4589.org, 2026-10-29, directory lists it
- [6] www.unoosa.org, 2026-11-01, authority's own record
- [7] www1.hkexnews.hk, 2026-05-14, operator says
StarcloudUnited Statesoperatingnot found
- Power
- not found
Solar arrays: array dimensions: two deployable photovoltaic solar arrays per spacecraft, each approximately 5.0 m by 107.0 m flat plate, 535 kg each (up to 88,000-satellite system design) [2, 1]
array dimensions: gross footprint of the whole satellite approximately 6 x 220 m (up to 88,000-satellite system design) [2, 1] - Full name
- Starcloud Orbital Datacenter System (Starcloud-1, Starcloud-2 and successors) [0, 1]
- Operator
- Starcloud, Inc. [0]
- Operator's country
- US [0]
- Partners
- NVIDIA: chip supplier (H100 on Starcloud-1) [6]
Astro Digital: bus (Corvus platform) [5, 9]
SpaceX: launch (Bandwagon-4 for Starcloud-1; Transporter-19 planned for Starcloud-2) and two Plaser optical terminals on Starcloud-2 [5, 10]
Mynaric: Condor Mk3 optical terminal on Starcloud-2 [5]
Firefly Aerospace: host spacecraft (Elytra orbiter) for Starcloud's SC-1L compute payload in lunar orbit, on Firefly's third lunar mission, launch targeted no earlier than 2028 (commercial payload agreement announced 2026-09-30) [16] - Stage
- operating (as of 2025-12-10) [7]
- Satellites planned
- up to 88,000 satellites [1, 3] plan
- Satellites flying
- 1 (as of 2026-10-29) [9]
- Computers on board
- Starcloud-1: 1x NVIDIA H100 (pre-launch statement); Starcloud-2: 'a GPU cluster' (no count stated by Starcloud) [6, 8]
- Physical facts
- mass: Starcloud-1: 60 kg (NVIDIA, pre-launch); GCAT Mass 50 kg [6, 9]
- Orbit
- System: narrow shells between 600 km and 850 km, sun-synchronous, nominal 06:00 crossing time; Starcloud-1: 508 x 512 km, 45.40 deg (GCAT); Starcloud-2 planned: 561 km +/- 25 km, 97.5 deg, then 06:00 LTAN SSO [1, 9, 5]
- Filings
- FCC SAT-LOA-20260202-00073 (call sign S00803), 'Starcloud Orbital Datacenter System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing PN 2026-03-13 (Report SAT-01982); Space Bureau information request 2026-08-28, response deadline extended to 2026-09-18 (letter of 2026-09-11); Starcloud response dated 2026-09-16; Part 100 supplement 2026-10-20, dated 2026-02-04 [0, 2, 3, 4]
FCC (OET ELS) 0290-EX-CN-2026 (call sign WQ2XLC), Starcloud-2 (experimental licence application), status Pending (status date 03/12/2026), dated 2026-03-12 [11]
FCC (OET ELS) 1019-EX-CN-2024 (call sign WP2XJD), Lumen Orbit, Inc. (experimental licence (Starcloud-1 / Lumen-1 demonstration)), status Grant Expired Due to New License (06/02/2025); successor licence file not identified in this run, dated 2024-11-08 [12] - Registered by
- USA (Starcloud-1, 2025-248L, ST/SG/SER.E/1327; UN remark: submission 'presently being processed') [13]
- Launch state
- US (Starcloud-1: Falcon 9 Bandwagon-4 from Cape Canaveral LC-40) [10]
- Ground stations
- Planned Starcloud-2 TT&C stations: South Africa (Pretoria, RBC), Portugal (Azores, Leaf), Bulgaria (Kaspichan, Leaf), USA (Deadhorse and Fairbanks AK, RBC), Norway (Tromsø, KSAT) [5]
System: Ka-band backup TT&C only (18.8-19.3 GHz down, 28.6-29.1 GHz up); primary communication via optical links to third-party constellations [1] - Canadian link
- Kepler Communications (the Canadian operator in row kepler-compute) is named in Starcloud's FCC narrative (2026-02-04) among optical relay networks its links may use, 'subject to commercial arrangements' (a stated possibility, not an agreement); no Canadian licence, gateway, funding or customer found in ISED TAFL_LTAF_Satellite extract (2026-10-05 build), ISED foreign FSS list and authorized Canadian satellites (both 2026-08-19), Starcloud-2 ground-station list [14, 5, 15]
- Next step
- Starcloud-2 on a SpaceX Falcon 9 Transporter-19 mission; 'fully operational in sun-synchronous orbit by 2027' [5, 8]
3 more items on this system have not passed a check yet. They are in the claims ledger.
- [0] fccprod.servicenowservices.com, undated (live record; Status Date 2026-02-05), authority's own record
- [1] api-prod.fcc.gov, 2026-02-04, operator says
- [2] api-prod.fcc.gov, 2026-09-16, operator says
- [3] api-prod.fcc.gov, 2026-09-11, authority's own record
- [4] api-prod.fcc.gov, 2026-10-20, operator says
- [5] apps.fcc.gov, 2026-07-21, operator says
- [6] blogs.nvidia.com, 2025-10-15, operator says
- [7] www.cnbc.com, 2025-12-10, press report
- [8] www.starcloud.com, undated, operator says
- [9] planet4589.org, 2026-10-29, directory lists it
- [10] planet4589.org, 2026-10-29, directory lists it
- [11] apps.fcc.gov, 2026-03-12, authority's own record
- [12] apps.fcc.gov, 2025-06-02, authority's own record
- [13] www.unoosa.org, undated, authority's own record
- [14] www.ic.gc.ca, 2026-10-05, authority's own record
- [15] api-prod.fcc.gov, 2026-02-04, operator says
- [16] fireflyspace.com, 2026-09-30, operator says
Three-BodyChinaoperatingnot found
- Power
- not found
- Full name
- Three-Body Computing Constellation (三体计算星座) [0, 3]
- Operator
- Zhejiang Lab (之江实验室), Hangzhou [0, 1, 5]
- Operator's country
- CN [0]
- Partners
- ADA Space (国星宇航, Adaspace Technology Co., Ltd.): satellite platform and whole-satellite build for the first launch; same launch is the first of its Star-Compute plan [2, 0]
氦星光联: laser communication terminals (24 sets on the first-launch satellites) [1]
Fudan University and Shanghai Academy of AI for Science (Fuxi, Dayu models) and Hangzhou Mita (Puyun model): weather models on Xiguang-2 03 [4] - Stage
- operating (as of 2026-07-28) [5, 3]
- Satellites planned
- 千星规模 (thousand-satellite scale); Zhejiang Lab expects thousand-satellite scale by 2032 (per CLS); 2026 target: more than 50 computing satellites with several satellite firms [0, 6, 1] plan
- Satellites flying
- 14 (as of 2026-07-24) [our sum of launches (12 + 2); no source states the total] [3, 4]
- Computers on board
- first 12 satellites: up to 744 TOPS per satellite, 5 POPS aggregate, 30 TB storage; 8-billion-parameter space-based model on board; built-out target 1000 POPS [2]
- Orbit
- about 488-491 x 503-506 km, 97.4 deg (sun-synchronous) per GCAT; 12 satellites in a single orbital plane per ADA Space [7, 10]
- Registered by
- not found in UNOOSA Online Index: newest China-registered object there launched 2024-12-19 (all 1086 'China' hits read, 2026-11-01); China's latest UN submission listed is ST/SG/SER.E/1315 (2026) [9]
- Launch state
- China (Jiuquan Satellite Launch Center 2025-05-14; Dongfeng commercial space innovation test zone 2026-07-24) [0, 4, 8]
- Ground stations
- China: Three-Body Computing Constellation command centre at Zhejiang Lab, Hangzhou [1]
- Canadian link
- none found in the Xinhua (2025-05-14, 2025-12-31, 2026-02-13, 2026-07-28), Chinanews 2026-07-24 and CLS 2026-07-30 articles read [0, 1, 3, 4, 5, 6]
- Next step
- 2026: complete a constellation layout of more than 50 computing satellites with several satellite firms (stated 2025-12-31); AI models on the July satellites in on-orbit verification, stage results expected in about three months (stated 2026-07-30) [1, 6]
2 more items on this system have not passed a check yet. They are in the claims ledger.
- [0] www.news.cn, 2025-05-14, operator says
- [1] www.news.cn, 2025-12-31, operator says
- [2] cs.com.cn, 2025-05-14, operator says
- [3] www.news.cn, 2026-02-13, operator says
- [4] www.chinanews.com.cn, 2026-07-24, operator says
- [5] www.news.cn, 2026-07-28, operator says
- [6] www.cls.cn, 2026-07-30, press report
- [7] planet4589.org, 2026-10-29, directory lists it
- [8] planet4589.org, 2026-10-29, directory lists it
- [9] www.unoosa.org, 2026-11-01, authority's own record
- [10] www1.hkexnews.hk, 2026-05-14, operator says
Show all 48Show fewer
Tiansuan ConstellationChinaoperatingnot found
- Power
- not found
- Full name
- Tiansuan Constellation (天算星座) [0, 1]
- Operator
- Beijing University of Posts and Telecommunications (北京邮电大学, BUPT), Star Network and Intelligent Computing Laboratory (星网与智能计算实验室) [0, 1]
- Operator's country
- CN [1]
- Partners
- Changsha Tianyi Research Institute (长沙天仪研究院, Spacety): co-developer of BUPT-2 and BUPT-3 [2]
more than 60 institutions supported in orbital tests [1] - Stage
- operating (as of 2026-09-01) [1]
- Satellites planned
- phase 1: 6 satellites; phase 2: 24 satellites; phase 3: 300 satellites [0, 2] plan
- Computers on board
- BUPT-2 and BUPT-3 carry a 'space server' (太空服务器) among their payloads; no aggregate figure stated in sources read [2]
- Orbit
- BUPT-2/BUPT-3: about 517 x 524 km, 97.42 deg (sun-synchronous) per GCAT [5]
- Registered by
- BUPT-1 (2023-007) registered by China, ST/SG/SER.E/1237; BUPT-2/BUPT-3 (2025-103E/F) not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01) [6]
- Launch state
- China (BUPT-2/3: Dongfeng commercial space innovation test zone, Jiuquan, 2025-05-17) [3, 7]
- Ground stations
- seven ground stations (countries not stated) [1]
- Canadian link
- none found in Beijing Review/Xinhua 2026-09-01, China Daily 2025-05-19, The Paper 2025-05-17 or the tiansuan.org.cn bundle text [1, 2, 3, 0]
- Next step
- phase 2 to total 24 satellites (no date stated) [2]
1 more item on this system has not passed a check yet. It is in the claims ledger.
- [0] www.tiansuan.org.cn, undated, operator says
- [1] www.bjreview.com, 2026-09-01, operator says
- [2] cn.chinadaily.com.cn, 2025-05-19, operator says
- [3] m.thepaper.cn, 2025-05-17, operator says
- [5] planet4589.org, 2026-10-29, directory lists it
- [6] www.unoosa.org, 2026-11-01, authority's own record
- [7] planet4589.org, 2026-10-29, directory lists it
AltairUnited Arab Emirateslaunchednot found
- Power
- not found
- Full name
- Altair [0, 3]
- Operator
- Orbitworks Satellites Manufacturing L.L.C. S.P.C. (joint venture of Marlan Space and Loft Orbital) [0]
- Operator's country
- AE [0]
- Partners
- Loft Orbital: JV partner, satellite integrator [0]
Marlan Space (IHC subsidiary): JV partner [0]
NVIDIA: onboard GPUs (chip supplier) [0]
SpaceX: launch (Transporter-18) [0]
Mistral, BlackSky, MaiaSpace: Altair-Next Gen consortium members (MaiaSpace preferred launch partner) [1] - Stage
- launched (as of 2026-10-01) [0, 4]
- Satellites planned
- 10 (Altair); initial phase of fifty satellites for Altair-Next Gen [0, 1] plan
- Satellites flying
- 1 (as of 2026-10-02) [0]
- Computers on board
- Onboard NVIDIA GPUs (model and count not stated) [0]
- Registered by
- not found in UNOOSA Online Index (exact-name queries 'Altair-1', 'ALTAIR-1'; UAE state-of-registry list, first page of 35) on 2026-11-01; launch post-dates the index's latest entries (about 2026-09-16) [5]
- Launch state
- US (Vandenberg Space Force Base, California) [0]
- Canadian link
- none found in Orbitworks press releases of 2026-09-09 and 2026-10-02 and the Altair page [0, 1, 3]
- Next step
- The other nine satellites will follow through 2027 [0]
- [0] orbitworks.space, 2026-10-02, operator says
- [1] orbitworks.space, 2026-09-09, operator says
- [3] orbitworks.space, undated, operator says
- [4] planet4589.org, 2026-10-29, directory lists it
- [5] www.unoosa.org, undated (query 2026-11-01), authority's own record
Mingzhu Constellation PlanChinalaunchedplan gigawatt-class
- Power
- gigawatt-class (吉瓦级), no figure stated (long-term goal for the planned constellation, per system) [0, 2] plan
- Full name
- Mingzhu Constellation Plan (明珠星座计划), Shanghai [0, 1]
- Operator
- Shanghai Dongfang Tiansuan Technology Co., Ltd. (上海东方天算科技有限公司), 'chain leader', with Shanghai Jiao Tong University and partners [0, 1]
- Operator's country
- CN [0]
- Partners
- Shanghai Jiao Tong University: research partner [0]
27 partners incl. CAS Innovation Academy for Microsatellites, Shanghai Institute of Space Power Sources, Shanghai Institute of Satellite Engineering, Alibaba Cloud, iFlytek, Biren, Iluvatar CoreX: industry cooperation agreements [2]
ADA Space: host satellites (Star-Compute 02 group, incl. XSD-44 'Dongfang Tiansuan') [1] - Stage
- launched (as of 2026-10-14) [1, 3]
- Satellites planned
- long-term goal: gigawatt (GW)-class space-based computing constellation; global coverage by 2030 (no satellite count stated) [0, 2] plan
- Computers on board
- payload computing core peak about 2 PFLOPS per payload set, 16 TB local storage; carried on six satellites of the 2026-10-14 batch [1]
- Orbit
- dawn-dusk orbit (host Star-Compute 02 group) [1]
- Registered by
- not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01) [4]
- Launch state
- China (Dongfeng commercial space innovation test zone, Jiuquan; Zhuque-2E Y4) [1, 3]
- Canadian link
- none found in the China Securities Journal (2026-09-22), Jiemian (2026-09-13) and Securities Daily (2026-10-15) articles read [0, 1, 2]
- Next step
- continued in-orbit verification of domestic compute payloads, optical computing payloads and new energy systems, then first-batch deployment and constellation networking; built out by 2030 [0]
- [0] www.cs.com.cn, 2026-09-22, operator says
- [1] cj.sina.com.cn, 2026-10-15, operator says
- [2] m.jiemian.com, 2026-09-13, press report
- [3] planet4589.org, 2026-10-29, directory lists it
- [4] www.unoosa.org, 2026-11-01, authority's own record
Project SuncatcherUnited Stateslaunchednot found
- Power
- not found
- Full name
- Project Suncatcher [0, 1]
- Operator
- Google (Google Research, 'Paradigms of Intelligence') [0]
- Operator's country
- US [3]
- Partners
- Planet: satellite builder/partner for the prototype [0, 1]
SpaceX: launch (Transporter-18 rideshare) [0, 2] - Stage
- launched (as of 2026-10-01) [0, 2]
- Satellites planned
- illustrative 81-satellite constellation configuration (design study); 'two prototype satellites by early 2027' (Nov 2025 plan) [1] plan
- Satellites flying
- 1 (as of 2026-10-01) [0]
- Computers on board
- Google TPUs (count not stated); Trillium (v6e Cloud TPU) radiation-tested on the ground [0, 1]
- Orbit
- planned constellation 'likely operating in a dawn–dusk sun-synchronous low earth orbit'; prototype orbit not stated [1]
- Launch state
- US (Transporter-18: Falcon 9 from Vandenberg SFB SLC-4E, 2026-10-01) [2]
- Next step
- 'a learning mission in partnership with Planet, slated to launch two prototype satellites by early 2027' (stated 2025-11-04; on 2026-10-01 one prototype launched) [1, 0]
- [0] blog.google, 2026-10-01, operator says
- [1] research.google, 2025-11-04, operator says
- [2] planet4589.org, 2026-10-29, directory lists it
- [3] planet4589.org, 2026-10-29, directory lists it
Space StringChinalaunchednext satellite 11.5 kW
- Power
- 11.5 kW (compute, per satellite) [2] next satellite
- Full name
- Space String computing constellation (太空之弦计算星座) [0, 1]
- Operator
- Dongfang Xinglian Spatiotemporal Intelligence (Shandong) Technology Development Co. (东方星链时空智能(山东)技术发展有限公司): overall design and operation; STAR.VISION (地卫二空间技术(杭州)有限公司): AI capability and international market [0, 1]
- Operator's country
- CN [0]
- Partners
- Hangzhou Tianji Zhinao Aerospace Technology (杭州天基智脑航天科技): joint development of computing satellites [0]
Galactic Energy (星河动力, Ceres-2) and Orienspace (东方空间, Gravity-1): dedicated launch cooperation agreements [0]
Agricultural Bank of China and ICBC: strategic credit agreements of RMB 5 billion each (first tranche RMB 0.5 billion each) [0]
Indonesia's National Research and Innovation Agency and Uzcosmos (Uzbekistan): owners of the two first inference verification satellites, bought from STAR.VISION [3] - Stage
- launched (as of 2026-08-05) [2, 3, 6]
- Satellites planned
- more than 1,000 (超千颗 / 一千颗以上); one account: 720+ data (inference) satellites in a business layer and 360+ computing (training) satellites in dawn-dusk orbits [0, 1, 4] plan
- Satellites flying
- 2 (as of 2026-08-05) [2, 3]
- Computers on board
- first two satellites: STAR.VISION 'Xian' (弦) AI onboard computing platform; G1 design peak about 40-60 PFLOPS FP8, G2 160-310 PFLOPS, G3 460-1000 PFLOPS (design estimates from a reference configuration) [2, 5]
- Physical facts
- mass: 300 kg each (Lampung-1 / Samarqand-2028, also Dongfang Xinglian 05/06) [3]
- Orbit
- first two satellites: sun-synchronous; computing layer planned in dawn-dusk orbits [3, 4]
- Registered by
- not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01); state of registry for the two satellites owned by Indonesian and Uzbek agencies not established [7]
- Launch state
- China (sea launch from the Yellow Sea near Haiyang, Shandong; Jielong-3 Y12) [3, 6]
- Canadian link
- none found in the Yicai (2026-09-26), Tide News (2026-09-25), 36Kr (2026-09-30), ifeng (2026-09-27), NBD (2026-09-29) and China in Space (2026-08-05) articles read [0, 1, 2, 3, 4, 5]
- Next step
- G1 verification satellite launch expected Q4 2027 (36Kr says '2027') [4, 2]
- [0] finance.sina.cn, 2026-09-26, press report
- [1] tidenews.com.cn, 2026-09-25, press report
- [2] eu.36kr.com, 2026-09-30, press report
- [3] www.china-in-space.com, 2026-08-05, press report
- [4] tech.ifeng.com, 2026-09-27, press report
- [5] www.mrjjxw.com, 2026-09-29, press report
- [6] planet4589.org, 2026-10-29, directory lists it
- [7] www.unoosa.org, 2026-11-01, authority's own record
SupersmartcomputeChinalaunchednot found
- Power
- not found
- Full name
- Supersmartcompute intelligent-computing constellation (超智算·智算星座), first satellite Super Intelligent Computing-1 (超智算一号) [0, 1]
- Operator
- Supersmartcompute (Beijing) Technology Co., Ltd. (超智算(北京)科技有限公司) [1]
- Operator's country
- CN [1]
- Partners
- CAS Space (北京中科宇航技术有限公司): Lijian-1 Y18 launch, rocket named '超智算号'; co-organiser of the May 2026 event [0, 1]
Shanghai Xuntian Qianhe Space Technology and Shanghai Institute of Aerospace Electronic Technology: co-organisers of the May 2026 event (role in the satellite not stated) [1]
Zhongguancun Shijingshan Park administration / Shijingshan district science commission: co-host [1] - Stage
- launched (as of 2026-09-20) [0, 2]
- Satellites planned
- 千颗级 (thousand-satellite-class) LEO computing constellation [1] plan
- Satellites flying
- 1 (as of 2026-09-20) [0]
- Registered by
- not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01) [3]
- Launch state
- China (Jiuquan Satellite Launch Center; Lijian-1 Y18) [0, 2]
- Canadian link
- none found in the Science and Technology Daily articles of 2026-05-31 and 2026-09-22 [0, 1]
- Next step
- steady roll-out of a thousand-satellite LEO computing constellation (no date stated) [1]
- [0] www.stdaily.com, 2026-09-22, press report
- [1] www.stdaily.com, 2026-05-31, operator says
- [2] planet4589.org, 2026-10-29, directory lists it
- [3] www.unoosa.org, 2026-11-01, authority's own record
YaotaiChinalaunchednot found
- Power
- not found
- Full name
- 瑶台 (Yaotai) space computing satellites / 太空算力中心 (space AI computing centre) [0, 1]
- Operator
- 芯际穿越 (Xinji Chuanyue), an 'ecosystem company' (生态企业) of 追觅科技 (Dreame Technology) [0]
- Operator's country
- CN [0, 1]
- Partners
- 追觅科技 (Dreame Technology): parent ecosystem; announced the plan at its AWE 2026 chip forum [0]
- Stage
- launched (as of 2026-03-16) [1, 2]
- Satellites planned
- 最终目标是构建一个由 200 万颗卫星组成的庞大网络 (ultimate goal: a network of 2,000,000 satellites) [0] plan
- Satellites flying
- 1 (as of 2026-03-18) [1]
- Computers on board
- '瑶台系列太空算力盒' (Yaotai space computing box); chip type and count not stated [0]
- Orbit
- 约561千米的太阳同步轨道 (about 561 km sun-synchronous orbit) per 36Kr; GCAT launch.tsv gives 528 x 545 km, 97.5 deg for launch 2026-052 (GCAT satcat: seven of eight payloads at 528 x 540-545 km, 97.54 deg) (conflict noted) [1, 2]
- Launch state
- CN (Jiuquan, Kuaizhou-11 Y7, 2026-03-16) [1, 2]
- Canadian link
- none found in the ITHome (2026-03-11) and 36Kr (2026-03-18) articles [0, 1]
- [0] www.ithome.com, 2026-03-11, press report
- [1] eu.36kr.com, 2026-03-18, press report
- [2] planet4589.org, 2026-10 (retrieved 2026-10-31), authority's own record
Orbital Datacenter SystemUnited Statesfiledplan 250 kW
- Power
- 250 kW (planned peak, 'approaching', per satellite (Orbital-1)) [3] plan
- Full name
- Orbital Datacenter System (Orbital Compute Inc.; first satellite Orbital-1) [0, 3]
- Operator
- Orbital Compute Inc. [0, 1]
- Operator's country
- US [0, 3]
- Partners
- Reflex Aerospace (Germany): satellite bus platform designer and space-system integrator for Orbital-1 and the constellation, exclusive for orbital compute [3]
- Stage
- filed (as of 2026-06-24) [0, 1]
- Satellites planned
- up to 100,000 satellites (7 shells; nominal 14,300 per shell in S1-S6 and 14,200 in S7, max 25,000 per shell, system cap 100,000) [1, 5] plan
- Satellites flying
- 0 (as of 2026-10-29) [6]
- Physical facts
- solar array area: ~260 m² (two wings), preliminary [4]
radiator area: ~100 m², preliminary [4]
mass: dry mass ~2,000 kg, preliminary [4] - Orbit
- sun-synchronous circular orbits at 500-850 km, nominal 06:00 LTAN; shells S1-S7 at 525-825 km, inclinations 97.50-98.71 deg [2, 5]
- Filings
- FCC SAT-LOA-20260624-00251 (call sign S00867), 'Orbital Compute Inc. — Orbital Datacenter System (LOA)' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02024 (2026-07-31); Space Bureau request 2026-08-28; Orbital response 2026-09-11 (filed 2026-09-10) requesting until 2026-12-10 for remaining items, dated 2026-06-24 [0, 1, 4]
FCC Public Notice Report No. SAT-02024 (SAT-LOA-20260624-00251, S00867) (public notice: application accepted for filing), status accepted for filing, dated 2026-07-31 [same application as filings#1; not a separate filing] [7] - Ground stations
- back-up TT&C only (18.8-19.3 GHz down, 28.6-29.1 GHz up); traffic via optical inter-satellite links with other commercial LEO systems; gateway locations not stated in the PN [1]
- Canadian link
- none found in the FCC public notice, narrative and 2026-09-11 response [1, 2, 4]
- Next step
- File the compatibility analysis and NASA DAS demonstrations with the FCC by the requested date of 2026-12-10 [4]
6 more items on this system have not passed a check yet. They are in the claims ledger.
- [0] fccprod.servicenowservices.com, undated (live record; Status Date 2026-07-15), authority's own record
- [1] docs.fcc.gov, 2026-07-31, authority's own record
- [2] api-prod.fcc.gov, 2026-06, operator says
- [3] www.reflexaerospace.com, 2026-09-10, operator says
- [4] api-prod.fcc.gov, 2026-09-11, operator says
- [5] api-prod.fcc.gov, 2026-09-11, operator says
- [6] planet4589.org, 2026-10-29, directory lists it
- [7] docs.fcc.gov, 2026-07-31, authority's own record
Project SunriseUnited Statesfilednot found
- Power
- not found
Solar arrays: array dimensions: not provided: asked by the FCC for physical dimensions incl. solar panels, Blue Origin answered that its 'space station design is maturing' and dimensions will come in a future orbital debris assessment report [2] - Full name
- Project Sunrise (Blue Origin Orbital Data Center System) [0, 1]
- Operator
- Blue Origin, LLC [0]
- Operator's country
- US [0]
- Stage
- filed (as of 2026-03-19) [0, 1]
- Satellites planned
- up to 51,600 satellites [1] plan
- Satellites flying
- 0 (as of 2026-10-29) [3]
- Orbit
- circular, sun-synchronous orbits from 500-1,800 km altitude, inclinations between 97 and 104 degrees; up to 131 altitudes, one plane per altitude band, maximum 450 satellites per altitude (2026-09-18 response; the 2026-03-19 narrative had said approximately 300-1,000 satellites per orbital plane) [1, 4]
- Filings
- FCC SAT-LOA-20260310-00118 (call sign S00830), 'Project Sunrise' (application (launch and operating authority, NGSO)), status Pending Payment (status date 2026-03-19); accepted for filing PN 2026-04-17; Space Bureau information request of 2026-08-28; Blue Origin response 2026-09-18, dated 2026-03-19 [0, 2]
- Ground stations
- No gateway locations stated in the narrative: traffic routed 'through its TeraWave system and other mesh backhaul networks to transmit to the ground'; Ka-band TT&C for early, post-mission and emergency phases [1]
1 more item on this system has not passed a check yet. It is in the claims ledger.
- [0] fccprod.servicenowservices.com, undated (live record; Status Date 2026-03-19), authority's own record
- [1] api-prod.fcc.gov, 2026-03-19, operator says
- [2] api-prod.fcc.gov, 2026-09-18, operator says
- [3] planet4589.org, 2026-10-29, directory lists it
- [4] api-prod.fcc.gov, 2026-09-18, operator says
SpaceXUnited Statesfilednot found
- Power
- not found
- Full name
- SpaceX Orbital Data Center System [0, 2]
- Operator
- Space Exploration Holdings, LLC (SpaceX) [0, 2]
- Operator's country
- US [0, 4]
- Stage
- filed (as of 2026-01-30) [0, 2]
- Satellites planned
- up to one million satellites [1, 2] plan
- Satellites flying
- 0 (as of 2026-10-29) [5]
- Orbit
- narrow orbital shells spanning up to 50 km each, between 500 km and 2,000 km altitude, 30 degrees and sun-synchronous inclinations [1, 2]
- Filings
- FCC SAT-LOA-20260108-00016 (call sign S00798), 'SpaceX Orbital Data Center System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing by Public Notice DA 26-113 released 2026-02-04 (comments due 2026-03-06), dated 2026-01-30 [0, 2]
- Ground stations
- No dedicated gateways stated: traffic routed over optical links to Starlink, 'which in turn will transmit traffic to authorized earth stations on the ground'; Ka-band TT&C requested: 18.8-19.3 GHz down and 28.6-29.1 GHz up per SpaceX's narrative (2026-01-30); 18.3-19.3 GHz down and 28.6-29.1 GHz up per the FCC's public notice DA 26-113 (2026-02-04) [1, 2, 6, 7]
1 more item on this system has not passed a check yet. It is in the claims ledger.
- [0] fccprod.servicenowservices.com, undated (live record; Status Date 2026-01-30), authority's own record
- [1] api-prod.fcc.gov, 2026-01-30, operator says
- [2] api-prod.fcc.gov, 2026-02-04, authority's own record
- [4] planet4589.org, 2026-10-29, directory lists it
- [5] planet4589.org, 2026-10-29, directory lists it
- [6] api-prod.fcc.gov, 2026-01-30, operator says
- [7] api-prod.fcc.gov, 2026-02-04, authority's own record
Stampede Data Center SystemUnited Statesfilednot found
- Power
- not found
Solar arrays: array dimensions: each solar panel array approximately 57 m by 30 m, two arrays of equal size ('system is still under active design') [4] - Full name
- Stampede Data Center System [0, 1]
- Operator
- Cowboy Space Corp. [0]
- Operator's country
- US [0]
- Partners
- NVIDIA: planned chip supplier (Space-1 Vera Rubin Module) [2]
- Stage
- filed (as of 2026-05-11) [0, 1]
- Satellites planned
- up to 20,000 satellites [3] plan
- Satellites flying
- 0 (as of 2026-10-29) [3]
- Computers on board
- NVIDIA Space-1 Vera Rubin Module (partnership stated; count not stated) [2]
- Orbit
- dawn-dusk sun-synchronous orbits in shells between 700 and 1000 km altitude [3, 1]
- Filings
- FCC SAT-LOA-20260323-00135 (call sign S00851), 'Stampede Data Center System Application' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02007 (2026-06-12); Space Bureau request 2026-08-28; Cowboy response 2026-09-18; bond/milestone waiver supplement 2026-10-28, dated 2026-05-11 [0, 1, 4]
- Ground stations
- Ka-band TT&C requested (18.8-19.3 GHz down, 28.6-29.1 GHz up); gateway locations not read [1]
- Next step
- 'Launch of the first data center satellite in Stampede is targeted for 2028' [3]
4 more items on this system have not passed a check yet. They are in the claims ledger.
- [0] fccprod.servicenowservices.com, undated (live record; Status Date 2026-05-19), authority's own record
- [1] docs.fcc.gov, 2026-06-12, authority's own record
- [2] api-prod.fcc.gov, 2026-05-11, operator says
- [3] api-prod.fcc.gov, 2026-05-11, operator says
- [4] api-prod.fcc.gov, 2026-09-18, operator says
Adagio-XLUnited Statesannouncedplan 100 kW power generation · plan 200 kW power generation
- Power
- 100 kW (power generation (Adagio-XL, launch aimed for late 2029), per satellite) [0] plan
200 kW (power generation on later iterations of Adagio-XL, per satellite) [0] plan - Full name
- Adagio-XL [0]
- Operator
- Symphony Space [0]
- Operator's country
- US [0]
- Partners
- Catalyst Data Centers: terrestrial data-centre developer, agreement (May 2026) for customer pipeline and data-centre design expertise [0]
- Stage
- announced (as of 2026-06-10) [0]
- Satellites flying
- 0 (as of 2026-06-10) [0]
- Physical facts
- payload capacity: 1,200 kg (same as Adagio) [0]
design life: 15 years on orbit; up to eight GPU-generation upgrades via robotic arm [0] - Canadian link
- none found in the Payload article (2026-06-10) [0]
- Next step
- launch targeted for late 2029 [0]
- [0] payloadspace.com, 2026-06-10, press report
ASCENDFranceannouncedplan 1 GW
- Power
- 1 GW (planned constellation, per system) [0] plan
- Full name
- ASCEND (Advanced Space Cloud for European Net zero emission and Data sovereignty) [0]
- Operator
- Thales Alenia Space (study coordinator; no operator named for a deployed system) [0, 1]
- Operator's country
- FR [1]
- Partners
- Carbone 4, VITO: environmental aspects [0]
Orange Business, CloudFerro, Hewlett Packard Enterprise: cloud computing [0]
ArianeGroup: launchers [0]
DLR, Airbus Defence & Space: orbital systems [0]
European Commission (Horizon Europe): funder of the feasibility study, EUR 2,047,882 EU contribution [0, 1] - Stage
- announced (as of 2024-06-27) [0]
- Satellites planned
- one gigawatt before 2050 (capacity target; no satellite count stated) [0] plan
- Satellites flying
- 0 (as of 2024-06-27) [0]
- Registered by
- not applicable (study) [1]
- Canadian link
- none found in the Thales Alenia Space PR of 2024-06-27 or the CORDIS project page [0, 1]
- Next step
- Thales Alenia Space and its partners now intend to pursue the ASCEND feasibility study to consolidate and optimize its results (undated) [0]
1 more item on this system has not passed a check yet. It is in the claims ledger.
- [0] www.thalesaleniaspace.com, 2024-06-27, operator says
- [1] cordis.europa.eu, 2025-11-11 (last update), authority's own record
CASCChinaannouncedplan gigawatt-class
- Power
- gigawatt-class (吉瓦级), no figure stated (planned infrastructure (太空数智基础设施), per system) [0] plan
- Full name
- CASC gigawatt-class space digital-intelligence infrastructure (吉瓦级太空数智基础设施), 15th Five-Year Plan new-domain goal [0]
- Operator
- China Aerospace Science and Technology Corporation (中国航天科技集团, CASC) [0]
- Operator's country
- CN [0]
- Stage
- announced (as of 2026-01-29) [0]
- Satellites flying
- 0 (as of 2026-01-29) [0]
- Registered by
- not applicable: no object announced [0]
- Canadian link
- none found in the CCTV text carried by Huanqiu 2026-01-29 [0]
- [0] china.huanqiu.com, 2026-01-29, operator says
CNSA-led special feasibility study of a 'space intelligent computing constellation'Chinaannouncednot found
- Power
- not found
- Full name
- 太空智能算力星座专项论证 (CNSA-led special feasibility study of a 'space intelligent computing constellation') [0]
- Operator
- China National Space Administration (国家航天局, CNSA), lead of the study [0]
- Operator's country
- CN [0]
- Stage
- announced (as of 2026-04-07) [0]
- Satellites planned
- not stated [0] plan
- Computers on board
- not stated [0]
- Orbit
- not stated [0]
- Canadian link
- none found in the source read (Xinhua, 2026-04-07) [0]
- Next step
- not stated [0]
- [0] www.news.cn, 2026-04-07, press report
ComospaceChinaannouncednot found
- Power
- not found
- Full name
- Comospace (中科天算) 'Tiansuan Plan' (天算计划) space supercomputing network, with the Hangsheng/Comospace/Yanhe two-satellite compute demo [1, 0]
- Operator
- Comospace (中科天算), with Hangsheng Satellite (航升卫星) as satellite integrator for the demo [1, 0]
- Operator's country
- CN [1]
- Partners
- Hangsheng Satellite (航升卫星): satellite platform and integrated design; build, integration, launch and in-orbit verification of two computing satellites [0]
Yanhe Technology (炎和科技): dedicated perovskite solar wings [0, 1] - Stage
- announced (as of 2026-04-21) [0]
- Satellites planned
- two computing satellites launched and verified before March 2027; a commercial space computing constellation (no count stated) [0] plan
- Satellites flying
- 0 (as of 2026-04-22) [0]
- Computers on board
- supercomputing-node prototype on a multi-card full-size GPU architecture using domestic high-performance GPUs; 2030 target: 10,000-card-class space supercomputing centre [1]
- Physical facts
- solar array: dedicated perovskite solar wings from Yanhe Technology (no dimensions stated) [0]
- Registered by
- not applicable: no launch found [0]
- Canadian link
- none found in the Shanghai Securities News (2026-04-22) and 36Kr (2026-03-12) articles read [0, 1]
- Next step
- prototype supercomputing node to launch in H2 2026 (stated 2026-03-12); two computing satellites launched and verified in orbit before March 2027 (stated 2026-04-22) [1, 0]
- [0] finance.eastmoney.com, 2026-04-22, operator says
- [1] eu.36kr.com, 2026-03-12, press report
Hanwha SystemsSouth Koreaannouncednot found
- Power
- not found
- Full name
- Hanwha Systems orbiting AI data center (AI data center in space) [0]
- Operator
- Hanwha Systems (Hanwha Group) [0]
- Operator's country
- KR [0]
- Partners
- Hanwha Aerospace: launch vehicles (group company) [0]
- Stage
- announced (as of 2026-07-03) [0]
- Satellites flying
- 0 (as of 2026-07-03) [0]
- Physical facts
- solar array: 'new high-efficiency solar panels' (no size stated) [0]
- Orbit
- 400 kilometers [0]
- Registered by
- not applicable (not launched) [0]
- Ground stations
- KR: defense AI data center in Changwon, South Gyeongsang (integrates information collected across space, land, sea and air; 45 MW initially, 135 MW by 2032 per press) [0]
- Canadian link
- none found in Korea JoongAng Daily 2026-07-03 [0]
- Next step
- no date stated for the data center; Hanwha Systems plans to launch and operate 64 SAR satellites by 2031 (data source for it); group investment horizon 2040 [0]
- [0] www.koreajoongangdaily.com, 2026-07-03, press report
Madari SpaceUnited Arab Emiratesannouncednot found
- Power
- not found
- Full name
- Madari Space orbital data centre (pilot) [0]
- Operator
- Madari Space [0, 1]
- Operator's country
- AE [1]
- Partners
- INNOSPACE (Korea): MoU on joint development and commercialisation of space data centres, launch and satellite-operation services [1]
Mohammed Bin Rashid Innovation Fund (UAE Ministry of Finance): support [1] - Stage
- announced (as of 2025-08-04) [0]
- Satellites planned
- pilot data centre in LEO; later phase envisioned in cislunar space (no count stated) [0] plan
- Satellites flying
- 0 (as of 2026-10-29) [2]
- Orbit
- Low Earth Orbit (pilot) [0]
- Registered by
- not applicable (no launch found) [2]
- Canadian link
- none found in RCR Wireless 2025-08-04 or SmallSat News 2025-11-19 [0, 1]
- Next step
- launch a data center into Low Earth Orbit (LEO) in the third quarter of 2026 (stated 2025; passed with no launch found) [0, 2]
- [0] www.rcrwireless.com, 2025-08-04, press report
- [1] smallsatnews.com, 2025-11-19, press report
- [2] planet4589.org, 2026-10-29, directory lists it
NeevCloudIndiaannouncednot found
- Power
- not found
- Full name
- NeevCloud AI Data Centre in Space (with Agnikul Cosmos) [0]
- Operator
- NeevCloud (RackBank Datacenters Private Limited) [0]
- Operator's country
- IN [0]
- Partners
- Agnikul Cosmos Private Limited (Chennai): launch vehicle and orbital hosting platform on its extendable upper stage [0]
- Stage
- announced (as of 2026-02-12) [0]
- Satellites planned
- first pilot, then '600+ orbital edge data centers over the next three years' after validation [0] plan
- Satellites flying
- 0 (as of 2026-11-01) [2]
- Computers on board
- high-performance AI inference nodes (chips and counts not stated) [0]
- Physical facts
- bus: Agnikul rocket upper stage 'including the top nozzle will remain in low Earth orbit and be repurposed as a fully functional space-based data centre' [0]
- Orbit
- Low Earth Orbit (LEO) [0]
- Canadian link
- none found in the 2026-02-12 announcement or India TV 2026-03-04 [0, 1]
- Next step
- The first pilot is scheduled for launch before the end of this year (2026); commercialisation from 2027 per Agnikul co-founder [0, 1]
1 more item on this system has not passed a check yet. It is in the claims ledger.
- [0] www.itvoice.in, 2026-02-12, operator says
- [1] www.indiatvnews.com, 2026-03-04, press report
- [2] www.inspace.gov.in, undated list (newest entries 01 Oct, 2026), authority's own record
ODC.SpaceUnited Statesannouncedplan 2.5 kW power the source does not define · plan 10 kW power the source does not define · plan 105 kW power the source does not define
- Power
- 2.5 kW ('Power, kW' column of the storefront, not defined by the site, per plan: 1U Collocated) [0] plan
10 kW ('Power, kW' column of the storefront, not defined by the site, per plan: 4U Sovereign) [0] plan
105 kW ('Power, kW' column of the storefront, not defined by the site, per plan: 42U Sovereign) [0] plan - Full name
- ODC.Space (powered by Atomic-6) [0]
- Operator
- Atomic-6 (ODC.Space) [0, 1]
- Operator's country
- US [3, 2]
- Stage
- announced (as of 2026-04-13) [3, 0]
- Satellites flying
- 0 (as of 2026-04-13) [3]
- Computers on board
- customer-furnished hardware in racks (1U, 4U or 42U plans) [1, 0]
- Physical facts
- solar array area: not stated; arrays are Atomic-6 Light Wing, radiators Atomic-6 Hot Wing [1]
- Next step
- delivery to customers 'as soon as 2029' (press) [3]
1 more item on this system has not passed a check yet. It is in the claims ledger.
- [0] odc.space, undated (documents linked are dated 2026-04), operator says
- [1] odc.space, 2026-04-12, operator says
- [2] odc.space, 2026-04-12, operator says
- [3] www.ajc.com, 2026-04-13, press report
Open-Source Computing ConstellationChinaannouncednot found
- Power
- not found
- Full name
- 开源计算星座 (Open-Source Computing Constellation), part of the OpenSpace 开源太空生态 (OpenSpace open-source space ecosystem) [0]
- Operator
- not stated as a single operator: OpenSpace was jointly initiated by 北京开运联合信息技术集团股份有限公司 (Beijing Kaiyun Lianhe Information Technology Group) with 东方空间 (Orienspace), 银河航天 (GalaxySpace), 北京航空航天大学 (Beihang University) and others [0]
- Operator's country
- CN [0]
- Partners
- 东方空间技术(北京)有限公司 (Orienspace): co-initiator of the OpenSpace ecosystem and community [0]
银河航天(北京)科技集团股份有限公司 (GalaxySpace): co-initiator of the OpenSpace ecosystem and community [0]
北京航空航天大学 (Beihang University): co-initiator [0] - Stage
- announced (as of 2026-10-17) [0]
- Satellites planned
- 首期规划发射2600颗卫星 (first phase: 2,600 satellites: 1,000 general-computing, 1,000 intelligent/supercomputing, 500 edge-computing, 100 quantum-computing) [0] plan
- Canadian link
- none found in the Science and Technology Daily article (2026-10-18) [0]
- [0] www.stdaily.com, 2026-10-18, press report
Orbital Cloud–announcednot found
- Power
- not found
- Full name
- Orbital Cloud (Orbit AI / Smartlink AI: DeStarlink and DeStarAI), with PowerBank [0]
- Operator
- Smartlink AI ("Orbit AI") [0]
- Partners
- PowerBank Corporation (Toronto): solar energy systems and adaptive thermal control; public-company partner relaying the program [0]
- Stage
- announced (as of 2025-12-11) [PowerBank states a launch of DeStarlink Genesis-1 on 2025-12-10; no matching object in GCAT (2026-10-29)] [0, 1]
- Satellites planned
- '2026: Expansion to 5–8 orbital nodes integrating compute and connectivity'; 'larger-scale deployments anticipated through 2028–2030' [0] plan
- Computers on board
- 'initial AI inference payload' on Genesis-1 (no chip stated in the release read) [0]
- Registered by
- not found in GCAT satcat/auxcat/ftocat/tmpcat (2026-10-29 builds) under Genesis, DeStar, Orbit AI or Smartlink; UN Online Index not searched by name [1]
- Canadian link
- PowerBank Corporation, Toronto (Cboe Canada-listed), is the named partner that intends to contribute solar and thermal systems; PowerBank 6-K and 20-F filings with the SEC mention Orbit AI and Smartlink (index hits only, not read) [0, 2]
- Next step
- '2026: Expansion to 5–8 orbital nodes integrating compute and connectivity'; '2027–2028: Full constellation rollout and commercialization of Orbital Cloud services' [0]
- [0] www.prnewswire.com, 2025-12-11, operator says
- [1] planet4589.org, 2026-10-29, directory lists it
- [2] efts.sec.gov, 2026-09-28, directory lists it
orbital data centre built on highly reliable edge computingJapanannouncednot found
- Power
- not found
- Full name
- 高信頼性エッジコンピューティングによる軌道上データセンターの構築 (orbital data centre built on highly reliable edge computing), JAXA Space Strategy Fund theme 'orbital data center construction technology' [0]
- Operator
- 株式会社SpaceBlast (SpaceBlast Inc.), implementing organisation [0, 2]
- Operator's country
- JP [2]
- Partners
- JAXA (Space Strategy Fund): funder, theme owner [0, 4]
Development partners (連携機関) named at the 2026-06-16 kickoff: DigitalBlast, Institute of Science Tokyo (東京科学大学), テックラボ, KEK, モルゲンロット [5] - Stage
- announced (as of 2026-01-26) [2]
- Satellites planned
- not stated (to use existing assets such as space stations and satellites) [1] plan
- Satellites flying
- 0 (as of 2026-11-01) [1]
- Computers on board
- non-rad-hard commercial (COTS) high-performance, power-efficient computers; no chip, count or performance stated [1]
- Orbit
- inside commercial space stations or on satellites (low Earth orbit implied by the post-ISS framing; altitude not stated) [3]
- Canadian link
- none found in the sources read (JAXA selection PDF, JAXA theme page, SpaceBlast release) [0, 2, 4]
- Next step
- not stated with a date in sources read [0, 2]
- [0] fund.jaxa.jp, 2026-05-14 (PDF creation date), authority's own record
- [1] fund.jaxa.jp, 2026-05-14 (PDF creation date), operator says
- [2] spaceblast.co.jp, 2026-01-26, operator says
- [3] spaceblast.co.jp, 2026-01-26, operator says
- [4] fund.jaxa.jp, undated (schedule lists selection results 2026-01-16), authority's own record
- [5] spaceblast.co.jp, 2026-06-24, operator says
OrbitsEdgeUnited Statesannouncednot found
- Power
- not found
- Full name
- OrbitsEdge orbital edge compute (commercial mission led by OrbitsEdge and Copernic Space) [0, 1]
- Operator
- OrbitsEdge [0]
- Operator's country
- US [2]
- Partners
- Copernic Space: co-lead of the first commercial mission [1]
Syntilay: customer (AI agent onboard to design a shoe) [1] - Stage
- announced (as of 2025-06-25) [1]
- Orbit
- low Earth orbit (Syntilay mission as reported) [1]
- Canadian link
- none found in orbitsedge.com (home, mission, contact) or the 2025-06-25 Space.com article [0, 1, 2]
- Next step
- first commercial mission with Copernic Space, stated for 2026 (Syntilay shoe design 'in 2026'); no launch found [1]
- [0] orbitsedge.com, undated (© 2026), operator says
- [1] www.space.com, 2025-06-25, press report
- [2] orbitsedge.com, undated, operator says
PathfinderIndiaannouncednot found
- Power
- not found
- Full name
- Pathfinder (Pixxel orbital data centre satellite, with Sarvam) [0]
- Operator
- Pixxel [0]
- Operator's country
- IN [0, 2]
- Partners
- Sarvam: AI backbone, models and inference platform (training and inference) [0]
- Stage
- announced (as of 2026-05-04) [0]
- Satellites planned
- 1 (Pathfinder demonstrator) [0] plan
- Satellites flying
- 0 (as of 2026-09-07) [0, 1]
- Computers on board
- datacentre-class GPUs (make, model and count not stated) [0]
- Physical facts
- mass: 200 kg-class satellite [0]
- Canadian link
- none found in the Pixxel PRs of 2026-05-04 and 2026-09-07 [0, 1]
- Next step
- scheduled to reach orbit as early as Q4 2026 [0]
1 more item on this system has not passed a check yet. It is in the claims ledger.
- [0] www.pixxel.space, 2026-05-04, operator says
- [1] www.pixxel.space, 2026-09-07, operator says
- [2] www.inspace.gov.in, undated list (newest entries 01 Oct, 2026), authority's own record
Quantum Spatial Orbital CloudSwitzerlandannouncednot found
- Power
- not found
- Full name
- Quantum Spatial Orbital Cloud (QSOC) [0, 1]
- Operator
- SEALSQ Corp (cloud service owner and operator); WISeSat.Space (space segment owner and operator); both WISeKey group companies [0, 1]
- Operator's country
- CH [1]
- Partners
- WISeSat.Space Corp.: owner and operator of the QSOC space segment (satellites, ground segment, frequency licences, mission control), sells dedicated capacity to SEALSQ [0]
- Stage
- announced (as of 2026-03-18) [0]
- Satellites planned
- up to 100 (Sept 2026 release); '100-satellite constellation' with FOC in 2033 (March 2026 release) [0, 1] plan
- Canadian link
- none found in the two SEALSQ releases read (2026-03-18, 2026-09-09) [0, 1]
- Next step
- binding letter of intent (2026-10-26) for SEALSQ to acquire capacity of an initial 12 WISeSat.Space satellites plus mission control and ground segment, about $15 million, as QSOC's initial infrastructure; no date stated; broader roadmap up to 100 satellites through 2033 [2, 1]
- [0] www.sealsq.com, 2026-03-18, operator says
- [1] www.sealsq.com, 2026-09-09, operator says
- [2] www.sec.gov, 2026-10-26, operator says
Ramon.SpaceIsraelannouncednot found
- Power
- not found
- Full name
- Ramon.Space in-orbit data centers (with Ingrasys) [0, 1]
- Operator
- Ramon.Space [0, 1]
- Operator's country
- IL [1]
- Partners
- Ingrasys (Foxconn subsidiary): manufacturing partner for the space product line; investor [0, 2]
- Stage
- announced (as of 2026-03-24) [1]
- Satellites planned
- prototype; 'early samples' in 2026, 'initial launches in 2027 and 2028' (no count) [1] plan
- Satellites flying
- 0 (as of 2026-03-24) [1]
- Computers on board
- Ramon.Space computing, storage and communications platforms (NuComm processors per Payload); no ODC chip counts stated [0, 1]
- Registered by
- not applicable (not launched) [1]
- Canadian link
- none found in Ramon.Space press listing (page 1) or Payload 2026-03-24 [0, 1]
- Next step
- fly 'early samples' in 2026; 'initial launches in 2027 and 2028' [1]
- [0] ramon.space, undated listing (release not individually dated on page 1), operator says
- [1] payloadspace.com, 2026-03-24, press report
- [2] ramon.space, undated, operator says
Relay Data CenterUnited Statesannouncednot found
- Power
- not found
- Full name
- Relay Data Center (Relativity Space Interplanetary Sciences Program, first Mars science orbiter) [0]
- Operator
- Relativity Space [0, 3]
- Operator's country
- US [6]
- Partners
- NASA (Ames Research Center): Aeolus instrument payload suite; NASA supports instrument operations [3]
- Stage
- announced (as of 2026-06) [5, 3]
- Satellites planned
- a Mars science orbiter (the program's first mission) [1] plan
- Satellites flying
- 0 (as of 2026-11-01) [1]
- Computers on board
- Server-class compute (no chip, count or performance stated) [2]
- Orbit
- Mars orbit (orbit parameters not stated) [1]
- Canadian link
- none found in the sources read (relativityspace.com/interplanetary, NASA release 2026-06-17) [0, 3]
- Next step
- Launch in 2028 [1, 4]
- [0] www.relativityspace.com, undated (same text in Wayback snapshot 2026-06-18), operator says
- [1] www.relativityspace.com, undated (same text in Wayback snapshot 2026-06-18), operator says
- [2] www.relativityspace.com, undated (same text in Wayback snapshot 2026-06-18), operator says
- [3] www.nasa.gov, 2026-06-17, operator says
- [4] www.nasa.gov, 2026-06-17, operator says
- [5] www.relativityspace.com, 2026-07-10, operator says
- [6] www.relativityspace.com, undated, operator says
SenseTimeChinaannouncednot found
- Power
- not found
- Full name
- SenseTime compute constellation (商汤算力星座 / 商汤太空算力星座), 'SenseTime' (商汤号) computing satellites [0]
- Operator
- Joint: Adaspace Technology (成都国星宇航科技股份有限公司) and Shanghai SenseTime Technology Development (上海商汤科技开发有限公司) [0]
- Operator's country
- CN [0]
- Partners
- ADA Space and SenseTime: joint builders of the constellation, jointly developing a 10,000-card space-ground AI compute scheduling platform (role split not stated) [0]
- Stage
- announced (as of 2026-07-18) [0]
- Satellites planned
- 千颗级 (thousand-class) computing satellites by 2030, total compute over 万P (10,000 P) [0] plan
- Satellites flying
- 0 (as of 2026-10-14) [0, 1]
- Computers on board
- first 'SenseTime' satellites: high-performance autonomous on-board computing platform (no figure); constellation total over 10,000 P by 2030 [0]
- Registered by
- not applicable: no launch found [0]
- Canadian link
- none found in the Science and Technology Daily article of 2026-07-18 [0]
- Next step
- first 'SenseTime' computing satellites networked within 2026; space-ground hybrid-cloud commercial compute backbone by 2028 [0]
- [0] www.stdaily.com, 2026-07-18, operator says
- [1] www.stdaily.com, 2026-10-14, operator says
Sophia Space TILEUnited Statesannouncedplan 1 MW
- Power
- 1 MW (computing power of an envisioned 2030s 50 m x 50 m structure (company hope, relayed by TechCrunch), per structure) [4] plan
- Full name
- Sophia Space TILE orbital compute (Athena demo; planned 10-satellite constellation) [0, 2]
- Operator
- Sophia Space Inc. [1]
- Operator's country
- US [1]
- Partners
- Kepler Communications: host for Sophia software and NVIDIA-powered compute nodes on Kepler satellites; optical relay [1]
Apex: Nova bus for the demo mission [3]
Spherical (Netherlands): electrical power system for Athena [2]
SLI (Libra Group): $300 million (USD) non-binding asset-financing framework, buys and leases the satellites [0] - Stage
- announced (as of 2026-09-13) [0]
- Satellites planned
- 10 (planned constellation, under a non-binding letter of support) [0] plan
- Satellites flying
- 0 (as of 2026-08-24) [2]
- Computers on board
- constellation: aggregate capacity 'equivalent to 240 state-of-the-art edge servers'; Kepler demo: NVIDIA-powered edge compute nodes [0, 1]
- Physical facts
- array dimensions: TILE modules 1 m x 1 m, a few centimetres deep, with integrated solar panels (press); envisioned 2030s structure 50 m x 50 m [4]
- Canadian link
- Kepler Communications (headquartered in Toronto): commercial agreement for Sophia to operate edge compute nodes and software on Kepler satellites from Q4 2026, and to explore joint Optical Data Center Nodes [1, 5]
- Next step
- Sophia software and NVIDIA-powered compute nodes on Kepler satellites, 'beginning in Q4 2026'; Athena TILE demo planned Q4 2027; constellation launches 'as early as 2028' [1, 2, 0]
- [0] www.sophia.space, 2026-09-13, operator says
- [1] www.sophia.space, 2026-04-13, operator says
- [2] www.sophia.space, 2026-08-24, operator says
- [3] www.prnewswire.com, 2026-06-23, operator says
- [4] techcrunch.com, 2026-02-26, press report
- [5] kepler.space, undated, operator says
Space CloudFinlandannouncednot found
- Power
- not found
- Full name
- Space Cloud [0]
- Operator
- ReOrbit [0]
- Operator's country
- FI [0]
- Partners
- Google Cloud: collaboration on AI and cloud-orchestration expertise (not an operator) [0]
- Stage
- announced (as of 2026-02-05) [0]
- Computers on board
- 'localised AI compute' on each data-processing satellite; no chip stated [0]
- Canadian link
- none found in the ReOrbit release (2026-02-05) [0]
- [0] www.reorbit.space, 2026-02-05, operator says
Space Integrated Computing NetworkJapanannouncednot found
- Power
- not found
- Full name
- Space Integrated Computing Network (Space Compass) [0, 1]
- Operator
- Space Compass Corporation (joint venture of NTT and SKY Perfect JSAT) [0, 1]
- Operator's country
- JP [0, 1]
- Partners
- NTT: JV parent [0]
SKY Perfect JSAT: JV parent [0]
Microsoft: co-engineering on Azure Orbital Space SDK, in-orbit AI demo [0]
SWISSto12: procurement contract for the first GEO optical data relay satellite (HummingSat platform) [2]
JAXA: Space Strategy Fund selection for optical data relay R&D and demonstration [1] - Stage
- announced (as of 2025-04-14) [0]
- Satellites planned
- first GEO optical data relay satellite (procured 2026-03-23); multi-orbit network, no count stated [2, 1] plan
- Satellites flying
- 0 (as of 2026-04-28) [2, 3]
- Orbit
- GEO (first optical data relay satellite) [2]
- Registered by
- not applicable (relay satellite not launched) [2]
- Canadian link
- none found in Space Compass English releases of 2025-04-14, 2026-03-23, 2026-04-22, 2026-04-28 [0, 1, 2, 3]
- [0] www.skyperfectjsat.space, 2025-04-14, operator says
- [1] space-compass.com, 2026-04-22, operator says
- [2] space-compass.com, 2026-03-23, operator says
- [3] space-compass.com, 2026-04-28, operator says
Xinghuan PlanChinaannouncednot found
- Power
- not found
- Full name
- Xinghuan Plan (星环计划), Shenkong Juzhen (深空矩阵) [0]
- Operator
- Shenkong Juzhen (深空矩阵), Beijing [0]
- Operator's country
- CN [0]
- Stage
- announced (as of 2026-07-19) [0]
- Satellites planned
- phase 1: about 210 satellites (low-orbit remote-sensing and computing integrated verification constellation); later thousands to tens of thousands [0] plan
- Satellites flying
- 0 (as of 2026-07-19) [0]
- Orbit
- LEO; later dawn-dusk computing orbits [0]
- Registered by
- not applicable: no launch found [0]
- Canadian link
- none found in the IT Home article of 2026-07-19 [0]
- [0] www.ithome.com, 2026-07-19, operator says
Xingshu PlanChinaannouncedplan 15 kW power generation
- Power
- 15 kW (solar array, per satellite) [0] plan
- Full name
- Xingshu Plan (星枢计划) space computing constellation, Shanghai [0]
- Operator
- Shanghai Xingshu Tiansuan (上海星枢天算) with Fudan University, which lead development and operation; Xingshu Tiansuan is 74% held by Xuntian Qianhe (巡天千河), a controlled subsidiary of Junda (钧达股份) [0]
- Operator's country
- CN [0]
- Partners
- Fudan University: space-based large-model technology; chief scientists Jin Yaqiu, Wang Jianyu, Chu Junhao, Li Jun [0]
Shanghai Institute of Technical Physics (CAS), Wang Jianyu team: payload engineering support for the central computing satellite [0]
Shanghai Academy of AI for Science, Fudan, Xuntian Qianhe: Fuxi weather satellite [0]
太驿微行航天科技: lead developer of the very-low-orbit instant remote-sensing satellite [0]
星算未来, 星遥光宇: co-founders of Shanghai Xingshu Tiansuan [0] - Stage
- announced (as of 2026-07-18) [0]
- Satellites planned
- engineering verification: 2 computing + 12 edge-computing satellites; commercial deployment: 50 computing + 100 edge-computing; commercial operation: thousand-satellite deployment. Xinhua Finance: 1,000 satellites; 2-12 launched in 2027, 200 by 2030, 800 launched by 2032 [0, 1] plan
- Satellites flying
- 0 (as of 2026-07-20) [0, 1]
- Computers on board
- central computing satellite: customised domestic space-grade GPU chips, 32P in-orbit compute; instant remote-sensing satellite: 2 POPS edge compute [0]
- Orbit
- instant remote-sensing satellite in very low Earth orbit (超低轨); no altitudes stated [0]
- Registered by
- not applicable: no launch found [0]
- Ground stations
- ground optical phased-array reception planned for 400 Gbps optical links (location not stated) [0]
- Canadian link
- none found in the Shanghai Securities News (2026-07-18) and Xinhua Finance (2026-07-20) articles read [0, 1]
- Next step
- 2-12 satellites launched in 2027 (Xinhua Finance) [1]
1 more item on this system has not passed a check yet. It is in the claims ledger.
- [0] finance.sina.com.cn, 2026-07-18, press report
- [1] www.cnfin.com, 2026-07-20, press report
Yiwei Aerospace space computing service platformChinaannouncednot found
- Power
- not found
- Full name
- 太空算力服务平台 (Yiwei Aerospace space computing service platform) [0]
- Operator
- 一苇宇航(北京)科技有限公司 (Yiwei Aerospace (Beijing) Technology Co., Ltd.) [3]
- Operator's country
- CN [3]
- Partners
- 浩瀚深度 (Haohan Deep): investor and joint-laboratory partner for space-ground integration and space computing R&D [8]
- Stage
- announced (as of 2026-06-29) [service platform released 2026-06-29; an internal beta (内测版) online since 2026-06 per Huxiu; no satellite named and no task run in orbit reported] [0, 4, 5]
- Satellites planned
- not stated [0, 4] plan
- Computers on board
- 全国产太空服务器 (all-domestic space servers) with its own onboard real-time OS RROS; no chip, count or performance stated [6]
- Orbit
- not stated [0]
- Canadian link
- none found in the sources read (Beijing News 2026-07-01, Huxiu 2026-09-06, Sina 2026-09-03) [0, 4, 6]
- Next step
- Funding directed to data-centre-class very-large-scale compute payloads and the compute service platform; no date stated [5]
- [0] www.bjnews.com.cn, 2026-07-01, press report
- [3] www.bjnews.com.cn, 2026-07-01, press report
- [4] m.huxiu.com, 2026-09-06, press report
- [5] m.huxiu.com, 2026-09-06, press report
- [6] news.sina.cn, 2026-09-03, press report
- [8] news.sina.cn, 2026-09-03, press report
Exodus Orbitalsnot yet checkedcancellednot found
- Power
- not found
- Full name
- Exodus Orbitals ('Launch your code in space'; NOVA cubesat) [0, 1]
- Operator
- Exodus Orbitals [0]
- Partners
- Open Cosmos: listed as organisation for the NOVA cubesat in the Nanosats directory (role not stated) [1]
- Stage
- cancelled (as of 2024-12-29) [Nanosats record (last modified 2024-12-29) shows status 'cancelled'; archived operator site 2022-12-06] [1]
- Satellites planned
- NOVA, 3U cubesat [1] plan
- Satellites flying
- 0 (as of 2026-11-01) [1]
3 more items on this system have not passed a check yet. They are in the claims ledger.
- [0] web.archive.org, 2022-12-06 (archive snapshot), operator says
- [1] www.nanosats.eu, undated, directory lists it
What the cells mean
Every value shown has passed an independent check against its cited sources. “Not yet checked” means a value is in the downloads but has not passed. “–” means no value is recorded. “Not found” means no power figure in the sources we hold. Our estimated upper limits come from a stated physical fact. They are never measurements. Power = area x 1,361 W/m2 x cell efficiency 0.28-0.32 x packing 0.85-1.0. Heat = area x emissivity 0.85-0.92 x σ x (T⁴ - T_sink⁴) x sides, with T 300-330 K and T_sink 250 K down to 0 K. method.txt gives the details in its section 6.
4 Jurisdiction
4.1 By country
Each line is one way a country's law can reach a system. The number is how many systems it reaches that way. We read each from checked facts. A system counts here only with a checked line for that way, so these numbers can be lower than the Summary's count of operators by country.
| How the law reaches | Countries, with the number of systems |
|---|---|
| UN registration of the satellites | Canada 2, United States 2, China 1, Italy 1 |
| Licence for the space activity, granted or applied for | United States 14, China 13, United Arab Emirates 2, Switzerland 2, India 2, Finland 1, Israel 1, Italy 1, Japan 1, South Korea 1 |
| Radio network filing at the ITU | United States 6, China 2, Germany 2 |
| Ground stations, built or planned | Canada 2, Bulgaria 1, China 1, Norway 1, Portugal 1, United States 1, South Africa 1 |
| Export control of the hardware | United States 9 |
| The operator's home country | United States 14, China 13, United Arab Emirates 2, Switzerland 2, India 2, Canada 1, Finland 1, France 1, Israel 1, Italy 1, Japan 1, South Korea 1 |
4.2 Canada
Canadian (1)
- Kepler Compute: Canadian operator (Toronto). Details
Linked to Canada (2)
- Axiom Space: ARC 1 and ARC 2 are hosted on Canadian-operated, Canada-registered Kepler satellites. Details
- Sophia Space TILE: Kepler Communications (headquartered in Toronto): commercial agreement for Sophia to operate edge compute nodes and software on Kepler satellites from Q4 2026. Details
Not counted, because the link is only a stated intention or possibility:
4.3 By system
Full table: each system, country by country
Star-Compute Project–CNCN––CN–
- Full name
- Star-Compute Project (星算计划)
- State of registry
- not found in UNOOSA Online Index: newest China-registered object there launched 2024-12-19 (all 1086 'China' hits read, 2026-11-01)
- Launch state
- China (Jiuquan Satellite Launch Center 2025-05-14; Dongfeng commercial space innovation test zone 2026-10-14)
- Licensing filings
- ITU (via China's administration) network names not stated (ITU filings (stated as 'ITU approval')), status operator states ITU approval of 3,156 satellites, dated 2026-05-04
NDRC not stated (project approval), status approval for development and launch of 60 additional satellites, obtained February 2025 (operator states), dated 2025-02
MIIT not stated (radio frequency use permit and radio station licence (per satellite)), status operator states requisite permits obtained, including for five pre-December 2023 satellites that lacked the relevant national ministry's pre-production approval (reported to the NDRC), dated 2026-05-04
- Authorization: CN. Based on: NDRC not stated (project approval), status approval for development and launch of 60 additional satellites, obtained February 2025 (operator states), dated 2025-02
MIIT not stated (radio frequency use permit and radio station licence (per satellite)), status operator states requisite permits obtained, including for five pre-December 2023 satellites that lacked the relevant national ministry's pre-production approval (reported to the NDRC), dated 2026-05-04 - Radio: CN. Based on: ITU (via China's administration) network names not stated (ITU filings (stated as 'ITU approval')), status operator states ITU approval of 3,156 satellites, dated 2026-05-04
- Home country: CN. Based on: CN
AetheroUSUS––USUS–
- Full name
- Aethero compute-as-a-service (Deimos, Phobos, Titan)
- State of registry
- Deimos (2024-149BL): USA, ST/SG/SER.E/1227; Phobos (2026-067BD): not found in the UNOOSA Online Index (search by designator, 2026-11-01)
- Launch state
- US (Vandenberg SLC-4E, both flown objects)
- Licensing filings
- FCC 0780-EX-CN-2025 (call sign WQ2XDL) (experimental licence), status Grant Expired Due to New License, dated 2026-03-05
FCC 0077-EX-CM-2026 (call sign WQ2XDL) (experimental licence modification), status Granted, dated 2026-04-02
FCC 0517-EX-CN-2026 (call sign WQ2XNL, Titan) (experimental licence), status Grant Expired Due to New License, dated 2026-07-23
FCC 0169-EX-CM-2026 (call sign WQ2XNL, Titan) (experimental licence modification), status Granted, dated 2026-10-14
ITU TITAN (network name as written in the ODAR header; not checked at ITU) (ITU filing referenced by operator), status not verified, dated 2026-09-25
- Registration: US. Based on: Deimos (2024-149BL): USA, ST/SG/SER.E/1227; Phobos (2026-067BD): not found in the UNOOSA Online Index (search by designator, 2026-11-01)
- Authorization: US. Based on: FCC 0780-EX-CN-2025 (call sign WQ2XDL) (experimental licence), status Grant Expired Due to New License, dated 2026-03-05
FCC 0077-EX-CM-2026 (call sign WQ2XDL) (experimental licence modification), status Granted, dated 2026-04-02
FCC 0517-EX-CN-2026 (call sign WQ2XNL, Titan) (experimental licence), status Grant Expired Due to New License, dated 2026-07-23
FCC 0169-EX-CM-2026 (call sign WQ2XNL, Titan) (experimental licence modification), status Granted, dated 2026-10-14 - Export control: US, our inference. Based on: Deimos: 1x NxN-ECM on COTS NVIDIA Jetson Orin, 100 TOPS; Phobos: 1x NxN-ECM on NVIDIA Jetson Orin NX (Super Mode), up to 157 TOPS; Titan (planned): clustered NxA-ECM modules on NVIDIA Jetson Thor, over 4,000 TFLOPS each, up to 16,000 TFLOPS for the mission
- Home country: US. Based on: US
NeevCloud–IN–––IN–
- Full name
- NeevCloud AI Data Centre in Space (with Agnikul Cosmos)
- Authorization: IN, our inference. Based on: IN
- Home country: IN. Based on: IN
Altair–AE––USAE–
- Full name
- Altair
- State of registry
- not found in UNOOSA Online Index (exact-name queries 'Altair-1', 'ALTAIR-1'; UAE state-of-registry list, first page of 35) on 2026-11-01; launch post-dates the index's latest entries (about 2026-09-16)
- Launch state
- US (Vandenberg Space Force Base, California)
- Authorization: AE, our inference. Based on: AE
- Export control: US, our inference. Based on: Onboard NVIDIA GPUs (model and count not stated)
- Home country: AE. Based on: AE
ASCEND–––––FR–
- Full name
- ASCEND (Advanced Space Cloud for European Net zero emission and Data sovereignty)
- State of registry
- not applicable (study)
- Home country: FR. Based on: FR
ODC.Space–US–––US–
- Full name
- ODC.Space (powered by Atomic-6)
- Authorization: US, our inference. Based on: US
- Home country: US. Based on: US
Axiom SpaceCAUSDECA–US–
- Full name
- Axiom Space Orbital Data Center (ODC) / Axiom Resilient Compute (ARC) nodes
- State of registry
- Host satellites registered by Canada (Kepler ÆTHER-3 to -12, ST/SG/SER.E/1367); which two carry ARC 1/2 is not stated
- Launch state
- US (Kepler Tranche 1, Falcon 9 from Vandenberg, 2026-01-11; GCAT launch 2026-004)
- Registration: CA. Based on: Host satellites registered by Canada (Kepler ÆTHER-3 to -12, ST/SG/SER.E/1367); which two carry ARC 1/2 is not stated
- Authorization: US, our inference. Based on: US
- Radio: DE, our inference. Based on: ARC 1 and ARC 2 are hosted on Canadian-operated, Canada-registered Kepler satellites
ITU D-ISIPELE-C (ITU coordination request (notice type N, provision 9.6) and Res.49 due-diligence notice), status CR notice received 21.01.2020; RES49 notice received 09.09.2026; notifying administration D (Germany), dated 2020-01-21 - Ground stations: CA, our inference. Based on: ARC 1 and ARC 2 are hosted on Canadian-operated, Canada-registered Kepler satellites
Canada: Inuvik, NT (Inuvik Sat. Station Facility, call sign XJ436; and Inuvik CSGI site, VF885), Kepler Communications Inc. as licensee - Home country: US. Based on: US
Project Sunrise–USUS––US–
- Full name
- Project Sunrise (Blue Origin Orbital Data Center System)
- Licensing filings
- FCC SAT-LOA-20260310-00118 (call sign S00830), 'Project Sunrise' (application (launch and operating authority, NGSO)), status Pending Payment (status date 2026-03-19); accepted for filing PN 2026-04-17; Space Bureau information request of 2026-08-28; Blue Origin response 2026-09-18, dated 2026-03-19
- Ground segment
- No gateway locations stated in the narrative: traffic routed 'through its TeraWave system and other mesh backhaul networks to transmit to the ground'; Ka-band TT&C for early, post-mission and emergency phases
- Authorization: US. Based on: FCC SAT-LOA-20260310-00118 (call sign S00830), 'Project Sunrise' (application (launch and operating authority, NGSO)), status Pending Payment (status date 2026-03-19); accepted for filing PN 2026-04-17; Space Bureau information request of 2026-08-28; Blue Origin response 2026-09-18, dated 2026-03-19
- Radio: US, our inference. Based on: FCC SAT-LOA-20260310-00118 (call sign S00830), 'Project Sunrise' (application (launch and operating authority, NGSO)), status Pending Payment (status date 2026-03-19); accepted for filing PN 2026-04-17; Space Bureau information request of 2026-08-28; Blue Origin response 2026-09-18, dated 2026-03-19
- Home country: US. Based on: US
Tiansuan ConstellationCNCN–––CN–
- Full name
- Tiansuan Constellation (天算星座)
- State of registry
- BUPT-1 (2023-007) registered by China, ST/SG/SER.E/1237; BUPT-2/BUPT-3 (2025-103E/F) not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01)
- Launch state
- China (BUPT-2/3: Dongfeng commercial space innovation test zone, Jiuquan, 2025-05-17)
- Ground segment
- seven ground stations (countries not stated)
- Registration: CN. Based on: BUPT-1 (2023-007) registered by China, ST/SG/SER.E/1237; BUPT-2/BUPT-3 (2025-103E/F) not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01)
- Authorization: CN, our inference. Based on: CN
- Home country: CN. Based on: CN
CASC–CN–––CN–
- Full name
- CASC gigawatt-class space digital-intelligence infrastructure (吉瓦级太空数智基础设施), 15th Five-Year Plan new-domain goal
- State of registry
- not applicable: no object announced
- Authorization: CN, our inference. Based on: CN
- Home country: CN. Based on: CN
Comospace–CN–––CN–
- Full name
- Comospace (中科天算) 'Tiansuan Plan' (天算计划) space supercomputing network, with the Hangsheng/Comospace/Yanhe two-satellite compute demo
- State of registry
- not applicable: no launch found
- Authorization: CN, our inference. Based on: CN
- Home country: CN. Based on: CN
Stampede Data Center System–USUS–USUS–
- Full name
- Stampede Data Center System
- Licensing filings
- FCC SAT-LOA-20260323-00135 (call sign S00851), 'Stampede Data Center System Application' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02007 (2026-06-12); Space Bureau request 2026-08-28; Cowboy response 2026-09-18; bond/milestone waiver supplement 2026-10-28, dated 2026-05-11
- Ground segment
- Ka-band TT&C requested (18.8-19.3 GHz down, 28.6-29.1 GHz up); gateway locations not read
- Authorization: US. Based on: FCC SAT-LOA-20260323-00135 (call sign S00851), 'Stampede Data Center System Application' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02007 (2026-06-12); Space Bureau request 2026-08-28; Cowboy response 2026-09-18; bond/milestone waiver supplement 2026-10-28, dated 2026-05-11
- Radio: US, our inference. Based on: FCC SAT-LOA-20260323-00135 (call sign S00851), 'Stampede Data Center System Application' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02007 (2026-06-12); Space Bureau request 2026-08-28; Cowboy response 2026-09-18; bond/milestone waiver supplement 2026-10-28, dated 2026-05-11
- Export control: US, our inference. Based on: NVIDIA Space-1 Vera Rubin Module (partnership stated; count not stated)
- Home country: US. Based on: US
D-OrbitITIT––USIT–
- Full name
- D-Orbit Space Cloud Services (on ION Satellite Carrier)
- State of registry
- Italy: ION SCV 003, 004, 014 and 020 are in the Italian national register (ASI, edition 01-07-2026) with D-Orbit as operator; UN registration column 'Si' for SCV 003/004, 'No' for SCV-014/020; UNOOSA Online Index shows ION SCV-004 Elysian Eleonora (2022-002K) under Italy in ST/SG/SER.E/1228
- Registration: IT. Based on: Italy: ION SCV 003, 004, 014 and 020 are in the Italian national register (ASI, edition 01-07-2026) with D-Orbit as operator; UN registration column 'Si' for SCV 003/004, 'No' for SCV-014/020; UNOOSA Online Index shows ION SCV-004 Elysian Eleonora (2022-002K) under Italy in ST/SG/SER.E/1228
- Authorization: IT, our inference. Based on: IT
- Export control: US, our inference. Based on: Unibap SpaceCloud iX5-100 (ION SCV003, SCV004): 4 TOPS over AMD CPU and GPU, Microsemi FPGA, Intel Movidius Myriad X VPU; Unibap iX5-106 (SCV014 'Ascend', SCV020 Skytrail); Unibap iX20 (ION launched 2026-10-01)
- Home country: IT. Based on: IT
Mingzhu Constellation Plan–CNCN––CN–
- Full name
- Mingzhu Constellation Plan (明珠星座计划), Shanghai
- State of registry
- not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01)
- Launch state
- China (Dongfeng commercial space innovation test zone, Jiuquan; Zhuque-2E Y4)
- Authorization: CN, our inference. Based on: CN
- Radio: CN, our inference. Based on: ADA Space: host satellites (Star-Compute 02 group, incl. XSD-44 'Dongfang Tiansuan')
ITU (via China's administration) network names not stated (ITU filings (stated as 'ITU approval')), status operator states ITU approval of 3,156 satellites, dated 2026-05-04 - Home country: CN. Based on: CN
Clustergate–CH––USCH–
- Full name
- Clustergate (Clustergate-2 on-orbit compute platform; OmniSat planned)
- State of registry
- not found in UNOOSA Online Index: search '2026-067' returned 0 objects; search 'Vigoride' returned Vigoride 3, 5, 6 (USA) but not Vigoride 7 (queried 2026-10-31)
- Launch state
- US (Vandenberg SFB SLC-4E, Falcon 9 Transporter-16, 2026-03-30)
- Authorization: CH, our inference. Based on: CH
- Export control: US, our inference. Based on: Clustergate-2: 'a heterogenous processing cluster' including 'an NVIDIA GPU provided by EDGX' (model and count not stated)
- Home country: CH. Based on: CH
Project Suncatcher–US––USUS–
- Full name
- Project Suncatcher
- Launch state
- US (Transporter-18: Falcon 9 from Vandenberg SFB SLC-4E, 2026-10-01)
- Authorization: US, our inference. Based on: US
- Export control: US, our inference. Based on: Google TPUs (count not stated); Trillium (v6e Cloud TPU) radiation-tested on the ground
- Home country: US. Based on: US
Hanwha Systems–KR–––KR–
- Full name
- Hanwha Systems orbiting AI data center (AI data center in space)
- State of registry
- not applicable (not launched)
- Ground segment
- KR: defense AI data center in Changwon, South Gyeongsang (integrates information collected across space, land, sea and air; 45 MW initially, 135 MW by 2032 per press)
- Authorization: KR, our inference. Based on: KR
- Home country: KR. Based on: KR
Kepler ComputeCA–DECAUSCA–
- Full name
- Kepler Compute (on-orbit compute on Kepler's Tranche 1 optical data relay constellation)
- State of registry
- Canada (ÆTHER-3 to ÆTHER-12, 2026-004M to 2026-004W, ST/SG/SER.E/1367)
- Launch state
- US (Falcon 9 from Vandenberg SFB, SLC-4E)
- Licensing filings
- ITU D-ISIPELE-C (ITU coordination request (notice type N, provision 9.6) and Res.49 due-diligence notice), status CR notice received 21.01.2020; RES49 notice received 09.09.2026; notifying administration D (Germany), dated 2020-01-21
ISED ISIPELE / D-ISIPELE-C (foreign satellite approved to provide FSS in Canada (CPC-2-6-04 list)), status listed, NGSO, downlink 10.7-12.2 and 12.7-13.25 GHz, uplink 13.75-14.5 GHz, dated 2026-08-19
ISED call sign XJ436 (Inuvik Sat. Station Facility); VF885 (Inuvik CSGI) (earth station radio authorizations naming network D-ISIPELE-C), status in SMS extract; dated 2026-05-28 (XJ436) and 2025-05-12 (VF885), dated 2026-05-28
CSA 25STDPZ09 (contribution agreement 'Orbital Cloud Infrastructure'), status value CAD 429,262 after amendment 1 of 2026-04-01 (original CAD 500,000); agreement value, not amount paid, dated 2025-09-09 - Ground segment
- Canada: Inuvik, NT (Inuvik Sat. Station Facility, call sign XJ436; and Inuvik CSGI site, VF885), Kepler Communications Inc. as licensee
- Registration: CA. Based on: Canada (ÆTHER-3 to ÆTHER-12, 2026-004M to 2026-004W, ST/SG/SER.E/1367)
- Radio: DE, our inference. Based on: ITU D-ISIPELE-C (ITU coordination request (notice type N, provision 9.6) and Res.49 due-diligence notice), status CR notice received 21.01.2020; RES49 notice received 09.09.2026; notifying administration D (Germany), dated 2020-01-21
ISED call sign XJ436 (Inuvik Sat. Station Facility); VF885 (Inuvik CSGI) (earth station radio authorizations naming network D-ISIPELE-C), status in SMS extract; dated 2026-05-28 (XJ436) and 2025-05-12 (VF885), dated 2026-05-28 - Ground stations: CA, our inference. Based on: Canada: Inuvik, NT (Inuvik Sat. Station Facility, call sign XJ436; and Inuvik CSGI site, VF885), Kepler Communications Inc. as licensee
ISED ISIPELE / D-ISIPELE-C (foreign satellite approved to provide FSS in Canada (CPC-2-6-04 list)), status listed, NGSO, downlink 10.7-12.2 and 12.7-13.25 GHz, uplink 13.75-14.5 GHz, dated 2026-08-19
ISED call sign XJ436 (Inuvik Sat. Station Facility); VF885 (Inuvik CSGI) (earth station radio authorizations naming network D-ISIPELE-C), status in SMS extract; dated 2026-05-28 (XJ436) and 2025-05-12 (VF885), dated 2026-05-28 - Export control: US, our inference. Based on: 40x NVIDIA Jetson Orin modules across 10 satellites (introductory capability); release of 2026-01-11 says 'multi-GPU on-orbit compute modules with terabytes of storage'
- Home country: CA. Based on: CA
Loft Orbital–USUS––US–
- Full name
- Loft Orbital Virtual Missions / on-orbit AI (Ultimate Edge)
- Licensing filings
- FCC SAT-LOA-20260513-00196 (YAM-30), SAT-MOD-20260519-00203 (YAC-1, ten satellites) (application / modification), status Pending Review (ICFS, 2026-10-31), dated 2026-07-09 (filed date shown in ICFS for -00196)
- Authorization: US. Based on: FCC SAT-LOA-20260513-00196 (YAM-30), SAT-MOD-20260519-00203 (YAC-1, ten satellites) (application / modification), status Pending Review (ICFS, 2026-10-31), dated 2026-07-09 (filed date shown in ICFS for -00196)
- Radio: US, our inference. Based on: FCC SAT-LOA-20260513-00196 (YAM-30), SAT-MOD-20260519-00203 (YAC-1, ten satellites) (application / modification), status Pending Review (ICFS, 2026-10-31), dated 2026-07-09 (filed date shown in ICFS for -00196)
- Home country: US. Based on: US
Madari Space–AE–––AE–
- Full name
- Madari Space orbital data centre (pilot)
- State of registry
- not applicable (no launch found)
- Authorization: AE, our inference. Based on: AE
- Home country: AE. Based on: AE
NOVI smart satellites with SP240 on-board computers: partner and customer software run in orbit–––––––
- Full name
- NOVI smart satellites with SP240 on-board computers: partner and customer software run in orbit (GENIE satellites, Missions-as-a-Service)
- Launch state
- US (Vandenberg Space Force Base, per GCAT launch site VSFBS for all three)
- Licensing filings
- FCC SAT-LOA-20250609-00140 (call sign S3234) (application), status granted with conditions 2025-12-11 (Space Bureau public notice DA 25-1053, Report SAT-01959, 2025-12-12), dated 2025-06-09
- Ground segment
- United States: NOVI mission control centre, Arlington, Virginia; commercial ground stations in and outside the US (countries not named in the narrative read)
Open-Source Computing Constellation–CN–––CN–
- Full name
- 开源计算星座 (Open-Source Computing Constellation), part of the OpenSpace 开源太空生态 (OpenSpace open-source space ecosystem)
- Authorization: CN, our inference. Based on: CN
- Home country: CN. Based on: CN
Orbital Datacenter System–USUS––US–
- Full name
- Orbital Datacenter System (Orbital Compute Inc.; first satellite Orbital-1)
- Licensing filings
- FCC SAT-LOA-20260624-00251 (call sign S00867), 'Orbital Compute Inc. — Orbital Datacenter System (LOA)' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02024 (2026-07-31); Space Bureau request 2026-08-28; Orbital response 2026-09-11 (filed 2026-09-10) requesting until 2026-12-10 for remaining items, dated 2026-06-24
FCC Public Notice Report No. SAT-02024 (SAT-LOA-20260624-00251, S00867) (public notice: application accepted for filing), status accepted for filing, dated 2026-07-31 [same application as filings#1; not a separate filing] - Ground segment
- back-up TT&C only (18.8-19.3 GHz down, 28.6-29.1 GHz up); traffic via optical inter-satellite links with other commercial LEO systems; gateway locations not stated in the PN
- Authorization: US. Based on: FCC SAT-LOA-20260624-00251 (call sign S00867), 'Orbital Compute Inc. — Orbital Datacenter System (LOA)' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02024 (2026-07-31); Space Bureau request 2026-08-28; Orbital response 2026-09-11 (filed 2026-09-10) requesting until 2026-12-10 for remaining items, dated 2026-06-24
- Radio: US, our inference. Based on: FCC SAT-LOA-20260624-00251 (call sign S00867), 'Orbital Compute Inc. — Orbital Datacenter System (LOA)' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing in Public Notice Report No. SAT-02024 (2026-07-31); Space Bureau request 2026-08-28; Orbital response 2026-09-11 (filed 2026-09-10) requesting until 2026-12-10 for remaining items, dated 2026-06-24
- Home country: US. Based on: US
OrbitsEdge–US–––US–
- Full name
- OrbitsEdge orbital edge compute (commercial mission led by OrbitsEdge and Copernic Space)
- Authorization: US, our inference. Based on: US
- Home country: US. Based on: US
Pathfinder–IN–––IN–
- Full name
- Pathfinder (Pixxel orbital data centre satellite, with Sarvam)
- Authorization: IN, our inference. Based on: IN
- Home country: IN. Based on: IN
Orbital Cloud–––––––
- Full name
- Orbital Cloud (Orbit AI / Smartlink AI: DeStarlink and DeStarAI), with PowerBank
- State of registry
- not found in GCAT satcat/auxcat/ftocat/tmpcat (2026-10-29 builds) under Genesis, DeStar, Orbit AI or Smartlink; UN Online Index not searched by name
Ramon.Space–IL–––IL–
- Full name
- Ramon.Space in-orbit data centers (with Ingrasys)
- State of registry
- not applicable (not launched)
- Authorization: IL, our inference. Based on: IL
- Home country: IL. Based on: IL
Space Cloud–FI–––FI–
- Full name
- Space Cloud
- Authorization: FI, our inference. Based on: FI
- Home country: FI. Based on: FI
Quantum Spatial Orbital Cloud–CH–––CH–
- Full name
- Quantum Spatial Orbital Cloud (QSOC)
- Authorization: CH, our inference. Based on: CH
- Home country: CH. Based on: CH
SenseTime–CN–––CN–
- Full name
- SenseTime compute constellation (商汤算力星座 / 商汤太空算力星座), 'SenseTime' (商汤号) computing satellites
- State of registry
- not applicable: no launch found
- Authorization: CN, our inference. Based on: CN
- Home country: CN. Based on: CN
Xinghuan Plan–CN–––CN–
- Full name
- Xinghuan Plan (星环计划), Shenkong Juzhen (深空矩阵)
- State of registry
- not applicable: no launch found
- Authorization: CN, our inference. Based on: CN
- Home country: CN. Based on: CN
FeatherEdge GEN-2–––––––
- Full name
- FeatherEdge GEN-2 / Orlaith AI on LizzieSat-3 (third-party algorithm integration)
- Launch state
- US (Vandenberg Space Force Base, California)
Sophia Space TILE–US––USUS–
- Full name
- Sophia Space TILE orbital compute (Athena demo; planned 10-satellite constellation)
- Authorization: US, our inference. Based on: US
- Export control: US, our inference. Based on: constellation: aggregate capacity 'equivalent to 240 state-of-the-art edge servers'; Kepler demo: NVIDIA-powered edge compute nodes
- Home country: US. Based on: US
Space Integrated Computing Network–JP–––JP–
- Full name
- Space Integrated Computing Network (Space Compass)
- State of registry
- not applicable (relay satellite not launched)
- Authorization: JP, our inference. Based on: JP
- Home country: JP. Based on: JP
Space String–CN–––CN–
- Full name
- Space String computing constellation (太空之弦计算星座)
- State of registry
- not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01); state of registry for the two satellites owned by Indonesian and Uzbek agencies not established
- Launch state
- China (sea launch from the Yellow Sea near Haiyang, Shandong; Jielong-3 Y12)
- Authorization: CN, our inference. Based on: CN
- Home country: CN. Based on: CN
SpaceX–USUS––US–
- Full name
- SpaceX Orbital Data Center System
- Licensing filings
- FCC SAT-LOA-20260108-00016 (call sign S00798), 'SpaceX Orbital Data Center System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing by Public Notice DA 26-113 released 2026-02-04 (comments due 2026-03-06), dated 2026-01-30
- Ground segment
- No dedicated gateways stated: traffic routed over optical links to Starlink, 'which in turn will transmit traffic to authorized earth stations on the ground'; Ka-band TT&C requested: 18.8-19.3 GHz down and 28.6-29.1 GHz up per SpaceX's narrative (2026-01-30); 18.3-19.3 GHz down and 28.6-29.1 GHz up per the FCC's public notice DA 26-113 (2026-02-04)
- Authorization: US. Based on: FCC SAT-LOA-20260108-00016 (call sign S00798), 'SpaceX Orbital Data Center System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing by Public Notice DA 26-113 released 2026-02-04 (comments due 2026-03-06), dated 2026-01-30
- Radio: US, our inference. Based on: FCC SAT-LOA-20260108-00016 (call sign S00798), 'SpaceX Orbital Data Center System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing by Public Notice DA 26-113 released 2026-02-04 (comments due 2026-03-06), dated 2026-01-30
- Home country: US. Based on: US
StarcloudUSUSUSZA, PT, BG, US, NOUSUS–
- Full name
- Starcloud Orbital Datacenter System (Starcloud-1, Starcloud-2 and successors)
- State of registry
- USA (Starcloud-1, 2025-248L, ST/SG/SER.E/1327; UN remark: submission 'presently being processed')
- Launch state
- US (Starcloud-1: Falcon 9 Bandwagon-4 from Cape Canaveral LC-40)
- Licensing filings
- FCC SAT-LOA-20260202-00073 (call sign S00803), 'Starcloud Orbital Datacenter System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing PN 2026-03-13 (Report SAT-01982); Space Bureau information request 2026-08-28, response deadline extended to 2026-09-18 (letter of 2026-09-11); Starcloud response dated 2026-09-16; Part 100 supplement 2026-10-20, dated 2026-02-04
FCC (OET ELS) 0290-EX-CN-2026 (call sign WQ2XLC), Starcloud-2 (experimental licence application), status Pending (status date 03/12/2026), dated 2026-03-12
FCC (OET ELS) 1019-EX-CN-2024 (call sign WP2XJD), Lumen Orbit, Inc. (experimental licence (Starcloud-1 / Lumen-1 demonstration)), status Grant Expired Due to New License (06/02/2025); successor licence file not identified in this run, dated 2024-11-08 - Ground segment
- Planned Starcloud-2 TT&C stations: South Africa (Pretoria, RBC), Portugal (Azores, Leaf), Bulgaria (Kaspichan, Leaf), USA (Deadhorse and Fairbanks AK, RBC), Norway (Tromsø, KSAT)
System: Ka-band backup TT&C only (18.8-19.3 GHz down, 28.6-29.1 GHz up); primary communication via optical links to third-party constellations
- Registration: US. Based on: USA (Starcloud-1, 2025-248L, ST/SG/SER.E/1327; UN remark: submission 'presently being processed')
- Authorization: US. Based on: FCC SAT-LOA-20260202-00073 (call sign S00803), 'Starcloud Orbital Datacenter System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing PN 2026-03-13 (Report SAT-01982); Space Bureau information request 2026-08-28, response deadline extended to 2026-09-18 (letter of 2026-09-11); Starcloud response dated 2026-09-16; Part 100 supplement 2026-10-20, dated 2026-02-04
FCC (OET ELS) 0290-EX-CN-2026 (call sign WQ2XLC), Starcloud-2 (experimental licence application), status Pending (status date 03/12/2026), dated 2026-03-12
FCC (OET ELS) 1019-EX-CN-2024 (call sign WP2XJD), Lumen Orbit, Inc. (experimental licence (Starcloud-1 / Lumen-1 demonstration)), status Grant Expired Due to New License (06/02/2025); successor licence file not identified in this run, dated 2024-11-08 - Radio: US, our inference. Based on: FCC SAT-LOA-20260202-00073 (call sign S00803), 'Starcloud Orbital Datacenter System' (application (launch and operating authority, NGSO)), status Pending Review; accepted for filing PN 2026-03-13 (Report SAT-01982); Space Bureau information request 2026-08-28, response deadline extended to 2026-09-18 (letter of 2026-09-11); Starcloud response dated 2026-09-16; Part 100 supplement 2026-10-20, dated 2026-02-04
- Ground stations: ZA, PT, BG, US, NO. Based on: Planned Starcloud-2 TT&C stations: South Africa (Pretoria, RBC), Portugal (Azores, Leaf), Bulgaria (Kaspichan, Leaf), USA (Deadhorse and Fairbanks AK, RBC), Norway (Tromsø, KSAT)
System: Ka-band backup TT&C only (18.8-19.3 GHz down, 28.6-29.1 GHz up); primary communication via optical links to third-party constellations - Export control: US, our inference. Based on: Starcloud-1: 1x NVIDIA H100 (pre-launch statement); Starcloud-2: 'a GPU cluster' (no count stated by Starcloud)
- Home country: US. Based on: US
Supersmartcompute–CN–––CN–
- Full name
- Supersmartcompute intelligent-computing constellation (超智算·智算星座), first satellite Super Intelligent Computing-1 (超智算一号)
- State of registry
- not found in UNOOSA Online Index (newest China-registered launch there 2024-12-19, searched 2026-11-01)
- Launch state
- China (Jiuquan Satellite Launch Center; Lijian-1 Y18)
- Authorization: CN, our inference. Based on: CN
- Home country: CN. Based on: CN
Adagio-XL–US–––US–
- Full name
- Adagio-XL
- Authorization: US, our inference. Based on: US
- Home country: US. Based on: US
LEOcloud Space Edge–US–––US–
- Full name
- LEOcloud Space Edge
- State of registry
- not determined: hosted on the ISS; module not stated in the releases read
- Launch state
- US (Cape Canaveral LC-40; inferred delivery flight Cygnus NG-23)
- Authorization: US, our inference. Based on: US
- Home country: US. Based on: US
Xingshu Plan–CN–––CN–
- Full name
- Xingshu Plan (星枢计划) space computing constellation, Shanghai
- State of registry
- not applicable: no launch found
- Ground segment
- ground optical phased-array reception planned for 400 Gbps optical links (location not stated)
- Authorization: CN, our inference. Based on: CN
- Home country: CN. Based on: CN
Yaotai–CN–––CN–
- Full name
- 瑶台 (Yaotai) space computing satellites / 太空算力中心 (space AI computing centre)
- Launch state
- CN (Jiuquan, Kuaizhou-11 Y7, 2026-03-16)
- Authorization: CN, our inference. Based on: CN
- Home country: CN. Based on: CN
Three-Body–CN–CN–CN–
- Full name
- Three-Body Computing Constellation (三体计算星座)
- State of registry
- not found in UNOOSA Online Index: newest China-registered object there launched 2024-12-19 (all 1086 'China' hits read, 2026-11-01); China's latest UN submission listed is ST/SG/SER.E/1315 (2026)
- Launch state
- China (Jiuquan Satellite Launch Center 2025-05-14; Dongfeng commercial space innovation test zone 2026-07-24)
- Ground segment
- China: Three-Body Computing Constellation command centre at Zhejiang Lab, Hangzhou
- Authorization: CN, our inference. Based on: CN
- Ground stations: CN. Based on: China: Three-Body Computing Constellation command centre at Zhejiang Lab, Hangzhou
- Home country: CN. Based on: CN
How to read this grid
Each row is a system with at least one checked fact about registration, launch, filings or ground stations. Each column is a lever a country may hold over it. A cell names the country. Plain text means a source we read says so. Italics mean we inferred it from a rule and a checked fact. A cell appears only when every value behind it has passed its check. Open a row to see those values. All levers, shown or not, are in levers.csv.
4.4 National space rules
Rules by country
For each country, what its law reaches on five levers, with the instrument and section. On paper means a rule's text reaches it. Present means an authority has applied it to a system in this register. Tested means it was challenged, enforced or reviewed.
- Space activity authorisation: a national space licence for operators that covers a compute payload.
- Ground segment: earth-station or landing-rights authorisation, and whether it can carry conditions.
- Export and remote access: controls on transferring control of compute in orbit, or on remote access to it.
- Service and market rules: AI, data or cloud rules that attach to services offered to residents.
- Disclosure: any public register or filing that would reveal compute or power of space objects.
| Country | Space activity authorisation | Ground segment | Export and remote access | Service and market rules | Disclosure |
|---|---|---|---|---|---|
| United Arab Emirates | on paper (Federal Decree by Law No. (46) of 2023 Concerning the Regulation of the Space Sector (repeals Federal Law No. 12 of 2019); Cabinet resolutions on authorisations (not read), Art. 3 scope; Art. 4(1)(e) regulated activities; Art. 5(1) permits) | on paper (TDRA General Space Services Licence (telecom licensing under the UAE telecommunications law, not read); Decree-Law 46/2023 Art. 5(8) (satellite communications need a UAE Space Agency NOC and a final TDRA permit), DL 46/2023 Art. 5(8); WAM report of TDRA licence grant) | on paper (Federal Decree by Law No. (46) of 2023, Art. 5(7) (assignment of space-activity permit needs Agency approval); export control law Federal Decree-Law No. 43 of 2021 on goods subject to non-proliferation not read, DL 46/2023 Art. 5(7)) | on paper (Federal Decree by Law No. (45) of 2021 Concerning the Protection of Personal Data (PDPL), Art. 2(1)(c) scope) | not yet checked |
| Australia | on paper (Space (Launches and Returns) Act 2018 Part 3 Div 5 overseas payload permit (s.46B, s.46C), applied in the Australian Space Agency 'Decisions about space activities' table, s.46B(1)(b), s.46C; decision of 15/04/2025 (Akula Tech Pty Ltd)) | not yet checked | on paper (Defence Trade Controls Act 2012 s.10B (re-supply outside Australia of DSGL goods or technology first exported from Australia) and s.5 definition of 'supply', s.10B(1)(d)(i), (e); s.5 'supply') | on paper (Privacy Act 1988 s.5B (extra-territorial operation, 'Australian link'), s.5B(1A), (3)) | on paper (Space (Launches and Returns) Act 2018 s.76 Register of Space Objects (public), s.76(2)(e), s.76(5); Register entry 04/2025 'Espresso and Nexus-01') |
| Canada | on paper (Radiocommunication Act (R.S.C. 1985, c. R-2) s.5(1)(a)(i.1) spectrum licence for space stations, procedure ISED CPC-2-6-02 issue 7, Act s.5(1); CPC-2-6-02 s.1 and s.5.1.1) | on paper (Radiocommunication Act s.5; ISED earth station spectrum licences (SMS/TAFL satellite extract) and CPC-2-6-04 issue 3 foreign-licensed satellite approval, Act s.5(1)(a); CPC-2-6-04 s.7.5 and Annex B; earth station call signs XJ436 and VF885 naming network D-ISIPELE-C) | on paper (ISED CPC-2-6-02 (Issue 7), s.5.1.3) | on paper (Personal Information Protection and Electronic Documents Act (S.C. 2000, c. 5) Part 1, s.4(1)) | not yet checked |
| China | on paper (PRC Radio Regulations (中华人民共和国无线电管理条例, State Council/CMC Order No. 672) Art. 30: space radio station licence by MIIT (national radio administration); enforcement in MIIT Radio Administration Bureau 2025 space-service 'double random' inspection results, Art. 27, Art. 30 para 2; MIIT notice 2026-02-12) | on paper (PRC Radio Regulations Art. 30 (gateway and international earth stations licensed by MIIT; other fixed stations by provincial radio administrations) and Art. 32 (licence content); MIIT 2025 inspection of satellite earth stations, Art. 30, Art. 32; MIIT notice 2026-02-12) | on paper (Regulations on Export Control of Dual-Use Items (两用物项出口管制条例, State Council Order No. 792), under the Export Control Law (2020), Art. 2) | on paper (Interim Measures for the Management of Generative AI Services (生成式人工智能服务管理暂行办法), CAC with NDRC, MOE, MOST, MIIT, MPS, NRTA, Art. 2, Art. 20) | not yet checked |
| Finland | on paper (Laki avaruustoiminnasta / Act on Space Activities 63/2018, s.5 (authorisation) with s.4(1) definition and s.1 scope, s.4(1), s.5(1)) | on paper (Laki sähköisen viestinnän palveluista / Act on Electronic Communications Services 917/2014, s.39 (radio licence) and s.42 (licence conditions), Traficom, s.39(1), s.42(1)) | on paper (Act on Space Activities 63/2018, s.11 (transfer of space objects and space activities), s.11(1)-(2)) | on paper (Regulation (EU) 2024/1689 (AI Act) Art. 2(1); Regulation (EU) 2016/679 (GDPR) Art. 3(2), directly applicable in Finland, AI Act Art. 2(1)(a),(c); GDPR Art. 3(2)) | on paper (Act on Space Activities 63/2018, s.6 public registry of space objects (TEM), s.6(1)-(2), item 4) |
| United Kingdom | on paper (Space Industry Act 2018 (c. 5) s.1(4) and s.3(1) operator licence; Outer Space Act 1986 (c. 38) s.1 and s.3 for UK persons' activities outside the UK, SIA 2018 s.1(4) 'space activity', s.3(1); OSA 1986 s.1) | on paper (Wireless Telegraphy Act 2006 (c. 36) s.8 and s.9; Ofcom Satellite (Non-Geostationary Earth Station) gateway and network licences, WTA 2006 s.9(1)) | on paper (Space Industry Act 2018 s.15 (transfer of licence); Outer Space Act 1986 s.5(2)(e)(iv) (licence conditions), SIA s.15(1)-(2); OSA s.5(2)(e)(iv)) | on paper (UK GDPR (retained Regulation (EU) 2016/679 as amended), Art. 3(2)(a)) | on paper (UK register of space objects and launches, CAA CAP 2207 (SIA 2018 s.61, OSA 1986 s.7), CAP 2207 entry fields) |
| Malaysia | on paper (Malaysian Space Board Act 2022 (Act 834), Part IV licensing; Malaysian Space Board Regulations 2024 (not read), s.16(1) licence; s.17 launch permit; s.18(1) launch certificate) | on paper (Communications and Multimedia Act 1998 (Act 588) s.157 and Communications and Multimedia (Spectrum) Regulations 2000: apparatus assignment for earth stations; MCMC Register of Apparatus Assignments (Earth Station), CMA 1998 s.157 (as summarised on MCMC page)) | absent (Strategic Trade Act 2010 (Act 708), definitions as restated in MITI Intangible Technology Transfer (ITT) Guideline, s.2 'export' (via MITI ITT Guideline p.1)) | on paper (Online Safety Act 2025 (Act 866), s.3 Territorial and extra-territorial application, subss.(1)-(3); s.2(1) scope) | not yet checked |
| Netherlands | on paper (Wet ruimtevaartactiviteiten (Space Activities Act, BWBR0021418) art. 1(b), 2(1), 3(1), art. 1(b), art. 3(1); art. 3(3) conditions) | on paper (Telecommunicatiewet (BWBR0009950) art. 3.13 (frequency-use licence) and art. 3.14 (restrictions and conditions), Rijksinspectie Digitale Infrastructuur, art. 3.13(1), art. 3.14(1)-(4)) | on paper (Wet ruimtevaartactiviteiten art. 8 (licence not transferable) with art. 3(1), art. 8(1)-(2)) | on paper (Regulation (EU) 2024/1689 (AI Act) Art. 2(1); Regulation (EU) 2016/679 (GDPR) Art. 3(2), directly applicable in the Netherlands, AI Act Art. 2(1)(a),(c); GDPR Art. 3(2)) | on paper (Wet ruimtevaartactiviteiten art. 11 (register of space objects), RDI Nationaal Register Ruimtevoorwerpen, art. 11(1)-(2); register column 'Omschrijving/functie ruimtevoorwerp') |
| Norway | on paper (Lov om aktiviteter i verdensrommet (romloven), LOV-2025-12-22-128, §§ 2, 3, 5, 6, § 2(c), § 5) | on paper (Forskrift om etablering, drift og bruk av jordstasjon for satellitt på Svalbard, FOR-2017-04-21-493 (Nkom); ekomloven LOV-2024-12-13-76 § 11-2 and § 11-5 (frequency licence conditions), Svalbard reg. §§ 3, 4, 7; ekomloven § 11-5) | on paper (Romloven LOV-2025-12-22-128 § 7 (Overdragelser), § 7(1)(a)-(c), § 7(2)) | on paper (Personopplysningsloven LOV-2018-06-15-38 § 1 (GDPR as Norwegian law via the EEA Agreement) and § 4 (territorial scope), § 4(2)) | not yet checked |
| Singapore | on paper (IMDA Licence for the Use of Satellite Orbital Slot (granted under the Telecommunications Act 1999 framework; procedure in IMDA 'Guidelines on the Submission of Application for the Grant of Licence for the Use of Satellite Orbital Slot'), Guidelines paras 2.1, 2.2, 2.5) | on paper (IMDA Satellite Communication Station Licence (Telecommunications Act 1999), Application Guidelines with licence conditions, Requirements para 1; Licence Conditions; cancellation under s.10 of the Act) | absent (Strategic Goods (Control) Act 2002, s.2 definitions of 'export' and 'transmit'; s.5(1)) | on paper (Personal Data Protection Act 2012, s.2(1) definition of 'organisation') | not public (NSAS national registry of space objects, under the non-binding Guidelines for Singapore-related Space Activities, Guidelines para 2.1; Registration Form Sections F-G) |
| United States | not yet checked | on paper (FCC earth station licensing, 47 CFR 25.115(a) and 25.102(a); applied in FCC 18-184 (Swarm consent decree, unauthorised earth-station transmissions), 47 CFR 25.115(a)(1)(i); FCC 18-184 para 3) | on paper (Export Administration Regulations 15 CFR 734.13(a)(3) (control transfer of spacecraft); ITAR 22 CFR 120.50(a)(3); remote-access licence condition in Supp. No. 2 to Part 748 para (dd) added by FR 2026-00789 (91 FR 1684), 15 CFR 734.13(a)(3) [81 FR 35603, 2016-06-03]; 734.18(a)(1); 22 CFR 120.50(a)(3); 15 CFR Part 748 Supp. 2 (dd)(1)(v)-(vii)) | on paper (Children's Online Privacy Protection Act (15 USC 6501-6506) and FTC COPPA Rule, 16 CFR Part 312, 16 CFR 312.2 definition of Operator) | present (FCC public notice and public filing of space station applications, 47 CFR 25.151 (ICFS); applied in DA 26-113 (SpaceX Orbital Data Center system), 47 CFR 25.151(a)(1); DA 26-113) |
5 Launch cost and cadence
SpaceX mass to orbit and launch counts, by quarter. Each row is checked against its cited source. Rows marked our estimate are derived from SpaceX's filings by subtraction. The download gives the method. The full series, with prices, revenue per kg and each row's verdict, is in launch-series.csv.
| Figure | Basis | Source |
|---|---|---|
| launches_starship: Q1 2025: 2; Q4 2025: 1; Q1 2026: 0; FY2023: 2; FY2024: 4; FY2025: 5 launches (filing definition: successful orbital and flight tests) (2023-2026-Q1, Starship) | our estimate | www.sec.gov · www.sec.gov |
| mass_to_orbit_total: 450 metric tons (2025-Q1, all SpaceX) | SpaceX's SEC filings | www.sec.gov |
| launches_falcon_total: 41 launches (2025-Q4, Falcon (F9 + FH)) | our estimate | www.sec.gov · www.sec.gov |
| mass_to_orbit_total: 586 metric tons (2025-Q4, all SpaceX) | our estimate | www.sec.gov · www.sec.gov |
| mass_to_orbit_total: 556 metric tons (2026-Q1, all SpaceX) | SpaceX's SEC filings | www.sec.gov |
| launches_falcon_total: 37 launches (2026-Q2, Falcon (F9 + FH combined)) | SpaceX's SEC filings | www.sec.gov |
| launches_starship: 1 launches (2026-Q2, Starship) | SpaceX's SEC filings | www.sec.gov |
| mass_to_orbit_customer: 87 metric tons (2026-Q2, all SpaceX) | SpaceX's SEC filings | www.sec.gov |
| mass_to_orbit_internal: 397 metric tons (2026-Q2, all SpaceX) | SpaceX's SEC filings | www.sec.gov |
| mass_to_orbit_total: 485 metric tons (2026-Q2, all SpaceX) | SpaceX's SEC filings | www.sec.gov |
| launches_falcon_customer: 12 launches (2026-Q3, Falcon) | SpaceX's SEC filings | www.sec.gov |
| launches_falcon_internal: 21 launches (2026-Q3, Falcon) | SpaceX's SEC filings | www.sec.gov |
| launches_falcon_total: 33 launches (2026-Q3, Falcon (Falcon 9 and Falcon Heavy combined)) | SpaceX's SEC filings | www.sec.gov |
| launches_starship: 2 launches (2026-Q3, Starship) | SpaceX's SEC filings | www.sec.gov |
| mass_to_orbit_customer: 119 metric tons (2026-Q3, all SpaceX) | SpaceX's SEC filings | www.sec.gov |
| mass_to_orbit_internal: 358 metric tons (2026-Q3, all SpaceX) | SpaceX's SEC filings | www.sec.gov |
| mass_to_orbit_total: 476 metric tons (2026-Q3, all SpaceX (Falcon + Starship)) | SpaceX's SEC filings | www.sec.gov |
6 What the forms do not ask for
No filing form, register or catalogue we found asks for computing power, chip type, heat, tenants or customer checks.
What we checked
We read FCC Schedule S and ITU Appendix 4. We read UN registration under Article IV of the Registration Convention. We read the public satellite catalogues Space-Track, CelesTrak and GCAT. The last open power column was in the UCS Satellite Database. It stopped in May 2023. So this register records what operators say. Where it can, it adds an upper limit from physics.
Seen from the ground
Brightness data could one day show how big a satellite's arrays are. We searched the public databases on 2026-11-01. The IAU CPS SCORE database has no brightness data for any of the 55 flown objects we looked up. The Mini-MegaTORTORA survey (Karpov et al. 2016) has 60 tracks of 20 of them. That is too little to bound anything yet. Counts and links per object are in observation.csv. We do not republish magnitudes.
7 Dated events
Each filing of a system shown here that has a date and a status in the record, newest first. The date is the one the record gives for the filing. The status is the one the record gives, in its own words, and may be later than that date.
| Date | System | Filing | Status in the record | Source |
|---|---|---|---|---|
| 14 Oct 2026 | Aethero | FCC | Granted | apps.fcc.gov, undated (live database); apps.fcc.gov, 2026-09-03 |
| 19 Aug 2026 | Kepler Compute | ISED | listed | ised-isde.canada.ca, 2026-08-19 |
| 23 Jul 2026 | Aethero | FCC | Grant Expired Due to New License | apps.fcc.gov, undated (live database); apps.fcc.gov, 2026-09-03 |
| 24 Jun 2026 | Orbital Datacenter System | FCC SAT-LOA-20260624-00251 | Pending Review | fccprod.servicenowservices.com, undated (live record; Status Date 2026-07-15); docs.fcc.gov, 2026-07-31; api-prod.fcc.gov, 2026-09-11 |
| 28 May 2026 | Kepler Compute | ISED | in SMS extract | www.ic.gc.ca, 2026-10-05 |
| 11 May 2026 | Stampede Data Center System | FCC SAT-LOA-20260323-00135 | Pending Review | fccprod.servicenowservices.com, undated (live record; Status Date 2026-05-19); docs.fcc.gov, 2026-06-12; api-prod.fcc.gov, 2026-09-18 |
| 2 Apr 2026 | Aethero | FCC | Granted | apps.fcc.gov, undated (live database) |
| 19 Mar 2026 | Project Sunrise | FCC SAT-LOA-20260310-00118 | Pending Payment (status date 2026-03-19) | fccprod.servicenowservices.com, undated (live record; Status Date 2026-03-19); api-prod.fcc.gov, 2026-09-18 |
| 12 Mar 2026 | Starcloud | FCC | Pending (status date 03/12/2026) | apps.fcc.gov, 2026-03-12 |
| 5 Mar 2026 | Aethero | FCC | Grant Expired Due to New License | apps.fcc.gov, undated (live database) |
| 4 Feb 2026 | Starcloud | FCC SAT-LOA-20260202-00073 | Pending Review | fccprod.servicenowservices.com, undated (live record; Status Date 2026-02-05); api-prod.fcc.gov, 2026-09-16; api-prod.fcc.gov, 2026-09-11; api-prod.fcc.gov, 2026-10-20 |
| 30 Jan 2026 | SpaceX | FCC SAT-LOA-20260108-00016 | Pending Review | fccprod.servicenowservices.com, undated (live record; Status Date 2026-01-30); api-prod.fcc.gov, 2026-02-04 |
| 9 Jun 2025 | NOVI smart satellites with SP240 on-board computers: partner and customer software run in orbit | FCC SAT-LOA-20250609-00140 | granted with conditions 2025-12-11 | api-prod.fcc.gov, 2025-06 (application narrative); docs.fcc.gov, 2025-12-12 |
| 8 Nov 2024 | Starcloud | FCC | Grant Expired Due to New License | apps.fcc.gov, 2025-06-02 |
| 21 Jan 2020 | Kepler Compute | ITU | CR notice received 21.01.2020 | www.itu.int, 2026-10-27 |
8 Method, sources, citation, downloads
Cite
Space compute register, Ω Observatory, Horizon Omega, edition of 2 Nov 2026. https://observatory.horizonomega.org/space-compute/. CC BY 4.0.
Published by Horizon Omega under CC BY 4.0. Send corrections to observatory@horizonomega.org.
What counts, and how values are checked
A system is in this register when it offers general-purpose computing in space. That covers space data centres, orbital cloud and edge compute, hosted compute payloads, and AI in orbit. The computing can serve the operator or its customers. Processing that serves only a satellite's own payload is left out. Each system is recorded from its first announcement. Every value cites a source. A value appears here only after someone other than its author has checked it against those sources. The stage of a launched system, and every physical estimate, also need a second, independent check. Solar array area gives an upper limit on power. Radiator area gives one on heat. Where a size is stated, we show the upper limit it implies. Programs left out under an earlier, narrower rule (computing offered as a service to others) were screened again under the rule above.
The numbers on this page are our counts. They use each system's checked stage. We track 53 systems. This page shows the 48 whose name and stage passed a check. The other 5 are in the downloads, marked unverified.
Full method: method.txt.
Downloads
- register.csv every system and value, each with its check verdict
- register.jsonl the same, one system per line
- claims-ledger.csv every claim and its standing verdict
- objects.csv flown objects by system
- bounds.csv our estimated upper limits
- excluded.csv programs considered and left out, with the reason
- levers.csv jurisdiction levers, shown or not
- launch-series.csv SpaceX launch series
- observation.csv ground observation counts
- method.txt the method
The downloads hold every system and value. Each value carries its check verdict. Values that have not passed are unverified.