{"site_id": "CA-AB-aeso-p3075-balzac-area-load", "name": "Balzac Area Load", "aliases": ["P3075 Balzac Area Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 06-Calgary", "address": null, "lat": 51.04561, "lon": -114.05754, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 45.0, "mw_basis": "requested", "mw_note": "Requested in stages: 30 MW (requested in-service date 2026-08-01), 15 MW (requested in-service date 2028-08-01).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3075", "date": "2024-12-18", "outcome": "pending", "conditions": "Status 'Active', Stage 2", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Active | P3075 Balzac Area Load | 06-Calgary | Data Load | Stage 2 | EN1 DTS 30 | EN2 DTS 15", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 45 MW of data-centre load in its 06-Calgary planning area (project P3075, filed 2024-12-18); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 45.0, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3078-calgary-a-i-centre-load", "name": "Calgary A.I. Centre Load", "aliases": ["P3078 Calgary A.I. Centre Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 06-Calgary", "address": null, "lat": 51.04561, "lon": -114.05754, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "proposed", "status_date": "2026-10-09", "mw": 74.9, "mw_basis": "requested", "mw_note": "Requested: 74.9 MW (requested in-service date 2029-01-15).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3078", "date": "2024-12-19", "outcome": "pending", "conditions": "Status 'Active', Stage 2", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Active | P3078 Calgary A.I. Centre Load | 06-Calgary | Data Load | Stage 2 | EN1 DTS 74.9", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 74.9 MW of data-centre load in its 06-Calgary planning area (project P3078, filed 2024-12-19). AESO does not name the applicant or the exact site, so no owner or tenant can be given; the AI label comes only from the project's name.", "checked": "2026-10-25", "mw_figures": [{"mw": 74.9, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"ai": "speculative"}, "tenant_countries": {}} {"site_id": "CA-AB-aeso-p3077-calgary-enterprise-a-i-load", "name": "Calgary Enterprise A.I. Load", "aliases": ["P3077 Calgary Enterprise A.I. Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 06-Calgary", "address": null, "lat": 51.04561, "lon": -114.05754, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "proposed", "status_date": "2026-10-09", "mw": 74.9, "mw_basis": "requested", "mw_note": "Requested: 74.9 MW (requested in-service date 2029-01-15).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3077", "date": "2024-12-19", "outcome": "pending", "conditions": "Status 'Active', Stage 2", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Active | P3077 Calgary Enterprise A.I. Load | 06-Calgary | Data Load | Stage 2 | EN1 DTS 74.9", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 74.9 MW of data-centre load in its 06-Calgary planning area (project P3077, filed 2024-12-19); AESO does not name the applicant or the exact site. AESO does not name the applicant, so no owner or tenant can be given; the AI label comes only from the project's name.", "checked": "2026-10-25", "mw_figures": [{"mw": 74.9, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"ai": "speculative"}, "tenant_countries": {}} {"site_id": "CA-AB-aeso-p3157-clearwater-technology-park-data-load", "name": "Clearwater Technology Park Data Load", "aliases": ["P3157 Clearwater Technology Park Data Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 06-Calgary", "address": null, "lat": 51.04561, "lon": -114.05754, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 74.9, "mw_basis": "requested", "mw_note": "Requested: 74.9 MW (requested in-service date 2028-11-20).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3157", "date": "2025-11-04", "outcome": "pending", "conditions": "Status 'Active', Stage 2", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Active | P3157 Clearwater Technology Park Data Load | 06-Calgary | Data Load | Stage 2 | EN1 DTS 74.9", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 74.9 MW of data-centre load in its 06-Calgary planning area (project P3157, filed 2025-11-04); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 74.9, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3156-high-plains-east-industrial-park", "name": "High Plains East Industrial Park", "aliases": ["P3156 High Plains East Industrial Park"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 06-Calgary", "address": null, "lat": 51.04561, "lon": -114.05754, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 300.0, "mw_basis": "requested", "mw_note": "Requested: 300 MW (in-service date under review).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3156", "date": "2026-02-28", "outcome": "pending", "conditions": "Status 'ISD Under Review', Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "ISD Under Review | P3156 High Plains East Industrial Park | 06-Calgary | Data Load | Stage 1 | EN1 DTS 300", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 300 MW of data-centre load in its 06-Calgary planning area (project P3156, filed 2026-02-28); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 300.0, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p2952-north-calgary-one-data-centre-mpc-load", "name": "North Calgary One Data Centre MPC Load", "aliases": ["P2952 North Calgary One Data Centre MPC Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 06-Calgary", "address": null, "lat": 51.04561, "lon": -114.05754, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 74.9, "mw_basis": "requested", "mw_note": "Requested: 74.9 MW (requested in-service date 2027-03-26).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P2952", "date": "2024-09-11", "outcome": "pending", "conditions": "Status 'Active', Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Active | P2952 North Calgary One Data Centre MPC Load | 06-Calgary | Data Load | Stage 1 | EN1 DTS 74.9", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 74.9 MW of data-centre load in its 06-Calgary planning area (project P2952, filed 2024-09-11); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 74.9, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3112-north-calgary-three-data-centre-mpc-load", "name": "North Calgary Three Data Centre MPC Load", "aliases": ["P3112 North Calgary Three Data Centre MPC Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 06-Calgary", "address": null, "lat": 51.04561, "lon": -114.05754, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 450.0, "mw_basis": "requested", "mw_note": "Requested: 450 MW (in-service date under review).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3112", "date": "2025-04-22", "outcome": "pending", "conditions": "Status 'ISD Under Review', Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "ISD Under Review | P3112 North Calgary Three Data Centre MPC Load | 06-Calgary | Data Load | Stage 1 | EN1 DTS 450", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 450 MW of data-centre load in its 06-Calgary planning area (project P3112, filed 2025-04-22); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 450.0, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p2953-north-calgary-two-data-centre-mpc-load", "name": "North Calgary Two Data Centre MPC Load", "aliases": ["P2953 North Calgary Two Data Centre MPC Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 06-Calgary", "address": null, "lat": 51.04561, "lon": -114.05754, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 74.9, "mw_basis": "requested", "mw_note": "Requested: 74.9 MW (requested in-service date 2027-03-26).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P2953", "date": "2024-09-11", "outcome": "pending", "conditions": "Status 'Active', Stage 2", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Active | P2953 North Calgary Two Data Centre MPC Load | 06-Calgary | Data Load | Stage 2 | EN1 DTS 74.9", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 74.9 MW of data-centre load in its 06-Calgary planning area (project P2953, filed 2024-09-11); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 74.9, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3116-rocky-view-data-center-mpc-load", "name": "Rocky View Data Center MPC Load", "aliases": ["P3116 Rocky View Data Center MPC Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 06-Calgary", "address": null, "lat": 51.04561, "lon": -114.05754, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 800.0, "mw_basis": "requested", "mw_note": "Requested in stages: 400 MW (in-service date under review), 400 MW (in-service date under review).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3116", "date": "2025-05-21", "outcome": "pending", "conditions": "Status 'ISD Under Review', Stage 2", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "ISD Under Review | P3116 Rocky View Data Center MPC Load | 06-Calgary | Data Load | Stage 2 | EN1 DTS 400 | EN2 DTS 400", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 800 MW of data-centre load in its 06-Calgary planning area (project P3116, filed 2025-05-21); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 800.0, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3283-bbpi-mpc-gas-data-load", "name": "BBPI MPC Gas Data Load", "aliases": ["P3283 BBPI MPC Gas Data Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 26-Swan Hills", "address": null, "lat": 54.71807, "lon": -115.40083, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 600.0, "mw_basis": "requested", "mw_note": "Requested in stages: 200 MW (requested in-service date 2030-03-29), 200 MW (requested in-service date 2030-11-29), 200 MW (requested in-service date 2031-08-01). The same request includes 600 MW of gas generation.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "Cluster 3 connection request (Gas + Data Load)", "ref": "P3283", "date": "2026-08-06", "outcome": "pending", "conditions": "Status 'Cluster 3', Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Cluster 3 | P3283 BBPI MPC Gas Data Load | 26-Swan Hills | Gas + Data Load | Stage 1 | EN1 DTS 200 | EN2 DTS 200 | EN3 DTS 200", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 600 MW of data-centre load with 600 MW of on-site gas generation in its 26-Swan Hills planning area (project P3283, filed 2026-08-06); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 600.0, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3326-ursa-major-gas-data-load", "name": "Ursa Major Gas Data Load", "aliases": ["P3326 Ursa Major Gas Data Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 26-Swan Hills", "address": null, "lat": 54.71807, "lon": -115.40083, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 466.0, "mw_basis": "requested", "mw_note": "Requested: 466 MW (requested in-service date 2029-01-01). The same request includes 466 MW of gas generation.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "Cluster 3 connection request (Gas + Data Load)", "ref": "P3326", "date": "2026-08-06", "outcome": "pending", "conditions": "Status 'Cluster 3', Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Cluster 3 | P3326 Ursa Major Gas Data Load | 26-Swan Hills | Gas + Data Load | Stage 1 | EN1 DTS 466", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 466 MW of data-centre load with 466 MW of on-site gas generation in its 26-Swan Hills planning area (project P3326, filed 2026-08-06); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 466.0, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3198-lynx-data-load", "name": "Lynx Data Load", "aliases": ["P3198 Lynx Data Load", "P3204 Lynx Data Load Phase 2"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 33-Fort Saskatchewan", "address": null, "lat": 53.71286, "lon": -113.21489, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 3600.0, "mw_basis": "requested", "mw_note": "P3198: 1,800 MW requested 2026-02-27; P3204 (Phase 2): 1,800 MW requested 2026-05-07; in-service dates under review.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3198", "date": "2026-02-27", "outcome": "pending", "conditions": "Status 'ISD Under Review', Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}, {"authority": "AESO", "instrument": "load connection request", "ref": "P3204", "date": "2026-05-07", "outcome": "pending", "conditions": "Status 'ISD Under Review', Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "ISD Under Review | P3198 Lynx Data Load | 33-Fort Saskatchewan | Data Load | Stage 1 | EN1 DTS 1800 | P3204 Lynx Data Load Phase 2 | 33-Fort Saskatchewan | EN1 DTS 1800", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "Two requests to AESO, Alberta's grid operator, to connect 1,800 MW of data-centre load each (3,600 MW in total) in its 33-Fort Saskatchewan planning area (projects P3198 and P3204, filed 2026-02-27 and 2026-05-07); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 3600.0, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3281-rimbey-mpc-gas-data-load", "name": "Rimbey MPC Gas Data Load", "aliases": ["P3281 Rimbey MPC Gas Data Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 35-Red Deer", "address": null, "lat": 52.26906, "lon": -113.81415, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 600.0, "mw_basis": "requested", "mw_note": "Requested in stages: 200 MW (requested in-service date 2029-09-21), 200 MW (requested in-service date 2031-07-25), 200 MW (requested in-service date 2031-07-25). The same request includes 600 MW of gas generation.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "Cluster 3 connection request (Gas + Data Load)", "ref": "P3281", "date": "2026-08-06", "outcome": "pending", "conditions": "Status 'Cluster 3', Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Cluster 3 | P3281 Rimbey MPC Gas Data Load | 35-Red Deer | Gas + Data Load | Stage 1 | EN1 DTS 200 | EN2 DTS 200 | EN3 DTS 200", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 600 MW of data-centre load with 600 MW of on-site gas generation in its 35-Red Deer planning area (project P3281, filed 2026-08-06); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 600.0, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3066-leedale-data-load", "name": "Leedale Data Load", "aliases": ["P3066 Leedale Data Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 38-Caroline", "address": null, "lat": 52.0943, "lon": -114.73917, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 1864.0, "mw_basis": "requested", "mw_note": "Requested: 1,864 MW (in-service date under review).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3066", "date": "2024-11-11", "outcome": "pending", "conditions": "Status 'ISD Under Review', Stage 2", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "ISD Under Review | P3066 Leedale Data Load | 38-Caroline | Data Load | Stage 2 | EN1 DTS 1864", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 1,864 MW of data-centre load in its 38-Caroline planning area (project P3066, filed 2024-11-11); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 1864.0, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3282-nexus-west-mpc-gas-data-load", "name": "Nexus West MPC Gas Data Load", "aliases": ["P3282 Nexus West MPC Gas Data Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 38-Caroline", "address": null, "lat": 52.0943, "lon": -114.73917, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 600.0, "mw_basis": "requested", "mw_note": "Requested in stages: 200 MW (requested in-service date 2029-11-30), 200 MW (requested in-service date 2031-02-21), 200 MW (requested in-service date 2031-02-21). The same request includes 600 MW of gas generation.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "Cluster 3 connection request (Gas + Data Load)", "ref": "P3282", "date": "2026-08-06", "outcome": "pending", "conditions": "Status 'Cluster 3', Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Cluster 3 | P3282 Nexus West MPC Gas Data Load | 38-Caroline | Gas + Data Load | Stage 1 | EN1 DTS 200 | EN2 DTS 200 | EN3 DTS 200", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 600 MW of data-centre load with 600 MW of on-site gas generation in its 38-Caroline planning area (project P3282, filed 2026-08-06); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 600.0, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3101-carstairs-technology-park-mpc-load", "name": "Carstairs Technology Park MPC Load", "aliases": ["P3101 Carstairs Technology Park MPC Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 39-Didsbury", "address": null, "lat": 51.65677, "lon": -114.13757, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 950.0, "mw_basis": "requested", "mw_note": "Requested in stages: 650 MW (in-service date under review), 300 MW (in-service date under review).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3101", "date": "2025-03-17", "outcome": "pending", "conditions": "Status 'ISD Under Review', Stage 2", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "ISD Under Review | P3101 Carstairs Technology Park MPC Load | 39-Didsbury | Data Load | Stage 2 | EN1 DTS 650 | EN2 DTS 300", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 950 MW of data-centre load in its 39-Didsbury planning area (project P3101, filed 2025-03-17); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 950.0, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3284-resilion-mpc-gas-data-load", "name": "ResiliON MPC Gas Data Load", "aliases": ["P3284 ResiliON MPC Gas Data Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 40-Wabamun", "address": null, "lat": 53.55927, "lon": -114.47831, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 800.0, "mw_basis": "requested", "mw_note": "Requested: 800 MW of load and 800 MW of gas generation, in five stages from January 2030 to July 2031.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "Cluster 3 connection request (Gas + Data Load)", "ref": "P3284", "date": "2026-08-06", "outcome": "pending", "conditions": "Status 'Cluster 3', Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Cluster 3 | P3284 ResiliON MPC Gas Data Load | 40-Wabamun | Gas + Data Load | Stage 1 | EN1 DTS 800", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 800 MW of data-centre load with on-site gas generation in its 40-Wabamun planning area (project P3284, filed 2026-08-06); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 800.0, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3136-sundance-data-mpc-load", "name": "Sundance Data MPC Load", "aliases": ["P3136 Sundance Data MPC Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 40-Wabamun", "address": null, "lat": 53.55927, "lon": -114.47831, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 401.0, "mw_basis": "requested", "mw_note": "Requested: 401 MW (in-service date under review).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3136", "date": "2025-08-07", "outcome": "pending", "conditions": "Status 'ISD Under Review', Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "ISD Under Review | P3136 Sundance Data MPC Load | 40-Wabamun | Data Load | Stage 1 | EN1 DTS 401", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 401 MW of data-centre load in its 40-Wabamun planning area (project P3136, filed 2025-08-07); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 401.0, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3227-sheerness-data-load", "name": "Sheerness Data Load", "aliases": ["P3227 Sheerness Data Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 43-Sheerness", "address": null, "lat": 51.5, "lon": -111.68333, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 74.9, "mw_basis": "requested", "mw_note": "Requested: 74.9 MW (requested in-service date 2028-02-04).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3227", "date": "2026-07-06", "outcome": "pending", "conditions": "Status 'Active', Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Active | P3227 Sheerness Data Load | 43-Sheerness | Data Load | Stage 1 | EN1 DTS 74.9", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 74.9 MW of data-centre load in its 43-Sheerness planning area (project P3227, filed 2026-07-06); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 74.9, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3137-sheerness-data-mpc-load", "name": "Sheerness Data MPC Load", "aliases": ["P3137 Sheerness Data MPC Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 43-Sheerness", "address": null, "lat": 51.5, "lon": -111.68333, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 800.0, "mw_basis": "requested", "mw_note": "Requested: 800 MW (in-service date under review).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3137", "date": "2025-08-07", "outcome": "pending", "conditions": "Status 'ISD Under Review', Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "ISD Under Review | P3137 Sheerness Data MPC Load | 43-Sheerness | Data Load | Stage 1 | EN1 DTS 800", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 800 MW of data-centre load in its 43-Sheerness planning area (project P3137, filed 2025-08-07); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 800.0, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3285-wildcat-mpc-gas-data-load", "name": "Wildcat MPC Gas Data Load", "aliases": ["P3285 Wildcat MPC Gas Data Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 44-Seebe", "address": null, "lat": 51.09912, "lon": -115.05112, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 150.0, "mw_basis": "requested", "mw_note": "Requested in stages: 50 MW (requested in-service date 2029-07-27), 50 MW (requested in-service date 2030-01-25), 50 MW (requested in-service date 2030-11-29). The same request includes 192 MW of gas generation.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "Cluster 3 connection request (Gas + Data Load)", "ref": "P3285", "date": "2026-08-06", "outcome": "pending", "conditions": "Status 'Cluster 3', Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Cluster 3 | P3285 Wildcat MPC Gas Data Load | 44-Seebe | Gas + Data Load | Stage 1 | EN1 DTS 50 | EN2 DTS 50 | EN3 DTS 50", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 150 MW of data-centre load with 192 MW of on-site gas generation in its 44-Seebe planning area (project P3285, filed 2026-08-06); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 150.0, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3216-georgetown-data-load", "name": "Georgetown Data Load", "aliases": ["P3216 Georgetown Data Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 45-Strathmore/Blackie", "address": null, "lat": 51.04355, "lon": -113.39985, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 72.9, "mw_basis": "requested", "mw_note": "Requested: 72.9 MW (requested in-service date 2029-08-31).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3216", "date": "2026-06-01", "outcome": "pending", "conditions": "Status 'Active', Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Active | P3216 Georgetown Data Load | 45-Strathmore/Blackie | Data Load | Stage 1 | EN1 DTS 72.9", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 72.9 MW of data-centre load in its 45-Strathmore/Blackie planning area (project P3216, filed 2026-06-01); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 72.9, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3280-nexus-east-mpc-gas-data-load", "name": "Nexus East MPC Gas Data Load", "aliases": ["P3280 Nexus East MPC Gas Data Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 48-Empress", "address": null, "lat": 50.95528, "lon": -110.0084, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 600.0, "mw_basis": "requested", "mw_note": "Requested in stages: 200 MW (requested in-service date 2030-03-22), 200 MW (requested in-service date 2031-05-31), 200 MW (requested in-service date 2031-05-31). The same request includes 600 MW of gas generation.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "Cluster 3 connection request (Gas + Data Load)", "ref": "P3280", "date": "2026-08-06", "outcome": "pending", "conditions": "Status 'Cluster 3', Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Cluster 3 | P3280 Nexus East MPC Gas Data Load | 48-Empress | Gas + Data Load | Stage 1 | EN1 DTS 200 | EN2 DTS 200 | EN3 DTS 200", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 600 MW of data-centre load with 600 MW of on-site gas generation in its 48-Empress planning area (project P3280, filed 2026-08-06); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 600.0, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3106-alberta-south-a-i-load", "name": "Alberta South A.I. Load", "aliases": ["P3106 Alberta South A.I. Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 54-Lethbridge", "address": null, "lat": 49.69458, "lon": -112.8331, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "proposed", "status_date": "2026-10-09", "mw": 400.0, "mw_basis": "requested", "mw_note": "Requested: 400 MW (in-service date under review).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3106", "date": "2025-02-26", "outcome": "pending", "conditions": "Status 'ISD Under Review', Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "ISD Under Review | P3106 Alberta South A.I. Load | 54-Lethbridge | Data Load | Stage 1 | EN1 DTS 400", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 400 MW of data-centre load in its 54-Lethbridge planning area (project P3106, filed 2025-02-26); AESO does not name the applicant or the exact site. AESO does not name the applicant, so no owner or tenant can be given; the AI label comes only from the project's name.", "checked": "2026-10-25", "mw_figures": [{"mw": 400.0, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"ai": "speculative"}, "tenant_countries": {}} {"site_id": "CA-AB-aeso-p3126-sollair-load", "name": "Sollair Load", "aliases": ["P3126 Sollair Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 57-Airdrie", "address": null, "lat": 51.28597, "lon": -114.01062, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 4.99, "mw_basis": "requested", "mw_note": "Requested: 4.99 MW (requested in-service date 2027-12-10).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3126", "date": "2025-06-17", "outcome": "pending", "conditions": "Status 'Active', Stage 2", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Active | P3126 Sollair Load | 57-Airdrie | Data Load | Stage 2 | EN1 DTS 4.99", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 4.99 MW of data-centre load in its 57-Airdrie planning area (project P3126, filed 2025-06-17); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 4.99, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-aeso-p3174-sovereign-cloud-data-load", "name": "Sovereign Cloud Data Load", "aliases": ["P3174 Sovereign Cloud Data Load"], "operator": "undisclosed (AESO does not name applicants)", "owner": null, "tenants": [], "province": "AB", "municipality": "AESO planning area 60-Edmonton", "address": null, "lat": 53.54621, "lon": -113.49124, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 74.9, "mw_basis": "requested", "mw_note": "Requested: 74.9 MW (requested in-service date 2029-12-31).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3174", "date": "2026-01-19", "outcome": "pending", "conditions": "Status 'Active', Stage 2", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Active | P3174 Sovereign Cloud Data Load | 60-Edmonton | Data Load | Stage 2 | EN1 DTS 74.9", "supports": ["name", "mw", "status", "approvals", "municipality"], "kind": "public_record"}], "confidence": "medium", "notes": "A request to AESO, Alberta's grid operator, to connect 74.9 MW of data-centre load in its 60-Edmonton planning area (project P3174, filed 2026-01-19); AESO does not name the applicant or the exact site.", "checked": "2026-10-25", "mw_figures": [{"mw": 74.9, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-qu-airdrie-cgy3", "name": "CGY3", "aliases": ["Qu Airdrie CGY3", "Rogers Calgary DC3 (Airdrie)"], "operator": "Qu Data Centres", "owner": "InfraRed Capital Partners (Qu Data Centres Limited Partnership), both part of SLC Management (Sun Life)", "tenants": [], "province": "AB", "municipality": "Airdrie", "address": "34 Highland Park Way NE, Airdrie, AB T4A 2L5", "lat": 51.30346, "lon": -113.98297, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 9, "mw_basis": "buildout", "mw_note": "Operator: expandable to 9 MW at full design; 80,000 sq ft building with 42,600 sq ft of raised floor; Tier III certified.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://qudatacentres.com/locations/calgary-data-centre", "title": "Calgary data centres (Qu Data Centres)", "date": "undated", "quote": "At 80,000 ft² with 42,600 ft² of raised floor and expandable capacity to 9 MW, it is purpose-built for the scale that energy sector operations technology and AI infrastructure demand.", "supports": ["name", "operator", "municipality", "type", "status", "mw"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/5810", "title": "PeeringDB: Rogers Calgary DC3 (Airdrie)", "date": "2025-09-26", "quote": "34 Highland Park Way NE", "supports": ["address", "aliases"], "kind": "directory"}, {"url": "https://www.renx.ca/qu-data-centres-manage-infrared-former-rogers-dc-portfolio", "title": "RENX: Qu Data Centres founded to manage former Rogers DC portfolio", "date": "2025-12-09", "kind": "press", "quote": "will be operated by an entity called the Qu Data Centres Limited Partnership , new owner InfraRed Capital Partners has announced", "supports": ["owner"]}, {"url": "https://www.renx.ca/qu-data-centres-manage-infrared-former-rogers-dc-portfolio", "title": "RENX: Qu Data Centres to manage InfraRed's former Rogers DC portfolio", "date": "2025-12-09", "quote": "Qu Data Centres and InfraRed Capital Partners are subsidiaries of Canadian-owned SLC Management", "supports": ["owner", "ownership_country"], "kind": "press"}], "confidence": "medium", "notes": "Marketed as AI-ready; a peering directory gives Calgary as the city, but the postal code and operator page put it in Airdrie. InfraRed Capital Partners bought it with eight other Rogers data centres in 2025 and runs them as Qu, which calls itself Canadian-owned.", "checked": "2026-10-25", "mw_figures": [{"mw": 9, "basis": "buildout", "stage": "planned", "date": "undated", "source_idx": 0}], "ownership_country": "Canada", "field_confidence": {"location": "likely", "ai": "speculative", "owner": "likely"}} {"site_id": "CA-AB-avaxone-bantry", "name": "Bantry Data Site", "aliases": [], "operator": "AVAX One Technology Ltd. (prospective acquirer)", "owner": null, "tenants": [], "province": "AB", "municipality": "Bantry area (County of Newell)", "address": null, "lat": 50.67201, "lon": -111.68663, "coord_precision": "area", "type": "ai_hpc", "ai": "unknown", "status": "announced", "status_date": "2026-07-01", "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://albertadatacentrewatch.ca", "title": "Alberta Data Centre Watch: project listing", "date": "2026-07-31", "quote": "Subject to a non-binding acquisition letter of intent; closing and development are not confirmed", "supports": ["status", "operator"], "kind": "directory"}, {"url": "https://data.sec.gov/submissions/CIK0001826397.json", "title": "SEC EDGAR company record, AVAX One Technology Ltd.", "date": "undated", "kind": "public_record", "quote": "\"name\":\"AVAX ONE TECHNOLOGY LTD.\" | \"city\":\"WEST PALM BEACH\",\"stateOrCountry\":\"FL\" | \"stateOfIncorporation\":\"A1\"", "supports": ["operator"]}, {"url": "https://www.nasdaq.com/press-release/avax-one-signs-non-binding-letter-intent-acquire-powered-data-center-site-alberta", "title": "AVAX One signs non-binding letter of intent to acquire powered data center site in Alberta (GlobeNewswire)", "date": "2026-07-01", "kind": "proponent", "quote": "signed a non-binding letter of intent (the “LOI”) to acquire the Bantry Data Site, an energy-advantaged data center site in Alberta, Canada", "supports": ["status", "status_date", "operator", "type"]}], "confidence": "high", "notes": "AVAX One is a British Columbia company with its business address in West Palm Beach, Florida (SEC filings), and its SEC filings since January 2026 do not mention Bantry.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {}, "tenant_countries": {}} {"site_id": "CA-AB-teton-black-bear", "name": "Black Bear Campus", "aliases": ["Black Bear Gas Data Load", "Teton Digital Black Bear Campus"], "operator": "Teton Digital", "owner": "Teton Digital, LLC", "tenants": [], "province": "AB", "municipality": "Big Lakes County", "address": "Power plant site: SE and SW 15-64-11-W5M, about 24 km south-west of Swan Hills", "lat": 54.53254, "lon": -115.57319, "coord_precision": "area", "type": "ai_hpc", "ai": "unknown", "status": "approved", "status_date": "2024-07-12", "mw": 200, "mw_basis": "requested", "mw_note": "AESO Cluster 3 request P3211: 200 MW of data load with 466 MW of gas supply. Teton's 466 MW (460 MW in the AUC approval) is the power plant's capacity, not the data centre's load; another 466 MW request in the same area (P3326, Ursa Major) has no confirmed link to it.", "power_source": "onsite gas", "opened": null, "expected_online": "2028", "approvals": [{"authority": "AUC", "instrument": "power-plant approval (Black Bear Combined-Cycle Power Plant)", "ref": "Decision 28964-D01-2024; Approval 28964-D02-2024", "date": "2024-07-12", "outcome": "approved", "conditions": "Approves a 460 MW combined-cycle power plant only, not the data centre; transferred from Kiwetinohk to Black Bear Power Plant Inc. (Nexilon Power) on 2026-06-11.", "url": "https://prd-api-efiling20.auc.ab.ca/Anonymous/DownloadPublicDocumentAsync/809080"}, {"authority": "IAAC", "instrument": "designated project review (Black Bear Power Plant)", "ref": "IAAC 88747", "date": "2024-12-23", "outcome": "approved", "conditions": "No further federal assessment required; not a construction approval.", "url": "https://iaac-aeic.gc.ca/050/evaluations/proj/88747"}, {"authority": "AESO", "instrument": "Cluster 3 connection request (gas + data load)", "ref": "P3211", "date": "2026-08-06", "outcome": "pending", "conditions": "Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.tetondigital.io/projects", "title": "Teton Digital: Projects", "date": "undated", "quote": "anchored by two flagship Alberta projects — the fully permitted 466 MW Black Bear and the 200 MW Northern Forge", "supports": ["mw", "operator", "name"], "kind": "proponent"}, {"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "P3211 Black Bear Gas Data Load | 26-Swan Hills | Gas + Data Load | 1 | 200 | 466", "supports": ["approvals", "status"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca", "title": "Alberta Data Centre Watch: project listing", "date": "2026-08-19", "quote": "The underlying power plant has approvals, but the data centre campus remains a proponent proposal", "supports": ["approvals"], "kind": "directory"}, {"url": "https://www.tetondigital.io/about", "title": "Teton Digital, About", "date": "undated", "kind": "proponent", "quote": "Teton Digital, LLC is a Wyoming-headquartered developer of large-scale, vertically integrated power generation and Tier-compatible data center campuses.", "supports": ["owner", "ownership_country"]}, {"url": "https://prd-api-efiling20.auc.ab.ca/Anonymous/DownloadPublicDocumentAsync/809080", "title": "AUC Decision 28964-D01-2024: Black Bear Combined-Cycle Power Plant and Substation", "date": "2024-07-12", "quote": "a thermal power plant that would generate up to 460 megawatts (MW) of power", "supports": ["approvals", "status", "status_date", "mw_note", "municipality", "address"], "kind": "public_record"}, {"url": "https://prd-api-efiling20.auc.ab.ca/Anonymous/DownloadPublicDocumentAsync/858085", "title": "AUC Decision 30847-D01-2026: Black Bear power plant approval transfer", "date": "2026-06-11", "quote": "Black Bear Power Plant Inc., a wholly owned subsidiary of Nexilon Power Inc.", "supports": ["approvals"], "kind": "public_record"}, {"url": "https://www.tetondigital.io/projects", "title": "Teton Digital: Projects (pipeline table)", "date": "undated", "kind": "proponent", "quote": "Federally & provincially permitted; AESO Cluster 3 filed; Q3 2028 target", "supports": ["expected_online"]}, {"url": "https://iaac-aeic.gc.ca/050/evaluations/proj/88747", "title": "IAAC registry: Black Bear Power Plant Project", "date": "2024-12-23", "kind": "public_record", "quote": "decided that an assessment of the designated project is not required", "supports": ["approvals"]}], "confidence": "medium", "notes": "The plant approval is now held by Black Bear Power Plant Inc., a Nexilon Power subsidiary; no source states how it relates to Teton Digital.", "checked": "2026-10-25", "mw_figures": [{"mw": 200, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 1}], "ownership_country": "United States", "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-woodcote-big-lakes", "name": "Woodcote Big Lakes Cryptocurrency Facility", "aliases": [], "operator": "Woodcote Inc.", "owner": null, "tenants": [], "province": "AB", "municipality": "Big Lakes County", "address": "SW 7-76-9-W5, north of the Lesser Slave Lake narrows", "lat": 55.558, "lon": -115.375, "coord_precision": "area", "type": "crypto", "ai": "no", "status": "approved", "status_date": "2026-09-23", "mw": null, "mw_basis": null, "mw_note": "The applicant says its gas generation will be under 1 MW.", "power_source": "onsite gas", "opened": null, "expected_online": null, "approvals": [{"authority": "Big Lakes County", "instrument": "discretionary development permit (Cryptocurrency Data Mining)", "ref": "26-D0053", "date": "2026-09-23", "outcome": "approved", "conditions": "Recommended: work to start within 12 months; other permits and provincial approvals required; structure protection plan. Appeal deadline 2026-10-13.", "url": "https://biglakescounty.ca/approved-development-permits-7/"}, {"authority": "Alberta Forestry and Parks", "instrument": "Crown disposition for cryptocurrency use", "ref": "DLO260101", "date": "2026-07-03", "outcome": "approved", "conditions": "Licence of occupation, effective 2026-07-03 to 2048-01-23.", "url": "https://pub-biglakescounty.escribemeetings.com/FileStream.ashx?DocumentId=3949"}], "ownership": null, "sources": [{"url": "https://biglakescounty.ca/approved-development-permits-7/", "title": "Big Lakes County: approved development permits", "date": "2026-09-23", "quote": "26-D0053 Cryptocurrency Data Mining (Discretionary Use) SW 7-76-9-W5 (East of the Hamlet of Grouard)", "supports": ["approvals", "status", "address", "type"], "kind": "public_record"}, {"url": "https://pub-biglakescounty.escribemeetings.com/FileStream.ashx?DocumentId=3949", "title": "Big Lakes County: Request for Decision, Development Permit Application 26-D0053", "date": "2026-09-22", "kind": "public_record", "quote": "an application for a development permit from Woodcote Inc. to place cryptocurrency equipment within an existing oil and gas lease site on SW 7-76-9-W5", "supports": ["operator", "address", "approvals", "power_source", "mw_note"]}, {"url": "https://biglakescounty.ca/approved-development-permits-7/", "title": "Point estimated from the legal land description SW 7-76-9-W5 (Alberta Township System)", "date": "2026-10-25", "kind": "estimate", "quote": "26-D0053 Cryptocurrency Data Mining (Discretionary Use) SW 7-76-9-W5", "supports": ["lat", "lon"]}], "confidence": "high", "notes": "Cryptocurrency mining equipment in a shipping container on an existing oil and gas lease site. The point is estimated from the legal land description, about 50 km east of Grouard.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-crusoe-alsike", "name": "Alsike Energy Park Data Centre", "aliases": ["Crusoe Alsike Energy Park", "Crusoe/Kalina Alsike"], "operator": "Crusoe / KALiNA Distributed Power", "owner": "Crusoe (data centre, planned); KALiNA Distributed Power (power plant)", "tenants": [], "province": "AB", "municipality": "Brazeau County", "address": null, "lat": 53.19119, "lon": -114.46478, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "announced", "status_date": "2026-10-09", "mw": null, "mw_basis": null, "mw_note": "AESO request P3153 (280 MW data load) is listed as recently cancelled. KALiNA plans a 170 MW gas plant at each energy park, and AESO lists a new 178 MW gas-generation request (P3251, filed 2026-10-05).", "power_source": "onsite gas (proposed)", "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3153", "date": "2024-10-11", "outcome": "withdrawn", "conditions": "Reason not published; AESO lists the request as recently cancelled.", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Recently Cancelled | P3153 Alsike Energy Park MPC Data Load | 30-Drayton Valley | 280 | Cancelled", "supports": ["approvals", "status"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca", "title": "Alberta Data Centre Watch: project listing", "date": "2026-09-03", "quote": "Named in a three-site development framework; AESO's August 2026 list shows the separate 280 MW Alsike data-load request as recently cancelled", "supports": ["operator", "municipality"], "kind": "directory"}, {"url": "https://www.newswire.ca/news-releases/kalina-power-and-crusoe-sign-framework-agreement-for-joint-development-of-multiple-co-sited-ai-data-centre-projects-in-alberta-886151615.html", "title": "KALiNA Power and Crusoe Sign Framework Agreement", "date": "2025-02-12", "kind": "proponent", "quote": "Anticipates Crusoe to own and operate its AI Data Centres contracting for affordable power with KALiNA's owned and operated Power-CCS plants", "supports": ["owner"]}, {"url": "https://data.sec.gov/submissions/CIK0001770688.json", "title": "SEC EDGAR company record: Crusoe Energy Systems Inc.", "date": "undated", "quote": "\"name\":\"Crusoe Energy Systems Inc.\", \"stateOfIncorporation\":\"DE\", business address city \"DENVER\", \"CO\"", "supports": ["ownership_country", "notes"], "kind": "public_record"}, {"url": "https://www.newswire.ca/news-releases/kalina-power-and-crusoe-sign-framework-agreement-for-joint-development-of-multiple-co-sited-ai-data-centre-projects-in-alberta-886151615.html", "title": "KALiNA Power and Crusoe sign framework agreement (CNW)", "date": "2025-02-12", "kind": "proponent", "quote": "Each of KALiNA's 170 MW Power-CCS plant represents gross unlevered capex of ~CAD$1 billion", "supports": ["mw_note", "power_source"]}, {"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "kind": "public_record", "quote": "P3251 Alsike Gas | Cluster | Gas | 1 | 2026-10-05 | 0 | 3 | 178", "supports": ["mw_note"]}], "confidence": "low", "notes": "AESO lists the 280 MW grid request as cancelled, but the Crusoe and KALiNA three-site plan has not been publicly withdrawn, so the project is shown as announced. Alberta Data Centre Watch and the AESO planning area place it near Warburg in Brazeau County. Crusoe's ownership is uncertain: a 2025 framework anticipated it, but no project agreement had been announced as of 2026-10-25. KALiNA Distributed Power is a subsidiary of KALiNA Power Limited, listed on the Australian exchange (ASX). Crusoe Energy Systems is a Delaware company with its business address in Denver (SEC records).", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "United States", "field_confidence": {"owner": "speculative"}, "tenant_countries": {}} {"site_id": "CA-AB-aws-calgary-ca-west-1", "name": "AWS Canada West (Calgary) Region", "aliases": ["ca-west-1"], "operator": "Amazon Web Services", "owner": null, "tenants": [], "province": "AB", "municipality": "Calgary", "address": null, "lat": 51.0447, "lon": -114.0719, "coord_precision": "city", "type": "hyperscale_cloud", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "AWS publishes no capacity; one industry directory lists 80 MW, which no primary source confirms.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://docs.aws.amazon.com/global-infrastructure/latest/regions/aws-regions.html", "title": "AWS Regions (AWS documentation)", "date": "undated", "quote": "ca-west-1 | Canada West (Calgary) | 3 | Canada", "supports": ["name", "aliases", "operator", "municipality", "status", "type"], "kind": "proponent"}, {"url": "https://aws.amazon.com/about-aws/global-infrastructure/regions_az/", "title": "Global Infrastructure Regions & AZs (AWS)", "date": "undated", "quote": "Canada West (Calgary)", "supports": ["status"], "kind": "proponent"}], "confidence": "medium", "notes": "AWS does not publish where its three Calgary-area availability zones are, so this point at the Calgary centre stands for several unnamed buildings.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely", "ai": "speculative"}} {"site_id": "CA-AB-arrow-calgary-dc2", "name": "Arrow Calgary DC2", "aliases": ["Arrow Datacenters NE Calgary"], "operator": "Arrow Datacenters Inc.", "owner": null, "tenants": [], "province": "AB", "municipality": "Calgary", "address": "2712 37th Ave NE, Calgary, AB T1Y 5L3", "lat": 51.08714, "lon": -113.99673, "coord_precision": "address", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://arrowcalgary.ca/", "title": "Arrow Datacenters Calgary Carrier-Neutral Facility", "date": "undated", "quote": "Arrow Datacenters Inc. runs a carrier-neutral facility in NE Calgary with N+1 power and cooling, access to multiple Tier 1 carriers", "supports": ["name", "operator", "type", "status", "municipality"], "kind": "proponent"}, {"url": "https://arrowcalgary.ca/", "title": "Arrow Datacenters Calgary Carrier-Neutral Facility", "date": "undated", "quote": "2712 37th Ave NE, Calgary, AB T1Y 5L3", "supports": ["address"], "kind": "proponent"}], "confidence": "high", "notes": "Arrow also lists an on-net presence in the downtown Cologix CGY1 building (840 7th Ave SW), not shown as a separate site.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely"}} {"site_id": "CA-AB-estruxture-calgary-cal1", "name": "CAL-1", "aliases": ["eStruxture CAL-1"], "operator": "eStruxture Data Centers", "owner": null, "tenants": [], "province": "AB", "municipality": "Calgary", "address": "7007 54th Street SE, Calgary, AB T2C 3C2", "lat": 50.99236, "lon": -113.95574, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": 15, "mw_basis": "unstated", "mw_note": "Operator page: total capacity 15 MW, 65,000 sq ft; its 2022 data sheet gave 9 MW (Alberta Data Centre Watch).", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.estruxture.com/data-centers/calgary/cal-1", "title": "CAL-1 Calgary data center (eStruxture)", "date": "undated", "quote": "CAL-1 is located near Calgary downtown at 7007 54th Street SE, Calgary, AB T2C 3C2", "supports": ["name", "operator", "address", "municipality", "status"], "kind": "proponent"}, {"url": "https://www.estruxture.com/data-centers/calgary/cal-1", "title": "CAL-1 Calgary data center (eStruxture)", "date": "undated", "quote": "The Calgary CAL-1 data center offers colocation services with high power density of up to 30kW per cabinet (higher upon request) with a total capacity of 15MW.", "supports": ["type", "mw"], "kind": "proponent"}], "confidence": "high", "notes": "Sources differ on the address: a peering directory gives 7007 69 Ave SE; the map uses the operator's 7007 54th Street SE.", "checked": "2026-10-25", "mw_figures": [{"mw": 15, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely"}} {"site_id": "CA-AB-cologix-calgary-cgy1", "name": "CGY1", "aliases": ["DataHiveOne", "Datahive Calgary (840 7th Ave SW)"], "operator": "Cologix", "owner": null, "tenants": [], "province": "AB", "municipality": "Calgary", "address": "840 7th Avenue SW, Calgary, AB T2P 3G2", "lat": 51.04722, "lon": -114.08012, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": 0.324, "mw_basis": "unstated", "mw_note": "Cologix lists 324 kW and 3,700 sq ft of data-centre space; Alberta Data Centre Watch lists 400 kW.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/calgary/cgy1/", "title": "Colocation in Calgary: CGY1 Data Center (Cologix)", "date": "undated", "quote": "CGY1 is conveniently located in downtown Calgary at 840 7th Avenue SW.", "supports": ["name", "operator", "address", "municipality", "status", "type"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/calgary/cgy1/", "title": "Colocation in Calgary: CGY1 Data Center (Cologix)", "date": "undated", "quote": "324kW", "supports": ["mw"], "kind": "proponent"}, {"url": "https://cologix.com/news/cologix-enters-new-canadian-market-with-strategic-calgary-carrier-hotel-acquisition/", "title": "Cologix Enters New Canadian Market With Strategic Calgary Carrier Hotel Acquisition", "date": "2025-10-22", "quote": "today announced its acquisition of DataHiveOne, Calgary’s primary carrier hotel and Western Canada’s hub for global interconnection", "supports": ["aliases", "operator"], "kind": "proponent"}], "confidence": "high", "notes": "Cologix bought DataHive's DataHiveOne carrier hotel in this building in October 2025; Arrow Datacenters also has a suite in the building.", "checked": "2026-10-25", "mw_figures": [{"mw": 0.324, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely"}} {"site_id": "CA-AB-qu-calgary-cgy1", "name": "CGY1", "aliases": ["Qu Calgary CGY1", "Rogers Calgary DC1 (Franklin Atrium)"], "operator": "Qu Data Centres", "owner": "InfraRed Capital Partners (Qu Data Centres Limited Partnership), both part of SLC Management (Sun Life)", "tenants": [], "province": "AB", "municipality": "Calgary", "address": "100-3015 5th Ave NE, Calgary, AB T2A 6K4", "lat": 51.05577, "lon": -113.99029, "coord_precision": "address", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": 2.6, "mw_basis": "facility", "mw_note": "Operator: 2.6 MW of utility power; 25,649 sq ft building.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://qudatacentres.com/locations/calgary-data-centre", "title": "Calgary data centres (Qu Data Centres)", "date": "undated", "quote": "CGY1 provides a proven colocation footprint in Calgary with 2.6 MW utility power, 510 tons of N+1 cooling, and seven carrier options", "supports": ["name", "operator", "municipality", "type", "status", "mw"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/1747", "title": "PeeringDB: Rogers Calgary DC1 (Franklin Atrium)", "date": "2025-09-26", "quote": "100-3015 5th Ave NE", "supports": ["address", "aliases"], "kind": "directory"}, {"url": "https://www.renx.ca/qu-data-centres-manage-infrared-former-rogers-dc-portfolio", "title": "RENX: Qu Data Centres founded to manage former Rogers DC portfolio", "date": "2025-12-09", "kind": "press", "quote": "will be operated by an entity called the Qu Data Centres Limited Partnership , new owner InfraRed Capital Partners has announced", "supports": ["owner"]}, {"url": "https://www.renx.ca/qu-data-centres-manage-infrared-former-rogers-dc-portfolio", "title": "RENX: Qu Data Centres to manage InfraRed's former Rogers DC portfolio", "date": "2025-12-09", "quote": "Qu Data Centres and InfraRed Capital Partners are subsidiaries of Canadian-owned SLC Management", "supports": ["owner", "ownership_country"], "kind": "press"}], "confidence": "medium", "notes": "Qu publishes no street address; the address comes from a peering directory record under the former Rogers name. InfraRed Capital Partners bought it with eight other Rogers data centres in 2025 and runs them as Qu, which calls itself Canadian-owned.", "checked": "2026-10-25", "mw_figures": [{"mw": 2.6, "basis": "facility", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": "Canada", "field_confidence": {"location": "likely", "ai": "likely", "owner": "likely"}} {"site_id": "CA-AB-qu-calgary-cgy2", "name": "CGY2", "aliases": ["Qu Calgary CGY2 Downtown", "Rogers Calgary DC2 (1313 10th Ave SW)"], "operator": "Qu Data Centres", "owner": "InfraRed Capital Partners (Qu Data Centres Limited Partnership), both part of SLC Management (Sun Life)", "tenants": [], "province": "AB", "municipality": "Calgary", "address": "1313 10th Ave SW, Calgary, AB T3C 3P9", "lat": 51.04386, "lon": -114.09199, "coord_precision": "address", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": 1.8, "mw_basis": "facility", "mw_note": "Operator: 1.8 MW of utility power, expandable to about 6 MW; 39,470 sq ft building with 32,000 sq ft of white space.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://qudatacentres.com/locations/calgary-data-centre", "title": "Calgary data centres (Qu Data Centres)", "date": "undated", "quote": "With 32,000 ft² of white space, 1.8 MW expandable to 6 MW, and unique access to City of Calgary carrier infrastructure", "supports": ["name", "operator", "municipality", "type", "status", "mw"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/1746", "title": "PeeringDB: Rogers Calgary DC2 (1313 10th Ave SW)", "date": "2025-09-26", "quote": "1313 10th Ave SW", "supports": ["address", "aliases"], "kind": "directory"}, {"url": "https://www.renx.ca/qu-data-centres-manage-infrared-former-rogers-dc-portfolio", "title": "RENX: Qu Data Centres founded to manage former Rogers DC portfolio", "date": "2025-12-09", "kind": "press", "quote": "will be operated by an entity called the Qu Data Centres Limited Partnership , new owner InfraRed Capital Partners has announced", "supports": ["owner"]}, {"url": "https://www.renx.ca/qu-data-centres-manage-infrared-former-rogers-dc-portfolio", "title": "RENX: Qu Data Centres to manage InfraRed's former Rogers DC portfolio", "date": "2025-12-09", "quote": "Qu Data Centres and InfraRed Capital Partners are subsidiaries of Canadian-owned SLC Management", "supports": ["owner", "ownership_country"], "kind": "press"}], "confidence": "medium", "notes": "Qu publishes no street address; the address comes from a peering directory record under the former Rogers name. InfraRed Capital Partners bought it with eight other Rogers data centres in 2025 and runs them as Qu, which calls itself Canadian-owned.", "checked": "2026-10-25", "mw_figures": [{"mw": 1.8, "basis": "facility", "stage": "built", "date": "undated", "source_idx": 0}, {"mw": 6, "basis": "facility", "stage": "planned", "date": "undated", "source_idx": 0}], "ownership_country": "Canada", "field_confidence": {"location": "likely", "ai": "likely", "owner": "likely"}} {"site_id": "CA-AB-equinix-calgary-cl1", "name": "CL1", "aliases": ["Equinix Calgary CL1"], "operator": "Equinix", "owner": null, "tenants": [], "province": "AB", "municipality": "Calgary", "address": "315 8th Avenue SW, Calgary, AB T2P 4K1", "lat": 51.04529, "lon": -114.06887, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Operator lists colocation space 1,203 m2 (12,949 ft2); no MW published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.equinix.com/data-centers/americas-colocation/canada-colocation/calgary-data-centers/cl1", "title": "Calgary CL1 (Equinix)", "date": "undated", "quote": "Learn about Equinix CL1 carrier-neutral data centre, located at 315 8th Avenue SW in Calgary, Canada.", "supports": ["name", "operator", "address", "municipality", "type", "status"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely"}} {"site_id": "CA-AB-equinix-calgary-cl2", "name": "CL2", "aliases": ["Equinix Calgary CL2"], "operator": "Equinix", "owner": null, "tenants": [], "province": "AB", "municipality": "Calgary", "address": "1930 Maynard Road SE, Calgary, AB T2E 6J8", "lat": 51.04798, "lon": -114.00937, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Operator lists colocation space 1,547 m2 (16,652 ft2); no MW published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.equinix.com/data-centers/americas-colocation/canada-colocation/calgary-data-centers/cl2", "title": "Calgary CL2 (Equinix)", "date": "undated", "quote": "Learn about Equinix CL2 carrier-neutral data centre, located at 1930 Maynard Road SE in Calgary, Canada.", "supports": ["name", "operator", "address", "municipality", "type", "status"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely"}} {"site_id": "CA-AB-equinix-calgary-cl3", "name": "CL3", "aliases": ["Equinix Calgary CL3", "Q9 Calgary Three"], "operator": "Equinix", "owner": null, "tenants": [], "province": "AB", "municipality": "Calgary", "address": "5300 86th Avenue SE, Calgary, AB T2C 4L7", "lat": 50.97662, "lon": -113.95659, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Operator lists colocation space 7,137 m2 (76,822 ft2); no MW published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.equinix.com/data-centers/americas-colocation/canada-colocation/calgary-data-centers/cl3", "title": "Calgary CL3 (Equinix)", "date": "undated", "quote": "Learn about Equinix CL3 carrier-neutral data centre, located at 5300 86th Avenue in Calgary, Canada.", "supports": ["name", "operator", "address", "municipality", "type", "status"], "kind": "proponent"}, {"url": "https://www.sec.gov/Archives/edgar/data/1101239/000156459020045402/d80601d991.htm", "title": "Equinix 8-K, exhibit 99.1 (Bell data centre acquisition), 2020-10-01", "date": "2020-10-01", "quote": "Calgary (CL1, CL2, CL3)", "supports": ["notes"], "kind": "public_record"}], "confidence": "high", "notes": "One of the 13 Bell data centres Equinix bought in 2020 (Equinix SEC filing, 2020-10-01).", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely"}} {"site_id": "CA-AB-datahive-calgary-datahivetwo", "name": "DataHiveTwo", "aliases": [], "operator": "DataHive", "owner": null, "tenants": [], "province": "AB", "municipality": "Calgary", "address": "4th Floor, 801 7 Avenue SW, Calgary, AB", "lat": 51.04654, "lon": -114.07926, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": "2025-10-22", "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/news/cologix-enters-new-canadian-market-with-strategic-calgary-carrier-hotel-acquisition/", "title": "Cologix Enters New Canadian Market With Strategic Calgary Carrier Hotel Acquisition (About DataHive)", "date": "2025-10-22", "quote": "The establishment of its new location, DataHiveTwo translates to an expansion of scope to include proactive and forensic cybersecurity, secure archival data storage", "supports": ["name", "operator", "status"], "kind": "proponent"}, {"url": "https://albertadatacentrewatch.ca/?project=datahive-two#project-map", "title": "Alberta Data Centre Watch: DataHiveTwo", "date": "2026-07-31", "quote": "4th Floor, 801 7 Avenue SW, Calgary", "supports": ["address", "municipality", "type"], "kind": "directory"}], "confidence": "low", "notes": "The address and colocation use come from Alberta Data Centre Watch; DataHive's own site gives no address for this location. An industry directory describes it as about 9,000 sq ft, opened in 2024 in the Nexen Building.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely", "ai": "likely"}} {"site_id": "CA-AB-denvr-calgary", "name": "Denvr Dataworks Calgary data centre", "aliases": ["Denvr Dataworks MSC1"], "operator": "Denvr Dataworks", "owner": null, "tenants": [], "province": "AB", "municipality": "Calgary", "address": null, "lat": 51.04561, "lon": -114.05754, "coord_precision": "city", "type": "ai_hpc", "ai": "yes", "status": "operating", "status_date": "2026-04-01", "mw": null, "mw_basis": "unstated", "mw_note": "No MW published; Denvr says it builds clusters as small as one to five megawatts.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "Denvr Dataworks (calls itself 'Proudly Canadian'; investors not named)", "sources": [{"url": "https://thelogic.co/news/the-big-read/denvr-artificial-intelligence-data-centres-canada/", "title": "The Logic: Denvr and AI data centres in Canada (press, paywalled)", "date": "2026-04-01", "quote": "Denvr's current data centre in southeast Calgary powers clients that include AI startups and researchers.", "supports": ["status", "status_date", "municipality", "ai", "operator"], "kind": "press"}, {"url": "https://denvr.com/", "title": "Denvr homepage", "date": "undated", "kind": "proponent", "quote": "Cloud and on-prem solutions built on sovereign Canadian infrastructure. | Proudly Canadian", "supports": ["ownership", "ownership_country"]}], "confidence": "low", "notes": "The address is published only as southeast Calgary, so the point is the city centre. The Logic reports that Denvr builds and owns its own data centres; clients are described only as AI startups and researchers (The Logic, 2026-04-01).", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-telus-calgary-idc", "name": "TELUS Calgary Internet Data Centre", "aliases": ["TELUS Calgary IDC"], "operator": "TELUS", "owner": null, "tenants": [], "province": "AB", "municipality": "Calgary", "address": null, "lat": 51.04395, "lon": -114.09597, "coord_precision": "address", "type": "colocation", "ai": "no", "status": "operating", "status_date": "2001-07-05", "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": "2001", "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.theglobeandmail.com/technology/telus-opens-two-new-internet-data-centres/article18416120/", "title": "Telus opens two new Internet data centres (Globe and Mail, press)", "date": "2001-07-05", "quote": "has committed more than $22-million to develop its Internet data centre in Calgary and $25-million for the Toronto facility.", "supports": ["name", "operator", "municipality", "opened"], "kind": "press"}], "confidence": "low", "notes": "Current status is not confirmed: the newest dated source is 2001 press, and TELUS's own page for the site is gone. Industry directories still list it as operating colocation at 1525 10 Ave SW.", "directory_only": false, "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely", "ai": "likely"}} {"site_id": "CA-AB-ktech-aurora-poc", "name": "K-Tech and Aurora AZ Energy Compute Facility (5 MW proof of concept)", "aliases": ["K-Tech / Aurora AZ Energy"], "operator": "K-Tech Solutions / Aurora AZ Energy (JV)", "owner": "Joint venture of K-Tech Solutions Company Limited (75%) and Aurora AZ Energy Ltd. (25%)", "tenants": [], "province": "AB", "municipality": "Calgary (registry category; site undisclosed)", "address": null, "lat": 51.04561, "lon": -114.05754, "coord_precision": "city", "type": "crypto", "ai": "partial", "status": "under_construction", "status_date": "2026-06", "mw": 5, "mw_basis": "unstated", "mw_note": "5 MW proof of concept under construction, within an initial phase of 100 MW of IT capacity; the joint venture plans a potential expansion up to 500 MW.", "power_source": "onsite gas (wellhead generation)", "opened": null, "expected_online": null, "approvals": [], "ownership": "K-Tech Solutions 75% / Aurora AZ Energy 25% (joint venture)", "sources": [{"url": "https://majorprojects.alberta.ca/details/K-Tech-and-Aurora-AZ-Energy-Compute-Facility/12173", "title": "Alberta Major Projects: K-Tech and Aurora AZ Energy Compute Facility", "date": "undated", "quote": "Stage: Under Construction", "supports": ["status", "name"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/2049187/000121390026028027/ea028181001ex10-2.htm", "title": "K-Tech Solutions 6-K exhibit 10.2, Supplemental joint venture agreement", "date": "2026-03-16", "kind": "public_record", "quote": "(i) K-Tech: 75% of the Units; (ii) Aurora: 25% of the Units. | Aurora AZ Energy Ltd., a company incorporated under the laws of Alberta, Canada", "supports": ["owner"]}, {"url": "https://data.sec.gov/submissions/CIK0002049187.json", "title": "SEC EDGAR company record, K-Tech Solutions Co Ltd", "date": "undated", "kind": "public_record", "quote": "\"city\":\"NEW TERRITORIES\",\"stateOrCountry\":\"K3\",\"stateOrCountryDescription\":\"Hong Kong\"", "supports": ["ownership_country"]}, {"url": "https://majorprojects.alberta.ca/details/K-Tech-and-Aurora-AZ-Energy-Compute-Facility/12173", "title": "Alberta Major Projects: K-Tech and Aurora AZ Energy Compute Facility", "date": "undated", "quote": "The initial phase of the joint venture will see the deployment of 100 MW of IT capacity with plans for potential expansion up to 500 MW.", "supports": ["mw_figures", "mw_note", "notes"], "kind": "public_record"}, {"url": "https://majorprojects.alberta.ca/details/K-Tech-and-Aurora-AZ-Energy-Compute-Facility/12173", "title": "Alberta Major Projects: K-Tech and Aurora AZ Energy Compute Facility", "date": "undated", "quote": "The construction has started on the first 5 MW serving as an operational proof-of-concept.", "supports": ["mw", "mw_figures", "status", "notes", "name"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/2049187/000121390026067526/ea029445401ex99-1.htm", "title": "K-Tech Solutions 6-K, exhibit 99.1, press release of 2026-06-11 (phrases confirmed by EDGAR full-text search)", "date": "2026-06-11", "quote": "initial 5 MW ... proof-of-concept ... onsite technical testing ... wellhead natural gas power", "supports": ["status_date", "power_source", "notes"], "kind": "public_record"}], "confidence": "medium", "notes": "A mixed AI, high-performance computing and bitcoin-mining joint venture. Alberta's major-projects registry describes the first 5 MW, now under construction, as the joint venture's operational proof of concept, and K-Tech's June 2026 SEC filing reports technical testing on wellhead natural gas power. The exact site is not public, so the point is the Calgary centre; Hong Kong is shown as K-Tech's home, as in its SEC filings.", "checked": "2026-10-25", "mw_figures": [{"mw": 5, "basis": "unstated", "stage": "building", "date": "2026-06", "source_idx": 4}, {"mw": 100, "basis": "it", "stage": "planned", "date": null, "source_idx": 3}, {"mw": 500, "basis": "buildout", "stage": "planned", "date": null, "source_idx": 3}], "ownership_country": "Hong Kong", "field_confidence": {"owner": "confirmed"}, "tenant_countries": {}} {"site_id": "CA-AB-datadistrict-calgary", "name": "Data District Calgary-region Facility", "aliases": ["Data District Calgary Data Center"], "operator": "Data District Inc. / Technologies New Energy", "owner": "Data District Inc. (a division of Alcral AG); Technologies New Energy supplies power", "tenants": [], "province": "AB", "municipality": "Calgary region", "address": null, "lat": 50.98515, "lon": -113.93394, "coord_precision": "area", "type": "ai_hpc", "ai": "unknown", "status": "announced", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Its share of the 240 MW Phase 1 programme is not stated.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://majorprojects.alberta.ca/details/Technologies-New-Energy-Data-District-Data-Centres-Phase-1/11969", "title": "Alberta Major Projects: TNE & Data District Data Centres (Phase 1)", "date": "undated", "quote": "Phase one of this investment is expected to include four data centre projects in Olds, Bonnyville, Calgary and Edmonton regions", "supports": ["operator", "municipality", "status"], "kind": "public_record"}, {"url": "https://www.tneplc.com/investors/", "title": "Technologies New Energy plc, Investor Relations", "date": "undated", "kind": "proponent", "quote": "Key information, documents and disclosures for shareholders and potential investors in Technologies New Energy plc. | 9th Floor, 107 Cheapside London EC2V 6DN – United Kingdom", "supports": ["notes"]}, {"url": "https://reddeeradvocate.com/2025/12/18/data-centre-announced-for-olds/", "title": "Data centre announced for Olds (Red Deer Advocate)", "date": "2025-12-18", "kind": "press", "quote": "Data District is a division of Swiss asset management firm Alcral AG.", "supports": ["owner", "ownership_country"]}], "confidence": "low", "notes": "The site is not known; the point is the provincial registry's placeholder. Data District Inc., reported in the press to be a division of the Swiss firm Alcral AG, is the data-centre developer; Technologies New Energy, a UK company, is to supply most of the power. No tenant is named.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Switzerland", "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-beacon-chestermere", "name": "Chestermere Enterprise AI Hub", "aliases": ["Beacon Chestermere AI Data Center Hub", "Chestermere AI Hub"], "operator": "Beacon Data Centers", "owner": "Beacon Data Centers (founded 2023 by Nadia Partners)", "tenants": [], "province": "AB", "municipality": "Chestermere", "address": "Pt. N 1/2 35-23-28-W4", "lat": 51.00328, "lon": -113.80241, "coord_precision": "address", "type": "ai_hpc", "ai": "yes", "status": "approved", "status_date": "2025-04-01", "mw": 400, "mw_basis": "requested", "mw_note": "AESO request P3107 (Chestermere Enterprise A.I. Load): 400 MW, in-service date under review; AESO does not name the applicant.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "City of Chestermere", "instrument": "Land Use Bylaw amendment adding Data Centre Campus as permitted use (~310 acres)", "ref": "Bylaw 014-25", "date": "2025-04-01", "outcome": "approved", "conditions": "Development permit and development agreement still required (Alberta Data Centre Watch).", "url": "https://thecityofchestermere.ca/cityhall/wp-content/uploads/sites/10/2025/03/Bylaw-014-25-LUB-Amendments-for-Data-Center.pdf"}, {"authority": "AESO", "instrument": "load connection request", "ref": "P3107", "date": "2025-02-26", "outcome": "pending", "conditions": "Stage 1; in-service date under review.", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://thecityofchestermere.ca/beacon-data-centre/", "title": "City of Chestermere: Beacon Data Centre", "date": "2025-02-27", "quote": "City Council received a presentation from Beacon Data Centres on a proposed data centre located within the City of Chestermere.", "supports": ["operator", "municipality", "ai"], "kind": "public_record"}, {"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "P3107 Chestermere Enterprise A.I. Load | 06-Calgary | Data Load | 1 | 400", "supports": ["mw", "approvals"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/beacon-chestermere-ai-data-center-hub/", "title": "Alberta Data Centre Watch: project profile", "date": "2026-09-07", "quote": "Council holds the public hearing and passes Bylaw 014-25 at second and third reading.", "supports": ["approvals", "status_date", "address"], "kind": "directory"}, {"url": "https://beacondatacenters.com/about/", "title": "Beacon Data Centers, About", "date": "undated", "kind": "proponent", "quote": "Founded in 2023 by Nadia Partners, a specialist investor in AI, digital infrastructure and energy infrastructure, Beacon Data Centers was established to deliver best-in-class digital infrastructure solutions", "supports": ["owner"]}, {"url": "https://beacondatacenters.com/news/", "title": "Beacon Data Centers, News (press excerpt)", "date": "2026-06", "kind": "proponent", "quote": "David Lane, CEO of Calgary-based Beacon Data Centers, said his company is planning to make a final decision on its first project in the province in the next six months.", "supports": ["owner"]}, {"url": "https://thecityofchestermere.ca/legislativeservices/resolutions-of-council/", "title": "City of Chestermere: resolutions of council (April 1, 2025 special meeting)", "date": "2025-04-01", "kind": "public_record", "quote": "Council give Third and Final Reading to Bylaw #014-25, being amendments to the Land Use Bylaw #020-24", "supports": ["approvals", "status", "status_date"]}], "confidence": "high", "notes": "Approved here means the land-use change only (Bylaw 014-25, passed 2025-04-01); no development permit has been confirmed. Beacon's own campus list no longer shows this site; Beacon is Calgary-based and was founded in 2023 by Nadia Partners, which states no home country, and no tenant is named.", "checked": "2026-10-25", "mw_figures": [{"mw": 400, "basis": "requested", "stage": "requested", "date": "2025-02-26", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-pathfinder-rocky5", "name": "Rocky 5 Bitcoin Mining Project", "aliases": ["Pathfinder Rocky 5"], "operator": "Pathfinder Energy Ltd. (in receivership)", "owner": null, "tenants": [], "province": "AB", "municipality": "Clearwater County", "address": "NE and SE 28-42-8-W5M, near Rocky Mountain House", "lat": 52.64687, "lon": -115.08704, "coord_precision": "address", "type": "crypto", "ai": "no", "status": "paused", "status_date": "2025-10-15", "mw": null, "mw_basis": null, "mw_note": "60 MW is the approved natural-gas generation's capacity, not the data centre's load, which has not been published.", "power_source": "onsite gas", "opened": null, "expected_online": null, "approvals": [{"authority": "AUC", "instrument": "power-plant approval and time extension", "ref": "Proceeding 29846, Decision 29846-D01-2025, Approval 29846-D02-2025", "date": "2025-03-28", "outcome": "approved", "conditions": "Not transferable without Commission approval; completion date extended to 2026-03-31.", "url": "https://prd-api-efiling20.auc.ab.ca/Anonymous/DownloadPublicDocumentAsync/833120"}], "ownership": null, "sources": [{"url": "https://albertadatacentrewatch.ca", "title": "Alberta Data Centre Watch: project listing", "date": "2026-09-16", "quote": "AUC approval remains documented, but Pathfinder and MCK entered receivership in October 2025; current ownership, construction, and operating status are unresolved", "supports": ["status", "approvals", "mw", "address"], "kind": "directory"}], "confidence": "low", "notes": "Shown as paused because Pathfinder and its partner MCK entered receivership on 2025-10-15; about 10 MW of the approved generation had been installed when the AUC extended the approval in 2025 (Alberta Data Centre Watch). Current ownership, construction and operation are unknown.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-emerson-trail-pldev20250629", "name": "Emerson Trail Data Processing Establishment", "aliases": ["Emerson Trail Data Centre"], "operator": "undisclosed", "owner": null, "tenants": [], "province": "AB", "municipality": "County of Grande Prairie No. 1", "address": "732041 Range Road 62, SW-14-73-6-W6", "lat": 55.31974, "lon": -118.81416, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "approved", "status_date": "2026-09-04", "mw": null, "mw_basis": null, "mw_note": "No MW published; the permit covers five buildings, 15 generators and 15 make-up air and cooling units, but does not approve how the site will be powered.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "County of Grande Prairie", "instrument": "development permit (data processing establishment, permitted use, with variances)", "ref": "PLDEV20250629", "date": "2026-09-04", "outcome": "approved", "conditions": "several approval conditions before construction; appealed to Land and Property Rights Tribunal, preliminary hearing 2026-10-26", "url": "https://www.countygp.ab.ca/business-building-development/data-centres/"}], "ownership": null, "sources": [{"url": "https://www.countygp.ab.ca/business-building-development/data-centres/", "title": "County of Grande Prairie: Data centres", "date": "undated", "quote": "Development permit PLDEV20250629 was approved for a data processing establishment, five buildings, 15 generators and 15 make-up air/cooling units.", "supports": ["approvals", "status", "address", "mw_note"], "kind": "public_record"}], "confidence": "high", "notes": "The permit has been appealed to the Land and Property Rights Tribunal (preliminary hearing 2026-10-26). The County has also approved a second data processing establishment (PLDEV20260129, listed separately) and five buildings with no stated use (PLDEV20260127).", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-AB-emerson-trail-pldev20260129", "name": "Emerson Trail data processing establishment (PLDEV20260129)", "aliases": [], "operator": "undisclosed", "owner": null, "tenants": [], "province": "AB", "municipality": "County of Grande Prairie No. 1", "address": "Emerson Trail Area Structure Plan lands (parcel not published)", "lat": 55.31974, "lon": -118.81416, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "approved", "status_date": "2026-05", "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "County of Grande Prairie", "instrument": "development permit (data processing establishment on land zoned RM-2)", "ref": "PLDEV20260129", "date": "2026-05", "outcome": "approved", "conditions": "not published", "url": "https://www.countygp.ab.ca/business-building-development/data-centres/"}], "ownership": null, "sources": [{"url": "https://www.countygp.ab.ca/business-building-development/data-centres/", "title": "County of Grande Prairie: Data centres", "date": "undated", "quote": "May 2026 – The first data processing establishment development permit approved PLDEV20260129 was approved for a data processing establishment on land already zoned Rural Medium Industrial (RM-2).", "supports": ["approvals", "status", "status_date"], "kind": "public_record"}], "confidence": "medium", "notes": "This may be the same developer or campus as permit PLDEV20250629; the point reuses that site's location.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "speculative"}} {"site_id": "CA-AB-fingermotion-brooks1", "name": "FingerMotion Brooks Campus #1", "aliases": ["FingerMotion Brooks Campus Zone, first site", "Newbit Brooks"], "operator": "FingerMotion, Inc. / BlueFlare Group Holdings", "owner": "FingerMotion, Inc. (acquiring Newbit Technology Inc., which holds the site; closing pending)", "tenants": [], "province": "AB", "municipality": "County of Newell", "address": "Brooks Campus #1 (Eastern Irrigation District surface lease)", "lat": 50.46986, "lon": -111.60226, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "proposed", "status_date": "2026-09-29", "mw": null, "mw_basis": null, "mw_note": "9.9 MW is the proposed on-site generation's capacity, part of a 99 MW Alberta programme; the data centre's own load is not stated.", "power_source": "onsite gas (behind the meter)", "opened": null, "expected_online": null, "approvals": [{"authority": "County of Newell", "instrument": "development permit (existing, held by Newbit)", "ref": "DP 2022055", "date": null, "outcome": "approved", "conditions": "Existing permit held by Newbit, as listed in FingerMotion's filing; replacement generation not yet approved.", "url": "https://ir.fingermotion.com/sec-filings/all-sec-filings/content/0001493152-26-044880/form8-k.htm"}, {"authority": "AEPA", "instrument": "EPEA approval (isolated generating unit, held by Newbit)", "ref": null, "date": null, "outcome": "approved", "conditions": "none published", "url": "https://ir.fingermotion.com/sec-filings/all-sec-filings/content/0001493152-26-044880/form8-k.htm"}, {"authority": "AUC", "instrument": "Rule 007 registration (isolated generating unit, held by Newbit)", "ref": null, "date": null, "outcome": "approved", "conditions": "none published", "url": "https://ir.fingermotion.com/sec-filings/all-sec-filings/content/0001493152-26-044880/form8-k.htm"}], "ownership": null, "sources": [{"url": "https://albertadatacentrewatch.ca", "title": "Alberta Data Centre Watch: project listing", "date": "2026-09-30", "quote": "Conditional Newbit acquisition; existing site permits reported; replacement generation, AI/HPC construction, and operation unconfirmed", "supports": ["status", "approvals", "mw"], "kind": "directory"}, {"url": "https://www.sec.gov/Archives/edgar/data/1602409/000149315226047254/form10-q.htm", "title": "FingerMotion, Inc. 10-Q", "date": "2026-10-15", "kind": "public_record", "quote": "On September 23, 2026, the Company entered into a share purchase agreement to acquire 100% of the outstanding shares of Newbit Technology Inc. | Newbit Technology Inc. holds the Brooks Campus #1 site", "supports": ["owner"]}, {"url": "https://data.sec.gov/submissions/CIK0001602409.json", "title": "SEC EDGAR company record, FingerMotion, Inc.", "date": "undated", "kind": "public_record", "quote": "\"city\":\"WEST PALM BEACH\",\"stateOrCountry\":\"FL\" | \"stateOfIncorporation\":\"DE\"", "supports": ["ownership_country"]}, {"url": "https://ir.fingermotion.com/sec-filings/all-sec-filings/content/0001493152-26-044880/form8-k.htm", "title": "FingerMotion, Inc. Form 8-K (Newbit share purchase agreement)", "date": "2026-09-29", "quote": "Environmental Protection and Enhancement Act (Alberta) approval and AUC Rule 007 registration in respect of the isolated generating unit at the Site", "supports": ["approvals", "notes"], "kind": "public_record"}], "confidence": "low", "notes": "FingerMotion's purchase of Newbit Technology, which holds the site and its permits, was due to close by 2026-10-29 and no closing has been reported; until then Newbit holds the site (its owners are not named). Gas offtake at the existing site has ceased and its generating equipment is to be removed before closing; BlueFlare would build and operate the new data centre, and FingerMotion says no customer has signed. FingerMotion is a Delaware company whose filings give its principal offices in Singapore.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "United States", "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-newell-p3109", "name": "Newell Data Center MPC Load", "aliases": ["AESO P3109"], "operator": "undisclosed", "owner": null, "tenants": [], "province": "AB", "municipality": "County of Newell", "address": null, "lat": 50.57103, "lon": -111.89301, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 1200, "mw_basis": "requested", "mw_note": "AESO request P3109: three stages of 400 MW, in-service dates under review.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3109", "date": "2025-04-17", "outcome": "pending", "conditions": "Stage 2; in-service dates under review.", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}, {"authority": "County of Newell", "instrument": "county-wide data-centre land-use bylaw", "ref": "Bylaw 2129-26", "date": "2026-09-10", "outcome": "pending", "conditions": "Public hearing held; third reading not confirmed. The bylaw would not itself approve this request (Alberta Data Centre Watch).", "url": "https://countyofnewell.ab.ca/public-hearings"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "P3109 Newell Data Center MPC Load | 47-Brooks | 2 | 400 | 400 | 400", "supports": ["mw", "status", "approvals"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/", "title": "Alberta Data Centre Watch: project listing", "date": "2026-09-29", "quote": "County-wide data centre rules remain proposed, and no project-specific development application or approval has been confirmed", "supports": ["approvals"], "kind": "directory"}], "confidence": "medium", "notes": "The developer is not disclosed; the point marks Brooks, the namesake of the AESO planning area.", "checked": "2026-10-25", "mw_figures": [{"mw": 1200, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-AB-firetech-ewing-lake", "name": "Fire Technology Ewing Lake Data Processing Centre", "aliases": [], "operator": "Fire Technology Corp.", "owner": null, "tenants": [], "province": "AB", "municipality": "County of Stettler No. 6", "address": "NE 33-36-21-W4M", "lat": 52.1393, "lon": -112.93958, "coord_precision": "address", "type": "crypto", "ai": "no", "status": "refused", "status_date": "2025-08-22", "mw": null, "mw_basis": null, "mw_note": "9.9 MW is the on-site natural-gas plant's capacity (nine generators), which kept its approval; it is not the data centre's load, and the data-processing use was revoked.", "power_source": "onsite gas", "opened": null, "expected_online": null, "approvals": [{"authority": "County of Stettler", "instrument": "development permit", "ref": "DP 24097", "date": "2024", "outcome": "approved", "conditions": "Later varied on appeal (Land and Property Rights Tribunal, 2025-08-22); the County's online copy of the permit no longer loads.", "url": "https://albertadatacentrewatch.ca/projects/"}, {"authority": "Land and Property Rights Tribunal", "instrument": "appeal of DP 24097", "ref": "LPRT2025/MG0520", "date": "2025-08-22", "outcome": "refused", "conditions": "Data-processing part revoked because the landowner-consent requirement was not met; power-generation approval kept with revised conditions.", "url": "https://albertadatacentrewatch.ca/?project=fire-technology-ewing-lake#project-map"}], "ownership": null, "sources": [{"url": "https://albertadatacentrewatch.ca/projects/", "title": "Alberta Data Centre Watch: project listing", "date": "2026-09-30", "quote": "Data-processing approval under DP 24097 revoked on August 22, 2025; power-generation approval preserved with revised conditions.", "supports": ["status", "approvals", "address"], "kind": "directory"}], "confidence": "low", "notes": "The tribunal decision is reported by Alberta Data Centre Watch and is not confirmed in the decision document itself. The power-generation part of the permit still stands.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-hut8-drumheller", "name": "Drumheller", "aliases": ["Hut 8 Drumheller"], "operator": "Hut 8 Corp.", "owner": null, "tenants": ["American Bitcoin"], "province": "AB", "municipality": "Drumheller", "address": null, "lat": 51.4016, "lon": -112.61852, "coord_precision": "city", "type": "crypto", "ai": "no", "status": "operating", "status_date": "2026-08-04", "mw": 42, "mw_basis": "unstated", "mw_note": "Hut 8 lists 42 MW output for the site, basis not stated.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "Hut 8 Corp. (United States, Delaware)", "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1964789/000110465926090025/hut-20260630x10q.htm", "title": "Hut 8 Corp. 10-Q (period to 2026-06-30)", "date": "2026-08-04", "quote": "In March 2026, our site in Drumheller, Alberta was reenergized in anticipation of the delivery and deployment of approximately 11,298 Bitcoin miners from American Bitcoin", "supports": ["status", "status_date", "tenants", "type"], "kind": "public_record"}, {"url": "https://www.hut8.com/our-platform", "title": "Hut 8: Our Platform", "date": "undated", "quote": "Drumheller | 42 MW | Drumheller, AB", "supports": ["mw"], "kind": "proponent"}, {"url": "https://data.sec.gov/submissions/CIK0001755953.json", "title": "SEC EDGAR company record: American Bitcoin Corp.", "date": "undated", "quote": "\"name\":\"American Bitcoin Corp.\", \"stateOfIncorporation\":\"DE\", business address city \"MIAMI\", \"FL\"", "supports": ["tenant_countries"], "kind": "public_record"}], "confidence": "high", "notes": "Re-energized in March 2026 for the deployment of about 11,300 bitcoin miners from American Bitcoin; no AI conversion has been announced. The point marks the town, not the site.", "checked": "2026-10-25", "mw_figures": [{"mw": 42, "basis": "unstated", "stage": "built", "date": null, "source_idx": 1}], "ownership_country": "United States", "field_confidence": {"owner": "confirmed", "tenants": "confirmed", "ai": "confirmed"}, "tenant_countries": {"American Bitcoin": "United States"}} {"site_id": "CA-AB-4web-edmonton", "name": "4WEB Edmonton Data Centre", "aliases": [], "operator": "4WEB", "owner": null, "tenants": [], "province": "AB", "municipality": "Edmonton", "address": "#160, 14315 118 Avenue NW, Edmonton, AB T5L 4S6", "lat": 53.56978, "lon": -113.56767, "coord_precision": "address", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Operator lists a 130kW generator and an 80kW APC UPS (equipment, not facility capacity).", "power_source": null, "opened": "2008", "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://4web.ca/about-us/", "title": "About Us (4WEB)", "date": "undated", "quote": "By January of 2008 we moved into our newly built facility strategically located in NW Edmonton.", "supports": ["opened", "municipality", "name"], "kind": "proponent"}, {"url": "https://4web.ca/about-us/", "title": "About Us (4WEB)", "date": "undated", "quote": "The 4WEB data centre is located in Edmonton, Alberta, Canada due to its ample power, few natural disasters", "supports": ["operator", "type", "status"], "kind": "proponent"}, {"url": "https://4web.ca/contact-us/", "title": "Contact Us (4WEB)", "date": "undated", "quote": "Mailing Address: #160, 14315 – 118 Avenue NW, Edmonton, Alberta, Canada T5L 4S6", "supports": ["address"], "kind": "proponent"}], "confidence": "medium", "notes": "The street address is the operator's mailing address; no source confirms it is the data centre building. The operator's pages look several years old, so current operation is not confirmed.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "speculative", "ai": "likely"}} {"site_id": "CA-AB-qu-edmonton-edm1", "name": "EDM1", "aliases": ["Qu Edmonton EDM1", "Rogers Edmonton DC1", "Wolfpaw EDM2 (suite)"], "operator": "Qu Data Centres", "owner": "InfraRed Capital Partners (Qu Data Centres Limited Partnership), both part of SLC Management (Sun Life)", "tenants": ["Wolfpaw Data Centres (restricted suite)"], "province": "AB", "municipality": "Edmonton", "address": "10200 102 Avenue NW, Edmonton, AB", "lat": 53.54341, "lon": -113.49599, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": 2.5, "mw_basis": "unstated", "mw_note": "Operator: 2.5 MW; 18,000 sq ft with 15,712 sq ft of raised floor.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://qudatacentres.com/locations/edmonton-data-centre", "title": "Edmonton data centres (Qu Data Centres)", "date": "undated", "quote": "At 18,000 ft² with 15,712 ft² of raised floor and 2.5 MW capacity, EDM1 serves organizations that require a certified", "supports": ["name", "operator", "municipality", "type", "status", "mw"], "kind": "proponent"}, {"url": "https://albertadatacentrewatch.ca/?project=qu-edm1#project-map", "title": "Alberta Data Centre Watch: Qu Edmonton EDM1", "date": "2026-08-14", "quote": "10200 102 Avenue NW, Edmonton", "supports": ["address", "tenants"], "kind": "directory"}, {"url": "https://www.renx.ca/qu-data-centres-manage-infrared-former-rogers-dc-portfolio", "title": "RENX: Qu Data Centres founded to manage former Rogers DC portfolio", "date": "2025-12-09", "kind": "press", "quote": "will be operated by an entity called the Qu Data Centres Limited Partnership , new owner InfraRed Capital Partners has announced", "supports": ["owner"]}, {"url": "https://www.renx.ca/qu-data-centres-manage-infrared-former-rogers-dc-portfolio", "title": "RENX: Qu Data Centres to manage InfraRed's former Rogers DC portfolio", "date": "2025-12-09", "quote": "Qu Data Centres and InfraRed Capital Partners are subsidiaries of Canadian-owned SLC Management", "supports": ["owner", "ownership_country"], "kind": "press"}], "confidence": "medium", "notes": "Qu publishes no street address; the address and Wolfpaw's suite here come from Alberta Data Centre Watch. InfraRed Capital Partners bought it with eight other Rogers data centres in 2025 and runs them as Qu, which calls itself Canadian-owned.", "checked": "2026-10-25", "mw_figures": [{"mw": 2.5, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": "Canada", "field_confidence": {"location": "likely", "ai": "likely", "tenants": "likely", "owner": "likely"}} {"site_id": "CA-AB-qu-edmonton-edm2", "name": "EDM2", "aliases": ["Qu Edmonton EDM2", "Rogers Edmonton DC2", "Wolfpaw EDM3 (suite)"], "operator": "Qu Data Centres", "owner": null, "tenants": ["Wolfpaw Data Centres (restricted suite)"], "province": "AB", "municipality": "Edmonton", "address": null, "lat": 53.5461, "lon": -113.4938, "coord_precision": "city", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 3, "mw_basis": "unstated", "mw_note": "Operator: 2.5 MW at Tier II or 3 MW at Tier III; 35,000 sq ft building in two phases.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://qudatacentres.com/locations/edmonton-data-centre", "title": "Edmonton data centres (Qu Data Centres)", "date": "undated", "quote": "Power capacity of 2.5 MW at Tier II and 3 MW at Tier III, with N+1 generator redundancy across both phases", "supports": ["name", "operator", "municipality", "type", "status", "mw"], "kind": "proponent"}, {"url": "https://albertadatacentrewatch.ca/?project=qu-edm2#project-map", "title": "Alberta Data Centre Watch: Qu Edmonton EDM2", "date": "2026-08-14", "quote": "17204 114 Avenue NW, Edmonton", "supports": ["tenants"], "kind": "directory"}], "confidence": "medium", "notes": "Qu publishes no street address and the address listed by Alberta Data Centre Watch is not confirmed by Qu or a public record, so the point is the Edmonton centre. Qu calls itself Canadian-owned, while an industry directory reports that Rogers sold nine data centres to InfraRed Capital Partners in 2025, so ownership is not confirmed.", "checked": "2026-10-25", "mw_figures": [{"mw": 3, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely", "ai": "speculative", "tenants": "likely"}} {"site_id": "CA-AB-walton-eetp-edmonton", "name": "Edmonton Energy & Technology Park AI Data Centre", "aliases": ["LDA26-0225", "Walton Global — EETP data centre campus"], "operator": "undisclosed (applicant Stantec for Walton Global Investments)", "owner": "Walton Global Investments Ltd. (landowner-applicant)", "tenants": [], "province": "AB", "municipality": "Edmonton", "address": "34 Street NW and 50 Street NW application lands, Edmonton Energy and Technology Park", "lat": 53.67594, "lon": -113.39969, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "proposed", "status_date": "2026-09-28", "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "City of Edmonton", "instrument": "area structure plan amendment (Petrochemical to Medium Industrial precinct, ~253 ha)", "ref": "LDA26-0225", "date": "2026-09-28", "outcome": "pending", "conditions": "engagement 2026-09-28 to 2026-10-25; Council decision to follow", "url": "https://engaged.edmonton.ca/eetpdatacentre"}], "ownership": null, "sources": [{"url": "https://engaged.edmonton.ca/eetpdatacentre", "title": "Engaged Edmonton: LDA26-0225 EETP AI Data Centre Amendment", "date": "2026-09-28", "quote": "The following engagement opportunities are open from September 28, 2026 until October 25, 2026 .", "supports": ["status", "approvals", "name", "ai"], "kind": "public_record"}, {"url": "https://engaged.edmonton.ca/eetpdatacentre", "title": "City of Edmonton, EETP data centre plan amendment", "date": "2026-09-28", "kind": "public_record", "quote": "The City has received a plan amendment application from Stantec Consulting Ltd. on behalf of Walton Global Investments Ltd.", "supports": ["owner"]}, {"url": "https://www.walton.com/about-us/", "title": "Walton, About us", "date": "undated", "kind": "proponent", "quote": "Walton’s offices are located around the world, including Calgary, Phoenix, Hong Kong, Singapore, Taipei, Manila and Tokyo.", "supports": ["notes"]}], "confidence": "high", "notes": "The City names the applicant, Stantec Consulting, acting for Walton Global Investments. It may relate to AESO requests in the Edmonton area (P3174 or P3198), but no link is established. The City says such amendments are 'typically proposed by landowners', so Walton is shown as owner; Walton names no head office, so no owner's country is shown, and no data-centre operator or tenant is named.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-internetcentre-edmonton", "name": "The Internet Centre data centre", "aliases": ["The Internet Centre Inc"], "operator": "The Internet Centre Canada Inc.", "owner": null, "tenants": [], "province": "AB", "municipality": "Edmonton", "address": "4130 95 Street NW, Edmonton, AB T6E 6H5", "lat": 53.47733, "lon": -113.47594, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://incentre.net/about/", "title": "About (The Internet Centre)", "date": "undated", "quote": "Internet, phone and hosting run from our own Edmonton facility, not a rented corner of someone else's.", "supports": ["name", "operator", "municipality", "status"], "kind": "proponent"}, {"url": "https://incentre.net/about/", "title": "About (The Internet Centre)", "date": "undated", "quote": "Internet, business phone, hosting and colocation under one roof, with one local team behind all of it.", "supports": ["type"], "kind": "proponent"}, {"url": "https://incentre.net/about/", "title": "About (The Internet Centre)", "date": "undated", "quote": "The Internet Centre, 4130 95 Street NW, Edmonton, AB T6E 6H5", "supports": ["address"], "kind": "proponent"}], "confidence": "medium", "notes": "The address is the company's; no source confirms it is the data centre building, though other listings agree.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "speculative", "ai": "likely"}} {"site_id": "CA-AB-thinktel-edmonton", "name": "ThinkTel Edmonton", "aliases": ["ThinkTel Communications Edmonton"], "operator": "ThinkTel Communications", "owner": null, "tenants": [], "province": "AB", "municipality": "Edmonton", "address": "C100-10250 101 St NW, Edmonton, AB T5J 3P4", "lat": 53.54409, "lon": -113.49418, "coord_precision": "address", "type": "colocation", "ai": "no", "status": "operating", "status_date": "2025-09-26", "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://thinktel.ca/services/colocation-data-center-services-hosting/", "title": "Colocation Data Center Services & Hosting (ThinkTel)", "date": "undated", "quote": "by colocating your servers in one of our three colocation data centres across Canada.", "supports": ["operator", "type"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/843", "title": "PeeringDB: ThinkTel Communications Edmonton", "date": "2025-09-26", "quote": "C100-10250 101 St NW", "supports": ["name", "address", "municipality", "status"], "kind": "directory"}], "confidence": "low", "notes": "ThinkTel's own page names no cities; the Edmonton location and address come from a peering directory, and current operation is not confirmed.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely", "ai": "likely"}} {"site_id": "CA-AB-ualberta-vulcan", "name": "Vulcan (University of Alberta / Amii)", "aliases": ["Amii Vulcan cluster"], "operator": "University of Alberta and Amii", "owner": "University of Alberta", "tenants": ["Amii"], "province": "AB", "municipality": "Edmonton", "address": null, "lat": 53.52682, "lon": -113.52449, "coord_precision": "area", "type": "research_hpc", "ai": "yes", "status": "operating", "status_date": "2025-04-15", "mw": null, "mw_basis": null, "mw_note": "MW not published.", "power_source": "grid", "opened": "2025", "expected_online": null, "approvals": [], "ownership": "public (university / federal AI compute funding)", "sources": [{"url": "https://docs.alliancecan.ca/wiki/Vulcan", "title": "Alliance docs: Vulcan", "date": "2025-04-15", "quote": "Vulcan is located at the University of Alberta and is managed by the University of Alberta and Amii.", "supports": ["operator", "municipality", "status", "status_date", "opened", "ai", "tenants"], "kind": "proponent"}, {"url": "https://www.amii.ca/about", "title": "Amii: About", "date": "undated", "quote": "Amii is proudly supported as a Canadian non-profit AI institute by the Government of Canada and CIFAR", "supports": ["tenant_countries"], "kind": "proponent"}], "confidence": "medium", "notes": "An AI cluster of 1,008 NVIDIA L40S GPUs; its power draw is not published. The point marks the University of Alberta campus. The host institution is shown as owner, but who holds title to the hardware is not published. Amii (Alberta Machine Intelligence Institute) co-manages the system and is its main user community; Alliance page last edited 2026-09-18.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"owner": "likely", "tenants": "confirmed"}, "tenant_countries": {"Amii": "Canada"}} {"site_id": "CA-AB-wolfpaw-edmonton-edm1", "name": "Wolfpaw EDM 1", "aliases": ["Wolfpaw Edmonton 1"], "operator": "Wolfpaw Data Centres", "owner": null, "tenants": [], "province": "AB", "municipality": "Edmonton", "address": "Scotia Place II, 10060 Jasper Ave, Edmonton, AB T5J 3R8", "lat": 53.54146, "lon": -113.49273, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.wolfpaw.com/edmonton-ab-data-center/", "title": "Edmonton Data Centres (Wolfpaw)", "date": "undated", "quote": "Wolfpaw EDM 1 | Wolfpaw EDM 2 | Wolfpaw EDM 3 | Downtown Edmonton | Downtown Edmonton | West End Edmonton", "supports": ["name", "operator", "municipality", "status", "type"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/1968", "title": "PeeringDB: Wolfpaw Edmonton 1", "date": "2025-09-26", "quote": "Scotia Place II 10060 Jasper Ave", "supports": ["address"], "kind": "directory"}], "confidence": "medium", "notes": "Wolfpaw's EDM 2 and EDM 3 are suites inside Qu's Edmonton buildings (Alberta Data Centre Watch), so they are not listed separately. The site hosts the Edmonton Internet Exchange (YEGIX).", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely", "ai": "likely"}} {"site_id": "CA-AB-datadistrict-edmonton", "name": "Data District Edmonton-region Facility", "aliases": ["Data District Edmonton Data Center"], "operator": "Data District Inc. / Technologies New Energy", "owner": "Data District Inc. (a division of Alcral AG); Technologies New Energy supplies power", "tenants": [], "province": "AB", "municipality": "Edmonton region", "address": null, "lat": 53.67281, "lon": -113.39119, "coord_precision": "area", "type": "ai_hpc", "ai": "unknown", "status": "announced", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Its share of the 240 MW Phase 1 programme is not stated.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://majorprojects.alberta.ca/details/Technologies-New-Energy-Data-District-Data-Centres-Phase-1/11969", "title": "Alberta Major Projects: TNE & Data District Data Centres (Phase 1)", "date": "undated", "quote": "Phase one of this investment is expected to include four data centre projects in Olds, Bonnyville, Calgary and Edmonton regions", "supports": ["operator", "municipality", "status"], "kind": "public_record"}, {"url": "https://www.tneplc.com/investors/", "title": "Technologies New Energy plc, Investor Relations", "date": "undated", "kind": "proponent", "quote": "Key information, documents and disclosures for shareholders and potential investors in Technologies New Energy plc. | 9th Floor, 107 Cheapside London EC2V 6DN – United Kingdom", "supports": ["notes"]}, {"url": "https://reddeeradvocate.com/2025/12/18/data-centre-announced-for-olds/", "title": "Data centre announced for Olds (Red Deer Advocate)", "date": "2025-12-18", "kind": "press", "quote": "Data District is a division of Swiss asset management firm Alcral AG.", "supports": ["owner", "ownership_country"]}], "confidence": "low", "notes": "The site is not known; the point is the provincial registry's placeholder. Data District Inc., reported in the press to be a division of the Swiss firm Alcral AG, is the data-centre developer; Technologies New Energy, a UK company, is to supply most of the power. No tenant is named.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Switzerland", "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-beacon-foothills", "name": "Beacon Foothills AI Data Center Hub", "aliases": ["Beacon Foothills / High River", "Foothills Crossing"], "operator": "Beacon Data Centers", "owner": "Beacon Data Centers (founded 2023 by Nadia Partners)", "tenants": [], "province": "AB", "municipality": "Foothills County", "address": "NE and SE 09-19-28-W4M, east of High River", "lat": 50.59393, "lon": -113.81905, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "approved", "status_date": "2025-02-26", "mw": 400, "mw_basis": "requested", "mw_note": "AESO request P2926: 400 MW, in-service date under review.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "Foothills County", "instrument": "Foothills Crossing ASP amendment, land-use amendment and redesignation", "ref": "Bylaws 05/2025, 06/2025, 07/2025", "date": "2025-02-26", "outcome": "approved", "conditions": "A data centre campus remains a discretionary use; further habitat assessment and mitigation at later approvals (Alberta Data Centre Watch).", "url": "https://www.foothillscountyab.ca/media/4780"}, {"authority": "AESO", "instrument": "load connection request", "ref": "P2926", "date": "2024-04-08", "outcome": "pending", "conditions": "Stage 2; in-service date under review.", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "P2926 Beacon Foothills A.I. Hub Load | 46-High River | Data Load | 2 | 400", "supports": ["mw", "approvals", "operator"], "kind": "public_record"}, {"url": "https://www.foothillscountyab.ca/resources/foothills-crossing-area-structure-plan-asp", "title": "Foothills County: Foothills Crossing ASP", "date": "undated", "quote": "Foothills Crossing ASP - 2025 Amended.pdf", "supports": ["approvals"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/beacon-foothills-data-center-hub/", "title": "Alberta Data Centre Watch: project profile", "date": "2026-09-11", "quote": "Bylaws approved February 26, 2025", "supports": ["approvals", "status_date", "address"], "kind": "directory"}, {"url": "https://beacondatacenters.com/about/", "title": "Beacon Data Centers, About", "date": "undated", "kind": "proponent", "quote": "Founded in 2023 by Nadia Partners, a specialist investor in AI, digital infrastructure and energy infrastructure, Beacon Data Centers was established to deliver best-in-class digital infrastructure solutions", "supports": ["owner"]}, {"url": "https://beacondatacenters.com/news/", "title": "Beacon Data Centers, News (press excerpt)", "date": "2026-06", "kind": "proponent", "quote": "David Lane, CEO of Calgary-based Beacon Data Centers, said his company is planning to make a final decision on its first project in the province in the next six months.", "supports": ["owner"]}], "confidence": "low", "notes": "Approved here means the land-use change only: a data centre campus remains a discretionary use and no development permit has been confirmed. Two of the three bylaw numbers come from Alberta Data Centre Watch, and Beacon's own campus list no longer shows this site. No tenant is named (Beacon markets to customers from 2 MW to 1,000 MW).", "checked": "2026-10-25", "mw_figures": [{"mw": 400, "basis": "requested", "stage": "requested", "date": "2025-02-26", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-fingermotion-hanna1", "name": "FingerMotion Hanna Campus #1", "aliases": [], "operator": "FingerMotion, Inc. / BlueFlare Group Holdings", "owner": "FingerMotion, Inc. (binding land purchase agreement, closing pending)", "tenants": [], "province": "AB", "municipality": "Hanna", "address": "409 Pioneer Trail South, Hanna", "lat": 51.6377, "lon": -111.91934, "coord_precision": "address", "type": "ai_hpc", "ai": "yes", "status": "announced", "status_date": "2026-10-01", "mw": null, "mw_basis": null, "mw_note": "The October 2026 design proposes 3 MW of grid supply and 3 MW of on-site gas generation; the data centre's own load is not stated.", "power_source": "onsite gas (proposed)", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://albertadatacentrewatch.ca", "title": "Alberta Data Centre Watch: project listing", "date": "2026-10-02", "quote": "Conditional purchase agreement executed September 30, 2026; closing and development approvals remain unconfirmed.", "supports": ["status", "address", "mw"], "kind": "directory"}, {"url": "https://www.sec.gov/Archives/edgar/data/1602409/000149315226047254/form10-q.htm", "title": "FingerMotion, Inc. 10-Q", "date": "2026-10-15", "kind": "public_record", "quote": "On September 30, 2026, the Company entered into a binding agreement to acquire approximately 20.2 acres of land located in Hanna, Alberta, Canada, for the development of the Company’s Hanna Campus #1.", "supports": ["owner"]}, {"url": "https://data.sec.gov/submissions/CIK0001602409.json", "title": "SEC EDGAR company record, FingerMotion, Inc.", "date": "undated", "kind": "public_record", "quote": "\"city\":\"WEST PALM BEACH\",\"stateOrCountry\":\"FL\" | \"stateOfIncorporation\":\"DE\"", "supports": ["ownership_country"]}], "confidence": "low", "notes": "A conditional purchase agreement was signed on 2026-09-30, subject to due diligence; closing and development approvals are not confirmed (Alberta Data Centre Watch), and no customer has signed.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "United States", "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-athill-carbon", "name": "Athill Carbon-Area Data Centre", "aliases": [], "operator": "Athill Tech Solution Ltd.", "owner": "Britestone Hutterian Brethren (landowner)", "tenants": [], "province": "AB", "municipality": "Kneehill County", "address": "Part of SE 24-28-24-W4M, ~10 km SW of Carbon", "lat": 51.40511, "lon": -113.24572, "coord_precision": "address", "type": "unknown", "ai": "unknown", "status": "approved", "status_date": "2025-07-23", "mw": null, "mw_basis": null, "mw_note": "9.97 MW is the approved natural-gas plant's capacity (approved in two phases of 4.425 MW and 5.545 MW), not the data centre's load, which has not been published.", "power_source": "onsite gas", "opened": null, "expected_online": null, "approvals": [{"authority": "Kneehill County", "instrument": "development permit (power plant and data centre)", "ref": "4152-24-D", "date": "2024-04", "outcome": "approved", "conditions": "Conditions not published in the County's list.", "url": "https://kneehillcounty.com/DocumentCenter/View/6907/April-2024-Approved-Applications"}, {"authority": "AUC", "instrument": "power-plant approval and construction time extension", "ref": "Proceedings 29239 and 30144 (Decision 30144-D01-2025)", "date": "2025-07-23", "outcome": "approved", "conditions": "Construction completion deadline extended to 2025-11-30.", "url": "https://prd-api-efiling20.auc.ab.ca/Anonymous/DownloadPublicDocumentAsync/840116"}], "ownership": null, "sources": [{"url": "https://albertadatacentrewatch.ca", "title": "Alberta Data Centre Watch: project listing", "date": "2026-09-16", "quote": "Municipal and AUC approvals are documented; Athill reported construction underway in June 2025, but current construction or operating status is not confirmed", "supports": ["status", "approvals", "mw", "address"], "kind": "directory"}, {"url": "https://kneehillcounty.com/DocumentCenter/View/6907/April-2024-Approved-Applications", "title": "Kneehill County: April 2024 approved applications", "date": "2024-04", "kind": "public_record", "quote": "4152-24-D Britestone Hutterian Brethren Ptn. SE 24-28-24 W4M Power Plant & Data Center Applicant: Athill Tech Solution Ltd.", "supports": ["approvals", "owner", "address", "status"]}, {"url": "https://prd-api-efiling20.auc.ab.ca/Anonymous/DownloadPublicDocumentAsync/840116", "title": "AUC Decision 30144-D01-2025: Athill 9.97 MW power plant time extension", "date": "2025-07-23", "kind": "public_record", "quote": "The Commission approves a time extension to November 30, 2025, for the completion of", "supports": ["approvals", "status_date", "mw_note"]}], "confidence": "high", "notes": "Athill told the AUC in June 2025 that construction of the power plant was under way and expected it in service in October 2025; no later source says whether the data centre is now built or operating.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely", "owner": "likely"}} {"site_id": "CA-AB-armada-kneehill", "name": "Kneehill Power Generation Facility (data processing)", "aliases": [], "operator": "Armada Nowlit Power Ltd.", "owner": null, "tenants": [], "province": "AB", "municipality": "Kneehill County", "address": "07-11-030-25 W4M", "lat": 51.55, "lon": -113.45, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-07", "mw": null, "mw_basis": null, "mw_note": "8.8 MW is the proposed off-grid gas plant's capacity, all of it to be used on site; the data centre's own load is not stated.", "power_source": "onsite gas, off-grid", "opened": null, "expected_online": null, "approvals": [{"authority": "AUC", "instrument": "power-plant application (8.8 MW, off-grid)", "ref": "Proceeding 31109 (31109-A001)", "date": "2026-10-07", "outcome": "pending", "conditions": "under review", "url": "https://www.auc.ab.ca/regulatory_documents/current-applications/"}], "ownership": null, "sources": [{"url": "https://www.auc.ab.ca/regulatory_documents/current-applications/", "title": "AUC current applications (ajax table)", "date": "2026-10-25", "quote": "Kneehill Power Generation Facility, a 8.8-megawatt (MW) natural gas-fired power plant. The Project is located at 07-11-030-25 W4M in Kneehill County", "supports": ["approvals", "mw", "address", "municipality", "operator"], "kind": "public_record"}], "confidence": "low", "notes": "The AUC filing says only that the plant's electricity will be consumed on site; it is listed as a data centre because the same developer pairs such plants with data processing elsewhere (Hoole, Clive, Gayford); no source confirms data processing at this site. The location is approximate (within about 2 km).", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-AB-firetechnology-torrington", "name": "Fire Technology Torrington Cryptomining Facility", "aliases": ["Torrington 9.5 MW cryptomining facility"], "operator": "Fire Technology Corp.", "owner": null, "tenants": [], "province": "AB", "municipality": "Kneehill County (near Torrington)", "address": "LSD 8, SE 28-32-26-W4M, Kneehill County", "lat": 51.79391, "lon": -113.60315, "coord_precision": "city", "type": "crypto", "ai": "no", "status": "operating", "status_date": "2026-04", "mw": 9.5, "mw_basis": "unstated", "mw_note": "9.5 MW is the facility's name in Alberta's carbon registry, not a measured load.", "power_source": "onsite gas (micropower generation, per 2022 permit)", "opened": null, "expected_online": null, "approvals": [{"authority": "Kneehill County", "instrument": "development permit (micropower generation and cryptocurrency mining)", "ref": "4010-22-D", "date": "2022-05-26", "outcome": "approved", "conditions": "Conditions not reviewed.", "url": "https://www.kneehillcounty.com/AgendaCenter"}, {"authority": "Kneehill County", "instrument": "discretionary permit (addition of 2 units to an existing data center)", "ref": "APPN-2026-0020", "date": "2026-04", "outcome": "approved", "conditions": "none published", "url": "https://www.kneehillcounty.com/DocumentCenter/View/7726/April-2026-Approved-Applications"}], "ownership": null, "sources": [{"url": "https://www.kneehillcounty.com/DocumentCenter/View/7726/April-2026-Approved-Applications", "title": "Kneehill County April 2026 approved applications", "date": "2026-04", "quote": "APPN-2026-0020 GVF Contracting Ltd. SE 28-32-26 W4M Addition of 2 units to an existing Data Center Appl: Fire Technology Corp.", "supports": ["status", "status_date", "operator", "approvals", "address"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/", "title": "Alberta Data Centre Watch directory", "date": "2026-09-16", "quote": "An operating 9.5 MW cryptomining facility near Torrington.", "supports": ["mw", "type", "power_source"], "kind": "directory"}, {"url": "https://www.csaregistries.ca/GHGR_Listing/Company_ListingDetail.aspx?CompanyId=2038", "title": "Alberta Emission Offset and Performance Credit Registry: Fire Technology Corp.", "date": "undated", "kind": "public_record", "quote": "Torrington 9.5 Mw cryptomining Facility LSD 8-28-32-26W4M", "supports": ["mw", "mw_figures", "status", "address"]}], "confidence": "medium", "notes": "Shown as operating because the County approved two more units for the existing data centre in April 2026 and Alberta's carbon registry lists credits for 2023; current load is unknown. The point marks Torrington, not the site.", "checked": "2026-10-25", "mw_figures": [{"mw": 9.5, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 2}], "ownership_country": null, "field_confidence": {"owner": "confirmed", "ai": "likely", "location": "likely"}} {"site_id": "CA-AB-armada-clive", "name": "Clive Facility", "aliases": ["Armada Nowlit Data Centre Southeast of Clive", "Data Centre West of Clive"], "operator": "Armada Nowlit Energy Ltd.", "owner": "Arkham Estates Corporation and Iceline Energy Inc. (landowner)", "tenants": [], "province": "AB", "municipality": "Lacombe County", "address": "40205 Range Road 243, LSD 8-16-040-24 W4M", "lat": 52.43956, "lon": -113.39051, "coord_precision": "address", "type": "crypto", "ai": "partial", "status": "proposed", "status_date": "2026-08-27", "mw": null, "mw_basis": null, "mw_note": "19.8 MW is the proposed natural-gas plant's capacity, not the data centre's load, which has not been published.", "power_source": "onsite gas", "opened": null, "expected_online": null, "approvals": [{"authority": "Lacombe County", "instrument": "redesignation Agricultural to Heavy Industrial (4.40 acres), then discretionary development permit", "ref": "not given", "date": "2026-08-27", "outcome": "pending", "conditions": "rezoning must precede DP application; no municipal approvals granted", "url": "https://www.lacombecounty.com/business-and-development/current-planning-projects/armada-nowlit-energy-ltd-proposed-clive-facility/"}, {"authority": "AUC", "instrument": "power-plant application", "ref": "none found", "date": null, "outcome": "pending", "conditions": "The developer says it applied to the AUC; no application appeared in the AUC's current-applications list on 2026-10-25.", "url": "https://www.auc.ab.ca/regulatory_documents/current-applications/"}], "ownership": null, "sources": [{"url": "https://www.lacombecounty.com/business-and-development/current-planning-projects/armada-nowlit-energy-ltd-proposed-clive-facility/", "title": "Lacombe County: Armada Nowlit Energy Ltd. Proposed Clive Facility", "date": "undated", "quote": "is seeking permission to redesignate approximately 1.78 hectares (4.40 acres)", "supports": ["approvals", "status", "operator", "mw"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/data-centre-west-of-clive/", "title": "Alberta Data Centre Watch: project profile", "date": "2026-09-29", "quote": "The revised air-dispersion model described the nine data buildings as miner containers MC1 to MC9.", "supports": ["type", "ai", "address"], "kind": "directory"}, {"url": "https://www.lacombecounty.com/business-and-development/current-planning-projects/armada-nowlit-energy-ltd-proposed-clive-facility/", "title": "Lacombe County: Armada Nowlit Energy Ltd. Proposed Clive Facility", "date": "undated", "kind": "public_record", "quote": "Armada Nowlit Energy Ltd., on behalf of the landowner Arkham Estates Corporation and Iceline Energy Inc., is seeking permission to redesignate", "supports": ["owner"]}], "confidence": "high", "notes": "The developer's revised air-dispersion model describes the nine data buildings as miner containers (Alberta Data Centre Watch). Lacombe County says the developer applied on behalf of the landowner, Arkham Estates Corporation and Iceline Energy Inc.; the developer's parent and home country are not confirmed, and no tenant is named.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-beacon-saunders-lake", "name": "Beacon Saunders Lake AI Data Center Hub", "aliases": ["Beacon Saunders Lake / Leduc"], "operator": "Beacon Data Centers", "owner": "Beacon Data Centers (founded 2023 by Nadia Partners)", "tenants": [], "province": "AB", "municipality": "Leduc County", "address": "SW 7-50-24-W4M", "lat": 53.29784, "lon": -113.50674, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "approved", "status_date": "2024-12-10", "mw": 400, "mw_basis": "requested", "mw_note": "AESO request P2935: 400 MW, in-service date under review.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "Leduc County", "instrument": "redesignation Agricultural to Light Industrial (160 acres)", "ref": "Bylaw 18-24 (LA24-004)", "date": "2024-12-10", "outcome": "approved", "conditions": "development permit required; County reports none approved for any data centre", "url": "https://www.leduc-county.com/public/download/files/316139"}, {"authority": "AESO", "instrument": "load connection request", "ref": "P2935", "date": "2024-05-10", "outcome": "pending", "conditions": "Stage 2; in-service date under review.", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.leduc-county.com/business-and-development/data-centres", "title": "Leduc County: Data centres", "date": "undated", "quote": "Leduc County does not currently have any data centres approved for development, and has not approved any development permits for structures intended to host a data centre.", "supports": ["status", "approvals"], "kind": "public_record"}, {"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "P2935 Beacon Saunders Lake A.I. Hub Load | 60-Edmonton | Data Load | 2 | 400", "supports": ["mw", "approvals"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/beacon-saunders-lake-ai-data-center-hub/", "title": "Alberta Data Centre Watch: project profile", "date": "2026-09-11", "quote": "Council unanimously passed Bylaw 18-24 on December 10, 2024, changing 160 acres from Agricultural to Light Industrial.", "supports": ["approvals", "address"], "kind": "directory"}, {"url": "https://beacondatacenters.com/about/", "title": "Beacon Data Centers, About", "date": "undated", "kind": "proponent", "quote": "Founded in 2023 by Nadia Partners, a specialist investor in AI, digital infrastructure and energy infrastructure, Beacon Data Centers was established to deliver best-in-class digital infrastructure solutions", "supports": ["owner"]}, {"url": "https://beacondatacenters.com/news/", "title": "Beacon Data Centers, News (press excerpt)", "date": "2026-06", "kind": "proponent", "quote": "David Lane, CEO of Calgary-based Beacon Data Centers, said his company is planning to make a final decision on its first project in the province in the next six months.", "supports": ["owner"]}, {"url": "https://www.leduc-county.com/public/download/files/316139", "title": "Leduc County: Regular Council Meeting minutes, December 10, 2024", "date": "2024-12-10", "kind": "public_record", "quote": "That Council gives third and final reading to Bylaw 18—24.", "supports": ["approvals", "status", "status_date"]}], "confidence": "high", "notes": "Approved here means rezoning only; Leduc County says it has approved no development permit for any data centre. Beacon's own campus list no longer shows this site. No tenant is named (Beacon markets to customers from 2 MW to 1,000 MW).", "checked": "2026-10-25", "mw_figures": [{"mw": 400, "basis": "requested", "stage": "requested", "date": "2024-05-10", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-capitalpower-genesee", "name": "Genesee Data Centre", "aliases": ["Capital Power Genesee Data Centre", "Capital Power Genesee Ph2", "Genesee Data Center 1 MPC Load", "Genesee Data Center 2 MPC Load"], "operator": "Capital Power", "owner": null, "tenants": [], "province": "AB", "municipality": "Leduc County", "address": "Genesee Generating Station, Leduc County", "lat": 53.344, "lon": -114.305, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 1500, "mw_basis": "requested", "mw_note": "AESO requests P2942 (1,000 MW) and P2946 (500 MW), in-service dates under review. Capital Power says about 500 MW of existing generation could serve the site (Alberta Data Centre Watch); this is not additional.", "power_source": "grid or co-located Genesee generation (not decided in sources read)", "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P2942 (1,000 MW); P2946 (500 MW)", "date": "2024-06-26", "outcome": "pending", "conditions": "Stage 2; in-service dates under review.", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}, {"authority": "Leduc County", "instrument": "development permit", "ref": "none", "date": null, "outcome": "pending", "conditions": "County states no data-centre development permits approved; information service use is permitted in the Genesee Power Project Overlay", "url": "https://www.leduc-county.com/business-and-development/data-centres"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "P2942 Genesee Data Center 1 MPC Load | 40-Wabamun | 1000 | P2946 Genesee Data Center 2 MPC Load | 500", "supports": ["mw", "status", "approvals"], "kind": "public_record"}, {"url": "https://www.leduc-county.com/business-and-development/data-centres", "title": "Leduc County: Data centres", "date": "undated", "quote": "The information service land use is currently listed a permitted use within the following: Genesee Power Project Overlay (GP)", "supports": ["approvals"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/", "title": "Alberta Data Centre Watch: project listing", "date": "2026-08-20", "quote": "AESO lists 1.5 GW across two data-load requests, but Capital Power says the site is not advancing immediately and no tenant or active build is confirmed", "supports": ["operator", "address", "notes"], "kind": "directory"}], "confidence": "medium", "notes": "Capital Power has said the site is not advancing immediately, and no tenant or construction is confirmed (Alberta Data Centre Watch).", "checked": "2026-10-25", "mw_figures": [{"mw": 1000, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}, {"mw": 500, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-AB-whipcord-lethbridge-ldc01", "name": "LDC01", "aliases": ["Whipcord Edge Alberta Data Centre", "Whipcord LDC01"], "operator": "Whipcord Edge Data Centers", "owner": null, "tenants": [], "province": "AB", "municipality": "Lethbridge", "address": "3636 30 St N, Lethbridge, AB T1H 6Z4", "lat": 49.7354, "lon": -112.80042, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": 2.5, "mw_basis": "facility", "mw_note": "Phase 1: 2.5 MW of City of Lethbridge utility power; a future Phase 2 adds 2.5 MW (5 MW total); 1,500 kW generator.", "power_source": "grid (City of Lethbridge utility)", "opened": "2011", "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.whipcord.com/hubfs/Blog-Spec-sheet/Whipcord_LDC01_Specifications.pdf", "title": "LDC01 Facility Specifications (Whipcord)", "date": "undated", "quote": "Location Lethbridge, Alberta | Completion June 2011 | Phase 1 utility power City of Lethbridge, 2.5 MW", "supports": ["name", "municipality", "opened", "mw", "power_source"], "kind": "proponent"}, {"url": "https://www.whipcord.com/canadian-data-centres-main", "title": "Canadian Data Centres by Whipcord Edge", "date": "undated", "quote": "Our Alberta data centre delivers enterprise-grade infrastructure for organizations across Western Canada.", "supports": ["operator", "status", "type"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/10152", "title": "PeeringDB: Whipcord LDC01", "date": "2025-09-26", "quote": "3636 30 St N", "supports": ["address"], "kind": "directory"}], "confidence": "high", "notes": "Sources differ on the address: a peering directory gives 3636 30 St N and Alberta Data Centre Watch 3582 30 Street North; Whipcord publishes none.", "checked": "2026-10-25", "mw_figures": [{"mw": 2.5, "basis": "facility", "stage": "built", "date": "undated", "source_idx": 0}, {"mw": 5, "basis": "facility", "stage": "planned", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely", "ai": "likely"}} {"site_id": "CA-AB-datadistrict-bonnyville", "name": "Data District Bonnyville Facility", "aliases": ["Data District Bonnyville Data Center", "Data District Inc. & TNE - Data Centres"], "operator": "Data District Inc. / Technologies New Energy", "owner": "Data District Inc. (a division of Alcral AG); Technologies New Energy supplies power", "tenants": [], "province": "AB", "municipality": "MD of Bonnyville No. 87", "address": null, "lat": 54.2978, "lon": -110.73877, "coord_precision": "area", "type": "ai_hpc", "ai": "unknown", "status": "announced", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "The Phase 1 programme totals 240 MW across four regions; the Bonnyville share is not stated.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://majorprojects.alberta.ca/details/Technologies-New-Energy-Data-District-Data-Centres-Phase-1/11969", "title": "Alberta Major Projects: TNE & Data District Data Centres (Phase 1)", "date": "undated", "quote": "Phase one of this investment is expected to include four data centre projects in Olds, Bonnyville, Calgary and Edmonton regions", "supports": ["operator", "municipality", "status"], "kind": "public_record"}, {"url": "https://www.tneplc.com/investors/", "title": "Technologies New Energy plc, Investor Relations", "date": "undated", "kind": "proponent", "quote": "Key information, documents and disclosures for shareholders and potential investors in Technologies New Energy plc. | 9th Floor, 107 Cheapside London EC2V 6DN – United Kingdom", "supports": ["notes"]}, {"url": "https://reddeeradvocate.com/2025/12/18/data-centre-announced-for-olds/", "title": "Data centre announced for Olds (Red Deer Advocate)", "date": "2025-12-18", "kind": "press", "quote": "Data District is a division of Swiss asset management firm Alcral AG.", "supports": ["owner", "ownership_country"]}], "confidence": "low", "notes": "The site is not known; the point is the provincial registry's placeholder. Data District Inc., reported in the press to be a division of the Swiss firm Alcral AG, is the data-centre developer; Technologies New Energy, a UK company, is to supply most of the power. No tenant is named.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Switzerland", "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-aec-mill-844s-slave-lake", "name": "AEC Mill 844S Data Load", "aliases": ["AESO P3236", "Slave Lake Pulp / A.E.C. Mill Data Load"], "operator": "undisclosed", "owner": null, "tenants": [], "province": "AB", "municipality": "MD of Lesser Slave River No. 124", "address": "Slave Lake Pulp mill area, 43016 East Mitsue Road (approximate)", "lat": 55.2481, "lon": -114.514, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-07-30", "mw": 60, "mw_basis": "requested", "mw_note": "AESO request P3236: 60 MW of grid demand at an existing facility (filed as a behind-the-fence change), requested in-service date 2028-07-15.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "behind-the-fence load connection request", "ref": "P3236", "date": "2026-07-30", "outcome": "pending", "conditions": "Active, Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "P3236 AEC Mill 844S Data Load | 21-High Prairie | BTF | Data Load | 1 | 60", "supports": ["mw", "status", "approvals"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca", "title": "Alberta Data Centre Watch: project listing", "date": "2026-10-05", "quote": "AESO P3236: 60 MW data-load request, BTF, Stage 1; data-centre approvals and construction unconfirmed", "supports": ["address", "municipality"], "kind": "directory"}], "confidence": "medium", "notes": "Alberta Data Centre Watch places this grid request at the Millar Western pulp mill in Slave Lake; the data-centre developer is not named.", "checked": "2026-10-25", "mw_figures": [{"mw": 60, "basis": "requested", "stage": "requested", "date": "2026-07-30", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-armada-hoole", "name": "Hoole Data Centre", "aliases": ["Armada Nowlit Wabasca / Hoole Data Centre", "Hoole Power Generation Facility"], "operator": "Armada Nowlit Energy Ltd.", "owner": null, "tenants": [], "province": "AB", "municipality": "MD of Opportunity No. 17", "address": "16-36-080-25 W4M", "lat": 55.98242, "lon": -113.76761, "coord_precision": "address", "type": "crypto", "ai": "no", "status": "approved", "status_date": "2026-08-25", "mw": null, "mw_basis": null, "mw_note": "19.8 MW is the off-grid gas plant under AUC review, all of it to be used on site; the data centre's own load is not stated (an earlier concept gave 50 MW).", "power_source": "onsite gas, off-grid", "opened": null, "expected_online": null, "approvals": [{"authority": "MD of Opportunity No. 17", "instrument": "development permit", "ref": "26-DP-001", "date": "2026-08-25", "outcome": "approved", "conditions": "Conditions not published.", "url": "https://albertadatacentrewatch.ca/downloads/31058-X0021-hoole-participant-involvement-report.pdf"}, {"authority": "AUC", "instrument": "power-plant application (19.8 MW, off-grid)", "ref": "Proceeding 31058 (31058-A001)", "date": "2026-09-14", "outcome": "pending", "conditions": "two earlier applications (30253, 30707) closed for deficiencies", "url": "https://www.auc.ab.ca/regulatory_documents/current-applications/"}, {"authority": "Alberta Forestry and Parks", "instrument": "Crown land disposition", "ref": "none", "date": null, "outcome": "pending", "conditions": "Required; not yet issued (Alberta Data Centre Watch).", "url": "https://albertadatacentrewatch.ca/projects/armada-wabasca-hoole-data-centre/"}], "ownership": null, "sources": [{"url": "https://www.auc.ab.ca/regulatory_documents/current-applications/", "title": "AUC current applications (ajax table)", "date": "2026-10-25", "quote": "all electricity generated will be consumed on site to serve associated data processing infrastructures.", "supports": ["approvals", "power_source", "mw", "address"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/armada-wabasca-hoole-data-centre/", "title": "Alberta Data Centre Watch: project profile", "date": "2026-09-15", "quote": "Development Permit 26-DP-001 has been issued by the Municipal District of Opportunity No. 17.", "supports": ["approvals", "status", "type"], "kind": "directory"}, {"url": "https://albertadatacentrewatch.ca/downloads/31058-X0021-hoole-participant-involvement-report.pdf", "title": "AUC Proceeding 31058: Hoole participant-involvement report (copy hosted by Alberta Data Centre Watch)", "date": "2026-08-25", "kind": "public_record", "quote": "Development Permit No. 26-DP-001 has been approved and issued to Armada-Nowlit.", "supports": ["approvals", "status", "status_date"]}, {"url": "https://mdopportunity.ab.ca/wp-content/uploads/2025/04/26-Mar-2025-Delegation-Council-Meeting-Amended-April-9-2025.pdf", "title": "MD of Opportunity No. 17: council meeting minutes, March 26, 2025 (Armada Nowlit delegation)", "date": "2025-03-26", "kind": "public_record", "quote": "expected to supply the power of 50MW data centre ... Supply agreements associated with crypto mines.", "supports": ["notes", "type"]}], "confidence": "high", "notes": "The municipality confirmed the development permit in a form signed on 2026-08-25 and filed with the AUC; the permit's conditions are not published. In March 2025 the developer told council its gas assets would power a 50 MW data centre and that it planned supply agreements with crypto mines.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-AB-captus-pincher-creek", "name": "Captus Generation Project", "aliases": ["Captus / Glenwood", "Captus Generation — Pincher Creek AI hub", "Captus Load", "Gryphon Alberta", "Gryphon Pincher Creek"], "operator": "Captus Generation (power and land proponent; data-centre developer not yet named)", "owner": "Captus Generation (land)", "tenants": [], "province": "AB", "municipality": "MD of Pincher Creek No. 9", "address": "Around the existing Drywood Generating Power Plant, south of Pincher Creek", "lat": 49.36667, "lon": -113.51667, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-09", "mw": 74.9, "mw_basis": "requested", "mw_note": "AESO request P3079: 74.9 MW at stage 3, requested in-service date 2027-09-01.", "power_source": "onsite gas plus grid request", "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3079", "date": "2025-01-17", "outcome": "pending", "conditions": "Active at stage 3; requested in-service date 2027-09-01.", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": "Summit Point Capital LP (since October 2025)", "sources": [{"url": "https://captusgeneration.com/", "title": "Captus Generation Project", "date": "undated", "quote": "Our proposed development south of Pincher Creek would pair reliable, on-site power generation with modern digital infrastructure", "supports": ["name", "operator", "address", "status", "power_source"], "kind": "proponent"}, {"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "P3079 Captus Load | 55-Glenwood | Data Load | 3 | 74.9", "supports": ["mw", "approvals"], "kind": "public_record"}, {"url": "https://captusgeneration.com/#land", "title": "Captus Generation Project", "date": "undated", "quote": "Captus Generation owns 825 acres of land around the existing Drywood Generating Power Plant.", "supports": ["owner"], "kind": "proponent"}, {"url": "https://captusgeneration.com/#faq", "title": "Captus Generation Project: FAQ", "date": "undated", "quote": "there is not yet a confirmed data centre developer", "supports": ["notes", "operator"], "kind": "proponent"}, {"url": "https://www.pentictonherald.ca/spare_news/article_1966e556-3b51-58c6-8dd8-0092bfe7410d.html", "title": "Shootin' the Breeze via Penticton Herald: Pincher Creek data-centre proposal (press)", "date": "2026-08-19", "quote": "In October 2025, Captus was acquired by Summit Point Capital LP", "supports": ["notes", "ownership"], "kind": "press"}], "confidence": "medium", "notes": "Captus has been owned by Summit Point Capital LP since October 2025 (press); Summit Point's home country is not published. The point marks Glenwood, the namesake of the AESO planning area, not the site.", "checked": "2026-10-25", "mw_figures": [{"mw": 74.9, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "confirmed"}, "tenant_countries": {}} {"site_id": "CA-AB-hut8-medicinehat", "name": "Medicine Hat", "aliases": ["Hut 8 Medicine Hat"], "operator": "Hut 8 Corp.", "owner": null, "tenants": ["American Bitcoin"], "province": "AB", "municipality": "Medicine Hat", "address": "5254 Box Springs Road NW, Medicine Hat, AB", "lat": 50.093, "lon": -110.7385, "coord_precision": "building", "type": "crypto", "ai": "no", "status": "operating", "status_date": "2026-08-04", "mw": 67, "mw_basis": "unstated", "mw_note": "Hut 8 lists 67 MW output; Alberta Data Centre Watch calls it site capacity, not measured use. One industry directory lists 63 MW.", "power_source": "grid (City of Medicine Hat municipal utility)", "opened": null, "expected_online": null, "approvals": [], "ownership": "Hut 8 Corp. (United States, Delaware)", "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1964789/000110465926090025/hut-20260630x10q.htm", "title": "Hut 8 Corp. 10-Q (period to 2026-06-30)", "date": "2026-08-04", "quote": "(2) Medicine Hat (Medicine Hat, Alberta)", "supports": ["status", "status_date", "operator"], "kind": "public_record"}, {"url": "https://www.hut8.com/our-platform", "title": "Hut 8: Our Platform", "date": "undated", "quote": "Medicine Hat | 67 MW | Medicine Hat, AB", "supports": ["mw", "type"], "kind": "proponent"}, {"url": "https://albertadatacentrewatch.ca/projects/hut-8-medicine-hat/", "title": "Alberta Data Centre Watch: Hut 8 Medicine Hat", "date": "2026-08-22", "quote": "Hut 8's operating 67 MW Medicine Hat data centre, where American Bitcoin operates Bitcoin miners under Hut 8 service agreements.", "supports": ["tenants", "address", "power_source"], "kind": "directory"}], "confidence": "high", "notes": "American Bitcoin runs bitcoin miners here under service agreements with Hut 8; no AI conversion has been announced for this site. The address comes from Alberta Data Centre Watch.", "checked": "2026-10-25", "mw_figures": [{"mw": 67, "basis": "unstated", "stage": "built", "date": null, "source_idx": 1}], "ownership_country": "United States", "field_confidence": {"owner": "confirmed", "tenants": "confirmed", "ai": "confirmed", "location": "likely"}} {"site_id": "CA-AB-2661707-greenview-kaybob", "name": "2661707 Alberta Ltd. Greenview Data Processing Centres", "aliases": [], "operator": "2661707 Alberta Ltd.", "owner": null, "tenants": [], "province": "AB", "municipality": "Municipal District of Greenview No. 16", "address": "Kaybob North area: SE-20-64-19-W5M, SW-35-64-19-W5M, SE-16-64-20-W5M, NE-14-64-20-W5M, NE-24-64-20-W5M, NW-06-65-18-W5M, NW-01-65-19-W5M, NW-19-64-19-W5M", "lat": 54.55, "lon": -116.85, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "approved", "status_date": "2026-04-01", "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "MD of Greenview", "instrument": "discretionary development permits (eight modular data processing centres)", "ref": "D25-175 to D25-179 (effective 2026-03-04); D25-180 to D25-182 (effective 2026-04-01); D25-183 deferred 2026-03-11", "date": "2026-04-01", "outcome": "approved", "conditions": "Safety Codes permits and any provincial authorizations are still required; D25-183 was deferred for more information on environmental impact, noise, recreational users and other land users such as trap lines.", "url": "https://mdgreenview.ab.ca/wp-content/uploads/2026/03/DP-ADVERTISEMENT-2026_03_11.pdf"}], "ownership": null, "sources": [{"url": "https://albertadatacentrewatch.ca", "title": "Alberta Data Centre Watch: project listing", "date": "2026-09-13", "quote": "Eight discretionary municipal development permits are effective; a ninth application is deferred, and construction, provincial land authorization, Safety Codes permits, and operation remain unconfirmed", "supports": ["status", "approvals", "address"], "kind": "directory"}, {"url": "https://mdgreenview.ab.ca/wp-content/uploads/2026/02/DP-ADVERTISEMENT-2026_02_11.pdf", "title": "MD of Greenview: notice of decision, Municipal Planning Commission, February 11, 2026", "date": "2026-02-11", "kind": "public_record", "quote": "APPROVED by the Municipal Planning Commission on February 11, 2026 and are effective on March 4,2026.", "supports": ["approvals", "operator", "address", "status"]}, {"url": "https://mdgreenview.ab.ca/wp-content/uploads/2026/03/DP-ADVERTISEMENT-2026_03_11.pdf", "title": "MD of Greenview: notice of decision, Municipal Planning Commission, March 11, 2026", "date": "2026-03-11", "kind": "public_record", "quote": "APPROVED by the Municipal Planning Commission on March 11, 2026 and are effective on April 1,2026.", "supports": ["approvals", "status", "status_date"]}, {"url": "https://pub-mdgreenview.escribemeetings.com/FileStream.ashx?DocumentId=6687", "title": "MD of Greenview: Municipal Planning Commission minutes, March 11, 2026", "date": "2026-03-11", "kind": "public_record", "quote": "That the Municipal Planning Commission Defer Development Permit Application D25-183 for Data Processing Centre on NW-23-64-19-W5M", "supports": ["approvals"]}], "confidence": "high", "notes": "Eight small modular data processing centres by one applicant, approved as one batch of permits and shown as one site; the point is an approximate centre of the listed land parcels. A ninth permit (D25-183) was deferred in March 2026, and Safety Codes and provincial approvals are still required.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-newwest-kakwa", "name": "Kakwa Data Processing Centre", "aliases": [], "operator": "New West Data Acquisition Corp.", "owner": null, "tenants": [], "province": "AB", "municipality": "Municipal District of Greenview No. 16", "address": "SE-23-63-5-W6M", "lat": 54.45981, "lon": -118.63906, "coord_precision": "area", "type": "crypto", "ai": "no", "status": "approved", "status_date": "2026-06-15", "mw": 9.9, "mw_basis": "requested", "mw_note": "Up to 9.9 MW requested in the municipal permit application, supplied by an 8.40 MW gas plant approved by the AUC.", "power_source": "onsite gas, isolated", "opened": null, "expected_online": null, "approvals": [{"authority": "AUC", "instrument": "isolated power-plant approval (8.40 MW)", "ref": "Proceeding 30521, Decision 30521-D01-2026, Approval 30521-D02-2026", "date": "2026-02-12", "outcome": "approved", "conditions": "Not transferable without Commission approval; construction to be completed by 2026-06-30.", "url": "https://pub-mdgreenview.escribemeetings.com/Meeting.aspx?Agenda=Agenda&Id=a6902a3d-f037-4f84-892f-ec7af175e348&lang=English"}, {"authority": "Alberta Forestry and Parks", "instrument": "Crown disposition (rural commercial cryptocurrency activity)", "ref": "DLO260092", "date": "2026-06-15", "outcome": "approved", "conditions": "Expires 2044-01-22.", "url": "https://pub-mdgreenview.escribemeetings.com/Meeting.aspx?Agenda=Agenda&Id=a6902a3d-f037-4f84-892f-ec7af175e348&lang=English"}, {"authority": "MD of Greenview", "instrument": "discretionary development permit", "ref": "D26-087", "date": "2026-09-09", "outcome": "pending", "conditions": "Recommended for up to 9.9 MW; work must start within 12 months, and the permit would expire with Crown disposition DLO260092 or on 2044-01-22, whichever is earlier; decision not published.", "url": "https://pub-mdgreenview.escribemeetings.com/Meeting.aspx?Agenda=Agenda&Id=a6902a3d-f037-4f84-892f-ec7af175e348&lang=English"}], "ownership": null, "sources": [{"url": "https://albertadatacentrewatch.ca/projects/kakwa-data-processing-centre/", "title": "Alberta Data Centre Watch: project profile", "date": "2026-09-21", "quote": "The 8.40 MW isolated gas plant and a Crown disposition are approved.", "supports": ["approvals", "status", "mw", "address", "operator"], "kind": "directory"}, {"url": "https://pub-mdgreenview.escribemeetings.com/Meeting.aspx?Agenda=Agenda&Id=a6902a3d-f037-4f84-892f-ec7af175e348&lang=English", "title": "MD of Greenview Municipal Planning Commission, 2026-09-09: D26-087 report and attachments", "date": "2026-09-09", "kind": "public_record", "quote": "APPROVE Development Permit Application D26-087 for Data Processing Centre not exceeding 9.9 MW on SE-23-63-5-W6M", "supports": ["mw", "mw_figures", "approvals", "operator", "address", "status"]}], "confidence": "medium", "notes": null, "checked": "2026-10-25", "mw_figures": [{"mw": 9.9, "basis": "requested", "stage": "requested", "date": "2026-09-09", "source_idx": 1}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-AB-teton-northern-forge", "name": "Northern Forge Campus", "aliases": ["Northern Forge Power Project", "Teton Digital Northern Forge"], "operator": "Teton Digital (Alberta Digital Energy 1 ULC)", "owner": "Teton Digital, LLC (project entity Alberta Digital Energy 1 ULC, link not confirmed)", "tenants": [], "province": "AB", "municipality": "Municipal District of Greenview No. 16", "address": "~35 km south of Fox Creek", "lat": 54.37423, "lon": -116.79884, "coord_precision": "area", "type": "ai_hpc", "ai": "unknown", "status": "proposed", "status_date": "2026-09-16", "mw": null, "mw_basis": null, "mw_note": "About 200 MW of planned gas generation for data-centre use and grid sales (provincial registry), and a 29.9 MW plant in the AUC application; both are power-plant capacity, not the data centre's load.", "power_source": "onsite gas", "opened": null, "expected_online": "2028", "approvals": [{"authority": "AUC", "instrument": "power-plant application (Northern Forge Power Plant, 29.9 MW)", "ref": "Proceeding 31066 (31066-A001)", "date": "2026-09-16", "outcome": "pending", "conditions": "under review", "url": "https://www.auc.ab.ca/regulatory_documents/current-applications/"}], "ownership": null, "sources": [{"url": "https://majorprojects.alberta.ca/details/Teton-Digital-Northern-Forge-Power-Project/12178", "title": "Alberta Major Projects: Northern Forge Power Project", "date": "undated", "quote": "The Northern Forge Project will generate approximately 200 megawatts of electricity for Tier 3 data center use and for grid sales.", "supports": ["mw", "status", "expected_online", "address"], "kind": "public_record"}, {"url": "https://www.auc.ab.ca/regulatory_documents/current-applications/", "title": "AUC current applications (ajax table)", "date": "2026-10-25", "quote": "Alberta Digital Energy 1 ULC is seeking approval to construct and operate the Northern Forge Power Plant, a 29.9 MW natural gas-fired power plant.", "supports": ["approvals", "status_date"], "kind": "public_record"}, {"url": "https://www.tetondigital.io/about", "title": "Teton Digital, About", "date": "undated", "kind": "proponent", "quote": "Teton Digital, LLC is a Wyoming-headquartered developer of large-scale, vertically integrated power generation and Tier-compatible data center campuses.", "supports": ["owner", "ownership_country"]}, {"url": "https://www.tetondigital.io/projects", "title": "Teton Digital: Projects", "date": "undated", "kind": "proponent", "quote": "200 MW gas-to-compute, behind-the-meter; 155-acre site Permits largely in hand; 10-yr gas & 6″ pipeline LOIs; Phase I 30 MW H1 2027", "supports": ["owner", "notes"]}], "confidence": "medium", "notes": "Alberta Digital Energy 1 ULC, the AUC applicant, is not named on Teton's pages, but Teton lists a 30 MW first phase for Northern Forge in the first half of 2027, matching the 29.9 MW plant applied for. No tenant is named.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "United States", "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-oleary-wonder-valley", "name": "Wonder Valley Alberta", "aliases": ["Wonder Valley AI Data Centre Park", "Wonder Valley Off-Grid AI Park"], "operator": "O'Leary Digital Limited", "owner": "O'Leary Digital Limited", "tenants": [], "province": "AB", "municipality": "Municipal District of Greenview No. 16", "address": "Greenview Industrial Gateway, ~42 km south of Grande Prairie", "lat": 54.81193, "lon": -118.68335, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "approved", "status_date": "2024-11-12", "mw": 1000, "mw_basis": "it", "mw_note": "About 1,000 MW of IT load in Phase 1: up to ten data centres of about 100 MW each (O'Leary Digital). The 2 GW Phase 1 figure and the about 7.5 GW long-term figure are on-site power capacity, not the data centres' load; the December 2024 announcement gave 1.4 GW for Phase 1.", "power_source": "onsite gas", "opened": null, "expected_online": null, "approvals": [{"authority": "MD of Greenview", "instrument": "Land Use Bylaw amendment making data processing centres a permitted use in the Greenview Industrial Gateway", "ref": "Bylaw 24-979", "date": "2024-11-12", "outcome": "approved", "conditions": "A development permit cannot be completed without AUC approval of the power plant.", "url": "https://mdgreenview.ab.ca/wp-content/uploads/2025/02/bylaw-24-979-2.pdf"}, {"authority": "AEPA", "instrument": "decision on need for provincial EIA report", "ref": "letter 2026-03-31", "date": "2026-03-31", "outcome": "approved", "conditions": "An EIA report is not required for the current project description; other EPEA and Water Act authorizations still apply (Alberta Data Centre Watch).", "url": "https://www.theenergymix.com/wp-content/uploads/2026/04/Letter-No-EIA-Required-Wonder-Valley.pdf"}, {"authority": "AEPA", "instrument": "Water Act licence to MD of Greenview (regional supply, Smoky River)", "ref": "DAUT0021649", "date": "2025-04-07", "outcome": "approved", "conditions": "Up to 6 million m3 a year; challenged in a judicial review by Sturgeon Lake Cree Nation, ongoing (Alberta Data Centre Watch).", "url": "https://geospatial.alberta.ca/services/DRASDocuments/Document/Get?authorizationNumber=DAUT0021649&documentType=WL&id=62643792"}], "ownership": null, "sources": [{"url": "https://www.olearydigital.ai/faq", "title": "O'Leary Digital FAQ", "date": "undated", "quote": "Wonder Valley Alberta is in a pre-construction stage with active, regulatory, design, and infrastructure planning activity ongoing", "supports": ["status", "name", "mw", "power_source", "ai"], "kind": "proponent"}, {"url": "https://mdgreenview.ab.ca/wonder-valley-newsletter/", "title": "MD of Greenview: Wonder Valley Newsletter", "date": "2026-05-28", "quote": "Greenview is pleased to share the latest public update on the Wonder Valley Project, provided by O’Leary Digital.", "supports": ["municipality", "operator"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/wonder-valley-ai-data-centre-park/", "title": "Alberta Data Centre Watch: project profile", "date": "2026-09-03", "quote": "Alberta Environment and Protected Areas decided that a provincial environmental impact assessment report was not required for the current project description.", "supports": ["approvals", "status_date"], "kind": "directory"}, {"url": "https://www.olearydigital.ai/faq", "title": "O'Leary Digital: Wonder Valley FAQ", "date": "undated", "quote": "supporting up to ten data center facilities, each designed for approximately 100 MW of IT load", "supports": ["mw", "mw_basis", "mw_note"], "kind": "proponent"}, {"url": "https://mdgreenview.ab.ca/wp-content/uploads/2025/02/bylaw-24-979-2.pdf", "title": "MD of Greenview Bylaw 24-979", "date": "2024-11-12", "quote": "Read a third time this 12th day of November, 2024.", "supports": ["status", "status_date", "approvals"], "kind": "public_record"}], "confidence": "medium", "notes": "O'Leary Digital now also markets a Wonder Valley campus in Utah.", "checked": "2026-10-25", "mw_figures": [{"mw": 1000, "basis": "it", "stage": "planned", "date": null, "source_idx": 3}], "ownership_country": null, "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-bitdeer-foxcreek", "name": "Fox Creek", "aliases": ["Bitdeer Crypto Mining Facility Fox Creek", "Bitdeer Fox Creek", "Fox Creek Data Center", "Opal Power Plant site"], "operator": "Bitdeer Technologies Group", "owner": null, "tenants": [], "province": "AB", "municipality": "Municipal District of Greenview No. 16 (near Fox Creek)", "address": "Opal Power Plant site, LSDs 5, 6, 11 and 12 of 21-62-19-W5M, near Fox Creek", "lat": 54.40619, "lon": -116.80049, "coord_precision": "city", "type": "crypto", "ai": "no", "status": "approved", "status_date": "2026-09-28", "mw": null, "mw_basis": null, "mw_note": "Bitdeer gives the site 101 MW of electrical capacity, which is the AUC-approved on-site Opal gas plant (101.133 MW), not a published data-centre load; energization is expected in Q4 2027. The 99 MW grid interconnection reported by Alberta Data Centre Watch matches the plant's supply connection, not a load allocation.", "power_source": "onsite gas (Opal Power Plant), grid-connected", "opened": null, "expected_online": "2027-H2", "approvals": [{"authority": "AUC", "instrument": "power-plant approval (101.133 MW Opal Power Plant), transferred from Kiwetinohk to BitDeer", "ref": "Approval 29843-D02-2025 (Decision 29843-D01-2025)", "date": "2025-03-12", "outcome": "approved", "conditions": "Nine gas engines totalling 101.133 MW; the plant was first approved in 2022.", "url": "https://prd-api-efiling20.auc.ab.ca/Anonymous/DownloadPublicDocumentAsync/862697"}, {"authority": "AUC", "instrument": "power-plant amendment (generators repositioned to fit a data centre on site)", "ref": "Decision 30907-D01-2026", "date": "2026-09-28", "outcome": "approved", "conditions": "Plant must be completed by 2027-09-30; the AUC has no approval authority over the bitcoin-mining and data-centre operations.", "url": "https://prd-api-efiling20.auc.ab.ca/Anonymous/DownloadPublicDocumentAsync/862695"}, {"authority": "AESO", "instrument": "generation connection (Opal gas plant) and behind-the-fence data load", "ref": "P2456 Opal Gas (98.5 MW supply); P3141 Opal Data Load (0 MW from the grid)", "date": "2025-08-28", "outcome": "pending", "conditions": "P2456 active at stage 5; P3141 (filed 2025-08-28) active at stage 1. Neither is a load allocation.", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}, {"authority": "AEPA", "instrument": "EPEA industrial approval (company-reported)", "ref": null, "date": null, "outcome": "pending", "conditions": "Company-reported approval, not confirmed in the authority's own record.", "url": "https://albertadatacentrewatch.ca/projects/bitdeer-fox-creek/"}], "ownership": "Bitdeer Technologies Group (Singapore)", "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1899123/000121390026086938/ea030131301ex99-1.htm", "title": "Bitdeer Reports Unaudited Financial Results for the Second Quarter of 2026 (6-K Ex. 99.1)", "date": "2026-08-10", "quote": "Energization time is now expected for Q4 2027. Data center design accommodating both AIDC and crypto is currently underway, following the power plant groundbreaking in June 2026.", "supports": ["status", "status_date", "expected_online", "mw", "type", "notes"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/bitdeer-fox-creek/", "title": "Alberta Data Centre Watch: Bitdeer Fox Creek", "date": "2026-08-23", "quote": "Power-plant approval: Approval transferred to Bitdeer. AUC Approval 29843-D02-2025 authorizes the 101.133 MW Opal Power Plant", "supports": ["approvals", "address", "power_source"], "kind": "directory"}, {"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "P2456 Opal Gas | 24-Fox Creek | Connection | Gas | Stage 5 | EN1 STS 98.5; P3141 Opal Data Load | 24-Fox Creek | BTF | Data Load | Stage 1 | EN1 DTS 0", "supports": ["approvals", "mw_note"], "kind": "public_record"}, {"url": "https://prd-api-efiling20.auc.ab.ca/Anonymous/DownloadPublicDocumentAsync/862697", "title": "AUC Approval 29843-D02-2025: Opal Power Plant Approval Transfer", "date": "2025-03-12", "quote": "granted to BitDeer an approval to construct and operate the power plant", "supports": ["approvals", "address", "mw_note"], "kind": "public_record"}, {"url": "https://prd-api-efiling20.auc.ab.ca/Anonymous/DownloadPublicDocumentAsync/862695", "title": "AUC Decision 30907-D01-2026: Opal Power Plant Amendments", "date": "2026-09-28", "quote": "BitDeer stated that it is proposing to incorporate a bitcoin mining data centre into the site layout", "supports": ["status", "status_date", "approvals", "notes"], "kind": "public_record"}], "confidence": "high", "notes": "Shown as approved because the on-site power plant holds AUC approvals; the AUC's September 2026 amendment decision records that construction had not started when Bitdeer applied, while Bitdeer reports a power-plant groundbreaking in June 2026 and says the data centre is still being designed. The site has no AESO load allocation: AESO lists the Opal plant's grid connection (98.5 MW of supply) and a behind-the-fence data load that draws no grid power.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"owner": "confirmed", "ai": "confirmed", "location": "likely"}} {"site_id": "CA-AB-mihta-askiy", "name": "Mihta Askiy Data Center", "aliases": ["Mihta Askiy (Northern Sunrise)", "Woodland's Mihta Askiy"], "operator": "Cree Ative Datacenter Corp GP / Mihta Askiy Datacenter LP", "owner": "Mihta Askiy Datacenter LP (GP: Cree Ative Datacenter Corp); majority Woodland Cree First Nation, 49% Sovereign Digital Infrastructure", "tenants": [], "province": "AB", "municipality": "Northern Sunrise County", "address": "Former Shell Carmon Creek site, ~40 km NE of Peace River", "lat": 56.37637, "lon": -116.74529, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "proposed", "status_date": "2026-05-04", "mw": 300, "mw_basis": "requested", "mw_note": "400 MW initially and 650 MW at full build (Alberta Data Centre Watch). AESO request P3110: 300 MW of load and 650 MW of supply, in-service date under review.", "power_source": "onsite gas plus grid connection request", "opened": null, "expected_online": null, "approvals": [{"authority": "AUC", "instrument": "power-plant, Sunrise Substation and industrial system designation applications", "ref": "Proceeding 30787 (30787-A001/A002/A003)", "date": "2026-05-04", "outcome": "pending", "conditions": "under review", "url": "https://www.auc.ab.ca/regulatory_documents/current-applications/"}, {"authority": "IAAC", "instrument": "early decision on designated project", "ref": "IAAC 90036", "date": "2026-03-04", "outcome": "approved", "conditions": "no further federal assessment required; not a construction approval", "url": "https://iaac-aeic.gc.ca/050/evaluations/proj/90036"}, {"authority": "AESO", "instrument": "connection request", "ref": "P3110", "date": "2025-04-17", "outcome": "pending", "conditions": "Stage 1; in-service date under review.", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": "Sovereign Digital Infrastructure, named as 49 per cent owner in a federal filing", "sources": [{"url": "https://www.auc.ab.ca/regulatory_documents/current-applications/", "title": "AUC current applications (ajax table)", "date": "2026-10-25", "quote": "Mihta Askiy Data Center Power Plant Project", "supports": ["status", "approvals", "operator"], "kind": "public_record"}, {"url": "https://iaac-aeic.gc.ca/050/evaluations/proj/90036", "title": "IAAC registry: Mihta Askiy Data Center Project", "date": "2026-03-04", "quote": "The Impact Assessment Agency of Canada issued an early decision with reasons that no further assessment of the designated project is required under the Impact Assessment Act .", "supports": ["approvals", "name"], "kind": "public_record"}, {"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "P3110 Mihta Askiy Data Load | 19-Peace River | 1 | 650 | 300", "supports": ["approvals", "mw_note"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/mihta-askiy-data-centre/", "title": "Alberta Data Centre Watch: project profile", "date": "2026-08-23", "quote": "650 MW proposed data centre load at full build", "supports": ["mw", "ownership"], "kind": "directory"}, {"url": "https://iaac-aeic.gc.ca/050/evaluations/proj/90036?culture=en-CA", "title": "IAAC registry, Mihta Askiy Data Center Project", "date": "2026-03-04", "kind": "public_record", "quote": "Cree Ative Datacenter Corp GP is proposing the development of a new power-generating facility fueled by natural gas, located about 40 kilometres northeast of Peace River", "supports": ["owner"]}, {"url": "https://albertadatacentrewatch.ca/projects/mihta-askiy-data-centre/", "title": "Alberta Data Centre Watch, Mihta Askiy", "date": "2026-08-23", "kind": "directory", "quote": "A majority Woodland Cree First Nation-owned proposal | Sovereign Digital Infrastructure, identified in the project's federal filing as its 49 per cent owner", "supports": ["owner"]}], "confidence": "high", "notes": "About 40 km northeast of Peace River. The IAAC page is dated 2026-03-04, while Alberta Data Centre Watch dates the federal decision 2026-03-03. Sovereign Digital Infrastructure's home country is not published, and Canada is shown because the First Nation holds the majority.", "checked": "2026-10-25", "mw_figures": [{"mw": 300, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 2}, {"mw": 400, "basis": "unstated", "stage": "planned", "date": "2026-08-23", "source_idx": 3}, {"mw": 650, "basis": "buildout", "stage": "planned", "date": "2026-08-23", "source_idx": 3}], "ownership_country": "Canada", "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-datadistrict-olds", "name": "Data District Olds Facility", "aliases": ["Data District Olds Data Center", "TNE Data District"], "operator": "Data District Inc. / Technologies New Energy", "owner": "Data District Inc. (a division of Alcral AG); Technologies New Energy supplies power", "tenants": [], "province": "AB", "municipality": "Olds", "address": null, "lat": 51.77578, "lon": -114.10516, "coord_precision": "city", "type": "ai_hpc", "ai": "unknown", "status": "announced", "status_date": "2025-12-18", "mw": 55, "mw_basis": "unstated", "mw_note": "55 MW is a planned power expansion with FortisAlberta reported in the press; the Phase 1 programme is 240 MW across Olds, Bonnyville, Calgary and Edmonton (provincial registry).", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "Data District Inc. (a division of Alcral AG, Switzerland)", "sources": [{"url": "https://majorprojects.alberta.ca/details/Technologies-New-Energy-Data-District-Data-Centres-Phase-1/11969", "title": "Alberta Major Projects: Technologies New Energy & Data District Data Centres (Phase 1)", "date": "undated", "quote": "Construction on the first facility in Olds will begin in 2026, and the second facility in Bonnyville in 2027.", "supports": ["operator", "municipality", "mw_note"], "kind": "public_record"}, {"url": "https://engage.olds.ca/data-centre-developments/current-status", "title": "Town of Olds: Current Status", "date": "undated", "quote": "The Town of Olds has not received an active development permit application for either proposed data centre project.", "supports": ["status", "notes"], "kind": "public_record"}, {"url": "https://www.tneplc.com/investors/", "title": "Technologies New Energy plc, Investor Relations", "date": "undated", "kind": "proponent", "quote": "Key information, documents and disclosures for shareholders and potential investors in Technologies New Energy plc. | 9th Floor, 107 Cheapside London EC2V 6DN – United Kingdom", "supports": ["notes"]}, {"url": "https://reddeeradvocate.com/2025/12/18/data-centre-announced-for-olds/", "title": "Data centre announced for Olds (Red Deer Advocate)", "date": "2025-12-18", "kind": "press", "quote": "Data District is a division of Swiss asset management firm Alcral AG.", "supports": ["owner", "ownership_country", "ownership"]}, {"url": "https://engage.olds.ca/data-centre-developments/current-status", "title": "Town of Olds: data centre developments, current status", "date": "undated", "kind": "public_record", "quote": "Data District Inc. has purchased land in Olds and has been working with Invest Olds on early planning and site readiness.", "supports": ["status", "notes"]}, {"url": "https://reddeeradvocate.com/2025/12/18/data-centre-announced-for-olds/", "title": "Red Deer Advocate: Data centre announced for Olds", "date": "2025-12-18", "quote": "The additional investment is contingent on the planned 55-megawatt power expansion in collaboration with Fortis Alberta.", "supports": ["mw", "mw_figures", "status", "status_date"], "kind": "press"}, {"url": "https://engage.olds.ca/data-centre-developments/current-status", "title": "Town of Olds: data centre developments, current status", "date": "undated", "quote": "At this time, no formal development or regulatory application has been submitted.", "supports": ["status", "notes"], "kind": "public_record"}], "confidence": "medium", "notes": "Announced in December 2025. The Town of Olds says Data District has bought land and that no formal development or regulatory application has been submitted (town status page, which reports events up to September 2026). Data District Inc., reported in the press to be a division of the Swiss firm Alcral AG, is the data-centre developer; Technologies New Energy, a UK company, is to supply most of the power. No tenant is named.", "checked": "2026-10-25", "mw_figures": [{"mw": 55, "basis": "unstated", "stage": "planned", "date": "2025-12-18", "source_idx": 5}], "ownership_country": "Switzerland", "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-synapse-olds", "name": "Synapse Olds Data Centre", "aliases": ["Synapse Data Center", "Synapse Data Centre (4601 46 Ave)"], "operator": "Synapse Real Estate Corp.", "owner": null, "tenants": [], "province": "AB", "municipality": "Olds", "address": "04-33-1-W5M, Highway 2A and Highway 27", "lat": 51.80183, "lon": -114.09058, "coord_precision": "address", "type": "ai_hpc", "ai": "unknown", "status": "cancelled", "status_date": "2026-08-17", "mw": 1000, "mw_basis": "buildout", "mw_note": "A 1 GW campus of ten data centres at build-out (Synapse's environmental application); the refused power supply was a 1,400 MW combined-cycle gas plant plus 600 diesel backup generators of 1,800 MW, 3,200 MW of installed generation in total.", "power_source": "onsite gas (denied)", "opened": null, "expected_online": null, "approvals": [{"authority": "AUC", "instrument": "power-plant approval", "ref": "Proceeding 30732, Decision 30732-D01-2026", "date": "2026-08-17", "outcome": "refused", "conditions": "location unsuitable for the scale and proximity to the community; Commission did not rule on the data centre itself", "url": "https://prd-api-efiling20.auc.ab.ca/Anonymous/DownloadPublicDocumentAsync/861007"}, {"authority": "AEPA", "instrument": "EPEA approval application (gas plant with attached data centre)", "ref": "001-510949", "date": null, "outcome": "applied", "conditions": "Status after the AUC refusal not published.", "url": "https://www.olds.ca/media/skliuvai/notice-of-application-request-revised_redacted.pdf"}], "ownership": null, "sources": [{"url": "https://engage.olds.ca/data-centre-developments/current-status", "title": "Town of Olds: Current Status", "date": "undated", "quote": "The Town of Olds acknowledges the Alberta Utilities Commission’s (AUC) decision to deny Synapse Real Estate Corp.’s application for its proposed power generation project", "supports": ["approvals", "status"], "kind": "public_record"}, {"url": "https://prd-api-efiling20.auc.ab.ca/Anonymous/DownloadPublicDocumentAsync/861007", "title": "AUC Decision 30732-D01-2026", "date": "2026-08-17", "quote": "In this decision, the Alberta Utilities Commission denies Synapse's power plant application.", "supports": ["approvals"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/synapse-olds-data-centre/", "title": "Alberta Data Centre Watch: project profile", "date": "2026-08-25", "quote": "Synapse confirmed that the Olds project will not proceed as proposed and said it would assess future opportunities elsewhere in Alberta.", "supports": ["status", "status_date", "mw", "address"], "kind": "directory"}, {"url": "https://globalnews.ca/news/12024680/olds-data-centre-alberta-utilities-commission-rejected-centre/", "title": "'Not suitable': Utilities commission rejects power plant for Olds, Alta., data centre (Global News)", "date": "2026-08-17", "quote": "In a statement emailed to Global News, Synapse confirmed “the project in Olds will not proceed as proposed,”", "supports": ["status", "status_date"], "kind": "press"}, {"url": "https://engage.olds.ca/download_file/view/102/529", "title": "Synapse Data Center Project: EPEA approval application (hosted by the Town of Olds)", "date": "2026-06-20", "quote": "Each subsequent data center will start in one month increments thereafter until the 1 GW Data Center Campus is complete.", "supports": ["mw", "mw_basis"], "kind": "proponent"}, {"url": "https://www.olds.ca/media/skliuvai/notice-of-application-request-revised_redacted.pdf", "title": "Alberta Environment and Protected Areas: notice of application, Synapse Real Estate Corp. (hosted by the Town of Olds)", "date": "undated", "quote": "The application number 001-510949.", "supports": ["approvals"], "kind": "public_record"}, {"url": "https://www.auc.ab.ca/regulatory_documents/current-applications/", "title": "AUC current applications (Proceeding 31044)", "date": "2026-09-16", "quote": "31044-A002 ORRD Cost Claim for Proceeding 30732", "supports": ["notes"], "kind": "public_record"}, {"url": "https://prd-api-efiling20.auc.ab.ca/Anonymous/DownloadPublicDocumentAsync/861007#gen", "title": "AUC Decision 30732-D01-2026", "date": "2026-08-17", "quote": "a total of 3,200 megawatts of installed generation, comprised of a 1,400-MW thermal power plant and 600 emergency diesel generators", "supports": ["mw_note"], "kind": "public_record"}], "confidence": "medium", "notes": "Synapse told Global News the Olds project \"will not proceed as proposed\" and that it will consider other sites in Alberta. The AUC refused the gas plant but did not rule on the data centre itself; a later AUC proceeding (31044) handles cost claims from that hearing, and the Town of Olds never received a development permit application.", "checked": "2026-10-25", "mw_figures": [{"mw": 1000, "basis": "buildout", "stage": "planned", "date": "2026-06-20", "source_idx": 4}], "ownership_country": null, "field_confidence": {}, "tenant_countries": {}} {"site_id": "CA-AB-beacon-harry-smith", "name": "Beacon Harry Smith AI Data Center Hub", "aliases": ["Beacon Harry Smith / Parkland"], "operator": "Beacon Data Centers", "owner": "Beacon Data Centers (founded 2023 by Nadia Partners)", "tenants": [], "province": "AB", "municipality": "Parkland County", "address": "Range Road 264 at Township Road 524 (reported)", "lat": 53.512, "lon": -113.7872, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "proposed", "status_date": "2026-10-09", "mw": 400, "mw_basis": "requested", "mw_note": "AESO request P2927: 400 MW, in-service date under review.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P2927", "date": "2024-04-08", "outcome": "pending", "conditions": "Stage 2; in-service date under review.", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "P2927 Beacon Harry Smith A.I. Hub Load | 40-Wabamun | Data Load | 2 | 400", "supports": ["mw", "status", "approvals", "operator"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca", "title": "Alberta Data Centre Watch: project listing", "date": "2026-09-04", "quote": "The provincial project registry identifies the proposal; AESO lists a 400 MW data-load connection request, while current municipal approvals remain unclear", "supports": ["municipality", "address"], "kind": "directory"}, {"url": "https://beacondatacenters.com/about/", "title": "Beacon Data Centers, About", "date": "undated", "kind": "proponent", "quote": "Founded in 2023 by Nadia Partners, a specialist investor in AI, digital infrastructure and energy infrastructure, Beacon Data Centers was established to deliver best-in-class digital infrastructure solutions", "supports": ["owner"]}, {"url": "https://beacondatacenters.com/news/", "title": "Beacon Data Centers, News (press excerpt)", "date": "2026-06", "kind": "proponent", "quote": "David Lane, CEO of Calgary-based Beacon Data Centers, said his company is planning to make a final decision on its first project in the province in the next six months.", "supports": ["owner"]}, {"url": "https://majorprojects.alberta.ca/", "title": "Alberta Major Projects: project index", "date": "undated", "quote": "Beacon Harry Smith AI Data Centre Hub", "supports": ["notes"], "kind": "public_record"}], "confidence": "medium", "notes": "The location is a road intersection reported by Alberta Data Centre Watch. Beacon is Calgary-based and was founded in 2023 by Nadia Partners, which states no home country; no tenant is named.", "checked": "2026-10-25", "mw_figures": [{"mw": 400, "basis": "requested", "stage": "requested", "date": "2024-04-08", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-boreal-keephills", "name": "Boreal Technology Hub", "aliases": ["Keephills Data Centre", "Keephills Ph2", "TransAlta Keephills Data Centre"], "operator": "BGRE (developer for Brookfield and CPP Investments)", "owner": null, "tenants": [], "province": "AB", "municipality": "Parkland County", "address": "Part of Section 25-51-4-W5M, south of Keephills Generating Station", "lat": 53.44767, "lon": -114.45147, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "approved", "status_date": "2025-09-04", "mw": 230, "mw_basis": "grid_allocation", "mw_note": "230 MW is AESO's Phase 1 allocation (P3083, contract executed); up to 1,600 MW at full build-out. AESO also lists P3095 (Phase 2, 466 MW) and P3152 (Phase 1.2, 165 MW), in-service dates under review; TransAlta earlier said up to 1 GW.", "power_source": "grid", "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "Phase 1 large-load allocation and load contract", "ref": "P3083 (230 MW); P3095; P3152", "date": "2025-01-28", "outcome": "approved", "conditions": "230 MW contract executed; the connection process continues. P3095 and P3152: in-service dates under review.", "url": "https://www.aeso.ca/grid/connecting-to-the-grid/large-load-projects/"}, {"authority": "Parkland County", "instrument": "area structure plan and land-use bylaw amendments (new Direct Control districts for data processing)", "ref": "Bylaws 2025-22 to 2025-26", "date": "2025-09-04", "outcome": "approved", "conditions": "development application not yet submitted (County, 2026-09-22); plan and permit still required", "url": "https://yourparkland.ca/transaltadatacentre"}], "ownership": "Brookfield and CPP Investments (developer BGRE), per Parkland County", "sources": [{"url": "https://www.borealtechnologyhub.com/", "title": "Boreal Technology Hub", "date": "undated", "quote": "has an initial power allocation of 230 MW supplied through the Alberta Electric System Operator ( AESO ) Phase 1: Large Load Integration.", "supports": ["mw", "name", "address", "power_source"], "kind": "proponent"}, {"url": "https://yourparkland.ca/transaltadatacentre", "title": "Parkland County: Boreal Technology Hub Application", "date": "undated", "quote": "The submission of a development application is anticipated in the coming months by BGRE on behalf of Brookfield and CPP Investments", "supports": ["operator", "ownership", "status"], "kind": "public_record"}, {"url": "https://www.aeso.ca/grid/connecting-to-the-grid/large-load-projects/", "title": "AESO Large Load Projects", "date": "undated", "quote": "P3083 Keephills Data Centre Phase I - 230 MW", "supports": ["approvals"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/keephills-data-centre/", "title": "Alberta Data Centre Watch: project profile", "date": "2026-10-19", "quote": "Council approved the land-use and planning changes.", "supports": ["approvals", "status_date"], "kind": "directory"}, {"url": "https://yourparkland.ca/transaltadatacentre", "title": "Parkland County: TransAlta data centre (Boreal Technology Hub)", "date": "undated", "kind": "public_record", "quote": "were approved by Parkland County Council on September 4th, 2025. The following Bylaws were passed", "supports": ["approvals", "status_date"]}], "confidence": "high", "notes": "Parkland County approved the land-use changes on 2025-09-04 and said in September 2026 that no development application had yet been filed. Boreal names cloud computing and AI as target demand but no tenant.", "checked": "2026-10-25", "mw_figures": [{"mw": 230, "basis": "grid_allocation", "stage": "allocated", "date": "undated", "source_idx": 2}, {"mw": 466, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 2}, {"mw": 165, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 2}, {"mw": 1600, "basis": "buildout", "stage": "planned", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-AB-havenz-blindman", "name": "AHI Red Deer / Blindman Industrial Park AI Data Centre", "aliases": ["AHI Hub Of Innovation", "AHI Red Deer Sustainable Innovation Campus", "Blindman (Red Deer)"], "operator": "Havenz Smart Communities (Agritech Haven Inc.)", "owner": "Agritech Haven Inc. (AHI; Havenz Smart Communities)", "tenants": [], "province": "AB", "municipality": "Red Deer County", "address": "N Part of NW 12-39-27-W4M, Blindman Industrial Park, Red Deer County", "lat": 52.34678, "lon": -113.78097, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "approved", "status_date": "2025-10-07", "mw": null, "mw_basis": null, "mw_note": "10 MW is the Phase 1 on-site natural-gas power block's capacity, not the data centre's load, which has not been published; there is also 1.5 MW of backup generation. The proponent aims for 200 MW or more across the campus.", "power_source": "onsite gas (hydrogen-ready engines)", "opened": null, "expected_online": "2026-H2", "approvals": [{"authority": "Red Deer County (Municipal Planning Commission)", "instrument": "discretionary use approval (data processing centre)", "ref": "D-25-212", "date": "2025-10-07", "outcome": "approved", "conditions": "17 conditions incl. hospital-plus-grade exhaust silencers, acoustic enclosures for 1.5 MW backup generators, receptor noise validation, written water-use confirmation, new TIA if beyond Phase 1", "url": "https://reddeercounty.civicweb.net/FileStorage/37F4C7BBAAA0428E853DC47DB0C94A86-4.3%20MPC%20Report%20D-25-212.pdf"}, {"authority": "AUC", "instrument": "power-plant approval", "ref": null, "date": null, "outcome": "pending", "conditions": "No AUC decision found for the Phase 1 generation (Alberta Data Centre Watch).", "url": "https://albertadatacentrewatch.ca/projects/ahi-red-deer-blindman-industrial-park/"}], "ownership": null, "sources": [{"url": "https://majorprojects.alberta.ca/details/Blindman-Industrial-Park-AI-Data-Centre/11890", "title": "Alberta Major Projects: Blindman Industrial Park AI Data Centre", "date": "undated", "quote": "Stage: Under Construction", "supports": ["operator"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/ahi-red-deer-blindman-industrial-park/", "title": "Alberta Data Centre Watch: AHI Red Deer / Blindman", "date": "2026-09-07", "quote": "The County approved Phase 1's discretionary use with conditions, and Havenz reports construction of the first 10 MW natural-gas power block.", "supports": ["address", "approvals", "expected_online", "mw", "power_source", "status", "status_date"], "kind": "directory"}, {"url": "https://www.agritechhaven.com/", "title": "Agritech Haven (AHI)", "date": "undated", "kind": "proponent", "quote": "INTEGRATED ENERGY & AI INFRASTRUCTURE · ALBERTA, CANADA | A HAVENZ × TURNING STONE PARTNERSHIP", "supports": ["owner", "ownership_country"]}, {"url": "https://reddeercounty.civicweb.net/FileStorage/37F4C7BBAAA0428E853DC47DB0C94A86-4.3%20MPC%20Report%20D-25-212.pdf", "title": "Red Deer County MPC request for decision D-25-212 (Data Processing Centre)", "date": "2025-10-07", "quote": "To consider a discretionary use development permit application for a Data Processing Centre", "supports": ["approvals", "address"], "kind": "public_record"}], "confidence": "low", "notes": "Shown as approved because Red Deer County approved the data centre's discretionary use on 2025-10-07 (County planning report and Alberta Data Centre Watch); the construction reported so far is of the 10 MW gas power block, and the Q3 2026 commissioning target has passed without confirmed operation. The County's permit conditions are as summarised by Alberta Data Centre Watch, and the point marks the industrial park, not the site.", "checked": "2026-10-25", "mw_figures": [{"mw": 200, "basis": "buildout", "stage": "planned", "date": null, "source_idx": 1}], "ownership_country": "Canada", "field_confidence": {"owner": "speculative"}, "tenant_countries": {}} {"site_id": "CA-AB-wave-junction42", "name": "Junction 42 AI Research Lab", "aliases": ["Wave Infrastructure — Junction 42"], "operator": "Wave Infrastructure", "owner": "Wave Infrastructure (prospective buyer of County lot)", "tenants": [], "province": "AB", "municipality": "Red Deer County", "address": "Lot 24, Junction 42 Business Park, SW-5-37-27-W4M, near Penhold", "lat": 52.1467, "lon": -113.83172, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "proposed", "status_date": "2026-09-29", "mw": 5, "mw_basis": "it", "mw_note": "About 5 MW critical compute target (Alberta Data Centre Watch).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "Red Deer County", "instrument": "Junction 42 Local Area Structure Plan amendment and redesignation AG to Medium Industrial", "ref": "Bylaws 1031/2026-A and 1002/2026-K", "date": "2026-11-17", "outcome": "pending", "conditions": "joint public hearing 2026-11-17; land sale of County-owned Lot 24 conditional", "url": "https://www.rdcounty.ca/DocumentCenter/View/10539/Joint-Public-Hearing-Notice-Bylaw-1031-2026-and-1002-2026-K"}], "ownership": null, "sources": [{"url": "https://rdcounty.ca/m/newsflash/home/detail/1982", "title": "Red Deer County: planning process for potential AI Research Lab at Junction 42", "date": "2026-09-29", "quote": "Red Deer County is providing information for a potential land sale at Junction 42 Business Park for a proposed enterprise that would provide high-performance computing infrastructure for an AI research lab.", "supports": ["status", "ai", "type", "municipality", "status_date"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca", "title": "Alberta Data Centre Watch: project listing", "date": "2026-10-10", "quote": "Joint public hearing scheduled for November 17, 2026 at 1:30 p.m.; planning changes and development approval are not confirmed.", "supports": ["approvals", "mw", "operator"], "kind": "directory"}, {"url": "https://www.waveinfra.com/", "title": "Wave Infrastructure", "date": "undated", "kind": "proponent", "quote": "Canadian-owned AI. Rooted in Alberta.", "supports": ["ownership_country", "owner"]}], "confidence": "medium", "notes": "Red Deer County is considering a land sale of Lot 24 (County release 2026-09-29), so the County is the current landowner. No tenant named.", "checked": "2026-10-25", "mw_figures": [{"mw": 5, "basis": "it", "stage": "planned", "date": "2026-09-29", "source_idx": 1}], "ownership_country": "Canada", "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-crusoe-myers", "name": "Myers Energy Park Data Centre", "aliases": ["Crusoe Myers Energy Park", "Crusoe/Kalina Myers"], "operator": "Crusoe / KALiNA Distributed Power", "owner": "Crusoe (data centre, planned); KALiNA Distributed Power (power plant)", "tenants": [], "province": "AB", "municipality": "Red Deer County", "address": null, "lat": 52.20333, "lon": -113.795, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "announced", "status_date": "2026-10-09", "mw": null, "mw_basis": null, "mw_note": "AESO request P3155 (280 MW data load) is listed as recently cancelled. KALiNA plans a 170 MW gas plant at each energy park, and AESO lists a new 178 MW gas-generation request (P3250, filed 2026-10-05).", "power_source": "onsite gas (proposed)", "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3155", "date": "2024-10-11", "outcome": "withdrawn", "conditions": "Reason not published; AESO lists the request as recently cancelled.", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Recently Cancelled | P3155 Myers Energy Park MPC Data Load | 35-Red Deer | 280 | Cancelled", "supports": ["approvals", "status"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca", "title": "Alberta Data Centre Watch: project listing", "date": "2026-09-03", "quote": "AESO's August 2026 list shows the separate 280 MW Myers data-load request as recently cancelled", "supports": ["operator", "municipality"], "kind": "directory"}, {"url": "https://www.newswire.ca/news-releases/kalina-power-and-crusoe-sign-framework-agreement-for-joint-development-of-multiple-co-sited-ai-data-centre-projects-in-alberta-886151615.html", "title": "KALiNA Power and Crusoe Sign Framework Agreement", "date": "2025-02-12", "kind": "proponent", "quote": "Anticipates Crusoe to own and operate its AI Data Centres contracting for affordable power with KALiNA's owned and operated Power-CCS plants", "supports": ["owner"]}, {"url": "https://data.sec.gov/submissions/CIK0001770688.json", "title": "SEC EDGAR company record: Crusoe Energy Systems Inc.", "date": "undated", "quote": "\"name\":\"Crusoe Energy Systems Inc.\", \"stateOfIncorporation\":\"DE\", business address city \"DENVER\", \"CO\"", "supports": ["ownership_country"], "kind": "public_record"}, {"url": "https://www.newswire.ca/news-releases/kalina-power-and-crusoe-sign-framework-agreement-for-joint-development-of-multiple-co-sited-ai-data-centre-projects-in-alberta-886151615.html", "title": "KALiNA Power and Crusoe sign framework agreement (CNW)", "date": "2025-02-12", "kind": "proponent", "quote": "Each of KALiNA's 170 MW Power-CCS plant represents gross unlevered capex of ~CAD$1 billion", "supports": ["mw_note", "power_source"]}, {"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "kind": "public_record", "quote": "P3250 Myers Gas | Cluster | Gas | 1 | 2026-10-05 | 0 | 3 | 178", "supports": ["mw_note"]}], "confidence": "low", "notes": "AESO lists the 280 MW grid request as cancelled, but the Crusoe and KALiNA three-site plan has not been publicly withdrawn, so the project is shown as announced. Crusoe's ownership is uncertain: a 2025 framework anticipated it, but no project agreement had been announced as of 2026-10-25. KALiNA Power Limited is listed on the Australian exchange (ASX).", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "United States", "field_confidence": {"owner": "speculative"}, "tenant_countries": {}} {"site_id": "CA-AB-armada-gayford", "name": "Armada Gayford Data Center", "aliases": ["Gayford Integrated Energy and Data Facility"], "operator": "Armada Nowlit Energy Ltd.", "owner": null, "tenants": [], "province": "AB", "municipality": "Rocky View County", "address": "NW 35-26-25-W4M, next to an Ember Resources gas compressor station, about 16 km southeast of Irricana", "lat": 51.26519, "lon": -113.39727, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-09-14", "mw": null, "mw_basis": null, "mw_note": "The County plan describes 18 MW of on-site gas generation (nine generators), all used on site; the three closed AUC applications described a 19.95 MW plant. The data centre's own load is not stated.", "power_source": "onsite gas (proposed)", "opened": null, "expected_online": null, "approvals": [{"authority": "Rocky View County", "instrument": "master site development plan and Direct Control redesignation (1.8 ha)", "ref": "Armada Gayford Data Center MSDP", "date": null, "outcome": "pending", "conditions": "listed as proposed, not final", "url": "https://www.rockyview.ca/node/4255/planning-projects-underway/proposed-master-site-development-plans"}, {"authority": "AUC", "instrument": "power-plant applications", "ref": "Proceedings 30385, 30476, 30709", "date": "2026", "outcome": "withdrawn", "conditions": "All three closed without prejudice for filing deficiencies (Alberta Data Centre Watch).", "url": "https://prd-api-efiling20.auc.ab.ca/Anonymous/DownloadPublicDocumentAsync/855671"}], "ownership": null, "sources": [{"url": "https://www.rockyview.ca/node/4255/planning-projects-underway/proposed-master-site-development-plans", "title": "Rocky View County: Proposed Master Site Development Plans", "date": "undated", "quote": "Armada Gayford Data Center", "supports": ["name", "approvals", "status", "municipality"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca", "title": "Alberta Data Centre Watch: project listing", "date": "2026-09-14", "quote": "No active AUC power-plant application was identified after proceedings 30385, 30476, and 30709 were closed without merits decisions.", "supports": ["approvals", "mw", "address"], "kind": "directory"}, {"url": "https://www.rockyview.ca/media/3522", "title": "Gayford Facility Master Site Development Plan (Rocky View County)", "date": "2026", "kind": "proponent", "quote": "Total installed generating capability will be 18 MW. Electricity will be consumed exclusively on site", "supports": ["mw_note", "power_source", "address", "operator"]}], "confidence": "medium", "notes": null, "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-AB-estruxture-cal3", "name": "CAL-3", "aliases": ["eStruxture CAL-3 (CoreWeave anchor)"], "operator": "eStruxture Data Centers", "owner": "eStruxture Data Centers (Fengate Asset Management the largest investor since 2024, stake not published)", "tenants": ["CoreWeave"], "province": "AB", "municipality": "Rocky View County", "address": "200 High Plains Common, Rocky View County, AB", "lat": 51.2016, "lon": -113.9321, "coord_precision": "building", "type": "ai_hpc", "ai": "yes", "status": "under_construction", "status_date": "2025-12-04", "mw": 90, "mw_basis": "facility", "mw_note": "Phase 1: 90 MW total power and 70 MW critical IT power (eStruxture data sheet, 2025). The AUC filing, as reported by Alberta Data Centre Watch, targets 30 MW of load by 2026-11-30 and 45 MW for Phase 1.", "power_source": "grid (FortisAlberta distribution)", "opened": null, "expected_online": "2026-H2", "approvals": [{"authority": "Rocky View County", "instrument": "development permit (office/warehouse accommodating a data centre)", "ref": "PRDP20251314", "date": "2025-10-17", "outcome": "approved", "conditions": "Water and wastewater connection to the High Plains Industrial Park systems; 2,560 L/day allocated (Alberta Data Centre Watch, from the permit).", "url": "https://albertadatacentrewatch.ca/projects/estruxture-cal-3/"}, {"authority": "Rocky View County", "instrument": "building permit (new, 27,263 m2, est. C$24.0M)", "ref": "PRBD20255100", "date": "2025-11", "outcome": "approved", "conditions": "none published", "url": "https://www.rockyview.ca/media/2672"}, {"authority": "Rocky View County", "instrument": "building permit (alteration, 4,020 m2, est. C$5.15M)", "ref": "PRBD20258056", "date": "2026-04", "outcome": "approved", "conditions": "none published", "url": "https://www.rockyview.ca/media/3090"}, {"authority": "AUC", "instrument": "power-plant approval (21 diesel emergency standby generators, 66.75 MW nameplate, no export)", "ref": "Proceeding 31020", "date": "2026-08-28", "outcome": "pending", "conditions": "The filing says the generators were installed before the application; decision pending.", "url": null}], "ownership": null, "sources": [{"url": "https://www.estruxture.com/press-releases/estruxture-announces-coreweave-as-anchor-tenant-for-cal-3-its-landmark-ai-ready-facility-in-alberta", "title": "eStruxture announces CoreWeave as anchor tenant for CAL-3", "date": "2026-05-14", "quote": "CoreWeave has signed on for a portion of the capacity as anchor tenant for Phase 1.", "supports": ["tenants", "expected_online", "ai", "operator"], "kind": "proponent"}, {"url": "https://info.estruxture.com/hubfs/Data%20Sheets/eStruxture_Datasheet_CAL3%20EN%20V2%202025.pdf", "title": "eStruxture CAL-3 datasheet V2 2025", "date": "2025", "quote": "Phase 1: 6 data halls and 90MW total power, 70MW of critical power", "supports": ["mw", "mw_basis", "mw_note", "address"], "kind": "proponent"}, {"url": "https://www.rockyview.ca/media/2672", "title": "Rocky View County StatCan major construction permits, November 2025", "date": "2025-12-04", "quote": "PRBD20255100 200 HIGH PLAINS COMMON, Rocky View County AB 01-New 460-Storage building", "supports": ["approvals", "status"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/estruxture-cal-3/", "title": "Alberta Data Centre Watch: eStruxture CAL-3", "date": "2026-10-06", "quote": "County development and building permits are issued. Commercial service is not confirmed", "supports": ["status", "approvals", "mw_note", "power_source"], "kind": "directory"}, {"url": "https://www.estruxture.com/press-releases/estruxture-announces-coreweave-as-anchor-tenant-for-cal-3-its-landmark-ai-ready-facility-in-alberta", "title": "eStruxture Announces CoreWeave as Anchor Tenant for CAL-3", "date": "2026-05-14", "kind": "proponent", "quote": "eStruxture is the largest Canadian data-centre provider. It is headquartered in Montreal with additional locations in Toronto, Calgary, and Vancouver.", "supports": ["owner", "ownership_country"]}, {"url": "https://renx.ca/fengate-makes-18b-investment-in-estruxture-data-centers", "title": "RENX, Fengate makes $1.8B investment in eStruxture Data Centers", "date": "2024-06-19", "kind": "press", "quote": "The investment significantly expands Fengate’s equity stake in eStruxture and expands a longstanding partnership between the two firms. | Fengate is a Toronto-based alternative investment manager", "supports": ["owner", "ownership_country"]}, {"url": "https://data.sec.gov/submissions/CIK0001769628.json", "title": "SEC EDGAR company record, CoreWeave, Inc.", "date": "undated", "kind": "public_record", "quote": "\"city\":\"LIVINGSTON\",\"stateOrCountry\":\"NJ\"", "supports": ["tenant_countries"]}], "confidence": "high", "notes": "County permits and the AUC generator filing (generators installed by August 2026) show work continuing despite reports of a pause; commercial service is not confirmed. Fengate became the largest investor in eStruxture in 2024 but its stake is not published, and eStruxture's 2025-2026 financing releases name lenders, not new owners.", "checked": "2026-10-25", "mw_figures": [{"mw": 90, "basis": "facility", "stage": "building", "date": "2025", "source_idx": 1}, {"mw": 70, "basis": "it", "stage": "building", "date": "2025", "source_idx": 1}, {"mw": 45, "basis": "unstated", "stage": "building", "date": "2026-08-28", "source_idx": 3}], "ownership_country": "Canada", "field_confidence": {"owner": "likely", "tenants": "confirmed"}, "tenant_countries": {"CoreWeave": "United States"}} {"site_id": "CA-AB-beacon-indus", "name": "Indus Data Center Hub", "aliases": ["Beacon AI Hub", "Beacon Indus Data Center Hub", "Beacon Langdon 2", "Beacon Langdon AI Hub", "Beacon Langdon/Indus"], "operator": "Beacon Data Centers", "owner": "Beacon Data Centers (founded 2023 by Nadia Partners)", "tenants": [], "province": "AB", "municipality": "Rocky View County", "address": "SW, SE, NW and part of NE 11-23-28-W4M, near Indus", "lat": 50.9434, "lon": -113.8072, "coord_precision": "address", "type": "ai_hpc", "ai": "yes", "status": "approved", "status_date": "2025-06-17", "mw": 1800, "mw_basis": "requested", "mw_note": "AESO requests P2928 (400 MW) and P2970 (1,400 MW), 1,800 MW together, both with in-service dates under review; one industry directory treats P2970 as a separate Langdon site. The AUC application is for a 1,494 MW on-site gas plant that would normally supply about 1,200 MW to the data halls.", "power_source": "onsite gas (proposed 1,494 MWe plant)", "opened": null, "expected_online": null, "approvals": [{"authority": "Rocky View County", "instrument": "area structure plan and redesignation to Special, Data Centre district (~900 acres)", "ref": "Beacon AI Hub ASP", "date": "2025-06-17", "outcome": "approved", "conditions": "development permits still required; from 2026-07-21 Bylaw C-8766-2026 makes Data Centre Campus a discretionary use decided by Council", "url": "https://www.rockyview.ca/build-plan-and-develop/planning/planning-projects-underway/beacon-ai-hub-area-structure-plan"}, {"authority": "AUC", "instrument": "power-plant application (thermal plant for data centre)", "ref": "Proceeding 30524, Application 30524-A001 (registered 2025-12-29)", "date": "2025-12-29", "outcome": "pending", "conditions": "oral hearing held; no decision posted", "url": "https://www.auc.ab.ca/featured/beacon-ai-centers-indus-project-thermal-power-plant/"}, {"authority": "IAAC", "instrument": "early decision on designated project", "ref": "IAAC 90121", "date": "2026-03-09", "outcome": "approved", "conditions": "No further federal impact assessment required; not a construction approval (Alberta Data Centre Watch).", "url": "https://iaac-aeic.gc.ca/050/evaluations/proj/90121"}, {"authority": "AESO", "instrument": "load connection request", "ref": "P2928 (400 MW), P2970 (1,400 MW)", "date": "2024-04-08", "outcome": "pending", "conditions": "In-service dates under review.", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.rockyview.ca/build-plan-and-develop/planning/planning-projects-underway/beacon-ai-hub-area-structure-plan", "title": "Rocky View County: Beacon AI Hub – Thermal Power Plant Application", "date": "undated", "quote": "On June 17, 2025, Rocky View County Council approved the Beacon AI Hub Area Structure Plan (ASP) to guide a proposed data centre development on approximately 900 acres near Indus", "supports": ["approvals", "municipality"], "kind": "public_record"}, {"url": "https://www.auc.ab.ca/regulatory_documents/current-applications/", "title": "AUC current applications (eFiling table, ajax data)", "date": "2026-10-25", "quote": "Beacon AI Centers - Indus Project Thermal Power Plant Application", "supports": ["status", "approvals"], "kind": "public_record"}, {"url": "https://www.auc.ab.ca/featured/beacon-ai-centers-indus-project-thermal-power-plant/", "title": "AUC Proceeding 30524 page", "date": "undated", "quote": "The AUC is considering the power plant development application in Proceeding 30524.", "supports": ["status", "approvals"], "kind": "public_record"}, {"url": "https://www.rockyview.ca/news-and-events/news/council-decisions-july-21-2026", "title": "Rocky View County Council Decisions July 21, 2026", "date": "2026-07-21", "quote": "Converts “Data Centre Campus” from a permitted use to a discretionary use", "supports": ["approvals"], "kind": "public_record"}, {"url": "https://beacondatacenters.com/campuses/", "title": "Beacon Data Centers: campuses", "date": "undated", "quote": "Indus Data Center Hub Calgary Area - Alberta, Canada", "supports": ["name", "operator"], "kind": "directory"}, {"url": "https://albertadatacentrewatch.ca/projects/beacon-indus-data-center-hub/", "title": "Alberta Data Centre Watch: project profile", "date": "2026-09-09", "quote": "planned 1.2 GW data centre load", "supports": ["mw", "address"], "kind": "directory"}, {"url": "https://beacondatacenters.com/about/", "title": "Beacon Data Centers, About", "date": "undated", "kind": "proponent", "quote": "Founded in 2023 by Nadia Partners, a specialist investor in AI, digital infrastructure and energy infrastructure, Beacon Data Centers was established to deliver best-in-class digital infrastructure solutions", "supports": ["owner"]}, {"url": "https://beacondatacenters.com/news/", "title": "Beacon Data Centers, News (press excerpt)", "date": "2026-06", "kind": "proponent", "quote": "David Lane, CEO of Calgary-based Beacon Data Centers, said his company is planning to make a final decision on its first project in the province in the next six months.", "supports": ["owner"]}, {"url": "https://www.auc.ab.ca/featured/beacon-ai-centers-indus-project-thermal-power-plant/", "title": "AUC: Beacon AI Centers - Indus Project Thermal Power Plant", "date": "undated", "quote": "would supply approximately 1,200 megawatts of power to co-located, on-site data halls", "supports": ["mw", "mw_basis", "mw_note"], "kind": "public_record"}, {"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Project List, October 2026", "date": "2026-10-09", "quote": "P2928 Beacon Langdon A.I. Hub Load | P2970 Beacon Langdon A.I. Hub 2 Load", "supports": ["mw_note", "approvals"], "kind": "public_record"}], "confidence": "high", "notes": "Shown as approved because Rocky View County adopted the area structure plan and redesignated the land for a data centre in June 2025; the AUC has not yet decided the power plant and no development permit is confirmed. AESO's requests named Beacon Langdon likely belong to this campus, but AESO names no site. No tenant is named (Beacon markets to customers from 2 MW to 1,000 MW).", "checked": "2026-10-25", "mw_figures": [{"mw": 400, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 9}, {"mw": 1400, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 9}, {"mw": 1200, "basis": "facility", "stage": "planned", "date": null, "source_idx": 8}], "ownership_country": null, "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-kineticor-rockyview", "name": "Kineticor Data Centre Campus", "aliases": ["Rocky View Technology Park"], "operator": "Kineticor Asset Management", "owner": null, "tenants": [], "province": "AB", "municipality": "Rocky View County", "address": "North of Highway 566, west of Range Road 281", "lat": 51.222, "lon": -113.805, "coord_precision": "area", "type": "ai_hpc", "ai": "unknown", "status": "refused", "status_date": "2025-09-09", "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "Rocky View County", "instrument": "area structure plan", "ref": "Bylaw C-8671-2025 (area structure plan); Bylaw C-8672-2025 (redesignation)", "date": "2025-09-09", "outcome": "refused", "conditions": "Refused primarily over the proposed location and its potential impact on local agricultural producers.", "url": "https://www.rockyview.ca/news-and-events/news/council-decisions-special-council-meeting-kineticor-data-centre-campus-area"}], "ownership": "OPTrust (Kineticor's majority shareholder)", "sources": [{"url": "https://albertadatacentrewatch.ca", "title": "Alberta Data Centre Watch: project listing", "date": "2026-07-31", "quote": "Rocky View County refused the area structure plan on September 9, 2025; the proposal cannot proceed under that plan", "supports": ["status", "status_date", "approvals", "operator", "address"], "kind": "directory"}, {"url": "https://www.rockyview.ca/news-and-events/news/council-decisions-special-council-meeting-kineticor-data-centre-campus-area", "title": "Council Decisions: Special Council Meeting – Kineticor Data Centre Campus Area Structure Plan, September 9, 2025 (Rocky View County)", "date": "2025-09-09", "quote": "Council did not approve the proposed Kineticor Area Structure Plan for an AI Data Centre.", "supports": ["status", "status_date", "approvals"], "kind": "public_record"}, {"url": "https://www.kineticor.ca/about", "title": "Kineticor, About", "date": "undated", "kind": "proponent", "quote": "Headquartered in Calgary, Alberta, we are focused on power projects", "supports": ["ownership_country"]}, {"url": "https://www.bennettjones.com/News/Client-Work/Morgan-Stanley-Infrastructure-Partners-Acquires-Interest-in-Greenlight-Electricity-Centre", "title": "Bennett Jones: Morgan Stanley Infrastructure Partners acquires interest in Greenlight Electricity Centre", "date": "2026-07-08", "quote": "The interest was acquired by MSIP from OPTrust, Kineticor's majority shareholder.", "supports": ["notes", "ownership"], "kind": "press"}, {"url": "https://www.optrust.com/", "title": "OPTrust", "date": "undated", "quote": "OPTrust invests and manages one of Canada's largest pension funds and administers the OPSEU Pension Plan", "supports": ["ownership_country"], "kind": "proponent"}], "confidence": "high", "notes": "Without the area structure plan, the data centre and technology park cannot proceed. Kineticor's majority shareholder is OPTrust, an Ontario pension plan, and Kineticor also holds 5% of the Greenlight power plant, which is unrelated to this site.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"owner": "likely", "location": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-crusoe-lone-pine-crossfield", "name": "Lone Pine Energy Park Data Centre", "aliases": ["Crusoe Crossfield Energy Park", "Crusoe/Kalina Crossfield", "Lone Pine Energy Centre"], "operator": "KALiNA Distributed Power / Crusoe", "owner": "Crusoe (data centre, planned); KALiNA Distributed Power (power plant)", "tenants": [], "province": "AB", "municipality": "Rocky View County", "address": null, "lat": 51.4068, "lon": -114.03067, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "cancelled", "status_date": "2026-06-09", "mw": null, "mw_basis": null, "mw_note": "AESO request P3154 (280 MW) is listed as recently cancelled.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "Rocky View County", "instrument": "area structure plan terms of reference", "ref": "Lone Pine Energy Centre", "date": "2026-06-09", "outcome": "withdrawn", "conditions": "proponent withdrew; County ended ASP work", "url": "https://www.rockyview.ca/news-and-events/news/council-decisions-june-9-2026"}, {"authority": "AESO", "instrument": "load connection request", "ref": "P3154", "date": "2024-10-11", "outcome": "withdrawn", "conditions": "Reason not published; AESO lists the request as recently cancelled.", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.rockyview.ca/news-and-events/news/council-decisions-june-9-2026", "title": "Rocky View County Council Decisions June 9, 2026", "date": "2026-06-09", "quote": "outlining the withdrawal of Kalina Distributed Power Limited’s proposed Lone Pine Energy Centre data centre project, ending Administration’s work on the area structure plan terms of reference.", "supports": ["status", "approvals"], "kind": "public_record"}, {"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "Recently Cancelled | P3154 Lone Pine Energy Park MPC Data Load | 57-Airdrie | 280 | Cancelled", "supports": ["approvals"], "kind": "public_record"}, {"url": "https://www.newswire.ca/news-releases/kalina-power-and-crusoe-sign-framework-agreement-for-joint-development-of-multiple-co-sited-ai-data-centre-projects-in-alberta-886151615.html", "title": "KALiNA Power and Crusoe Sign Framework Agreement", "date": "2025-02-12", "kind": "proponent", "quote": "Anticipates Crusoe to own and operate its AI Data Centres contracting for affordable power with KALiNA's owned and operated Power-CCS plants", "supports": ["owner"]}, {"url": "https://data.sec.gov/submissions/CIK0001770688.json", "title": "SEC EDGAR company record: Crusoe Energy Systems Inc.", "date": "undated", "quote": "\"name\":\"Crusoe Energy Systems Inc.\", \"stateOfIncorporation\":\"DE\", business address city \"DENVER\", \"CO\"", "supports": ["ownership_country"], "kind": "public_record"}], "confidence": "high", "notes": "The project is cancelled. Crusoe's ownership is uncertain: a 2025 framework anticipated it, but no project agreement had been announced as of 2026-10-25. KALiNA Power Limited is listed on the Australian exchange (ASX).", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "United States", "field_confidence": {"owner": "speculative"}, "tenant_countries": {}} {"site_id": "CA-AB-bhe-wild-rose", "name": "Wild Rose Power Hub", "aliases": ["Wild Rose Data Center"], "operator": "BHE Canada / Chinook Development LP", "owner": null, "tenants": [], "province": "AB", "municipality": "Rocky View County", "address": "Southwest of Langdon", "lat": 50.943, "lon": -113.703, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-06-03", "mw": 1300, "mw_basis": "requested", "mw_note": "AESO request P3108: 300 MW plus 1,000 MW in two stages, in-service dates under review.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "Rocky View County", "instrument": "area structure plan (terms of reference approved 2025-07-08)", "ref": "Wild Rose Power Hub ASP", "date": "2025-07-08", "outcome": "pending", "conditions": "ASP under preparation; open house 2026-06-03; County paused new S-DAT rezoning decisions 2026-07-21", "url": "https://www.rockyview.ca/build-plan-and-develop/planning/planning-projects-underway/wild-rose-power-hub-area-structure-plan"}, {"authority": "AESO", "instrument": "load connection request", "ref": "P3108", "date": "2025-04-04", "outcome": "pending", "conditions": "Stage 2; in-service date under review.", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.rockyview.ca/build-plan-and-develop/planning/planning-projects-underway/wild-rose-power-hub-area-structure-plan", "title": "Rocky View County: Wild Rose Power Hub ASP", "date": "undated", "quote": "You are invited to attend the Wild Rose Power Hub Area Structure Plan Open House on June 3, 2026.", "supports": ["status", "approvals", "municipality"], "kind": "public_record"}, {"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "P3108 Wild Rose Power Hub Load | 06-Calgary | 2 | 300 | 1000", "supports": ["mw", "approvals"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/wild-rose-power-hub/", "title": "Alberta Data Centre Watch: project profile", "date": "2026-09-11", "quote": "Terms of reference approved July 8, 2025; no final plan verified", "supports": ["approvals", "operator"], "kind": "directory"}], "confidence": "high", "notes": "The operator name is reported by Alberta Data Centre Watch and is not confirmed in a primary record.", "checked": "2026-10-25", "mw_figures": [{"mw": 300, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 1}, {"mw": 1000, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 1}], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-AB-estruxture-rockyview-cal2", "name": "CAL-2", "aliases": ["CAL-2 Calgary Data Center", "eStruxture CAL-2"], "operator": "eStruxture Data Centers", "owner": null, "tenants": [], "province": "AB", "municipality": "Rocky View County (Balzac)", "address": "149 High Plains Place, Rocky View County, AB T4A 0W7", "lat": 51.20153, "lon": -113.93271, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": 26, "mw_basis": "unstated", "mw_note": "Operator page: total capacity 26 MW, 106,000 sq ft; the 2021 announcement said 30 MW and about 93,000 sq ft. One industry directory lists 20 MW.", "power_source": "grid", "opened": null, "expected_online": null, "approvals": [{"authority": "AUC", "instrument": "power-plant approval (backup diesel generation)", "ref": "Decision 27614-D01-2022", "date": "2022", "outcome": "approved", "conditions": "Conditions not reviewed; Alberta Data Centre Watch describes a 12 MW diesel backup plant of four generators.", "url": null}], "ownership": null, "sources": [{"url": "https://www.estruxture.com/data-centers/calgary/cal-2", "title": "CAL-2 Calgary data center (eStruxture)", "date": "undated", "quote": "CAL-2 is a data center strategically located in Balzac at 149 High Plains Place, Rocky View County, AB T4A 0W7", "supports": ["name", "operator", "address", "municipality", "status"], "kind": "proponent"}, {"url": "https://www.estruxture.com/data-centers/calgary/cal-2", "title": "CAL-2 Calgary data center (eStruxture)", "date": "undated", "quote": "Our Calgary CAL-2 data center offers colocation services with high power density of up to 30kW per cabinet (higher upon request) with a total capacity of 26MW.", "supports": ["type", "mw"], "kind": "proponent"}, {"url": "https://www.estruxture.com/press-releases/estruxture-announces-the-opening-of-its-second-calgary-data-center-addressing-the-increasing-demand-for-high-capacity-facilities-in-the-market", "title": "eStruxture announces second Calgary data center", "date": "2021-11-03", "quote": "Planned for the second half of 2022, the CAL-2 facility reinforces the company’s commitment to grow its business in Canada", "supports": ["mw_note"], "kind": "proponent"}, {"url": "https://albertadatacentrewatch.ca/?project=estruxture-cal2#project-map", "title": "Alberta Data Centre Watch: eStruxture CAL-2", "date": "2026-07-31", "quote": "AUC Decision 27614-D01-2022 approved CAL-2's 12 MW diesel backup plant, consisting of four generators intended for monthly testing and outages.", "supports": ["approvals"], "kind": "directory"}], "confidence": "high", "notes": "The AUC approval is reported by Alberta Data Centre Watch and is not confirmed in the AUC's own record. The opening year (2023, per Alberta Data Centre Watch) is not confirmed.", "checked": "2026-10-25", "mw_figures": [{"mw": 26, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}, {"mw": 30, "basis": "unstated", "stage": "planned", "date": "2021-11-03", "source_idx": 2}], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely"}} {"site_id": "CA-AB-prairiesky-strathmore", "name": "Prairie Sky Strathmore Data Center", "aliases": ["Prairie Sky Strathmore Campus"], "operator": "Prairie Sky Data Solutions", "owner": null, "tenants": [], "province": "AB", "municipality": "Strathmore", "address": null, "lat": 51.03278, "lon": -113.39713, "coord_precision": "city", "type": "colocation", "ai": "yes", "status": "announced", "status_date": null, "mw": 50, "mw_basis": "buildout", "mw_note": "A 2 MW retrofit first, with a 50 MW roadmap (Alberta Data Centre Watch; the company's roadmap page was offline on 2026-10-25).", "power_source": null, "opened": null, "expected_online": "2026", "approvals": [], "ownership": null, "sources": [{"url": "https://majorprojects.alberta.ca/details/Prairie-Sky-Data-Solutions-Strathmore-Data-Center-Phase-1/11820", "title": "Alberta Major Projects: Prairie Sky Strathmore Data Center (Phase 1)", "date": "undated", "quote": "Prairie Sky Data Solutions is retrofitting a former cannabis manufacturing facility in Strathmore, Alberta to create a specialized AI-compatible data center", "supports": ["operator", "municipality", "ai", "type", "status", "expected_online"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/", "title": "Alberta Data Centre Watch: Prairie Sky Strathmore Campus", "date": "2026-09-11", "kind": "directory", "quote": "A phased AI-ready colocation campus beginning with a 2 MW retrofit and targeting 50 MW across five phases.", "supports": ["mw", "mw_note"]}], "confidence": "low", "notes": "The provincial registry lists it as proposed with completion by 2026, but no permit or operation has been confirmed; it may already run at small scale.", "checked": "2026-10-25", "mw_figures": [{"mw": 50, "basis": "buildout", "stage": "planned", "date": "2026-09-11", "source_idx": 1}], "ownership_country": null, "field_confidence": {}, "tenant_countries": {}} {"site_id": "CA-AB-beacon-heartland", "name": "Heartland Data Center Hub", "aliases": ["Beacon Heartland / Fort Saskatchewan", "Beacon Heartland AI Data Center Hub"], "operator": "Beacon Data Centers", "owner": "Beacon Data Centers (founded 2023 by Nadia Partners)", "tenants": [], "province": "AB", "municipality": "Sturgeon County", "address": "NW and SW 15-56-22-W4M", "lat": 53.84032, "lon": -113.19225, "coord_precision": "address", "type": "ai_hpc", "ai": "yes", "status": "approved", "status_date": "2026-10-23", "mw": 800, "mw_basis": "requested", "mw_note": "AESO lists two 400 MW requests, P2934 and P3175, both with in-service dates under review. About 800 MW of the AUC-approved 920 MW gas-fired power plant is to supply the on-site data centre under normal operation (AUC decision, 2026-10-23); 920 MW is the plant's capacity, not the data centre's load.", "power_source": "onsite gas (920 MW Heartland power plant)", "opened": null, "expected_online": null, "approvals": [{"authority": "AUC", "instrument": "power-plant approval (920 MW thermal plant for co-located data centre)", "ref": "Proceeding 30518, Decision 30518-D01-2026, Approval 30518-D02-2026", "date": "2026-10-23", "outcome": "approved", "conditions": "Approved with conditions: a final project update at least 90 days before construction, a final cumulative noise assessment of plant and data centre, an emergency response plan and reclamation security. The decision does not approve the data centre or a grid connection.", "url": "https://www.auc.ab.ca/featured/beacon-ai-centers-heartland-project-thermal-power-plant-application/"}, {"authority": "IAAC", "instrument": "early decision on designated project (Initial Project Description)", "ref": "IAAC 90123", "date": "2026-03-09", "outcome": "approved", "conditions": "no further federal impact assessment required; not a construction approval", "url": "https://iaac-aeic.gc.ca/050/evaluations/document/165326"}, {"authority": "Sturgeon County", "instrument": "master site development permit, amended Feb 2026 to add gas-to-electric generation", "ref": "not published", "date": "2025", "outcome": "approved", "conditions": "Reported by Alberta Data Centre Watch; the County's data-centre page lists the project as proposed and does not show the permit.", "url": "https://www.sturgeoncounty.ca/building-development/data-centre-development/"}, {"authority": "AESO", "instrument": "load connection request", "ref": "P2934; P3175", "date": "2024-05-10", "outcome": "pending", "conditions": "Stage 2 (P2934) and Stage 1 (P3175), in-service dates under review", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.auc.ab.ca/featured/beacon-ai-centers-heartland-project-thermal-power-plant-application/", "title": "AUC: Beacon AI Centers – Heartland Project Thermal Power Plant Application", "date": "2026-10-23", "quote": "The power plant is intended to supply power to a co-located data centre for artificial-intelligence and high-performing-computing facilities.", "supports": ["status", "approvals", "ai", "type", "power_source"], "kind": "public_record"}, {"url": "https://www.sturgeoncounty.ca/building-development/data-centre-development/", "title": "Sturgeon County: Data centre development", "date": "undated", "quote": "Beacon Heartland Data Centre is a proposed data centre development in Alberta’s Industrial Heartland.", "supports": ["municipality", "name"], "kind": "public_record"}, {"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "P2934 Beacon Heartland A.I. Hub Load | 33-Fort Saskatchewan | Data Load | 400 | P3175 Beacon Heartland Data Load | 400", "supports": ["mw_note", "approvals"], "kind": "public_record"}, {"url": "https://beacondatacenters.com/campuses/", "title": "Beacon Data Centers: campuses", "date": "undated", "quote": "Heartland Data Center Hub Edmonton Area - Alberta, Canada", "supports": ["operator", "name"], "kind": "directory"}, {"url": "https://albertadatacentrewatch.ca/projects/beacon-heartland-data-center-hub/", "title": "Alberta Data Centre Watch: project profile", "date": "2026-10-23", "quote": "The AUC approved the power plant with conditions on October 23, 2026. It did not approve the data centre or a grid connection.", "supports": ["approvals", "address", "mw"], "kind": "directory"}, {"url": "https://beacondatacenters.com/about/", "title": "Beacon Data Centers, About", "date": "undated", "kind": "proponent", "quote": "Founded in 2023 by Nadia Partners, a specialist investor in AI, digital infrastructure and energy infrastructure, Beacon Data Centers was established to deliver best-in-class digital infrastructure solutions", "supports": ["owner"]}, {"url": "https://beacondatacenters.com/news/", "title": "Beacon Data Centers, News (press excerpt)", "date": "2026-06", "kind": "proponent", "quote": "David Lane, CEO of Calgary-based Beacon Data Centers, said his company is planning to make a final decision on its first project in the province in the next six months.", "supports": ["owner"]}, {"url": "https://prd-api-efiling20.auc.ab.ca/Anonymous/DownloadPublicDocumentAsync/863766", "title": "AUC Decision 30518-D01-2026: Beacon AI Centers - Heartland Project Thermal Power Plant", "date": "2026-10-23", "quote": "Under normal operating conditions, the power plant will supply approximately 800 MW to the proposed co-located data centre.", "supports": ["mw", "mw_basis", "mw_note", "approvals"], "kind": "public_record"}, {"url": "https://prd-api-efiling20.auc.ab.ca/Anonymous/DownloadPublicDocumentAsync/863766", "title": "AUC Decision 30518-D01-2026: Beacon AI Centers Heartland Project thermal power plant", "date": "2026-10-23", "kind": "public_record", "quote": "Beacon Data Centers Inc. is the intended landowner and proposed beneficiary of the letter of credit.", "supports": ["owner", "notes"]}], "confidence": "high", "notes": "Approved here rests on the AUC power-plant approval; the AUC did not approve the data centre itself or a grid connection, and no construction has been confirmed. The AUC decision names Beacon Data Centers Inc. as the intended landowner and the plant's applicant, Heartland Power Generation LP, as an affiliate under the same parent; no tenant is named.", "checked": "2026-10-25", "mw_figures": [{"mw": 400, "basis": "requested", "stage": "requested", "date": "2024-05-10", "source_idx": 2}, {"mw": 400, "basis": "requested", "stage": "requested", "date": "2026-01-28", "source_idx": 2}, {"mw": 800, "basis": "facility", "stage": "planned", "date": "2026-10-23", "source_idx": 7}], "ownership_country": null, "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-meta-sturgeon", "name": "Sturgeon Data Centre", "aliases": ["GLDC Load", "Greenlight Campus", "Meta Sturgeon County AI Data Centre", "Meta Sturgeon Data Centre", "Project Frost"], "operator": "Meta", "owner": "Meta Platforms, Inc.", "tenants": [], "province": "AB", "municipality": "Sturgeon County", "address": "56111 Range Road 223, Sturgeon County, AB", "lat": 53.8245, "lon": -113.19873, "coord_precision": "address", "type": "hyperscale_cloud", "ai": "yes", "status": "approved", "status_date": "2026-10-20", "mw": 970, "mw_basis": "grid_allocation", "mw_note": "Display figure: 970 MW, AESO's Phase 1 grid allocation with an executed load contract, as published by both AESO and the Government of Alberta; Meta's own \"1 GW\" states no basis. AESO also lists an 830 MW Phase 1.2 request (in-service date under review); the Government of Alberta gives an 1,800 MW campus draw at full build-out including on-site generation, and the AUC approved the on-site Greenlight gas plant at 1,864 MW with a 932 MW first stage.", "power_source": "grid plus on-site gas (Greenlight Electricity Centre)", "opened": null, "expected_online": "2028", "approvals": [{"authority": "Sturgeon County", "instrument": "development permit (Master Site Development Permit, data processing facility major, permitted use)", "ref": "DP-26-0028", "date": "2026-06-16", "outcome": "approved", "conditions": "Effective 2026-07-07; preliminary appeals at the Land and Property Rights Tribunal unresolved as of 2026-10-22 (Alberta Data Centre Watch).", "url": "https://www.sturgeoncounty.ca/development-permit-approval-notice-for-56111-rge-rd-223/"}, {"authority": "Sturgeon County", "instrument": "development permit (piling foundation only, Building DCB01 and Mechanical Yard MY01, 56027 Rge Rd 223)", "ref": "DP-26-0293", "date": "2026-10-20", "outcome": "approved", "conditions": "takes effect 2026-11-10; appeal deadline 2026-11-10", "url": "https://www.sturgeoncounty.ca/development-permit-approval-notice-for-56027-rge-rd-223/"}, {"authority": "AUC", "instrument": "power-plant approval (Greenlight Electricity Centre, 1,864 MW)", "ref": "Proceeding 30261, Decision 30261-D02-2026", "date": "2026-06-25", "outcome": "approved", "conditions": "Municipal water-use approval or agreement to be confirmed in the final project update (Alberta Data Centre Watch summary of the decision).", "url": "https://www.auc.ab.ca/featured/greenlight-electricity-centre/"}, {"authority": "AESO", "instrument": "Phase 1 large-load allocation and load contract", "ref": "P2936 GLDC Load Phase 1.1 (970 MW); P3151 GLDC Load Phase 1.2 (830 MW)", "date": "2025-11", "outcome": "approved", "conditions": "Load contract executed for 970 MW (P2936). AESO's Phase 1 allocation process concluded in early November 2025 (Capital Power, a fellow Phase 1 applicant). Both requests were filed 2024-05-14; P3151 (830 MW) is still pending, in-service date under review.", "url": "https://www.aeso.ca/grid/connecting-to-the-grid/large-load-projects/"}], "ownership": "Meta Platforms (United States)", "sources": [{"url": "https://about.fb.com/news/2026/07/breaking-ground-on-metas-first-data-center-in-canada/", "title": "Breaking Ground on Meta's First Data Center in Canada", "date": "2026-07-08", "quote": "We're breaking ground on a new 1GW data center in Sturgeon County, Alberta", "supports": ["operator", "status", "mw_note", "ai"], "kind": "proponent"}, {"url": "https://www.sturgeoncounty.ca/wp-content/uploads/council-update-heartland-activity-dcs-august-2026.pdf", "title": "Council update: Heartland activity, data centres (Aug 2026)", "date": "2026-08", "quote": "Master Site Development Permit (MSDP), Transportation Impact Assessment (TIA) and Site Grading Issued.", "supports": ["status", "status_date", "expected_online", "approvals"], "kind": "public_record"}, {"url": "https://www.alberta.ca/datacentres/numbers", "title": "Alberta data centres: the numbers", "date": "2026-07-30", "quote": "970 MW | Meta's AESO-approved Phase 1 load allocation.", "supports": ["mw", "mw_basis", "mw_note", "approvals"], "kind": "public_record"}, {"url": "https://www.sturgeoncounty.ca/development-permit-approval-notice-for-56111-rge-rd-223/", "title": "Development permit approval notice for 56111 Rge Rd 223", "date": "2026-06-16", "quote": "Master Site Development Permit to establish a comprehensive framework for the development of a Data Processing Facility (Major) at 56111 Rge Rd 223", "supports": ["address", "approvals"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/sturgeon-data-centre/", "title": "Alberta Data Centre Watch: Sturgeon Data Centre", "date": "2026-10-22", "quote": "Physical piling work and main facility construction remain unverified.", "supports": ["notes"], "kind": "directory"}, {"url": "https://www.sturgeoncounty.ca/development-permit-approval-notice-for-56027-rge-rd-223/", "title": "Development permit approval notice for 56027 RGE RD 223", "date": "2026-10-20", "quote": "Piling Foundation Permit ONLY for Building DCB01 and Mechanical Yard MY01 at 56027 RGE RD 223 (SE-3-56-22-4).", "supports": ["approvals", "status", "status_date"], "kind": "public_record"}, {"url": "https://www.sturgeoncounty.ca/building-development/data-centre-development/", "title": "Sturgeon County: Data centre development", "date": "undated", "quote": "This is Meta’s first data centre in Canada, it reached final investment decision on July 8, 2026.", "supports": ["operator", "expected_online"], "kind": "public_record"}, {"url": "https://www.aeso.ca/grid/connecting-to-the-grid/large-load-projects/", "title": "AESO Large Load Projects", "date": "undated", "quote": "P2936 GLDC Load - 970 MW P3083 Keephills Data Centre Phase I - 230 MW", "supports": ["mw_note", "approvals"], "kind": "public_record"}, {"url": "https://sturgeondatacentre.com/", "title": "Sturgeon Data Centre (Meta project site)", "date": "undated", "quote": "Sturgeon Data Centre is Meta’s newest data centre project in Alberta's Sturgeon County in the Edmonton region.", "supports": ["name", "operator", "municipality"], "kind": "proponent"}, {"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "P3151 GLDC Load Phase 1.2 | 33-Fort Saskatchewan | Data Load | Stage 2 | Applied On 2024-05-14 | EN1 DTS 830 | Under Review", "supports": ["mw_figures", "approvals"], "kind": "public_record"}, {"url": "https://data.sec.gov/submissions/CIK0001326801.json", "title": "SEC EDGAR company record, Meta Platforms, Inc.", "date": "undated", "kind": "public_record", "quote": "\"name\":\"Meta Platforms, Inc.\" | \"city\":\"MENLO PARK\",\"stateOrCountry\":\"CA\"", "supports": ["ownership_country"]}, {"url": "https://www.capitalpower.com/wp-content/uploads/2025/12/Capital-Power-Genesee-Generating-Station-Newsletter-Winter-2025.pdf", "title": "Capital Power: Genesee Generating Station newsletter, Winter 2025", "date": "2025-12", "quote": "Two projects elected to proceed under this limit, and Phase 1 formally concluded in early November.", "supports": ["approvals"], "kind": "proponent"}], "confidence": "medium", "notes": "Work so far is site preparation: Meta announced groundbreaking on 2026-07-08 and Sturgeon County issued the master site development and grading permits, but the piling permit for the first building takes effect only on 2026-11-10 and vertical construction is not yet confirmed. Meta is building it for its own use, with no outside tenants, and has not disclosed the chips it will use.", "checked": "2026-10-25", "mw_figures": [{"mw": 1000, "basis": "unstated", "stage": "planned", "date": "2026-07-08", "source_idx": 0}, {"mw": 970, "basis": "grid_allocation", "stage": "allocated", "date": "2025", "source_idx": 7}, {"mw": 830, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 9}, {"mw": 1800, "basis": "buildout", "stage": "planned", "date": "2026-07", "source_idx": 2}], "ownership_country": "United States", "field_confidence": {"owner": "confirmed"}, "tenant_countries": {}} {"site_id": "CA-AB-palliser-travers", "name": "Travers AI Data Centre Campus", "aliases": ["Travers Battery Data Load"], "operator": "Palliser Grid", "owner": "Palliser Grid", "tenants": [], "province": "AB", "municipality": "Vulcan County", "address": "Section 14-15-21 W4M and portions of E1/2 15-15-21 W4M", "lat": 50.25927, "lon": -112.78815, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "approved", "status_date": "2026-06-17", "mw": 300, "mw_basis": "requested", "mw_note": "Up to 2,000 MW of IT load at full build-out, a planning target in four 500 MW phases, with Phase 1 at 400 MW by the end of 2027 (applicant's submission to the County). AESO Cluster 3 request P3312 (Travers Battery Data Load): 150 MW plus 150 MW of load with 200 MW of battery supply, likely this project given the name.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "Vulcan County", "instrument": "rezoning to rural industrial (594.55 acres)", "ref": "Bylaw 2026-007", "date": "2026-06-17", "outcome": "approved", "conditions": "Second and third readings carried 2026-06-17 (motions CC 2026-06-17-09 and -10), amended to 594.55 acres; a judicial review was reported filed 2026-07-22; no development permit issued.", "url": "https://vulcancounty.civicweb.net/document/148611"}, {"authority": "AESO", "instrument": "Cluster 3 connection request (battery + data load)", "ref": "P3312", "date": "2026-08-06", "outcome": "pending", "conditions": "Stage 1", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.vulcancounty.ab.ca/public-hearing-scheduled-for-bylaw-2026-007-rural-industrial-rezone/", "title": "Vulcan County: Public Hearing Scheduled for Bylaw 2026-007", "date": "2026-06-15", "quote": "Bylaw 2026-007 will be presented to Vulcan County Council for a decision on June 17, 2026.", "supports": ["approvals"], "kind": "public_record"}, {"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "P3312 Travers Battery Data Load | 49-Stavely | Battery + Data Load | 1 | 150 | 200 | 150", "supports": ["approvals", "mw_note"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/travers-ai-data-centre-campus/", "title": "Alberta Data Centre Watch: project profile", "date": "2026-09-17", "quote": "Vulcan County rezoned 594.55 acres in June 2026, allowing a development-permit application.", "supports": ["status", "status_date", "mw", "address"], "kind": "directory"}, {"url": "https://pallisergrid.com/", "title": "Palliser Grid", "date": "undated", "kind": "proponent", "quote": "A farmer-founded company advancing an integrated neocloud, power and land platform in southern Alberta.", "supports": ["owner", "ownership_country"]}, {"url": "https://vulcancounty.civicweb.net/document/148611", "title": "Vulcan County Council minutes, 17 June 2026", "date": "2026-06-17", "quote": "that Council give second reading to Bylaw 2026-007 with the amendment to Schedule A to 594.55 Acres.", "supports": ["status", "status_date", "approvals", "address"], "kind": "public_record"}, {"url": "https://www.vulcancounty.ab.ca/document/6505/", "title": "Proposed Bylaw 2026-007: applicant submission (Palliser Grid)", "date": "2026-01-21", "quote": "Ultimate build out: up to 2,000 MW IT load (planning target).", "supports": ["mw", "mw_basis", "mw_note", "operator"], "kind": "proponent"}, {"url": "https://www.vulcancounty.ab.ca/document/6505/", "title": "Proposed Bylaw 2026-007: applicant submission (Palliser Grid)", "date": "2026-01-21", "quote": "Ultimate 2 GW, ~8,000,000 sq ft, 20–30 buildings (max ~12 m). Phase 1: 400 MW by end of 2027.", "supports": ["mw_note"], "kind": "proponent"}], "confidence": "medium", "notes": "Vulcan County Council adopted the rezoning on 2026-06-17; no development permit has been issued.", "checked": "2026-10-25", "mw_figures": [{"mw": 300, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 1}, {"mw": 400, "basis": "it", "stage": "planned", "date": "2026-01-21", "source_idx": 6}, {"mw": 2000, "basis": "buildout", "stage": "planned", "date": "2026-01-21", "source_idx": 5}], "ownership_country": "Canada", "field_confidence": {"owner": "speculative"}, "tenant_countries": {}} {"site_id": "CA-AB-diode-goldfinch", "name": "Goldfinch Technology Park", "aliases": ["Diode Ventures Data Centre", "Goldfinch Technology Park MPC Load"], "operator": "Diode Ventures", "owner": null, "tenants": [], "province": "AB", "municipality": "Wheatland County", "address": "South of Township Road 222 and west of Highway 24, about 4.5 km west of Carseland", "lat": 50.855, "lon": -113.515, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "approved", "status_date": "2026-08-11", "mw": 950, "mw_basis": "requested", "mw_note": "AESO request P3102: 650 MW plus 300 MW, in-service dates under review.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "Wheatland County", "instrument": "Goldfinch Industrial ASP amendment, Data Centre Area Concept Plan and redesignation to Industrial General", "ref": "Bylaw 2026-32 (County file label; Alberta Data Centre Watch reports the consolidated plan prints 2025-32), PL2025-005", "date": "2026-08-11", "outcome": "approved", "conditions": "discretionary development permit required for each phase; no process water from local groundwater/surface water for cooling (proponent commitment)", "url": "https://wheatlandcounty.ca/wp-content/uploads/2026/08/Diode-Ventures-Data-Centre-ACP-2026-09-11-Final.pdf"}, {"authority": "AESO", "instrument": "load connection request", "ref": "P3102", "date": "2025-03-19", "outcome": "pending", "conditions": "Stage 2; in-service date under review.", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}], "ownership": null, "sources": [{"url": "https://www.diodeventures.com/insights/goldfinch-technology-park-reaches-land-use-milestone-in-wheatland-county", "title": "Diode Ventures: Goldfinch reaches land use milestone", "date": "2026-09-03", "quote": "Wheatland County Council gave third and final reading to amendments to the Goldfinch Industrial Area Structure Plan, approved a Data Centre Area Concept Plan, and redesignated the applicable lands to Industrial General.", "supports": ["approvals", "status"], "kind": "proponent"}, {"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "P3102 Goldfinch Technology Park MPC Load | 45-Strathmore/Blackie | 2 | 650 | 300", "supports": ["mw", "approvals"], "kind": "public_record"}, {"url": "https://albertadatacentrewatch.ca/projects/goldfinch-technology-park/", "title": "Alberta Data Centre Watch: project profile", "date": "2026-10-08", "quote": "The concept plan is adopted, but a development permit is required for each phase.", "supports": ["approvals", "address", "status_date"], "kind": "directory"}, {"url": "https://wheatlandcounty.ca/wp-content/uploads/2026/08/Diode-Ventures-Data-Centre-ACP-2026-09-11-Final.pdf", "title": "Diode Ventures Data Centre Area Concept Plan, final (Wheatland County)", "date": "2026-09-11", "kind": "proponent", "quote": "approximately 4.5 km west of the Hamlet of Carseland", "supports": ["address", "approvals"]}], "confidence": "high", "notes": "Approved here means the land-use stage only; a development permit is needed for each phase. The County's file names the bylaw 2026-32, while Alberta Data Centre Watch reports that the consolidated plan prints 2025-32.", "checked": "2026-10-25", "mw_figures": [{"mw": 650, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 1}, {"mw": 300, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 1}], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-AB-hubone-wheatland", "name": "HubOne AI & BTC High Density Compute Park", "aliases": ["HubOne Wheatland"], "operator": "HubOne / Elemental Developments", "owner": "HubOne / Elemental Developments", "tenants": [], "province": "AB", "municipality": "Wheatland County", "address": null, "lat": 51.0173, "lon": -113.52812, "coord_precision": "area", "type": "crypto", "ai": "partial", "status": "announced", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Up to 3,000 MW is the park's planned on-site power supply for mixed AI and bitcoin mining, not the data centres' load; the registry describes 15 AI facilities starting at 50 MW each.", "power_source": "onsite (unspecified)", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://majorprojects.alberta.ca/details/HubOne-AI-BTC-High-Density-Compute-Park/11638", "title": "Alberta Major Projects: HubOne AI & BTC High Density Compute Park", "date": "undated", "quote": "With up to 3,000 MW of dedicated on-site power, the campus would offer 10, 20, and 30-year Power Purchase Agreements to support technology operations.", "supports": ["mw", "status", "type", "ai", "municipality"], "kind": "public_record"}, {"url": "https://hub1.ca/", "title": "HubOne", "date": "undated", "kind": "proponent", "quote": "3553 31st Street N.W Calgary, Alberta Canada T2L2K7", "supports": ["ownership_country"]}], "confidence": "low", "notes": "The newest dated item is a November 2023 press release, HubOne's website no longer describes the park, and the point is the registry's approximate location.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"owner": "speculative"}, "tenant_countries": {}} {"site_id": "CA-AB-stratgrid-wheatland", "name": "StratGrid Project Wheatland", "aliases": [], "operator": "StratGrid Inc.", "owner": "StratGrid Inc. (about 26% held by SG Canada InvestCo LLC, a Jet.AI joint venture)", "tenants": [], "province": "AB", "municipality": "Wheatland County", "address": null, "lat": 51.11112, "lon": -112.92526, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "announced", "status_date": "2026-09-14", "mw": null, "mw_basis": null, "mw_note": "About 200 MW is the designed on-site generation's capacity (Alberta Data Centre Watch), not the data centre's load.", "power_source": "onsite generation", "opened": null, "expected_online": null, "approvals": [], "ownership": "SG Canada InvestCo LLC (60% Jet.AI, with Blackbird Investment Management) holds about 26%", "sources": [{"url": "https://albertadatacentrewatch.ca", "title": "Alberta Data Centre Watch: project listing", "date": "2026-09-14", "quote": "no parcel, municipal development application, AUC application, environmental authorization, construction, or operation has been verified", "supports": ["status", "mw", "ownership"], "kind": "directory"}, {"url": "https://www.sec.gov/Archives/edgar/data/1861622/000149315226038333/form10-q.htm", "title": "Jet.AI Inc. 10-Q, quarter ended 2026-06-30", "date": "2026-08-14", "kind": "public_record", "quote": "On July 28, 2026, the Company funded a $1,750,000 investment in StratGrid Inc. (“StratGrid”), a Calgary, Alberta-based developer of behind-the-meter, natural gas-powered data center infrastructure", "supports": ["owner", "ownership_country"]}], "confidence": "low", "notes": "No parcel, municipal or AUC application, environmental approval or construction has been confirmed (Alberta Data Centre Watch); the point marks Wheatland County, not the site. Jet.AI's filing says SG Canada InvestCo, its joint venture with Blackbird Investment Management (Jet.AI 60%), holds about 26% of StratGrid; the other holders are not named.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-AB-radiant-ridge-lynx", "name": "Radiant Ridge modular data centre", "aliases": [], "operator": "Radiant Ridge Energy Limited", "owner": null, "tenants": [], "province": "AB", "municipality": "Wheatland County (from the legal land description)", "address": "near Lynx Compressor Station, NW 1-24-22-W4M", "lat": 51.03, "lon": -112.93, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-08-18", "mw": null, "mw_basis": null, "mw_note": "9.96 MW is the off-grid plant's capacity (40 units of 0.249 MW) supplying modular data centre units; their own load is not stated.", "power_source": "onsite gas, off-grid", "opened": null, "expected_online": null, "approvals": [{"authority": "AUC", "instrument": "power-plant application (off-grid, 9.96 MW)", "ref": "Proceeding 30992 (30992-A001)", "date": "2026-08-18", "outcome": "pending", "conditions": "under review", "url": "https://www.auc.ab.ca/regulatory_documents/current-applications/"}], "ownership": null, "sources": [{"url": "https://www.auc.ab.ca/regulatory_documents/current-applications/", "title": "AUC current applications (ajax table)", "date": "2026-10-25", "quote": "Radiant Ridge Energy Limited proposes to operate off-grid power generators to supply electricity to the modular data centre units.", "supports": ["approvals", "mw", "operator", "status", "address"], "kind": "public_record"}], "confidence": "medium", "notes": "The AUC filing describes off-grid generators supplying modular data centre units; the location is approximate (within about 3 km), assumed near the gas supply point.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "speculative"}} {"site_id": "CA-AB-emerald-malachite-one", "name": "Malachite One Data Centre", "aliases": ["Banshee Data MPC Load"], "operator": "Emerald Energy Technologies (Tourmaline Oil subsidiary)", "owner": "Tourmaline Oil Corp. (via wholly owned Emerald Energy Technologies)", "tenants": [], "province": "AB", "municipality": "Yellowhead County", "address": "Crown land adjacent to Banshee Gas Plant, ~40 km SW of Edson", "lat": 53.30683, "lon": -116.93588, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "proposed", "status_date": "2026-10-09", "mw": 74.9, "mw_basis": "requested", "mw_note": "AESO request P3114 (Banshee Data MPC Load): 74.9 MW at stage 3, requested in-service date 2027-11-01; P3248 is a 0 MW reliability request. The one gigawatt in the provincial registry (from 150 million cubic feet of gas a day) and the 930 MW cited by Alberta Data Centre Watch are on-site generation, not the data centre's load.", "power_source": "onsite gas plus 74.9 MW grid request", "opened": null, "expected_online": null, "approvals": [{"authority": "AESO", "instrument": "load connection request", "ref": "P3114; P3248", "date": "2025-05-21", "outcome": "pending", "conditions": "P3114 active at stage 3; requested in-service date 2027-11-01.", "url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx"}, {"authority": "Yellowhead County", "instrument": "council presentation received as information", "ref": "2026-06-23 council", "date": "2026-06-23", "outcome": "pending", "conditions": "not a project approval; no development permit", "url": "https://yellowheadcounty.civicweb.net/document/97155/"}], "ownership": "Tourmaline Oil Corp. (Canada), per Alberta Major Projects", "sources": [{"url": "https://majorprojects.alberta.ca/details/Malachite-One-Data-Centre/12192", "title": "Alberta Major Projects: Malachite One Data Centre", "date": "undated", "quote": "The project would convert 150 million cubic feet of natural gas daily into one gigawatt of electricity to power the data centre.", "supports": ["mw", "operator", "owner", "ownership", "municipality", "address", "status"], "kind": "public_record"}, {"url": "https://www.aeso.ca/assets/Uploads/project-reporting/October-2026-Project-List.xlsx", "title": "AESO Connection Project List, October 2026", "date": "2026-10-09", "quote": "P3114 Banshee Data MPC Load | 29-Hinton/Edson | Data Load | 3 | 74.9", "supports": ["approvals", "mw_note"], "kind": "public_record"}, {"url": "https://majorprojects.alberta.ca/details/Malachite-One-Data-Centre/12192", "title": "Alberta Major Projects, Malachite One Data Centre", "date": "undated", "kind": "public_record", "quote": "Emerald Energy Technologies, a wholly-owned subsidiary of Tourmaline Oil Corp, is planning to build a power-generation facility and a data centre called Malachite One.", "supports": ["owner"]}, {"url": "https://data.sec.gov/submissions/CIK0002071881.json", "title": "SEC EDGAR company record, Tourmaline Oil Corp/ADR", "date": "undated", "kind": "public_record", "quote": "\"stateOfIncorporationDescription\":\"Alberta, Canada\"", "supports": ["ownership_country"]}], "confidence": "medium", "notes": "The proposed site is on Crown (provincial) land, according to the provincial registry; the project would be Tourmaline's. No tenant is named.", "checked": "2026-10-25", "mw_figures": [{"mw": 74.9, "basis": "requested", "stage": "requested", "date": "2026-10-09", "source_idx": 1}], "ownership_country": "Canada", "field_confidence": {"owner": "confirmed"}, "tenant_countries": {}} {"site_id": "CA-BC-sfu-fir", "name": "Fir (Simon Fraser University)", "aliases": ["Cedar successor", "SFU Water Tower data centre"], "operator": "Simon Fraser University", "owner": "Simon Fraser University", "tenants": ["Digital Research Alliance of Canada (national system)"], "province": "BC", "municipality": "Burnaby", "address": null, "lat": 49.27766, "lon": -122.90954, "coord_precision": "area", "type": "research_hpc", "ai": "yes", "status": "operating", "status_date": "2025-08-11", "mw": null, "mw_basis": "unstated", "mw_note": "MW not published.", "power_source": null, "opened": "2025", "expected_online": null, "approvals": [], "ownership": "public (university / Alliance-funded)", "sources": [{"url": "https://docs.alliancecan.ca/wiki/Fir", "title": "Alliance docs: Fir", "date": "2025-08-11", "quote": "It is hosted at Simon Fraser University (SFU) in Burnaby", "supports": ["operator", "municipality", "status", "status_date", "opened"], "kind": "proponent"}, {"url": "https://alliancecan.ca/en/about/alliance", "title": "Digital Research Alliance of Canada: About the Alliance", "date": "undated", "quote": "The Digital Research Alliance of Canada (the Alliance) is a national not-for-profit membership-based organization", "supports": ["tenant_countries"], "kind": "proponent"}], "confidence": "medium", "notes": "A national research cluster of 640 NVIDIA H100 GPUs, available since 2025-08-11; its power draw is not published. The point marks the SFU campus. The host institution is shown as owner, but who holds title to the hardware is not published. The Alliance allocates the system to Canadian researchers; page last edited 2026-07-21.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"owner": "likely", "tenants": "confirmed"}, "tenant_countries": {"Digital Research Alliance of Canada (national system)": "Canada"}} {"site_id": "CA-BC-equinix-burnaby-va1", "name": "VA1", "aliases": ["Equinix Vancouver VA1"], "operator": "Equinix", "owner": null, "tenants": [], "province": "BC", "municipality": "Burnaby", "address": "4185 Still Creek Drive, Burnaby, BC V5C 6G9", "lat": 49.26057, "lon": -123.01124, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Operator lists colocation space 343 m2 (3,692 ft2); no MW published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.equinix.com/data-centers/americas-colocation/canada-colocation/vancouver-data-centers/va1", "title": "Vancouver VA1 (Equinix)", "date": "undated", "quote": "Learn about Equinix VA1 carrier-neutral data centre, located at 4185 Still Creek Drive in Burnaby, Canada.", "supports": ["name", "operator", "address", "municipality", "type", "status"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely"}} {"site_id": "CA-BC-estruxture-burnaby-van3", "name": "VAN-3", "aliases": ["eStruxture VAN-3"], "operator": "eStruxture Data Centers", "owner": null, "tenants": [], "province": "BC", "municipality": "Burnaby", "address": "4590 Canada Way, Burnaby, BC V5G 1J6", "lat": 49.25431, "lon": -122.99724, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 13, "mw_basis": "it", "mw_note": "Operator page: 13 MW of critical power; the operator's data sheet gives 2 halls and 10 MW total power. 55,000 sq ft building.", "power_source": "hydro grid", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.estruxture.com/data-centers/vancouver/van-3", "title": "AI-ready Data Center in Vancouver – VAN-3 (eStruxture)", "date": "undated", "quote": "Spanning 55,000 square feet and delivering 13MW of critical power, VAN-3 is powered by clean, renewable hydrop", "supports": ["name", "operator", "municipality", "type", "mw", "power_source"], "kind": "proponent"}, {"url": "https://www.estruxture.com/data-centers/vancouver/van-3", "title": "AI-ready Data Center in Vancouver – VAN-3 (eStruxture)", "date": "undated", "quote": "High-density, state-of-the-art AI ready data center (4590 Canada Way)", "supports": ["address"], "kind": "proponent"}, {"url": "https://estruxture.com/data-centers/vancouver", "title": "Vancouver data centers (eStruxture)", "date": "undated", "quote": "Capacity available now in: VAN-3", "supports": ["status"], "kind": "proponent"}, {"url": "https://www.estruxture.com/hubfs/site-files/eStruxture_Datasheet_VAN3_EN-2.pdf?hsLang=en", "title": "eStruxture VAN-3 datasheet", "date": "undated", "quote": "SPACE 2 data halls and 10MW total power | YEAR BUILT Original construction - 1974", "supports": ["mw_note"], "kind": "proponent"}, {"url": "https://www.estruxture.com/hubfs/site-files/eStruxture_Datasheet_VAN3_EN-2.pdf?hsLang=en", "title": "eStruxture VAN-3 data sheet", "date": "undated", "kind": "proponent", "quote": "Data Center build - 2023-2024", "supports": ["notes"]}], "confidence": "medium", "notes": "Marketed as AI-ready. The building dates from 1974 and was fitted out as a data centre in 2023-2024, according to the operator's data sheet.", "checked": "2026-10-25", "mw_figures": [{"mw": 13, "basis": "it", "stage": "built", "date": "undated", "source_idx": 0}, {"mw": 10, "basis": "facility", "stage": "built", "date": "undated", "source_idx": 3}], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "speculative"}} {"site_id": "CA-BC-iren-canalflats", "name": "Canal Flats", "aliases": ["IREN Canal Flats"], "operator": "IREN Ltd", "owner": "IREN Ltd", "tenants": [], "province": "BC", "municipality": "Canal Flats", "address": "9018 Grainger Rd, Canal Flats, BC", "lat": 50.15969, "lon": -115.80769, "coord_precision": "city", "type": "crypto_to_ai", "ai": "unknown", "status": "operating", "status_date": "2026-08-27", "mw": 30, "mw_basis": "facility", "mw_note": "30 MW gross (IREN annual report, as of 2026-06-30).", "power_source": "hydro grid (BC Hydro)", "opened": null, "expected_online": null, "approvals": [], "ownership": "IREN Ltd (Australia)", "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm", "title": "IREN Ltd 10-K FY2026", "date": "2026-08-27", "quote": "Canal Flats (British Columbia, Canada) | 30", "supports": ["mw", "status", "status_date"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1878848/000187884826000051/irenreportsfy26results.htm", "title": "IREN Reports FY26 Results (8-K exhibit)", "date": "2026-08-27", "quote": "new liquid-cooled deployments planned at Mackenzie, Canal Flats and Prince George during 2027", "supports": ["type", "notes"], "kind": "public_record"}, {"url": "https://data.sec.gov/submissions/CIK0001878848.json", "title": "SEC EDGAR company record, IREN Ltd", "date": "undated", "kind": "public_record", "quote": "\"city\":\"SYDNEY\" | \"country\":\"Australia\"", "supports": ["ownership_country"]}, {"url": "https://iren.com/data-centers/canal-flats", "title": "IREN: Canal Flats data center", "date": "undated", "quote": "30 MW Total Capacity 10 Acres Total Land Area", "supports": ["address", "mw", "owner", "status"], "kind": "proponent"}, {"url": "https://iren.com/data-centers/canal-flats#site", "title": "IREN: Canal Flats data center", "date": "undated", "quote": "Located on a 10-acre freehold site", "supports": ["owner"], "kind": "proponent"}], "confidence": "medium", "notes": "IREN is moving its BC sites to AI cloud and plans liquid-cooled deployments at Canal Flats in 2027; no GPUs are reported here yet, so the site is likely still mining bitcoin. The site is freehold land with its own substation. IREN names AI cloud customers in its annual report but ties none to a BC site, so no tenant is listed; the point marks the town, not the building.", "checked": "2026-10-25", "mw_figures": [{"mw": 30, "basis": "facility", "stage": "built", "date": "2026-08-27", "source_idx": 0}], "ownership_country": "Australia", "field_confidence": {"owner": "confirmed"}, "tenant_countries": {}} {"site_id": "CA-BC-smartcolo-coquitlam", "name": "SmartColo Data Centre", "aliases": ["SmartColo"], "operator": "SmartColo (Dynacloud Inc.)", "owner": null, "tenants": [], "province": "BC", "municipality": "Coquitlam", "address": null, "lat": 49.2838, "lon": -122.7932, "coord_precision": "city", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_figures": [], "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://smartcolo.ca/", "title": "SmartColo", "date": "undated", "quote": "SmartColo, a division of Dynacloud Inc., offers a full suite of colocation services via our hardened and secure Data Centre.", "supports": ["name", "operator", "type", "status"], "kind": "proponent"}, {"url": "https://www.datacentermap.com/canada/vancouver/smartcolo1/", "title": "Data Center Map: SmartColo", "date": "undated", "quote": "SmartColo Data Center in Vancouver | 2075 Brigantine Dr", "supports": ["municipality"], "kind": "directory"}, {"url": "https://smartcolo.ca/facility", "title": "SmartColo: Facility", "date": "undated", "quote": "The SmartColo Data Centre is conveniently located in Coquitlam BC, less than 20 minutes from Vancouver.", "supports": ["municipality"], "kind": "proponent"}], "confidence": "low", "directory_only": true, "field_confidence": {"location": "likely", "ai": "likely"}, "notes": "SmartColo publishes no street address; a directory lists it at 2075 Brigantine Dr, and the point marks Coquitlam.", "checked": "2026-10-25"} {"site_id": "CA-BC-bell-kamloops-missionflats", "name": "Bell AI Fabric Kamloops, Mission Flats", "aliases": ["Bell AI Fabric Kamloops 1", "Groq Kamloops"], "operator": "Bell Canada (Bell AI Fabric)", "owner": null, "tenants": ["Groq"], "province": "BC", "municipality": "Kamloops", "address": "Mission Flats Road, Kamloops, BC", "lat": 50.69401, "lon": -120.4144, "coord_precision": "city", "type": "ai_hpc", "ai": "yes", "status": "operating", "status_date": "2026-08-06", "mw": 7, "mw_basis": "unstated", "mw_note": "7 MW, as stated by both Groq (2025-05-28) and Bell; basis not stated.", "power_source": "hydro grid", "opened": "2025", "expected_online": null, "approvals": [], "ownership": "BCE Inc. (Canada)", "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/718940/000071894026000009/a2026-q2xmda.htm", "title": "BCE Q2 2026 MD&A (Form 6-K)", "date": "2026-08-06", "quote": "higher revenues in Q2 2025 from the delivery of our first AI facility in Kamloops, B.C.", "supports": ["status", "status_date", "opened"], "kind": "public_record"}, {"url": "https://businessmarkets.bell.ca/economic-impact", "title": "Bell AI Fabric economic impact", "date": "undated", "quote": "The Mission Flats Road site is part of Bell's network of AI data centres in B.C. supporting high-performance compute workloads.", "supports": ["name", "address", "mw", "power_source"], "kind": "proponent"}, {"url": "https://groq.com/blog/groq-becomes-exclusive-inference-provider-for-bell-canadas-sovereign-ai-network", "title": "Groq becomes exclusive inference provider for Bell Canada's sovereign AI network", "date": "2025-05-28", "quote": "It begins with a 7MW Groq facility in Kamloops, British Columbia, coming online in June.", "supports": ["tenants", "ai", "mw_note"], "kind": "proponent"}, {"url": "https://groq.com/privacy-policy", "title": "Groq: Privacy policy", "date": "undated", "quote": "Groq LLC, P.O. Box 1778, Mountain View, CA 94042, USA", "supports": ["tenant_countries"], "kind": "proponent"}], "confidence": "high", "notes": "It is unclear whether Bell or Groq now owns the facility: BCE booked its 2025 'delivery' as product revenue, which suggests a sale to its customer, but no source names the owner. The point is on Mission Flats Road, not the building, and Groq's chip count is not disclosed; Bell AI Fabric is the operator on Bell's own page, and the owner's country shown is BCE's.", "checked": "2026-10-25", "mw_figures": [{"mw": 7, "basis": "unstated", "stage": "built", "date": "2025-05-28", "source_idx": 2}], "ownership_country": "Canada", "field_confidence": {"tenants": "confirmed", "owner": "speculative"}, "tenant_countries": {"Groq": "United States"}} {"site_id": "CA-BC-bell-kamloops-tru", "name": "Hillside AI Centre at TRU", "aliases": ["Bell AI Fabric — Kamloops TRU", "Bell Kamloops AI Data Center 2", "Hillside Data Centre"], "operator": "Bell Canada (Bell AI Fabric)", "owner": "Thompson Rivers University Community Trust (site); developer TrueNorth Sustainable Infrastructure Inc.", "tenants": [], "province": "BC", "municipality": "Kamloops", "address": "1452 McGill Road, Kamloops, BC", "lat": 50.67484, "lon": -120.37651, "coord_precision": "address", "type": "ai_hpc", "ai": "yes", "status": "under_construction", "status_date": "2026-04-09", "mw": 26, "mw_basis": "unstated", "mw_note": "Bell: 26 MW planned capacity; basis not stated.", "power_source": "hydro grid", "opened": null, "expected_online": "2027-H2", "approvals": [], "ownership": "BCE Inc. (Canada) as operator; developer TrueNorth Sustainable Infrastructure Inc.", "sources": [{"url": "https://inside.tru.ca/?p=2995804", "title": "TRU Community Trust advances data centre development", "date": "2026-04-09", "quote": "construction has officially begun on a new data centre at 1452 McGill Road, which will form part of Bell Canada’s Bell AI Fabric", "supports": ["status", "status_date", "address", "operator", "expected_online", "notes"], "kind": "proponent"}, {"url": "https://businessmarkets.bell.ca/economic-impact", "title": "Bell AI Fabric economic impact", "date": "undated", "quote": "Kamloops, Hillside AI Centre at TRU, British Columbia", "supports": ["name", "mw", "power_source"], "kind": "proponent"}, {"url": "https://cfjctoday.com/?p=1094903", "title": "Construction underway on new AI data centre as TRU reaffirms sustainability goals (CFJC, press)", "date": "2026-06-04", "quote": "Shovels are in the ground and work is underway on a new AI data centre at Thompson Rivers University", "supports": ["status"], "kind": "press"}], "confidence": "high", "notes": "TrueNorth Sustainable Infrastructure is the lead developer, and Thompson Rivers University expects completion in late 2027 (local press says next year). Neither the university trust nor TrueNorth says who will hold title to the building, and a reported land lease to 'Hillside Data Centre Inc.' is not confirmed in a primary source. No tenant is named.", "checked": "2026-10-25", "mw_figures": [{"mw": 26, "basis": "unstated", "stage": "planned", "date": null, "source_idx": 1}], "ownership_country": "Canada", "field_confidence": {"owner": "speculative"}, "tenant_countries": {}} {"site_id": "CA-BC-equinix-kamloops-ka1", "name": "KA1", "aliases": ["Equinix Kamloops KA1"], "operator": "Equinix", "owner": null, "tenants": [], "province": "BC", "municipality": "Kamloops", "address": "1460 Bunker Road, Kamloops, BC V2C 0B5", "lat": 50.67556, "lon": -120.37988, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Operator lists colocation space 4,221 m2 (45,436 ft2); no MW published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.equinix.com/data-centers/americas-colocation/canada-colocation/kamloops-data-centers/ka1", "title": "Kamloops KA1 (Equinix)", "date": "undated", "quote": "Learn about Equinix KA1 carrier-neutral data centre, located at 1460 Bunker Road in Kamloops, Canada.", "supports": ["name", "operator", "address", "municipality", "type", "status"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely"}} {"site_id": "CA-BC-silverservers-kamloops", "name": "SilverServers Kamloops data centre", "aliases": ["canshield1"], "operator": "SilverServers", "owner": null, "tenants": [], "province": "BC", "municipality": "Kamloops", "address": null, "lat": 50.6745, "lon": -120.3273, "coord_precision": "city", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": 1, "mw_basis": "facility", "mw_figures": [{"mw": 1, "basis": "facility", "stage": "built", "date": "undated", "source_idx": 2}], "mw_note": "SilverServers: 10,000 sq ft, 1 MW facility capacity, Tier II+.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.silverservers.com/", "title": "SilverServers (Kamloops)", "date": "undated", "quote": "10,000 sq ft, 1 MW, dual 100G connectivity, generator failover. Your hardware, our racks.", "supports": ["name", "operator", "type", "status", "mw"], "kind": "proponent"}, {"url": "https://www.silverservers.com/", "title": "SilverServers (Kamloops)", "date": "undated", "quote": "On our own servers in our Tier II+ data centre in Kamloops, BC", "supports": ["municipality"], "kind": "proponent"}, {"url": "https://www.silverservers.com/colocation", "title": "SilverServers: Colocation (Kamloops)", "date": "undated", "quote": "UPS + automatic diesel generator failover, 1 MW facility capacity", "supports": ["mw", "mw_basis"], "kind": "proponent"}], "confidence": "medium", "field_confidence": {"location": "likely", "ai": "likely"}, "notes": "SilverServers gives 765 Lorne Street, Kamloops, as its company address; it does not say the data centre is there, so the point marks Kamloops.", "checked": "2026-10-25"} {"site_id": "CA-BC-telus-kamloops", "name": "TELUS Kamloops data centre (Kamloops AI Factory)", "aliases": ["TELUS Kamloops Data Center", "Telus AI Data Centre - Kamloops", "Telus Kamloops Sovereign AI"], "operator": "TELUS", "owner": "TELUS Corporation", "tenants": [], "province": "BC", "municipality": "Kamloops", "address": null, "lat": 50.6771, "lon": -120.3774, "coord_precision": "address", "type": "enterprise", "ai": "yes", "status": "operating", "status_date": "2026-05-11", "mw": null, "mw_basis": "unstated", "mw_note": "TELUS gives no figure for this site. BC Hydro's initial 85 MW covers the three-site BC cluster (Kamloops, M3, 150 West Georgia, which has its own 39 MW commitment), scaling to over 150 MW and 60,000 GPUs by 2032; none of these figures is this site's own.", "power_source": "hydro grid (BC Hydro)", "opened": "2014", "expected_online": "2026", "approvals": [{"authority": "BC Hydro", "instrument": "electricity supply (initial 85 MW for three-site BC cluster)", "ref": null, "date": "2026-05-11", "outcome": "approved", "conditions": "none published", "url": "https://www.telus.com/en/about/news-and-events/media-releases/TELUS-and-Government-of-Canada-advance-work-to-scale-Canadas-sovereign-AI-infrastructure"}, {"authority": "ISED (Government of Canada)", "instrument": "Enabling Large-Scale Sovereign AI Data Centres: work toward non-binding MOU", "ref": null, "date": "2026-05-11", "outcome": "pending", "conditions": "non-binding", "url": "https://www.canada.ca/en/innovation-science-economic-development/news/2026/05/government-of-canada-and-telus-advance-work-to-build-sovereign-ai-infrastructure.html"}], "ownership": "TELUS Corporation (Canada)", "sources": [{"url": "https://www.telus.com/en/about/news-and-events/media-releases/TELUS-and-Government-of-Canada-advance-work-to-scale-Canadas-sovereign-AI-infrastructure", "title": "TELUS and Government of Canada advance work to scale Canada’s sovereign AI infrastructure", "date": "2026-05-11", "quote": "TELUS is expanding its existing Kamloops data centre and developing two new Vancouver facilities with Westbank and its partners. The Kamloops AI Factory will come online later this year", "supports": ["status", "status_date", "expected_online", "approvals", "mw_note"], "kind": "proponent"}, {"url": "https://www.sec.gov/Archives/edgar/data/0000868675/000110465926088973/tu-20260630xex99d2.htm", "title": "TELUS Q2 2026 report (6-K exhibit)", "date": "2026-07-31", "quote": "our Kamloops AI Factory, coming online later this year, will begin to enable", "supports": ["ai", "expected_online"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/868675/000110465926088973/tu-20260630xex99d2.htm", "title": "TELUS Q2 2026 MD&A (6-K exhibit 99.2)", "date": "2026-07-31", "kind": "public_record", "quote": "we continue to work with the Government of Canada on a proposed Sovereign AI Factory under its Enabling Large-Scale Sovereign AI Data Centres initiative, which our Kamloops AI Factory, coming online later this year, will begin to enable.", "supports": ["owner", "operator"]}, {"url": "https://data.sec.gov/submissions/CIK0000868675.json", "title": "SEC EDGAR company record, TELUS Corp", "date": "undated", "kind": "public_record", "quote": "\"city\":\"VANCOUVER\" | \"stateOrCountryDescription\":\"British Columbia, Canada\"", "supports": ["ownership_country"]}, {"url": "https://infonews.ca/?p=12758", "title": "Telus data centre uses a greener approach to business", "date": "2013-05-29", "kind": "press", "quote": "located next to the Q9 data centre near the corner of McGill Road and Bunker Road", "supports": ["lat", "lon", "coord_precision"]}, {"url": "https://armchairmayor.ca/2014/01/31/telus-officially-opens-new-kamloops-internet-data-centre/", "title": "Telus officially opens new Kamloops Internet data centre", "date": "2014-01-31", "kind": "press", "quote": "Telus officially opens new Kamloops Internet data centre", "supports": ["opened"]}], "confidence": "medium", "notes": "Operating here means the existing Kamloops data centre, opened in 2014; the AI Factory inside it was due online later in 2026, and the BC Hydro figures cover TELUS's three BC sites together. Press places the building next to the former Q9 (now Equinix KA1) data centre near McGill Road and Bunker Road; TELUS names no compute customer for the site.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-BC-hut8-kelowna", "name": "Hut 8 Kelowna Data Center", "aliases": ["Hut 8 KEL", "Hut 8 KEL1", "TeraGo Kelowna"], "operator": "Hut 8 Canada", "owner": null, "tenants": [], "province": "BC", "municipality": "Kelowna", "address": "200-2130 Leckie Place, Kelowna, BC V1Y 7W7", "lat": 49.8856, "lon": -119.44166, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 3, "mw_basis": "unstated", "mw_note": "Hut 8 gives 3 MW of power secured at Kelowna as at Q3 2026, of which 2.5 MW is available to customers; its chillers support more than 1 MW of IT load. Hut 8 lists 8.1 MW across its five Canadian facilities.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://canada.hut8.com/network", "title": "Data Centers in Canada | Hut 8 Nationwide Network", "date": "undated", "quote": "Hut 8 operates five data centers across Canada — two in British Columbia (Vancouver, Kelowna), one hardened facility in BC (Vancouver Vault), and two in the Greater Toronto Area", "supports": ["name", "operator", "municipality", "status", "type"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/14570", "title": "PeeringDB: Hut 8 KEL1", "date": "2025-09-26", "quote": "200-2130 Leckie Place", "supports": ["address"], "kind": "directory"}, {"url": "https://canada.hut8.com/centers/british-columbia", "title": "Hut 8 Canada: British Columbia data centres (KEL1 Kelowna)", "date": "undated", "quote": "KEL1 has 2.5 MW of high-density capacity available now, of 3 MW secured (as at Q3 2026).", "supports": ["ai", "mw", "mw_note"], "kind": "proponent"}, {"url": "https://canada.hut8.com/centers/british-columbia#gpu", "title": "Hut 8 Canada: British Columbia data centres (KEL1 Kelowna)", "date": "undated", "quote": "Built for dense GPU deployments KEL1 is Tier III designed and liquid-cooling capable.", "supports": ["ai"], "kind": "proponent"}], "confidence": "medium", "notes": "The address comes from a peering directory (PeeringDB); Hut 8's own page gives power and floor-space specs but no street address. Hut 8 markets the site for dense GPU deployments but names no AI customer.", "checked": "2026-10-25", "mw_figures": [{"mw": 3, "basis": "unstated", "stage": "built", "date": "2026-09", "source_idx": 2}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-BC-provisiondata-kelowna", "name": "Provision Data Kelowna", "aliases": ["Provision Data LM4DC2", "Provisiondata"], "operator": "Provision Data Systems Inc.", "owner": null, "tenants": [], "province": "BC", "municipality": "Kelowna", "address": "B3-1628 Dickson Ave, Kelowna, BC V1Y 9X1", "lat": 49.88153, "lon": -119.46163, "coord_precision": "address", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://provisiondata.com/data-center/colocation-servers/", "title": "Colocation (Provision Data)", "date": "undated", "quote": "Our stable geography in Kelowna, BC makes us a go-to colocation facility for disaster recovery.", "supports": ["name", "operator", "municipality", "type", "status"], "kind": "proponent"}, {"url": "https://provisiondata.com/contact/", "title": "Contact (Provision Data)", "date": "undated", "quote": "Provision Data Systems Inc. B3-1628 Dickson Ave Kelowna BC V1Y 9X1 Canada", "supports": ["address"], "kind": "proponent"}], "confidence": "medium", "notes": "The address is the company's contact address, which a peering directory also gives for the facility.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely"}} {"site_id": "CA-BC-iren-mackenzie", "name": "Mackenzie", "aliases": ["IREN Mackenzie"], "operator": "IREN Ltd", "owner": "IREN Ltd", "tenants": [], "province": "BC", "municipality": "Mackenzie", "address": "4900 Coquawaldy Rd, Mackenzie, BC", "lat": 55.3244, "lon": -123.09261, "coord_precision": "city", "type": "crypto_to_ai", "ai": "yes", "status": "operating", "status_date": "2026-08-27", "mw": 80, "mw_basis": "facility", "mw_note": "80 MW gross power capacity (IREN annual report, as of 2026-06-30).", "power_source": "hydro grid (BC Hydro)", "opened": null, "expected_online": "2026-H2", "approvals": [], "ownership": "IREN Ltd (Australia)", "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm", "title": "IREN Ltd 10-K FY2026", "date": "2026-08-27", "quote": "finance GPUs and ancillary equipment owned by the Borrower and located at the Mackenzie data center facilities in British Columbia, Canada", "supports": ["ai", "status_date", "mw", "type"], "kind": "public_record"}, {"url": "https://ckpgtoday.ca/?p=501918", "title": "IREN expands data centres in Prince George and Mackenzie (CKPG Today, press)", "date": "2026-05-19", "quote": "In Mackenzie, the buildings are getting ready for GPU installations planned for the second half of 2026.", "supports": ["expected_online", "status"], "kind": "press"}, {"url": "https://data.sec.gov/submissions/CIK0001878848.json", "title": "SEC EDGAR company record, IREN Ltd", "date": "undated", "kind": "public_record", "quote": "\"city\":\"SYDNEY\" | \"country\":\"Australia\"", "supports": ["ownership_country"]}, {"url": "https://iren.com/data-centers/mackenzie", "title": "IREN: Mackenzie data center", "date": "undated", "quote": "80 MW Total Capacity 11 Acres Total Land Area", "supports": ["address", "mw", "owner", "status"], "kind": "proponent"}, {"url": "https://iren.com/data-centers/mackenzie#site", "title": "IREN: Mackenzie data center", "date": "undated", "quote": "Located on an 11-acre freehold site", "supports": ["owner"], "kind": "proponent"}], "confidence": "high", "notes": "Historically a bitcoin-mining site, now converting to AI: IREN has up to USD 2.4 billion in financing for GPUs delivered to Mackenzie in stages to the end of 2026, owned by its subsidiary IE Mackenzie Compute Ltd. (lenders led by Blue Owl-managed funds are creditors, not owners). The site is freehold land with its own substation. IREN names AI cloud customers in its annual report but ties none to a BC site, so no tenant is listed; the point marks the town, not the building.", "checked": "2026-10-25", "mw_figures": [{"mw": 80, "basis": "facility", "stage": "built", "date": "2026-08-27", "source_idx": 0}], "ownership_country": "Australia", "field_confidence": {"owner": "confirmed"}, "tenant_countries": {}} {"site_id": "CA-BC-bell-merritt", "name": "Bell AI Fabric Merritt", "aliases": ["BUZZ HPC Merritt", "Bell AI Fabric — Merritt"], "operator": "Bell Canada (Bell AI Fabric)", "owner": "Bell Canada (BCE Inc.)", "tenants": ["BUZZ HPC (HIVE Digital Technologies)", "Cohere"], "province": "BC", "municipality": "Merritt", "address": null, "lat": 50.11249, "lon": -120.78841, "coord_precision": "city", "type": "ai_hpc", "ai": "yes", "status": "operating", "status_date": "2026-08-06", "mw": 5, "mw_basis": "it", "mw_note": "Bell: two phases of 6.5 MW (13 MW combined). HIVE: phase 1 is 5 MW of critical IT load, with a 7.6 MW phase 2 option in 2027. Bell's May 2025 release called Merritt a 7 MW facility; one industry directory's 26 MW is not supported.", "power_source": "hydro grid", "opened": "2026", "expected_online": "2027", "approvals": [], "ownership": "BCE Inc. (Canada)", "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/718940/000071894026000009/a2026-q2xmda.htm", "title": "BCE Q2 2026 MD&A (Form 6-K)", "date": "2026-08-06", "quote": "the delivery of our second AI facility in Merritt, B.C. in Q1 2026", "supports": ["status", "status_date", "opened", "expected_online"], "kind": "public_record"}, {"url": "https://businessmarkets.bell.ca/economic-impact", "title": "Bell AI Fabric economic impact", "date": "undated", "quote": "Fully sovereign stack in second phase through partnerships with Cohere, Hypertec and Buzz HPC", "supports": ["mw", "tenants", "power_source"], "kind": "proponent"}, {"url": "https://www.sec.gov/Archives/edgar/data/1720424/000106299326004434/form10q.htm", "title": "HIVE Digital Technologies 10-Q (period to 2026-06-30)", "date": "2026-08-14", "quote": "British Columbia - Phase 1 (new): 5 MW of critical IT load, available immediately", "supports": ["tenants", "mw_note", "ai"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1720424/000106299326004522/0001062993-26-004522.txt", "title": "HIVE Form 8-K, GB300 cluster contract", "date": "2026-08-19", "quote": "The cluster is expected to become operational later this year at the Bell AI Fabric facility in Merritt, British Columbia.", "supports": ["ai", "notes"], "kind": "public_record"}, {"url": "https://cohere.com/about", "title": "Cohere, About", "date": "undated", "kind": "proponent", "quote": "Cohere was founded in 2019 in Toronto with a bold vision", "supports": ["tenant_countries"]}, {"url": "https://data.sec.gov/submissions/CIK0001720424.json", "title": "SEC EDGAR company record, HIVE Digital Technologies Ltd.", "date": "undated", "quote": "\"city\":\"VANCOUVER\" | \"stateOrCountryDescription\":\"British Columbia, Canada\"", "supports": ["tenant_countries"], "kind": "public_record"}], "confidence": "high", "notes": "Bell delivered phase 1 in Q1 2026 and expects phase 2 in early 2027; HIVE says the site was not yet in commercial operation in mid-2026 and plans a 2,016-GPU NVIDIA GB300 cluster there in Q4 2026. The Bell and HIVE filings mention no approvals. HIVE books an operating lease of the facility from Bell and BCE calls it its own facility, but BCE also booked the 'delivery' of the Merritt facility as product revenue, so who holds title is unclear. HIVE is incorporated in British Columbia with its registered office in Vancouver; its filings name San Antonio, Texas, as its headquarters.", "checked": "2026-10-25", "mw_figures": [{"mw": 6.5, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}, {"mw": 5, "basis": "it", "stage": "built", "date": "2026-08-14", "source_idx": 2}, {"mw": 7.6, "basis": "it", "stage": "planned", "date": "2026-08-14", "source_idx": 2}, {"mw": 13, "basis": "unstated", "stage": "planned", "date": null, "source_idx": 1}], "ownership_country": "Canada", "field_confidence": {"owner": "likely", "tenants": "confirmed"}, "tenant_countries": {"BUZZ HPC (HIVE Digital Technologies)": "United States", "Cohere": "Canada"}} {"site_id": "CA-BC-cranberry-powell-river", "name": "Cranberry Business Park data centre (former Tis'kwat mill)", "aliases": ["Cranberry Business Park — Former Tis'kwat Mill"], "operator": "Cranberry Business Park (site owner)", "owner": null, "tenants": [], "province": "BC", "municipality": "Powell River", "address": "Former Catalyst Paper Tis'kwat millsite", "lat": 49.83568, "lon": -124.52441, "coord_precision": "city", "type": "unknown", "ai": "unknown", "status": "announced", "status_date": "2026-07-07", "mw": null, "mw_basis": null, "mw_note": "", "mw_figures": [], "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.prpeak.com/local-news/data-centre-questions-raised-to-city-of-powell-river-council-12521885", "title": "Powell River Peak: Data centre questions raised to City of Powell River Council", "date": "2026-07-07", "quote": "to express concerns about the prospect of a data centre locating on Cranberry Business Park property on the former Catalyst Paper Tis’kwat millsite", "supports": ["status", "address"], "kind": "press"}, {"url": "https://www.prpeak.com/local-news/data-centre-questions-raised-to-city-of-powell-river-council-12521885", "title": "Data centre questions raised to City of Powell River Council", "date": "2026-07-07", "kind": "press", "quote": "which is why we are intervening in the Powell River Energy Inc. application for a 30-year power export", "supports": ["notes"]}, {"url": "https://www.prpeak.com/local-news/former-catalyst-paper-tiskwat-mill-site-is-attracting-business-12495299", "title": "Former Catalyst Paper Tis'kwat mill site is attracting business", "date": "2026-07-02", "kind": "press", "quote": "Cranberry Business Park group that has taken over about 75 percent of the former Catalyst Paper Tis'kwat mill", "supports": ["operator"]}], "confidence": "low", "field_confidence": {"location": "likely"}, "notes": "A prospect only: a local climate group told council that the site owner's chief executive had mentioned a data centre as a possibility, and no proponent or application has been named. A city councillor said the City is intervening in Powell River Energy's application for a 30-year power export over electricity concerns; no source ties that application to a data centre.", "checked": "2026-10-25"} {"site_id": "CA-BC-iren-princegeorge", "name": "Prince George", "aliases": ["IREN Prince George", "Iris Energy Prince George"], "operator": "IREN Ltd", "owner": "IREN Ltd", "tenants": [], "province": "BC", "municipality": "Prince George", "address": "1144 Crocker Rd, Prince George, BC", "lat": 53.91286, "lon": -122.74537, "coord_precision": "city", "type": "crypto_to_ai", "ai": "yes", "status": "operating", "status_date": "2026-08-27", "mw": 50, "mw_basis": "facility", "mw_note": "50 MW gross power capacity (IREN annual report, as of 2026-06-30); new liquid-cooled deployments planned in 2027.", "power_source": "hydro grid (BC Hydro, regulated tariff)", "opened": null, "expected_online": null, "approvals": [], "ownership": "IREN Ltd (Australia)", "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm", "title": "IREN Ltd 10-K FY2026", "date": "2026-08-27", "quote": "the transition of the British Columbia data centers to AI Cloud.", "supports": ["status", "status_date", "type", "ai", "mw", "power_source"], "kind": "public_record"}, {"url": "https://ckpgtoday.ca/?p=501918", "title": "IREN expands data centres in Prince George and Mackenzie (CKPG Today, press)", "date": "2026-05-19", "quote": "In Prince George, all GPUs, which are the processors used for artificial intelligence and data computing, are either running or being set up.", "supports": ["ai", "status"], "kind": "press"}, {"url": "https://data.sec.gov/submissions/CIK0001878848.json", "title": "SEC EDGAR company record, IREN Ltd", "date": "undated", "kind": "public_record", "quote": "\"city\":\"SYDNEY\" | \"country\":\"Australia\"", "supports": ["ownership_country"]}, {"url": "https://iren.com/data-centers/prince-george", "title": "IREN: Prince George data center", "date": "undated", "quote": "50 MW Total Capacity 12 Acres Total Land Area", "supports": ["address", "mw", "owner", "status"], "kind": "proponent"}, {"url": "https://iren.com/data-centers/prince-george#site", "title": "IREN: Prince George data center", "date": "undated", "quote": "Located on a 12-acre freehold site", "supports": ["owner"], "kind": "proponent"}, {"url": "https://iren.com/data-centers/prince-george#gpus", "title": "IREN: Prince George data center", "date": "undated", "quote": ">23,000 GPUs Installed or on-order", "supports": ["ai", "notes"], "kind": "proponent"}], "confidence": "high", "notes": "IREN is replacing bitcoin miners with AI cloud capacity here and aims to finish by the end of 2026; it lists more than 23,000 GPUs installed or on order. The site is freehold land with its own substation. IREN names AI cloud customers in its annual report but ties none to a BC site, so no tenant is listed; the point marks the town, not the building.", "checked": "2026-10-25", "mw_figures": [{"mw": 50, "basis": "facility", "stage": "built", "date": "2026-08-27", "source_idx": 0}], "ownership_country": "Australia", "field_confidence": {"owner": "confirmed"}, "tenant_countries": {}} {"site_id": "CA-BC-dmg-christinalake", "name": "Christina Lake data center", "aliases": ["DMG Christina Lake Data Centre", "DMG Data Center"], "operator": "DMG Blockchain Solutions", "owner": "DMG Blockchain Solutions Inc.", "tenants": [], "province": "BC", "municipality": "Regional District of Kootenay Boundary, Area C (Christina Lake / Billings)", "address": null, "lat": 49.00561, "lon": -118.21615, "coord_precision": "area", "type": "crypto_to_ai", "ai": "unknown", "status": "operating", "status_date": "2026-03-05", "mw": 75, "mw_basis": "grid_allocation", "mw_note": "75 MW of available power (15 MW firm plus 60 MW non-firm) as of March 2026; DMG's chief executive spoke of power well beyond 50 MW of critical IT load; an earlier application sought 150 MW of firm power.", "power_source": "grid (utility not named in release)", "opened": null, "expected_online": "2026-H2", "approvals": [{"authority": "electric utility (not named)", "instrument": "additional 10 MW non-firm power (verbal approval)", "ref": null, "date": "2026-03-05", "outcome": "approved", "conditions": "non-firm (curtailable)", "url": "https://www.bnnbloomberg.ca/press-releases/2026/03/06/dmg-blockchain-solutions-announces-75-mw-utility-approval-expanding-christina-lake-data-center-power-february-preliminary-operational-results/"}, {"authority": "Regional District of Kootenay Boundary", "instrument": "zoning / building permits", "ref": null, "date": "2026-06", "outcome": "pending", "conditions": "The regional district says renovations were made without all required permits, that it never issued a building permit and that it placed a notice on the title in 2024; it says the property is still out of zoning compliance (press, June 2026).", "url": "https://mugglehead.com/?p=1445206"}], "ownership": null, "sources": [{"url": "https://www.bnnbloomberg.ca/press-releases/2026/03/06/dmg-blockchain-solutions-announces-75-mw-utility-approval-expanding-christina-lake-data-center-power-february-preliminary-operational-results/", "title": "DMG announces 75 MW utility approval expanding Christina Lake data center power (GlobeNewswire via BNN)", "date": "2026-03-05", "quote": "This raises DMG’s total available power capacity to 75 megawatts based on a combination of 15 megawatts of firm power and 60 megawatts of non-firm (curtailable) power.", "supports": ["mw", "mw_basis", "approvals", "status", "status_date"], "kind": "proponent"}, {"url": "https://mugglehead.com/?p=1445206", "title": "DMG Blockchain plans AI data centre conversion at Christina Lake (Mugglehead, press)", "date": "2026-06-22", "quote": "announced plans to convert its Bitcoin mining operation at Christina Lake into an artificial intelligence data centre by the end of the year.", "supports": ["type", "ai", "expected_online", "approvals"], "kind": "press"}, {"url": "https://mugglehead.com/?p=1445206", "title": "Mugglehead, DMG Blockchain plans AI data centre conversion at Christina Lake", "date": "2026-06-22", "kind": "press", "quote": "DMG Blockchain Solutions Inc. CVEDMGI OTCMKTSDMGGF announced plans to convert its Bitcoin mining operation at Christina Lake | signed a letter of intent with an undisclosed tenant", "supports": ["owner", "ownership_country", "tenants"]}], "confidence": "medium", "notes": "DMG mined bitcoin here in February 2026 and plans to convert the site to an AI data centre by the end of 2026 under a non-binding letter of intent (2026-06-01) with an unnamed tenant. The regional district says the property is out of zoning compliance and lacks permits for past renovations.", "checked": "2026-10-25", "mw_figures": [{"mw": 75, "basis": "grid_allocation", "stage": "allocated", "date": "2026-03-05", "source_idx": 0}, {"mw": 50, "basis": "it", "stage": "planned", "date": "2026-03-05", "source_idx": 0}], "ownership_country": "Canada", "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-BC-pacific-press-surrey", "name": "Pacific Press brownfield, Block A data centre", "aliases": ["Pacific Press brownfield — Block A"], "operator": "Pacific Press Properties Inc. (applicant, not confirmed)", "owner": null, "tenants": [], "province": "BC", "municipality": "Surrey", "address": "12091 and 12099 88 Avenue, Surrey", "lat": 49.1913, "lon": -122.84914, "coord_precision": "city", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2025-02-24", "mw": null, "mw_basis": null, "mw_note": "", "mw_figures": [], "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "City of Surrey", "instrument": "rezoning IL to CD and development permit (Data Centre as general service use on Block A)", "ref": "7924-0185-00", "date": "2025-02-24", "outcome": "pending", "conditions": "staff recommended by-law introduction and public hearing", "url": "https://www.surrey.ca/sites/default/files/planning-reports/PLR_7924-0185-00.pdf"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.surrey.ca/sites/default/files/planning-reports/PLR_7924-0185-00.pdf", "title": "City of Surrey Planning Report 7924-0185-00", "date": "2025-02-24", "quote": "The proposed Block A will have a proposed Data Centre, which has a much lower parking", "supports": ["approvals", "status", "address"], "kind": "public_record"}], "confidence": "medium", "field_confidence": {"location": "confirmed"}, "notes": "The planning report dates from 2025-02-24 and a later council decision is not confirmed; the applicant's name comes from a campaign map and is not confirmed. The point marks Surrey, not the parcel.", "checked": "2026-10-25"} {"site_id": "CA-BC-skeena-terrace-sidp", "name": "Skeena Data Centers AI campus (concept)", "aliases": ["Skeena Data Centers", "Skeena Industrial Development Park — emerging"], "operator": "Skeena Data Centers (founder Christopher Chong)", "owner": null, "tenants": [], "province": "BC", "municipality": "Terrace", "address": "Skeena Industrial Development Park, near Terrace airport", "lat": 54.51727, "lon": -128.59955, "coord_precision": "city", "type": "unknown", "ai": "unknown", "status": "announced", "status_date": "2026-07-20", "mw": 300, "mw_basis": "unstated", "mw_note": "The founder says the campus would draw up to 300 MW. The City's draft zoning amendment would cap a data centre at 50 MW per parcel.", "mw_figures": [{"mw": 300, "basis": "unstated", "stage": "planned", "date": "2026-07-20", "source_idx": 2}], "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "City of Terrace", "instrument": "City-initiated zoning bylaw amendment to permit 'Industrial Computing Data Centre' on three M2 parcels in the Skeena Industrial Development Park", "ref": "Zoning Bylaw No. 2069-2014 amendment (draft)", "date": "2026-07-27", "outcome": "pending", "conditions": "maximum electrical power capacity of 50 MW per parcel", "url": "https://terrace.civicweb.net/document/53137/Proposed%20Zoning%20Bylaw%20Amendment%20-%20Industrial%20Co.pdf?handle=718006CCF7DD44DF96ADE624BA029E9F"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://terrace.civicweb.net/document/53137/Proposed%20Zoning%20Bylaw%20Amendment%20-%20Industrial%20Co.pdf?handle=718006CCF7DD44DF96ADE624BA029E9F", "title": "City of Terrace council report: Proposed Zoning Bylaw Amendment - Industrial Computing Data Centre", "date": "2026-07-27", "quote": "subject to a maximum electrical power capacity of 50 megawatts per parcel", "supports": ["approvals", "mw_note"], "kind": "public_record"}, {"url": "https://thetyee.ca/News/2026/07/20/BC-Communities-Plot-How-Tame-Data-Centres/", "title": "BC Communities Plot How to Tame Data Centres", "date": "2026-07-20", "kind": "press", "quote": "For now, a new data centre in Terrace is just an idea with a name: Skeena Data Centers. No firm proposals have been submitted", "supports": ["status", "status_date", "operator", "name", "mw", "mw_basis", "address", "notes"]}, {"url": "https://thetyee.ca/News/2026/07/20/BC-Communities-Plot-How-Tame-Data-Centres/", "title": "BC Communities Plot How to Tame Data Centres", "date": "2026-07-20", "kind": "press", "quote": "Chong's proposed facility would use up to 300 megawatts of power at any one time", "supports": ["mw", "mw_basis", "mw_figures"]}], "confidence": "medium", "field_confidence": {"location": "likely"}, "notes": "The founder has floated the campus and signed an energy memorandum with Hanwha Energy USA, but no application had been submitted as of July 2026. The City's zoning amendment sets general rules for data centres in the park and does not answer a specific application.", "checked": "2026-10-25"} {"site_id": "CA-BC-truenorth-3438-lougheed", "name": "3438 Lougheed Hwy bulk data storage", "aliases": ["3438 Lougheed Hwy — Bulk Data Storage (DP-2026-00565)"], "operator": "TrueNorth Sustainable Infrastructure (not confirmed)", "owner": null, "tenants": [], "province": "BC", "municipality": "Vancouver", "address": "3438 Lougheed Hwy, Vancouver", "lat": 49.26232, "lon": -123.02912, "coord_precision": "address", "type": "unknown", "ai": "unknown", "status": "approved", "status_date": "2026-10-05", "mw": null, "mw_basis": null, "mw_note": "A 30,490 sq ft change of use; no MW published.", "mw_figures": [], "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "City of Vancouver", "instrument": "development permit (change of use to Bulk Data Storage, conditional use under I-2)", "ref": "DP-2026-00565", "date": "2026-10-05", "outcome": "approved", "conditions": "approved subject to conditions in the prior-to letter; permit issues once conditions are met", "url": "https://www.shapeyourcity.ca/3438-lougheed-hwy"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.shapeyourcity.ca/3438-lougheed-hwy", "title": "Shape Your City Vancouver: 3438 Lougheed Hwy (DP-2026-00565)", "date": "2026-10-05", "quote": "The Director of Planning approved the application on October 5, 2026, subject to conditions.", "supports": ["approvals", "status", "status_date", "address"], "kind": "public_record"}], "confidence": "high", "field_confidence": {"location": "confirmed"}, "notes": "The City lists the architect (Mara + Natha) as applicant; the TrueNorth link comes from the Stop the Datacentre campaign map and is not confirmed by the City or TrueNorth.", "checked": "2026-10-25"} {"site_id": "CA-BC-cologix-vancouver-harbour-centre", "name": "Harbour Centre (555 West Hastings) carrier hotel", "aliases": ["CCS Harbour Centre", "CentriLogic Vancouver", "Cologix VAN1", "Cologix VAN5", "Dynaworx Site 1", "Harbour Centre Vancouver", "PureColo Harbour Centre MMR6B", "Spencer Building Carrier Hotel", "eStruxture VAN-2", "iTel Networks Vancouver"], "operator": "Cologix", "owner": null, "tenants": ["eStruxture Data Centers (VAN-2)", "PureColo / Carrier Connect (MMR6B)"], "province": "BC", "municipality": "Vancouver", "address": "555 West Hastings Street, Vancouver, BC V6B 4N6", "lat": 49.28446, "lon": -123.11178, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Per-suite figures: Cologix VAN5 1.6 MW (10,800 sq ft); VAN1 5,000 sq ft (no MW); eStruxture VAN-2 2.14 MW critical IT load. No building total is published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/vancouver/van1/", "title": "Colocation in Vancouver: VAN1 Data Center (Cologix)", "date": "undated", "quote": "VAN1 is a 5K SQFT facility located in Vancouver’s primary carrier hotel, at 555 West Hastings Street.", "supports": ["name", "operator", "address", "municipality", "type", "status", "aliases"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/vancouver/van5/", "title": "Colocation in Vancouver: VAN5 Data Center (Cologix)", "date": "undated", "quote": "Providing added capacity to Vancouver’s downtown, Cologix’s VAN5 delivers an additional 10.8K SQFT and 1.6 MW of power.", "supports": ["aliases", "mw_note"], "kind": "proponent"}, {"url": "https://www.estruxture.com/data-centers/vancouver/van-2", "title": "Vancouver Data Center – VAN-2 (eStruxture)", "date": "undated", "quote": "Strategically located facility in the heart of Vancouver (555 W Hastings St.) | 2.14 MW of critical IT load", "supports": ["tenants", "aliases", "mw_note"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/vancouver/van3/", "title": "Colocation in Vancouver: VAN3 Data Center (Cologix)", "date": "undated", "quote": "direct connectivity to the Cologix-owned and operated carrier hotel in 555 West Hastings", "supports": ["operator"], "kind": "proponent"}], "confidence": "high", "notes": "Vancouver's main carrier hotel, holding suites run by Cologix (VAN1, VAN5), eStruxture (VAN-2) and others; directories list further tenants that no primary source confirms. One industry directory gives eStruxture VAN-2 10 MW, against the operator's 2.14 MW.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely", "tenants": "confirmed"}} {"site_id": "CA-BC-hut8-vancouver-900-w-hastings", "name": "Hut 8 Vancouver Data Center", "aliases": ["Hut 8 VAN1", "TeraGo Vancouver"], "operator": "Hut 8 Canada", "owner": null, "tenants": [], "province": "BC", "municipality": "Vancouver", "address": "900 W Hastings St, Vancouver, BC", "lat": 49.28655, "lon": -123.11638, "coord_precision": "address", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": 0.6, "mw_basis": "facility", "mw_note": "Operator: 0.6 MW designed power capacity, 329 kW IT load at capacity; 900 sq ft.", "power_source": "hydro grid", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://canada.hut8.com/centers/colocation-vancouver", "title": "Vancouver Data Center, Vancouver Colocation (Hut 8 Canada)", "date": "undated", "quote": "The Hut 8 Vancouver data center is a Tier I facility located at 900 W Hastings St, delivering secure, high-performance data center infrastructure", "supports": ["name", "operator", "address", "municipality", "status", "type"], "kind": "proponent"}, {"url": "https://canada.hut8.com/centers/colocation-vancouver", "title": "Vancouver Data Center, Vancouver Colocation (Hut 8 Canada)", "date": "undated", "quote": "0.6 MW designed power capacity", "supports": ["mw"], "kind": "proponent"}], "confidence": "high", "notes": "Hut 8 says its BC sites run entirely on BC Hydro power. One directory places this site at 701 W Georgia St; the map uses Hut 8's own address.", "checked": "2026-10-25", "mw_figures": [{"mw": 0.6, "basis": "facility", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely"}} {"site_id": "CA-BC-purecolo-vancouver-van01", "name": "PureColo VAN01 – Waterfront", "aliases": ["Carrier Connect Data Solutions", "PureColo VAN01 (Vancouver)"], "operator": "PureColo", "owner": null, "tenants": [], "province": "BC", "municipality": "Vancouver", "address": "200 Burrard St, Vancouver, BC V6C 3L6", "lat": 49.28764, "lon": -123.11535, "coord_precision": "address", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": 0.5, "mw_basis": "unstated", "mw_note": "Operator: 0.5 MW of power, 2,500 sq ft of white space.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://purecolo.com/locations/vancouver/", "title": "PureColo VAN01 – Waterfront", "date": "undated", "quote": "200 Burrard St Vancouver, BC V6C 3L6 | Power: 0.5MW White Space: 2,500 sq ft Density: 10kW/rack", "supports": ["name", "operator", "address", "municipality", "type", "status", "mw"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [{"mw": 0.5, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely"}} {"site_id": "CA-BC-telus-150-west-georgia", "name": "TELUS AI Factory, 150 West Georgia", "aliases": ["720 Beatty St", "Allied Properties 150 W Georgia Data Center", "Telus 150 West Georgia"], "operator": "TELUS / Westbank / Allied Properties REIT", "owner": "Westbank with Allied Properties REIT (partnership; Allied also lender on the site)", "tenants": [], "province": "BC", "municipality": "Vancouver", "address": "150 West Georgia St (formerly 720 Beatty St), Vancouver", "lat": 49.27843, "lon": -123.1124, "coord_precision": "address", "type": "ai_hpc", "ai": "yes", "status": "approved", "status_date": "2026-02-11", "mw": 39, "mw_basis": "grid_allocation", "mw_note": "BC Hydro committed 39 MW, with a clear path to 50 MW and potential to reach 100 MW (Allied, reported by Daily Hive).", "mw_figures": [{"mw": 39, "basis": "grid_allocation", "stage": "allocated", "date": "2026-02-11", "source_idx": 0}, {"mw": 100, "basis": "buildout", "stage": "planned", "date": "2026-02-11", "source_idx": 0}], "power_source": "hydro grid", "opened": null, "expected_online": "2029", "approvals": [{"authority": "BC Hydro", "instrument": "supply commitment", "ref": "none published", "date": "2026-02-11", "outcome": "approved", "conditions": "none published", "url": "https://dailyhive.com/vancouver/150-west-georgia-street-720-beatty-street-vancouver-westbank-allied-data-centre-proposal"}], "ownership": "Allied Properties REIT", "ownership_country": "Canada", "sources": [{"url": "https://dailyhive.com/vancouver/150-west-georgia-street-720-beatty-street-vancouver-westbank-allied-data-centre-proposal", "title": "Daily Hive: 10-storey AI data centre pivot for Westbank's stalled Vancouver office project", "date": "2026-02-11", "quote": "BC Hydro has committed to supplying 39 megawatts (MW) of power to the development site", "supports": ["mw", "approvals", "address", "owner", "ai"], "kind": "press"}, {"url": "https://dailyhive.com/vancouver/150-west-georgia-street-720-beatty-street-vancouver-westbank-allied-data-centre-proposal", "title": "Daily Hive, 150 West Georgia data centre pivot", "date": "2026-02-11", "kind": "press", "quote": "Allied and Westbank are now seeking to sell a major portion of the site to a Canadian operator, with proceeds to partially repay the loan, while retaining a minority interest.", "supports": ["owner"]}, {"url": "https://dailyhive.com/vancouver/m3-mount-pleasant-vancouver-telus-westbank-ai-data-centre-decision-deferred", "title": "Daily Hive, Telus-Westbank AI data centre decision deferred", "date": "2026-07-23", "kind": "press", "quote": "In mid-May 2026, Westbank and Telus jointly announced two proposed AI data centres in Vancouver: the conversion of the M3 building and a much larger, brand-new, purpose-built facility at 150 West Georgia St.", "supports": ["operator", "owner"]}, {"url": "https://www.telus.com/en/about/news-and-events/media-releases/TELUS-and-Government-of-Canada-advance-work-to-scale-Canadas-sovereign-AI-infrastructure", "title": "TELUS and Government of Canada advance work to scale Canada's sovereign AI infrastructure", "date": "2026-05-11", "kind": "proponent", "quote": "the 150 West Georgia facility will come online in 2029", "supports": ["expected_online", "operator"]}], "confidence": "medium", "field_confidence": {"owner": "likely"}, "notes": "Shown as approved because BC Hydro has committed 39 MW of supply (Allied, reported by Daily Hive); no development application for the data centre had been filed as of July 2026. TELUS names the site as a facility due online in 2029, and Allied and Westbank said in February 2026 that they sought to sell a major portion of the site to a Canadian operator, so the owner may change.", "checked": "2026-10-25", "tenant_countries": {}} {"site_id": "CA-BC-telus-m3-vancouver", "name": "TELUS M3 (Main Alley) AI data centre", "aliases": ["TELUS M3 Data Center", "Telus M3 Mount Pleasant", "Vancouver Urban Data Centre (M3)"], "operator": "TELUS / Westbank", "owner": "Westbank (Main Alley campus)", "tenants": [], "province": "BC", "municipality": "Vancouver", "address": "111 East 5th Ave and 2060 Quebec St, Vancouver", "lat": 49.26659, "lon": -123.10224, "coord_precision": "address", "type": "ai_hpc", "ai": "yes", "status": "proposed", "status_date": "2026-10-23", "mw": null, "mw_basis": null, "mw_note": "TELUS's three BC sites share an initial 85 MW BC Hydro allocation; no figure for this site.", "mw_figures": [], "power_source": "hydro grid", "opened": null, "expected_online": null, "approvals": [{"authority": "City of Vancouver", "instrument": "rezoning I-1A to CD-1 to allow Bulk Data Storage in existing building", "ref": "111 E 5th Ave rezoning application", "date": "2025-09-04", "outcome": "pending", "conditions": "pulled from public hearing 2026-07-21 until after the election; extra Q&A 2026-12-02 to 2026-12-15", "url": "https://www.shapeyourcity.ca/111-e-5"}], "ownership": null, "ownership_country": "Canada", "sources": [{"url": "https://www.shapeyourcity.ca/111-e-5", "title": "Shape Your City Vancouver: 111 E 5th Ave rezoning application", "date": "2026-10-23", "quote": "The City of Vancouver has received an application to rezone the subject site from I-1A (industrial) District to CD-1 (Comprehensive Development) District to allow for Bulk Data Storage use", "supports": ["approvals", "status", "status_date", "address"], "kind": "public_record"}, {"url": "https://dailyhive.com/vancouver/m3-mount-pleasant-vancouver-telus-westbank-ai-data-centre-decision-deferred", "title": "Daily Hive: Council punts decision on Telus-Westbank AI data centre", "date": "2026-07-23", "quote": "Artistic rendering of the Telus AI data centre at Main Alley tech campus' M3 building at 111 East 5th Ave. and 2060 Quebec St., Vancouver.", "supports": ["operator", "ai", "name"], "kind": "press"}, {"url": "https://dailyhive.com/vancouver/m3-mount-pleasant-vancouver-telus-westbank-ai-data-centre-decision-deferred", "title": "Daily Hive, Telus-Westbank AI data centre decision deferred", "date": "2026-07-23", "kind": "press", "quote": "The proposal would see Westbank substantially renovate M3 — a six-storey office building constructed in 1977 within its Main Alley tech campus.", "supports": ["owner"]}], "confidence": "high", "field_confidence": {"owner": "likely"}, "notes": "Council pulled the rezoning from a July 2026 public hearing until after the election, so the application is live but undecided. Westbank is shown as owner because press calls the site 'its Main Alley tech campus'; who holds the land is not confirmed, and TELUS is the intended data-centre operator.", "checked": "2026-10-25", "tenant_countries": {}} {"site_id": "CA-BC-uniserve-vancouver", "name": "Uniserve Vancouver data centres", "aliases": ["Uniserve Vancouver 1", "Uniserve Vancouver 2"], "operator": "Uniserve Communications", "owner": null, "tenants": [], "province": "BC", "municipality": "Vancouver", "address": null, "lat": 49.2827, "lon": -123.1207, "coord_precision": "city", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_figures": [], "mw_note": "One directory lists Uniserve Vancouver 2 at 2 MW; no primary source confirms it.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.uniserve.com/services/data-centres-cloud", "title": "Data Centres & Cloud (Uniserve)", "date": "undated", "quote": "With data centres in Vancouver, Calgary, and Ontario, Uniserve delivers secure, high-performance infrastructure for reliable, resilient growth.", "supports": ["name", "operator", "municipality", "status", "type"], "kind": "proponent"}], "confidence": "low", "field_confidence": {"location": "likely", "ai": "likely"}, "notes": "Directories list two Uniserve buildings (333 and 369 Terminal Ave), shown here as one site because Uniserve does not name them.", "checked": "2026-10-25"} {"site_id": "CA-BC-estruxture-vancouver-van1", "name": "VAN-1", "aliases": ["eStruxture VAN-1"], "operator": "eStruxture Data Centers", "owner": null, "tenants": [], "province": "BC", "municipality": "Vancouver", "address": "55 East 7th Ave, Vancouver, BC V5T 1M4", "lat": 49.2648, "lon": -123.10376, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": 2.4, "mw_basis": "unstated", "mw_note": "Operator: total capacity 2.4 MW; 7,500 sq ft of cabinet space.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.estruxture.com/data-centers/vancouver/van-1", "title": "Sustainable Vancouver Data Center – VAN-1 (eStruxture)", "date": "undated", "quote": "Innovative and strategically located facility in Mount Pleasant, adjacent to the Vancouver downtown core (55 East 7th Ave) | with a total capacity of 2.4MW", "supports": ["name", "operator", "address", "municipality", "status", "type", "mw"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [{"mw": 2.4, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely"}} {"site_id": "CA-BC-cologix-vancouver-van2", "name": "VAN2", "aliases": ["Cologix VAN2"], "operator": "Cologix", "owner": null, "tenants": [], "province": "BC", "municipality": "Vancouver", "address": "1050 West Pender Street, Vancouver, BC V6E 3S7", "lat": 49.28696, "lon": -123.11947, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": 2, "mw_basis": "unstated", "mw_note": "Cologix: 15,000 sq ft, 2 MW site capacity.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/vancouver/van2/", "title": "Colocation in Vancouver: VAN2 Data Center (Cologix)", "date": "undated", "quote": "Cologix’s VAN2, a 15K SQFT data center, is conveniently located only 2 blocks away from our VAN1 site", "supports": ["name", "operator", "municipality", "type", "status"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/vancouver/van2/", "title": "Colocation in Vancouver: VAN2 Data Center (Cologix)", "date": "undated", "quote": "1050 West Pender Street, Vancouver, British Columbia", "supports": ["address"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/vancouver/van2/#power", "title": "Colocation in Vancouver: VAN2 Data Center (Cologix)", "date": "undated", "quote": "Site Capacity: 2 MW", "supports": ["mw", "mw_basis"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [{"mw": 2, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 2}], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely"}} {"site_id": "CA-BC-cologix-vancouver-van3", "name": "VAN3", "aliases": ["Cologix VAN3", "Tech Futures YVR1"], "operator": "Cologix", "owner": null, "tenants": ["Tech Futures Interactive (YVR1, per PeeringDB)"], "province": "BC", "municipality": "Vancouver", "address": "2828 Natal Street, Vancouver, BC V5M 2H1", "lat": 49.25943, "lon": -123.02967, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": 5, "mw_basis": "unstated", "mw_note": "Operator: an additional 42,000 sq ft and 5 MW of power.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/vancouver/van3/", "title": "Colocation in Vancouver: VAN3 Data Center (Cologix)", "date": "undated", "quote": "VAN3 delivers an additional 42K SQFT and 5 MW of power to the Vancouver market.", "supports": ["name", "operator", "municipality", "type", "status", "mw"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/vancouver/van3/", "title": "Colocation in Vancouver: VAN3 Data Center (Cologix)", "date": "undated", "quote": "2828 Natal Street, Vancouver, British Columbia", "supports": ["address"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/2696", "title": "PeeringDB: Tech Futures YVR1", "date": "2025-09-26", "quote": "2828 Natal Street", "supports": ["tenants", "aliases"], "kind": "directory"}], "confidence": "high", "notes": "Tech Futures (YVR1) has a suite at the same address.", "checked": "2026-10-25", "mw_figures": [{"mw": 5, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely", "tenants": "likely"}} {"site_id": "CA-BC-cologix-vancouver-van4", "name": "VAN4", "aliases": ["175 West Cordova", "Cologix VAN4"], "operator": "Cologix", "owner": null, "tenants": [], "province": "BC", "municipality": "Vancouver", "address": "175 West Cordova Street, Vancouver, BC V6B 1E1", "lat": 49.28355, "lon": -123.10871, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": 6.5, "mw_basis": "unstated", "mw_note": "Cologix: 58,000 sq ft across four floors, 6.5 MW site capacity.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/vancouver/van4/", "title": "Colocation in Vancouver: VAN4 Data Center (Cologix)", "date": "undated", "quote": "VAN4, Cologix’s fourth Vancouver data center, is a secure, world-class, highly reliable and fault-tolerant, interconnection hub in the heart of downtown Vancouver.", "supports": ["name", "operator", "municipality", "type", "status"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/vancouver/van4/", "title": "Colocation in Vancouver: VAN4 Data Center (Cologix)", "date": "undated", "quote": "175 West Cordova Street, Vancouver, British Columbia", "supports": ["address"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/vancouver/van4/", "title": "Cologix VAN4 data center", "date": "undated", "kind": "proponent", "quote": "Facility 58K SQFT across four floors | Site Capacity: 6.5 MW", "supports": ["mw", "mw_basis", "mw_note"]}, {"url": "https://cologix.com/data-centers/vancouver/", "title": "Cologix Vancouver data centers", "date": "undated", "kind": "proponent", "quote": "135K SQFT across Vancouver", "supports": ["notes"]}], "confidence": "high", "notes": "Cologix lists 135,000 sq ft across its five Vancouver sites (VAN1 to VAN5).", "checked": "2026-10-25", "mw_figures": [{"mw": 6.5, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 2}], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely"}} {"site_id": "CA-BC-hut8-vancouver-vault", "name": "Vancouver Vault", "aliases": ["Hut 8 Vancouver Vault"], "operator": "Hut 8 Canada", "owner": null, "tenants": [], "province": "BC", "municipality": "Vancouver", "address": "1700-666 Burrard St, Vancouver, BC", "lat": 49.285, "lon": -123.11911, "coord_precision": "address", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": 1, "mw_basis": "facility", "mw_note": "Hut 8: 1 MW designed power capacity.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://canada.hut8.com/network", "title": "Data Centers in Canada | Hut 8 Nationwide Network", "date": "undated", "quote": "one hardened facility in BC (Vancouver Vault)", "supports": ["name", "operator", "municipality", "status", "type"], "kind": "proponent"}, {"url": "https://canada.hut8.com/centers/vancouver-vault", "title": "Hut 8 Canada: Vancouver Vault", "date": "undated", "quote": "Situated at 1700-666 Burrard St, Vancouver, BC.", "supports": ["address", "notes"], "kind": "proponent"}, {"url": "https://canada.hut8.com/centers/vancouver-vault#power", "title": "Hut 8 Canada: Vancouver Vault", "date": "undated", "quote": "1 MW designed power capacity", "supports": ["mw", "mw_basis"], "kind": "proponent"}], "confidence": "medium", "notes": "Hut 8 says the Vault was originally built for the Bank of Canada to protect gold bullion and cash reserves.", "checked": "2026-10-25", "mw_figures": [{"mw": 1, "basis": "facility", "stage": "built", "date": "undated", "source_idx": 2}], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely"}} {"site_id": "CA-BC-atlascloud-vancouver", "name": "Atlas Cloud Vancouver", "aliases": ["AtlasCloud AI Datacenter"], "operator": "Atlas Cloud Enterprises", "owner": null, "tenants": [], "province": "BC", "municipality": "Vancouver (Mount Pleasant)", "address": null, "lat": 49.26442, "lon": -123.10089, "coord_precision": "city", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Industry directories list 1 MW; the operator does not confirm it.", "mw_figures": [], "power_source": "hydro grid", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.atlascloud.ca/", "title": "Atlas Cloud: Vancouver, BC data center platform", "date": "undated", "quote": "Vancouver Mount Pleasant location for teams that need a dependable West Coast infrastructure footprint.", "supports": ["name", "operator", "municipality", "status", "type"], "kind": "proponent"}], "confidence": "medium", "field_confidence": {"location": "likely"}, "notes": "Marketed as AI-ready, but no AI tenant is known. Directories give 308 East 5th Avenue, which the operator does not confirm; the point marks the Mount Pleasant neighbourhood.", "checked": "2026-10-25"} {"site_id": "CA-BC-uvic-arbutus", "name": "Arbutus cloud (University of Victoria)", "aliases": ["Arbutus"], "operator": "University of Victoria", "owner": "University of Victoria", "tenants": ["Digital Research Alliance of Canada (national cloud)"], "province": "BC", "municipality": "Victoria (Saanich)", "address": null, "lat": 48.46206, "lon": -123.31142, "coord_precision": "area", "type": "research_hpc", "ai": "partial", "status": "operating", "status_date": null, "mw": null, "mw_basis": "unstated", "mw_note": "MW not published; H100 GPU configurations are listed.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "public", "sources": [{"url": "https://docs.alliancecan.ca/wiki/Arbutus", "title": "Alliance docs: Arbutus", "date": "undated", "quote": "Arbutus is an Infrastructure-as-a-Service cloud hosted at the University of Victoria.", "supports": ["operator", "municipality", "status", "ai"], "kind": "proponent"}, {"url": "https://alliancecan.ca/en/about/alliance", "title": "Digital Research Alliance of Canada: About the Alliance", "date": "undated", "quote": "The Digital Research Alliance of Canada (the Alliance) is a national not-for-profit membership-based organization", "supports": ["tenant_countries"], "kind": "proponent"}, {"url": "https://docs.alliancecan.ca/wiki/Arbutus", "title": "Arbutus (Alliance documentation)", "date": "2026-10-09", "kind": "proponent", "quote": "The first version of the Arbutus cloud (also called Legacy Arbutus) will be decommissioned on October 15, 2026. Please migrate all contents to the new Arbutus cloud", "supports": ["status", "notes"]}], "confidence": "medium", "notes": "The renewed Arbutus cloud is in service and the first system was scheduled for decommissioning on 2026-10-15; the point marks the UVic campus. The host institution is shown as owner, but who holds title to the hardware is not published.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"owner": "likely", "tenants": "confirmed"}, "tenant_countries": {"Digital Research Alliance of Canada (national cloud)": "Canada"}} {"site_id": "CA-BC-cube-victoria", "name": "CUBE Victoria Datacentre", "aliases": ["Cube Global", "Cube Global Storage"], "operator": "Cube Global Storage", "owner": null, "tenants": [], "province": "BC", "municipality": "Victoria (Saanich)", "address": "4220 Commerce Cir, Victoria, BC V8Z 6N6", "lat": 48.48102, "lon": -123.39488, "coord_precision": "address", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.cubeglobalstorage.com/datacentre-colocation-facility/", "title": "Victoria's High-Availability Datacentre Colocation Facility (CUBE)", "date": "undated", "quote": "CUBE’s state-of-the-art facility in Victoria, British Columbia allows organizations to house their IT environments in a secure, state-of-the-art, high-uptime (99.9%) data centre.", "supports": ["name", "operator", "municipality", "type", "status"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/15894", "title": "PeeringDB: Cube Global", "date": "2026-03-10", "quote": "4220 Commerce Cir", "supports": ["address"], "kind": "directory"}], "confidence": "medium", "notes": "The address comes from a peering directory; it is on Commerce Circle in Saanich, Greater Victoria.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely", "ai": "likely"}} {"site_id": "CA-MB-jetai-ile-des-chenes", "name": "Jet.AI / Consensus Core AI data centre (Île-des-Chênes)", "aliases": ["Convergence Compute", "Convergence Compute Midwest Canada campus", "Jet.AI / Consensus Core Ile-des-Chênes", "Jet.AI Winnipeg Campus"], "operator": "Convergence Compute LLC (Jet.AI / Consensus Core Technologies joint venture)", "owner": "Convergence Compute LLC (Consensus Core Technologies contributed the project; Jet.AI held 1.5% at 2026-06-30)", "tenants": [], "province": "MB", "municipality": "RM of Ritchot", "address": "~350 acres, 10 miles south of Winnipeg, north of Île-des-Chênes", "lat": 49.70921, "lon": -96.98756, "coord_precision": "city", "type": "ai_hpc", "ai": "yes", "status": "refused", "status_date": "2026-06-04", "mw": null, "mw_basis": null, "mw_note": "One industry directory lists 200 MW; the Winnipeg Free Press (2026-06-04) gives no figure beyond 'hundreds of megawatts'.", "mw_figures": [], "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "Government of Manitoba", "instrument": "provincial decision on the proposal", "ref": "Premier's statement", "date": "2026-06-04", "outcome": "refused", "conditions": "Premier Kinew: 'The very limited economic benefits for this project do not outweigh the serious environmental concerns and the unique rural way of life that people in the region enjoy.'", "url": "https://www.winnipegfreepress.com/business/2026/06/04/premier-pulls-plug-on-proposed-ai-data-centre"}], "ownership": null, "ownership_country": "Canada", "sources": [{"url": "https://www.winnipegfreepress.com/business/2026/06/04/premier-pulls-plug-on-proposed-ai-data-centre", "title": "Winnipeg Free Press: Premier pulls plug on proposed AI data centre", "date": "2026-06-04", "quote": "Premier Wab Kinew says a massive artificial intelligence data centre southeast of Winnipeg will not go ahead.", "supports": ["status", "status_date", "operator", "approvals", "ai"], "kind": "press"}, {"url": "https://finviz.com/news/245531/jetai-consensus-core-announce-strategic-interest-in-midwestern-canadian-data-center-campus", "title": "Jet.AI & Consensus Core announce Midwestern Canadian data-center campus (GlobeNewswire via Finviz)", "date": "2025-12-04", "quote": "The campus, located 10 miles south of Winnipeg, MB, spans roughly 350 contiguous acres with immediate access to key energy and network infrastructure.", "supports": ["operator", "address", "aliases"], "kind": "proponent"}, {"url": "https://www.sec.gov/Archives/edgar/data/1861622/000149315226038333/form10-q.htm", "title": "Jet.AI Inc. 10-Q, quarter ended 2026-06-30", "date": "2026-08-14", "kind": "public_record", "quote": "Consensus Core Technologies Inc., a British Columbia corporation (“Consensus Core”) | Consensus Core contributed 100% of the equity interests of its data center project located in Midwestern Canada | the Company held an aggregate 1.5% equity", "supports": ["owner", "ownership_country"]}], "confidence": "medium", "field_confidence": {"owner": "likely"}, "notes": "Refused here is a provincial government statement, not a formal permit decision. Convergence Compute is a Delaware company; with Jet.AI at 1.5%, most of it likely belongs to Consensus Core, the British Columbia company that contributed the project, so Canada is shown as likely; the other holdings are not published.", "checked": "2026-10-25", "tenant_countries": {}} {"site_id": "CA-MB-bell-rosser", "name": "Bell AI Fabric Winnipeg / RM of Rosser", "aliases": ["BUZZ HPC Manitoba", "Bell AI Fabric — Winnipeg (Buzz/HIVE)", "Merit Functional Data Center"], "operator": "Bell Canada (Bell AI Fabric)", "owner": "Bell Canada (BCE Inc.)", "tenants": ["BUZZ HPC (HIVE Digital Technologies)"], "province": "MB", "municipality": "RM of Rosser", "address": null, "lat": 50.00444, "lon": -97.4067, "coord_precision": "city", "type": "ai_hpc", "ai": "yes", "status": "operating", "status_date": "2026-08-14", "mw": 1, "mw_basis": "it", "mw_note": "Bell: 14 MW planned capacity. HIVE: 1 MW of critical IT deployed, 3 MW more optional. Press citing permits: 5.5 MW.", "power_source": null, "opened": "2026", "expected_online": null, "approvals": [{"authority": "South Interlake Planning District", "instrument": "building permits (conversion of former protein plant; pads for generators, chillers, transformers)", "ref": null, "date": "2026", "outcome": "applied", "conditions": "none published", "url": "https://aibusinessweekly.net/p/bell-canada-rosser-manitoba-ai-data-centre"}], "ownership": "BCE Inc. (Canada)", "sources": [{"url": "https://businessmarkets.bell.ca/economic-impact", "title": "Bell AI Fabric economic impact", "date": "undated", "quote": "Converting former protein processing facility into data centre", "supports": ["name", "mw", "operator", "municipality"], "kind": "proponent"}, {"url": "https://www.sec.gov/Archives/edgar/data/1720424/000106299326004434/form10q.htm", "title": "HIVE Digital Technologies 10-Q (period to 2026-06-30)", "date": "2026-08-14", "quote": "Originally expected to come online in the quarter ending March 31, 2026, the units became operational in May 2026.", "supports": ["status", "status_date", "tenants", "ai", "opened"], "kind": "public_record"}, {"url": "https://aibusinessweekly.net/p/bell-canada-rosser-manitoba-ai-data-centre", "title": "Bell Canada Rosser Manitoba AI data centre (press)", "date": "2026-04-29", "quote": "The Rosser data centre will only require 5.5 megawatts of electricity", "supports": ["mw_note", "approvals"], "kind": "press"}, {"url": "https://data.sec.gov/submissions/CIK0001720424.json", "title": "SEC EDGAR company record, HIVE Digital Technologies Ltd.", "date": "undated", "quote": "\"city\":\"VANCOUVER\" | \"stateOrCountryDescription\":\"British Columbia, Canada\"", "supports": ["tenant_countries"], "kind": "public_record"}], "confidence": "medium", "notes": "Operating here means a 504-GPU NVIDIA B200 cluster live since May 2026 in Bell's converted plant; the wider conversion toward 14 MW is still being built. HIVE is incorporated in British Columbia with its registered office in Vancouver; its filings name San Antonio, Texas, as its headquarters.", "checked": "2026-10-25", "mw_figures": [{"mw": 14, "basis": "unstated", "stage": "planned", "date": null, "source_idx": 0}, {"mw": 1, "basis": "it", "stage": "built", "date": "2026-05", "source_idx": 1}, {"mw": 5.5, "basis": "unstated", "stage": "building", "date": "2026-04-29", "source_idx": 2}], "ownership_country": "Canada", "field_confidence": {"owner": "likely", "tenants": "confirmed"}, "tenant_countries": {"BUZZ HPC (HIVE Digital Technologies)": "United States"}} {"site_id": "CA-MB-lesnet-winnipeg-ywg1", "name": "LES.NET Winnipeg data center (YWG1)", "aliases": ["LES.NET YWG1"], "operator": "LES.NET (1996) Inc.", "owner": null, "tenants": [], "province": "MB", "municipality": "Winnipeg", "address": "130 Portage Avenue East, Winnipeg, MB R3C 0A1", "lat": 49.89449, "lon": -97.13559, "coord_precision": "address", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_figures": [], "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://les.net/data-center-co-location/", "title": "Data Center / Co-Location (LES.NET)", "date": "undated", "quote": "Conveniently located in central Winnipeg, LES.NET offers a solution that can accommodate the needs of any sized business.", "supports": ["operator", "municipality", "type", "status"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/987", "title": "PeeringDB: LES.NET YWG1", "date": "2025-09-26", "quote": "130 Portage Avenue East", "supports": ["name", "address"], "kind": "directory"}], "confidence": "medium", "field_confidence": {"location": "likely", "ai": "likely"}, "notes": "LES.NET names no address; a peering directory lists three Winnipeg locations and the map shows YWG1 (130 Portage Ave E), as no source says which hold data centre space.", "checked": "2026-10-25"} {"site_id": "CA-MB-equinix-winnipeg-wi1", "name": "WI1", "aliases": ["Bell MTS Data Centres DC01", "Equinix Winnipeg WI1"], "operator": "Equinix", "owner": null, "tenants": [], "province": "MB", "municipality": "Winnipeg", "address": "1450 Waverley Street, Winnipeg, MB R3T 0P6", "lat": 49.82502, "lon": -97.17801, "coord_precision": "building", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Operator lists colocation space 2,323 m2 (25,005 ft2); no MW published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.equinix.com/data-centers/americas-colocation/canada-colocation/winnipeg-data-centers/wi1", "title": "Winnipeg WI1 (Equinix)", "date": "undated", "quote": "Learn about Equinix WI1 carrier-neutral data centre, located at 1450 Waverley Street in Winnipeg, Canada.", "supports": ["name", "operator", "address", "municipality", "type", "status"], "kind": "proponent"}, {"url": "https://www.sec.gov/Archives/edgar/data/1101239/000156459020045402/d80601d991.htm", "title": "Equinix completes US$780 million acquisition of 13 Bell data centers in Canada (8-K exhibit 99.1)", "date": "2020-10-01", "kind": "public_record", "quote": "Saint John (SJ1), Vancouver (VA1) and Winnipeg (WI1).", "supports": ["notes"]}], "confidence": "high", "notes": "Equinix bought this data centre from Bell (BCE) in 2020.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed", "ai": "likely"}} {"site_id": "CA-NB-chief-bathurst-695-poplar", "name": "Chief Technologies powered land, Bathurst", "aliases": ["695 Poplar Street — powered datacentre site"], "operator": "Chief Technologies Inc.", "owner": null, "tenants": [], "province": "NB", "municipality": "Bathurst", "address": null, "lat": 47.62087, "lon": -65.65375, "coord_precision": "city", "type": "unknown", "ai": "unknown", "status": "announced", "status_date": null, "mw": 20, "mw_basis": "grid_allocation", "mw_note": "The company says 20 MW of NB Power capacity is allocated to the site, with the facilities study and power supply agreement still to be signed by a buyer; NB Power's study indicates power around August 2027.", "mw_figures": [{"mw": 20, "basis": "grid_allocation", "stage": "allocated", "date": "undated", "source_idx": 0}], "power_source": "grid", "opened": null, "expected_online": null, "approvals": [{"authority": "NB Power", "instrument": "20 MW load allocation and power supply agreement", "ref": null, "date": null, "outcome": "pending", "conditions": "facilities study ready to sign; a CAD 1.5 million letter of credit and the power supply agreement are still required (company deck)", "url": "https://chieftechnologies.ca/deck"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://chieftechnologies.ca/deck", "title": "Chief Technologies deck", "date": "undated", "quote": "Chief Technologies, Powered Land, 20 MW Contracted, Bathurst NB", "supports": ["mw", "operator", "municipality"], "kind": "proponent"}, {"url": "https://chieftechnologies.ca/deck", "title": "Chief Technologies executive summary", "date": "undated", "kind": "proponent", "quote": "This site carries a 20 MW allocation with the NB Power Facilities Study ready to sign, a utility agreement in place", "supports": ["mw_note", "approvals", "notes"]}], "confidence": "low", "field_confidence": {"location": "likely"}, "notes": "Offered for sale as powered land: the company says the 24-acre site is zoned for a data centre, and no end user or data-centre build is named.", "checked": "2026-10-25"} {"site_id": "CA-NB-gnb-marysville-dc", "name": "Marysville Data Centre", "aliases": [], "operator": "Government of New Brunswick (Internal Services Agency in 2014)", "owner": null, "tenants": [], "province": "NB", "municipality": "Fredericton", "address": null, "lat": 45.97824, "lon": -66.58879, "coord_precision": "area", "type": "government", "ai": "no", "status": "operating", "status_date": "2014-11-19", "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "Government of New Brunswick", "sources": [{"url": "https://www.cbc.ca/news/canada/new-brunswick/data-centre-outage-cost-1-6m-in-equipment-lost-productivity-1.2840346", "title": "CBC: Data centre outage cost $1.6M in equipment, lost productivity (press)", "date": "2014-11-19", "quote": "Recovery from a massive failure at the Marysville Data Centre in June cost the provincial government $1.6 million", "supports": ["name", "operator", "ownership", "ownership_country", "status"], "kind": "press"}], "confidence": "low", "notes": "The latest source is a 2014 CBC report on a costly outage, so current operation is not confirmed. No source gives the building; the point marks the Marysville area of Fredericton.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"ai": "speculative", "location": "speculative", "owner": "likely"}} {"site_id": "CA-NB-hive-grandfalls", "name": "Grand Falls Data Centre", "aliases": ["HIVE Canada 2.0 — Edmundston / Grand Falls AI campus", "HIVE Grand Falls Data Center 2", "HIVE New Brunswick"], "operator": "HIVE Digital Technologies", "owner": null, "tenants": [], "province": "NB", "municipality": "Grand Falls / Saint-André", "address": null, "lat": 47.04756, "lon": -67.74075, "coord_precision": "city", "type": "crypto", "ai": "no", "status": "operating", "status_date": "2026-08-14", "mw": 70, "mw_basis": "facility", "mw_note": "70 MW of capacity available, 36.5 MW in use (HIVE 10-Q, quarter to 2026-06-30).", "power_source": "grid (NB Power)", "opened": null, "expected_online": null, "approvals": [], "ownership": "HIVE Digital Technologies Ltd.", "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1720424/000106299326004434/form10q.htm", "title": "HIVE Digital Technologies 10-Q (period to 2026-06-30)", "date": "2026-08-14", "quote": "The Company's New Brunswick 70 MW site has been identified by management as a candidate for conversion to Tier-III hyperscaler co-location", "supports": ["status", "status_date", "mw", "type", "notes"], "kind": "public_record"}, {"url": "https://www.hivedigitaltechnologies.com/news/hives-buzz-starts-building-a-digital-superhighway-for-eastern-canadas-first-sovereign-ai-factory/", "title": "HIVE’s BUZZ Starts Building A Digital Superhighway for Eastern Canada’s First Sovereign AI Factory", "date": "2026-05-08", "quote": "Private high-capacity wavelength services to Grand Falls — the connectivity moat that separates a powered campus from a sovereign AI factory", "supports": ["name", "notes"], "kind": "proponent"}, {"url": "https://www.sec.gov/Archives/edgar/data/1720424/000106299326004434/form10q.htm", "title": "HIVE Digital Technologies Form 10-Q, quarter to 2026-06-30", "date": "2026-08-14", "kind": "public_record", "quote": "The Company's headquarters are in San Antonio, Texas, United States, and its registered office is in Vancouver, British Columbia, Canada.", "supports": ["ownership_country", "ownership"]}, {"url": "https://www.sec.gov/Archives/edgar/data/1720424/000106299326004434/form10q.htm", "title": "HIVE Digital Technologies Form 10-Q, quarter to 2026-06-30", "date": "2026-08-14", "kind": "public_record", "quote": "Design development and site planning at New Brunswick are advancing.", "supports": ["notes"]}], "confidence": "high", "notes": "HIVE's August 2026 filing names this bitcoin-mining site a candidate for conversion to Tier III hosting and says design and site planning are advancing; no conversion work is reported.", "checked": "2026-10-25", "mw_figures": [{"mw": 70, "basis": "facility", "stage": "built", "date": "2026-08-14", "source_idx": 0}], "ownership_country": "United States", "field_confidence": {"owner": "confirmed", "ai": "confirmed", "location": "likely"}} {"site_id": "CA-NB-ftl-miramichi", "name": "FTL Miramichi data centre campus", "aliases": ["FTL Miramichi datacentre campus"], "operator": "Faster Than Light (FTL)", "owner": null, "tenants": [], "province": "NB", "municipality": "Miramichi", "address": null, "lat": 47.0298, "lon": -65.47042, "coord_precision": "city", "type": "colocation", "ai": "unknown", "status": "announced", "status_date": "2026-10", "mw": 375, "mw_basis": "buildout", "mw_note": "375 MW campus at full build-out, Phase 1 in 2027 (FTL presentation to city council).", "mw_figures": [{"mw": 375, "basis": "buildout", "stage": "planned", "date": "2026-10", "source_idx": 0}], "power_source": "grid (NB Power) with on-site backup generation", "opened": null, "expected_online": "2027", "approvals": [], "ownership": "FTL (Faster Than Light), a Canadian-owned private company", "ownership_country": "Canada", "sources": [{"url": "https://ftl.com/FTL_Miramichi_City_Council_Presentation_20261006.pdf", "title": "FTL Miramichi City Council presentation", "date": "2026-10", "quote": "375 MW Campus", "supports": ["mw", "operator", "municipality", "expected_online"], "kind": "proponent"}, {"url": "https://ftl.com/FTL_Miramichi_City_Council_Presentation_20261006.pdf", "title": "FTL Miramichi presentation to city council", "date": "2026-10", "kind": "proponent", "quote": "Headquarters: New Brunswick Business Type: Private Corp Industry: Colocation", "supports": ["type", "ownership", "ownership_country"]}], "confidence": "low", "field_confidence": {"location": "likely"}, "notes": "The brownfield site has not been named.", "checked": "2026-10-25"} {"site_id": "CA-NB-fibrecentre-moncton", "name": "Fibre Centre Moncton (MON1)", "aliases": ["Fibre Centre MON1"], "operator": "Fibre Centre Ltd.", "owner": null, "tenants": [], "province": "NB", "municipality": "Moncton", "address": "770 St George Blvd, Moncton", "lat": 46.08434, "lon": -64.81164, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "The operator markets 'up to 30MW' of power: a ceiling, not a built figure.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://fibrecentre.com/", "title": "Fibre Centre homepage", "date": "undated", "quote": "Fibre Centre owns and operates network-neutral data centres and meet-me-rooms located in Moncton and Ottawa.", "supports": ["operator", "municipality", "status"], "kind": "proponent"}, {"url": "https://fibrecentre.com/", "title": "Fibre Centre homepage", "date": "undated", "quote": "Flexible spaces with N+1 power, up to 30MW, 2N cooling, and dry-pipe fire suppression. Includes AI colocation.", "supports": ["mw_note"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/3785", "title": "PeeringDB facility 3785 (Fibre Centre)", "date": "undated", "quote": "770 St George Blvd", "supports": ["address"], "kind": "directory"}], "confidence": "medium", "notes": "The operator markets AI colocation, but no AI tenant is named. The street address comes from PeeringDB only.", "checked": "2026-10-25", "mw_figures": [{"mw": 30, "basis": "unstated", "stage": "planned", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-NB-bell-saint-john-co", "name": "Bell Saint John data centre (central office)", "aliases": [], "operator": "Bell Canada (BCE)", "owner": null, "tenants": [], "province": "NB", "municipality": "Saint John", "address": null, "lat": 45.27276, "lon": -66.06279, "coord_precision": "city", "type": "telecom", "ai": "unknown", "status": "operating", "status_date": "2020-06-01", "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "BCE Inc. (Bell Canada's parent)", "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/718940/000119312520156858/d904312dex1.htm", "title": "BCE 6-K Ex.1: Bell to sell 25 data centres at 13 sites to Equinix (news release)", "date": "2020-06-01", "quote": "5 other data centres that are located in its network central offices in Calgary, Halifax, Saint John, St. John’s and Toronto", "supports": ["municipality", "operator", "ownership", "ownership_country", "status"], "kind": "public_record"}], "confidence": "medium", "notes": "A data centre inside a Bell network central office, as listed in BCE's 2020 filing; the building is not named. It is not the former Bell Aliant data centre in Millidgeville (now Equinix SJ1), and the latest source is from 2020, so current operation is not confirmed.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"location": "likely", "owner": "likely"}} {"site_id": "CA-NB-purecolo-saint-john", "name": "PureColo Saint John (STJ01)", "aliases": ["Carbon60 Saint John", "Cirrus9 Saint John", "PureColo STJ01"], "operator": "PureColo Inc. (Carrier Connect Data Solutions)", "owner": null, "tenants": [], "province": "NB", "municipality": "Saint John", "address": "75 Prince William Street, Saint John (per PeeringDB)", "lat": 45.27192, "lon": -66.06225, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": "2026-03-02", "mw": 0.5, "mw_basis": "unstated", "mw_note": "500 kW across three data halls, per Carrier Connect's investor presentation as reported by DCD.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "Carrier Connect Data Solutions Inc. (through PureColo Inc.)", "sources": [{"url": "https://www.newsfilecorp.com/release/285802", "title": "Carrier Connect Data Solutions Inc. Completes Acquisition of Saint John Data Center (news release)", "date": "2026-03-02", "quote": "completed its previously announced acquisition (the \"Acquisition\") of the principal business assets comprising the data center operation located in Saint John", "supports": ["operator", "status", "municipality"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/5965", "title": "PeeringDB facility 5965 (PureColo STJ01)", "date": "undated", "quote": "75 Prince William Street", "supports": ["address"], "kind": "directory"}, {"url": "https://feeds.newsfilecorp.com/company/12061", "title": "Carrier Connect Data Solutions news feed (Newsfile)", "date": "2026-03-02", "kind": "proponent", "quote": "has completed its previously announced acquisition (the \"Acquisition\") of the principal business assets comprising the data center operation located in Saint John", "supports": ["operator", "status", "ownership"]}, {"url": "https://www.datacenterdynamics.com/en/news/canadas-carrier-connect-acquires-data-center-assets-of-new-brunswick-msp-carbon60/", "title": "Canada's Carrier Connect acquires data center assets of New Brunswick MSP Carbon60", "date": "2026-01-28", "kind": "press", "quote": "the acquired facility totals 500kW across three data halls, fully built out and serving more than 20 customers", "supports": ["mw", "mw_note", "notes"]}], "confidence": "medium", "notes": "Carrier Connect completed its purchase of this Saint John data-centre business in March 2026. The previous owner ran two Saint John sites (75 Prince William Street and Market Square) and press did not say which was bought; PureColo's own PeeringDB listing gives 75 Prince William Street.", "checked": "2026-10-25", "mw_figures": [{"mw": 0.5, "basis": "unstated", "stage": "built", "date": "2026-01-28", "source_idx": 3}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-NB-equinix-sj1", "name": "SJ1", "aliases": ["Equinix SJ1"], "operator": "Equinix", "owner": null, "tenants": [], "province": "NB", "municipality": "Saint John", "address": "7 McIntosh Street, Saint John, New Brunswick E2K 5B7", "lat": 45.29257, "lon": -66.09919, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "Equinix, Inc.", "sources": [{"url": "https://www.equinix.com/data-centers/americas-colocation/canada-colocation/saint-john-data-centers/sj1", "title": "Equinix SJ1 IBX data center page", "date": "undated", "quote": "Address | 7 McIntosh Street | Saint John, New Brunswick E2K 5B7 | Colocation Space\t502 m2 (5,403 ft2)", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://www.sec.gov/Archives/edgar/data/1101239/000156459020045402/d80601d991.htm", "title": "Equinix 8-K Ex.99.1: Equinix Completes US$780 Million Acquisition of 13 Bell Data Centers in Canada", "date": "2020-10-01", "quote": "one in each of the following metros: Kamloops (KA1), Montreal (MT1), Ottawa (OT1)3, Saint John (SJ1), Vancouver (VA1) and Winnipeg (WI1).", "supports": ["notes"], "kind": "public_record"}, {"url": "https://data.sec.gov/submissions/CIK0001101239.json", "title": "SEC EDGAR company record, Equinix Inc", "date": "undated", "quote": "\"name\":\"EQUINIX INC\" | \"city\":\"REDWOOD CITY\",\"stateOrCountry\":\"CA\"", "supports": ["ownership", "ownership_country"], "kind": "public_record"}], "confidence": "high", "notes": "Equinix bought this data centre from Bell (BCE) in 2020.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "United States", "field_confidence": {"location": "confirmed", "owner": "likely"}} {"site_id": "CA-NB-beacon-voltagrid-spruce-lake", "name": "Spruce Lake Data Centre Hub", "aliases": ["Beacon Lorneville 400 MW data centre", "Beacon Saint John Data Center Campus", "Saint John / Lorneville AI Data Centre", "Spruce Lake AI Data Centre Project", "Voltagrid off-grid data centre — Lorneville"], "operator": "Beacon New Brunswick Inc. / VoltaGrid LLC", "owner": "Beacon New Brunswick Inc. and VoltaGrid LLC (co-proponents)", "tenants": [], "province": "NB", "municipality": "Saint John", "address": "Spruce Lake Industrial Park, west Saint John", "lat": 45.21874, "lon": -66.17667, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "proposed", "status_date": "2026-10-23", "mw": 390, "mw_basis": "facility", "mw_note": "390 MW power requirement, as reported by CBC from the provincial environmental registration; C$6 billion project on under 60 ha (proponent).", "mw_figures": [{"mw": 390, "basis": "facility", "stage": "planned", "date": "2026-04-21", "source_idx": 1}], "power_source": "onsite gas plus NB Power grid", "opened": null, "expected_online": null, "approvals": [{"authority": "NB Department of Environment", "instrument": "Environmental Impact Assessment registration", "ref": null, "date": "2026-04", "outcome": "pending", "conditions": "none published", "url": "https://www.cbc.ca/news/canada/new-brunswick/saint-john-data-centre-9.7167767"}, {"authority": "IAAC", "instrument": "requests to designate the project", "ref": "IAAC 90762", "date": "2026-10-14", "outcome": "pending", "conditions": "Two designation requests (2026-08-16 and 2026-10-14) under review.", "url": "https://iaac-aeic.gc.ca/050/evaluations/proj/90762?culture=en-CA"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://iaac-aeic.gc.ca/050/evaluations/proj/90762?culture=en-CA", "title": "IAAC registry: Spruce Lake AI Data Centre Project", "date": "2026-10-23", "quote": "On October 14, 2026, the Minister of the Environment, Climate Change and Nature received an additional request to designate the Spruce Lake AI Data Centre Project", "supports": ["approvals", "status", "status_date", "operator", "ai", "power_source"], "kind": "public_record"}, {"url": "https://www.cbc.ca/news/canada/new-brunswick/saint-john-data-centre-9.7167767", "title": "CBC News: EIA filings show substantial greenhouse gas emissions and energy need", "date": "2026-04-21", "quote": "would require a significant amount of power at 390 megawatts", "supports": ["mw", "approvals"], "kind": "press"}, {"url": "https://www.sjdatacentre.ca/", "title": "Spruce Lake Data Centre (proponent site)", "date": "undated", "quote": "The proposed Spruce Lake Data Centre Hub is a large-scale private investment in digital infrastructure designed to support AI and cloud computing, planned for Spruce Lake Industrial Park.", "supports": ["name", "address"], "kind": "proponent"}, {"url": "https://iaac-aeic.gc.ca/050/evaluations/proj/90762?culture=en-CA", "title": "IAAC registry, Spruce Lake AI Data Centre Project", "date": "2026-10-23", "kind": "public_record", "quote": "Beacon New Brunswick Inc. and VoltaGrid LLC are proposing to construct, operate and decommission a new data center and power-generating facility fueled by natural gas", "supports": ["owner", "operator"]}, {"url": "https://voltagrid.com/", "title": "VoltaGrid", "date": "undated", "kind": "proponent", "quote": "Head Office 10800 Telge Road, Houston, Texas, 77095", "supports": ["ownership_country"]}, {"url": "https://beacondatacenters.com/about/", "title": "Beacon Data Centers, About", "date": "undated", "kind": "proponent", "quote": "Founded in 2023 by Nadia Partners, a specialist investor in AI, digital infrastructure and energy infrastructure", "supports": ["owner"]}], "confidence": "high", "field_confidence": {"owner": "likely"}, "notes": "Two requests for a federal impact assessment were before IAAC as of October 2026; the provincial environmental assessment is pending. The two co-proponents are VoltaGrid, based in Houston (United States), and Beacon, whose parent's country is not published, so no owner's country is shown. No tenant is named.", "checked": "2026-10-25", "tenant_countries": {}} {"site_id": "CA-NL-cleancompute-holyrood", "name": "Clean Compute NL Data Center", "aliases": ["Clean Compute NL — Holyrood datacentre concept"], "operator": "Clean Compute NL", "owner": null, "tenants": [], "province": "NL", "municipality": "Holyrood", "address": null, "lat": 47.36452, "lon": -53.14702, "coord_precision": "city", "type": "unknown", "ai": "unknown", "status": "announced", "status_date": null, "mw": 100, "mw_basis": "it", "mw_note": "Phase 1: 100 MW IT load, ocean-water cooling, C$1.1 billion, construction 2027-2028 (proponent).", "mw_figures": [{"mw": 100, "basis": "it", "stage": "planned", "date": "undated", "source_idx": 0}], "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://cleancomputenl.com/technical/Environmental_Impact_Preview/", "title": "Clean Compute NL: Environmental Impact Preview", "date": "undated", "quote": "Capacity Phase 1: 100 MW IT load Investment $1.1 billion Timeline Construction 2027-2028", "supports": ["mw", "municipality", "name"], "kind": "proponent"}], "confidence": "low", "field_confidence": {"location": "likely"}, "notes": "Figures come from the proponent's own environmental impact preview, which does not name the company behind it.", "checked": "2026-10-25"} {"site_id": "CA-NL-bell-st-johns-co", "name": "Bell St. John's data centre (central office)", "aliases": [], "operator": "Bell Canada (BCE)", "owner": null, "tenants": [], "province": "NL", "municipality": "St. John's", "address": null, "lat": 47.56468, "lon": -52.7067, "coord_precision": "city", "type": "telecom", "ai": "unknown", "status": "operating", "status_date": "2020-06-01", "mw": 0.4, "mw_basis": "unstated", "mw_note": "400 kW in 2015 after a tenfold expansion, with room to more than double (Bell Aliant release).", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "BCE Inc. (Bell Canada's parent)", "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/718940/000119312520156858/d904312dex1.htm", "title": "BCE 6-K Ex.1: Bell to sell 25 data centres at 13 sites to Equinix (news release)", "date": "2020-06-01", "quote": "5 other data centres that are located in its network central offices in Calgary, Halifax, Saint John, St. John’s and Toronto", "supports": ["municipality", "operator", "ownership", "ownership_country", "status"], "kind": "public_record"}, {"url": "https://web.archive.org/web/20200904053057/https://www.bce.ca/news-and-media/releases/show/bell-aliant-announces-10-5-million-expansion-for-st-john-s-data-centre-2", "title": "Bell Aliant announces $10.5 million expansion for St. John's data centre (archive copy 2020-09-04)", "date": "2015-06-02", "quote": "with built-in flexibility to more than double the facility's 400kW capacity", "supports": ["mw"], "kind": "proponent"}], "confidence": "medium", "notes": "A data centre inside a Bell network central office, as listed in BCE's 2020 filing; the building is not named. The latest source is from 2020, so current operation is not confirmed.", "checked": "2026-10-25", "mw_figures": [{"mw": 0.4, "basis": "unstated", "stage": "built", "date": "2015-06-02", "source_idx": 1}], "ownership_country": "Canada", "field_confidence": {"location": "likely", "owner": "likely"}} {"site_id": "CA-NS-bell-halifax-co", "name": "Bell Halifax data centre (central office)", "aliases": [], "operator": "Bell Canada (BCE)", "owner": null, "tenants": [], "province": "NS", "municipality": "Halifax", "address": null, "lat": 44.64862, "lon": -63.58595, "coord_precision": "city", "type": "telecom", "ai": "unknown", "status": "operating", "status_date": "2020-06-01", "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "BCE Inc. (Bell Canada's parent)", "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/718940/000119312520156858/d904312dex1.htm", "title": "BCE 6-K Ex.1: Bell to sell 25 data centres at 13 sites to Equinix (news release)", "date": "2020-06-01", "quote": "5 other data centres that are located in its network central offices in Calgary, Halifax, Saint John, St. John’s and Toronto", "supports": ["municipality", "operator", "ownership", "ownership_country", "status"], "kind": "public_record"}], "confidence": "medium", "notes": "A data centre inside a Bell network central office, as listed in BCE's 2020 filing; the building is not named. A directory places it in the Halifax Main central office on North Street, which no primary source confirms; the latest source is from 2020, so current operation is not confirmed.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"location": "likely", "owner": "likely"}} {"site_id": "CA-NS-exa-halifax-bayers", "name": "EXA Edge DC Halifax", "aliases": ["Hibernia Halifax"], "operator": "EXA Infrastructure", "owner": null, "tenants": [], "province": "NS", "municipality": "Halifax", "address": "7071 Bayers Rd, Halifax (per PeeringDB)", "lat": 44.65588, "lon": -63.62586, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": "2025-09-26", "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.peeringdb.com/fac/7551", "title": "PeeringDB facility 7551 (EXA Edge DC Halifax), record updated 2025-09-26", "date": "2025-09-26", "quote": "EXA Edge DC Halifax | 7071 Bayers Rd", "supports": ["name", "operator", "address", "status"], "kind": "directory"}], "confidence": "low", "notes": "Listed only in directories: EXA's own colocation pages and 2026 network map do not name Halifax. Directories describe an edge colocation suite in an office complex that hosts the Halifax internet exchange.", "checked": "2026-10-25", "directory_only": true, "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-NS-rogers-halifax-hal-dc1", "name": "Rogers Halifax (HAL DC1)", "aliases": ["IAI Halifax", "Internetworking Atlantic"], "operator": "Rogers Communications", "owner": null, "tenants": [], "province": "NS", "municipality": "Halifax", "address": "5562 Sackville St, Halifax (per PeeringDB)", "lat": 44.64457, "lon": -63.57965, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": "2015-12-02", "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "Rogers Communications Inc.", "sources": [{"url": "https://entrevestor.com/blog/rogers-buys-halifaxs-iai", "title": "Entrevestor: Rogers Buys Halifax's IAI (press)", "date": "2015-12-02", "quote": "A Halifax-based data centre, which will be Rogers’ 16th in Canada.", "supports": ["municipality", "operator", "ownership", "ownership_country", "status"], "kind": "press"}, {"url": "https://www.peeringdb.com/fac/886", "title": "PeeringDB facility 886 (Internetworking Atlantic)", "date": "undated", "quote": "5562 Sackville St", "supports": ["address", "aliases"], "kind": "directory"}], "confidence": "medium", "notes": "Rogers bought this Halifax data centre in 2015; the latest source is from 2015, so current operation is not confirmed. The site name and street address come from directories.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"location": "likely", "owner": "likely"}} {"site_id": "CA-NS-everwind-point-tupper", "name": "Point Tupper Data Centre Campus", "aliases": ["EverWind Fuels, Point Tupper", "EverWind Point Tupper AI data-centre campus"], "operator": "EverWind Fuels", "owner": "EverWind (Point Tupper site owner; Membertou-led First Nations consortium negotiating a stake)", "tenants": [], "province": "NS", "municipality": "Point Tupper, Richmond County", "address": null, "lat": 45.60701, "lon": -61.36643, "coord_precision": "city", "type": "ai_hpc", "ai": "yes", "status": "announced", "status_date": "2026-10-16", "mw": 95, "mw_basis": "unstated", "mw_note": "Initial 95 MW phase in late 2027, a 325 MW expansion in 2028, 420 MW at full build (basis not stated).", "mw_figures": [{"mw": 95, "basis": "unstated", "stage": "planned", "date": "2026-10-16", "source_idx": 0}, {"mw": 420, "basis": "buildout", "stage": "planned", "date": "2026-10-16", "source_idx": 0}], "power_source": "grid plus new Nova Scotia wind (portfolio)", "opened": null, "expected_online": "2027-H2", "approvals": [], "ownership": null, "ownership_country": "Canada", "sources": [{"url": "https://everwindfuels.com/2026/10/everwind-announces-10-billion-investment-in-point-tupper-data-centre-campus-and-renewable-energy-portfolio-across-nova-scotia/", "title": "EverWind announces $10 billion investment in Point Tupper data centre campus", "date": "2026-10-16", "quote": "The campus is planned to begin with an initial 95-megawatt (MW) phase in late 2027, followed by a 325 MW expansion targeted for 2028", "supports": ["mw", "status", "status_date", "expected_online", "tenants", "ai"], "kind": "proponent"}, {"url": "https://everwindfuels.com/2026/10/everwind-announces-10-billion-investment-in-point-tupper-data-centre-campus-and-renewable-energy-portfolio-across-nova-scotia/", "title": "EverWind announces $10 billion investment in Point Tupper data centre campus", "date": "2026-10-16", "kind": "proponent", "quote": "The planned investment includes more than $8 billion to develop, construct, own, and finance the campus | EverWind is a Nova Scotia-based energy infrastructure company that owns and operates the Point Tupper terminal", "supports": ["owner", "ownership_country"]}, {"url": "https://everwindfuels.com/2026/10/everwind-announces-10-billion-investment-in-point-tupper-data-centre-campus-and-renewable-energy-portfolio-across-nova-scotia/", "title": "EverWind release (tenant and First Nations stake)", "date": "2026-10-16", "kind": "proponent", "quote": "EverWind has reached a long-term lease agreement with a leading frontier AI developer for the initial phase | Negotiations are underway with a First Nations consortium led by Membertou Development Corporation for an ownership stake", "supports": ["tenants", "owner"]}, {"url": "https://novascotia.ca/nse/ea/projects.asp", "title": "Nova Scotia environmental assessment: registered projects", "date": "undated", "kind": "public_record", "quote": "Harbour Hills Wind Project EverWind NS Holdings Ltd and Membertou Development Corporation 24 June 2026", "supports": ["notes"]}], "confidence": "medium", "field_confidence": {"owner": "confirmed"}, "notes": "EverWind says the project is subject to commercial, technical and regulatory conditions, and that the expansion will not connect to the grid until system studies and approvals are complete; no data-centre project appears on Nova Scotia's environmental assessment registry. The tenant is an unnamed 'leading frontier AI developer' (long-term lease, initial phase), so none is listed.", "checked": "2026-10-25", "tenant_countries": {}} {"site_id": "CA-NS-eastlink-pennant-point", "name": "Pennant Point Data Centre", "aliases": [], "operator": "Eastlink", "owner": null, "tenants": [], "province": "NS", "municipality": "Sambro (Halifax Regional Municipality)", "address": null, "lat": 44.47877, "lon": -63.60338, "coord_precision": "city", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://business.eastlink.ca/advanced-solutions/colocation/", "title": "Eastlink Business: Colocation", "date": "undated", "quote": "Businesses are taking advantage of Eastlink’s Pennant Point Data Centre, to securely co-locate their critical infrastructure at a fraction of the cost.", "supports": ["name", "operator", "status"], "kind": "proponent"}, {"url": "https://newswire.ca/news-releases/eastlink-chooses-nova-scotia-for-2nd-data-centre-513579961.html", "title": "Eastlink chooses Nova Scotia for 2nd data centre (news release)", "date": "2014-01-20", "quote": "the company will operate a second location based in Sambro, NS (otherwise known as the Pennant Point Data Centre).", "supports": ["municipality", "opened"], "kind": "proponent"}], "confidence": "high", "notes": "Eastlink's January 2014 release already describes the site as operational; the opening date and street address are not published.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-NT-katlotech-icefox-hay-river", "name": "IceFox Data Centre", "aliases": ["KatloTech Ice Fox DC, Hay River"], "operator": "KatloTech Communications Ltd.", "owner": null, "tenants": [], "province": "NT", "municipality": "Kátł'odeeche First Nation (near Hay River)", "address": null, "lat": 60.81559, "lon": -115.78661, "coord_precision": "city", "type": "colocation", "ai": "yes", "status": "announced", "status_date": "2026-08-11", "mw": null, "mw_basis": null, "mw_note": "Modular units of 35 kW and 100 kW; a 2025 petition by the company's founder says the site could grow to 3 MW in total.", "mw_figures": [], "power_source": "hydro grid (planned)", "opened": null, "expected_online": null, "approvals": [], "ownership": "KatloTech Communications (Indigenous-owned)", "ownership_country": "Canada", "sources": [{"url": "https://www.rcinet.ca/eye-on-the-arctic/?p=207109", "title": "Eye on the Arctic (CBC): Proposed data centre is no supersized AI facility, says N.W.T. company", "date": "2026-08-11", "quote": "KatloTech Communications looking for $12M in federal funding for fibre line, data centre near Hay River", "supports": ["operator", "status", "approvals", "municipality"], "kind": "press"}, {"url": "https://cabinradio.ca/304865/news/science/technology/what-should-the-nwts-approach-to-data-centres-look-like/", "title": "Cabin Radio: What should the NWT's approach to data centres look like?", "date": "2026-08-30", "quote": "He said his IceFox Data Centre became a formal project in 2025.", "supports": ["name", "status"], "kind": "press"}, {"url": "https://cabinradio.ca/304865/news/science/technology/what-should-the-nwts-approach-to-data-centres-look-like/", "title": "What should the NWT's approach to data centres look like?", "date": "2026-08-30", "kind": "press", "quote": "the data centre could grow to have a total capacity of three megawatts", "supports": ["mw_note"]}, {"url": "https://www.rcinet.ca/eye-on-the-arctic/?p=207109", "title": "Proposed data centre is no supersized AI facility, says N.W.T. company (CBC)", "date": "2026-08-11", "kind": "press", "quote": "securing $12 million from the Canadian Northern Economic Development Agency (CanNor), and connecting the data centre to the proposed Taltson hydro expansion project", "supports": ["notes", "power_source"]}, {"url": "https://www.rcinet.ca/eye-on-the-arctic/?p=207109", "title": "Proposed data centre is no supersized AI facility, says N.W.T. company (CBC)", "date": "2026-08-11", "kind": "press", "quote": "The data centre will also run some artificial intelligence services.", "supports": ["ai"]}], "confidence": "medium", "field_confidence": {"owner": "likely", "location": "likely"}, "notes": "A small, container-based facility planned on Kátł'odeeche First Nation land across the river from Hay River; the point marks the town. It depends on $12 million sought from the Canadian Northern Economic Development Agency (CanNor) and on power from the proposed Taltson hydro expansion, and would need an environmental assessment.", "checked": "2026-10-25"} {"site_id": "CA-NT-gnwt-yellowknife-data-centre", "name": "GNWT Data Centre", "aliases": ["GNWT Computer Data Center"], "operator": "Government of the Northwest Territories (Technology Service Centre, Department of Finance)", "owner": "Government of the Northwest Territories", "tenants": [], "province": "NT", "municipality": "Yellowknife", "address": null, "lat": 62.454, "lon": -114.3718, "coord_precision": "city", "type": "government", "ai": "no", "status": "operating", "status_date": "2024-03-28", "mw": null, "mw_basis": null, "mw_figures": [], "mw_note": "Design-build tender: 1,200 m2, two storeys; no MW published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "Government of the Northwest Territories", "ownership_country": "Canada", "sources": [{"url": "https://contracts.opennwt.ca/tenders/janitorial-services-gnwt-data-centre/ocds-v9mmex-GNWT1-23-0000006414", "title": "Janitorial Services - GNWT Data Centre (OpenNWT mirror of GNWT procurement)", "date": "2023-02-17", "quote": "requesting tenders on behalf of the Department of Infrastructure for the provision of Janitorial Services for the GNWT Data Centre in the city of Yellowknife, NT.", "supports": ["name", "operator", "municipality", "status", "type", "owner"], "kind": "directory"}, {"url": "https://contracts.opennwt.ca/tenders/new-gnwt-computer-data-center/ocds-v9mmex-GNWT1-09-CT100773/info", "title": "CT100773 - New GNWT Computer Data Center (OpenNWT)", "date": "undated", "quote": "Design-Build Contract for the 1,200 square meter, two (2) storey, new GNWT Computer Data Center.", "supports": ["aliases", "mw_note"], "kind": "directory"}, {"url": "https://www.fin.gov.nt.ca/sites/fin/files/job-descriptions/15-11488_manager_infrastructure_services_sig_28_mar_24_0.pdf", "title": "GNWT job description: Manager, Infrastructure Services (signed 28 Mar 2024)", "date": "2024-03-28", "quote": "the support of multiple data centre facilities. This integration provides the core computing infrastructure for the GNWT", "supports": ["status"], "kind": "public_record"}, {"url": "https://www.fin.gov.nt.ca/sites/fin/files/job-descriptions/15-11488_manager_infrastructure_services_sig_28_mar_24_0.pdf", "title": "GNWT job description: Manager, Infrastructure Services", "date": "2024-03-28", "kind": "public_record", "quote": "Department Finance Position Title Manager, Infrastructure Services", "supports": ["operator"]}], "confidence": "medium", "field_confidence": {"location": "likely", "ai": "likely", "owner": "likely"}, "notes": "Current operation is not confirmed: the newest sources are a 2023 tender and a 2024 job description. No address is published, so the point is the Yellowknife centre.", "checked": "2026-10-25"} {"site_id": "CA-ON-almaguin-armour", "name": "Almaguin Data containerized AI data centre", "aliases": ["Almaguin Data Armour Township Data Center"], "operator": "Almaguin Data Inc.", "owner": "Almaguin Data Inc. (proponent; withdrawn)", "tenants": [], "province": "ON", "municipality": "Armour Township", "address": "Highway 520 Industrial Park, Armour Township", "lat": 45.6203, "lon": -79.40889, "coord_precision": "city", "type": "ai_hpc", "ai": "yes", "status": "cancelled", "status_date": "2026-06-02", "mw": null, "mw_basis": null, "mw_note": "Reported as 2 MW initially with a 10 MW expansion; no primary source confirms these figures.", "mw_figures": [], "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "Armour Township", "instrument": "municipal review", "ref": "none", "date": "2026-06-02", "outcome": "withdrawn", "conditions": "Developer withdrew after a review of required studies and public feedback.", "url": "https://www.muskokaradio.com/news/local/proposed-ai-data-centre-in-armour-twp-withdrawn/"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.muskokaradio.com/news/local/proposed-ai-data-centre-in-armour-twp-withdrawn/", "title": "Hunters Bay Radio: Proposed AI Data Centre in Armour Twp withdrawn", "date": "2026-06-02", "quote": "A proposed AI data centre in Armour Township will not move forward after the developer withdrew the project following a review of required studies and public feedback.", "supports": ["status", "status_date", "approvals", "operator", "ai"], "kind": "press"}, {"url": "https://www.muskokaradio.com/news/local/proposed-ai-data-centre-in-armour-twp-withdrawn/", "title": "Muskoka Radio, Proposed AI data centre in Armour Twp withdrawn", "date": "2026-06-02", "kind": "press", "quote": "Almaguin Data Inc. says it has decided not to proceed with the Highway 520 Industrial Park facility", "supports": ["owner"]}], "confidence": "medium", "field_confidence": {"owner": "speculative"}, "notes": "The developer withdrew the proposal in June 2026 after a review of required studies and public feedback.", "checked": "2026-10-25", "tenant_countries": {}} {"site_id": "CA-ON-ssc-barrie-edc", "name": "EDC Barrie", "aliases": ["Enterprise Data Centre Barrie"], "operator": "Shared Services Canada", "owner": null, "tenants": [], "province": "ON", "municipality": "Barrie", "address": null, "lat": 44.39, "lon": -79.69, "coord_precision": "city", "type": "government", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "Government of Canada (Shared Services Canada)", "sources": [{"url": "https://www.canada.ca/en/shared-services/services/hosting-services/data-centres.html", "title": "Shared Services Canada: Government of Canada data centres", "date": "2025-12-30", "quote": "We have established 4 enterprise data centres: EDC Barrie EDC Borden EDC Gatineau EDC Montréal", "supports": ["name", "operator", "ownership", "ownership_country", "status"], "kind": "public_record"}], "confidence": "medium", "notes": "SSC lists EDC Barrie without an address, owner or capacity; it may be housed in a commercial facility; SSC does not say.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"location": "likely", "owner": "likely"}} {"site_id": "CA-ON-estruxture-barrie-tor5", "name": "TOR-5", "aliases": ["eStruxture TOR-5 (Barrie)"], "operator": "eStruxture Data Centers", "owner": null, "tenants": [], "province": "ON", "municipality": "Barrie", "address": "612 Welham Road, Barrie, ON L4N 8Z8", "lat": 44.3376, "lon": -79.6702, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "eStruxture Data Centers (Montréal-based); Fengate Asset Management (Toronto) expanded its equity stake in a 2024 investment that also brought in capital from investors co-led by Partners Group and Pantheon; shares not published", "sources": [{"url": "https://www.estruxture.com/data-centers/toronto", "title": "eStruxture Toronto Data Centers", "date": "undated", "quote": "TOR-5 612 Welham Road Barrie, ON, L4N 8Z8 Modern data center is built to exceed Tier III standards", "supports": ["name", "operator", "address", "status"], "kind": "proponent"}, {"url": "https://renx.ca/fengate-makes-18b-investment-in-estruxture-data-centers", "title": "RENX: Fengate makes $1.8B investment in eStruxture Data Centers (press)", "date": "2024-06-19", "quote": "eStruxture is the largest Canadian data centre provider with locations in Montreal, Toronto, Calgary and Vancouver. Headquartered in Montreal", "supports": ["ownership", "ownership_country"], "kind": "press"}, {"url": "https://renx.ca/fengate-makes-18b-investment-in-estruxture-data-centers", "title": "RENX: Fengate makes $1.8B investment in eStruxture Data Centers (press)", "date": "2024-06-19", "kind": "press", "quote": "The investment significantly expands Fengate's equity stake in eStruxture", "supports": ["ownership"]}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"location": "confirmed", "owner": "likely"}} {"site_id": "CA-ON-ssc-borden-edc", "name": "EDC Borden", "aliases": ["CFB Borden data centre", "Enterprise Data Centre Borden"], "operator": "Shared Services Canada", "owner": "Government of Canada", "tenants": [], "province": "ON", "municipality": "Borden (Essa / CFB Borden)", "address": null, "lat": 44.27, "lon": -79.9, "coord_precision": "city", "type": "government", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": "2018", "expected_online": null, "approvals": [], "ownership": "Government of Canada", "sources": [{"url": "https://www.canada.ca/en/shared-services/services/hosting-services/data-centres.html", "title": "Shared Services Canada: Government of Canada data centres", "date": "2025-12-30", "quote": "We have established 4 enterprise data centres: EDC Barrie EDC Borden EDC Gatineau EDC Montréal", "supports": ["name", "operator", "status"], "kind": "public_record"}, {"url": "https://www.canada.ca/en/shared-services/campaigns/stories/leed-silver-certification.html", "title": "SSC: Enterprise Data Centre (EDC) Borden achieves LEED Silver certification", "date": "2025-08-27", "quote": "Launched in September 2018, EDC Borden is one of SSC’s four state-of-the-art enterprise data centres", "supports": ["opened", "status"], "kind": "public_record"}], "confidence": "medium", "notes": "SSC gives no address or capacity. It opened in September 2018 and holds LEED Silver certification, per SSC.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"location": "likely", "owner": "likely"}} {"site_id": "CA-ON-55h-brampton-55-hereford", "name": "55H (55 Hereford Street)", "aliases": ["55 Hereford", "CORE Brampton Data Centre", "Core Data Centres Brampton"], "operator": "55H (with CORE Data Centres)", "owner": "55H (Grain Management and StratCap joint venture)", "tenants": [], "province": "ON", "municipality": "Brampton", "address": "55 Hereford Street, Brampton, ON", "lat": 43.61547, "lon": -79.77003, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 2.5, "mw_basis": "it", "mw_note": "20 MW IT planned in three phases: 2.5 MW available March 2025, 2.5 MW in summer 2025, 15 MW in summer 2026 (DCD). CORE's Brampton page cites 30 MW of utility supply over two feeds.", "power_source": "grid", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://web.archive.org/web/20260409125916/https://www.datacenterdynamics.com/en/news/55h-announces-data-center-expansion-in-ontario-canada/", "title": "DCD: 55H announces data center expansion in Ontario, Canada (press; archive copy 2026-04-09)", "date": "2025-03-07", "quote": "At the 55 Hereford Street site, the expansion will deliver 20MW of IT capacity in three stages to meet the growing demands of AI clients.", "supports": ["address", "name", "mw_note", "owner"], "kind": "press"}, {"url": "https://web.archive.org/web/20260409125916/https://www.datacenterdynamics.com/en/news/55h-announces-data-center-expansion-in-ontario-canada/", "title": "DCD: 55H announces data center expansion (press)", "date": "2025-03-07", "quote": "Phase I is immediately available, providing 2.5MW for lease. Phase II and Phase III will deliver a further 2.5MW and 15MW in summer 2025 and 2026, respectively.", "supports": ["mw", "status"], "kind": "press"}, {"url": "https://coredatacentres.com/location/brampton-data-centre/", "title": "CORE Data Centres: Brampton Data Centre", "date": "undated", "quote": "30 MWs hydro capacity – Two diverse “ACTIVE” utility feeds in Main Tie Main configuration from separate grids.", "supports": ["mw_note", "operator"], "kind": "proponent"}], "confidence": "medium", "notes": "Former Loblaw enterprise data centre. The 2.5 MW shown is Phase I, available from March 2025; completion of Phase II (2.5 MW, due summer 2025) or Phase III (15 MW, due summer 2026) had not been reported as of 2026-10-25.", "checked": "2026-10-25", "mw_figures": [{"mw": 2.5, "basis": "it", "stage": "built", "date": "2025-03-07", "source_idx": 1}, {"mw": 5, "basis": "it", "stage": "planned", "date": "2025-03-07", "source_idx": 1}, {"mw": 20, "basis": "buildout", "stage": "planned", "date": "2025-03-07", "source_idx": 0}, {"mw": 30, "basis": "grid_allocation", "stage": "allocated", "date": "undated", "source_idx": 2}], "ownership_country": null, "field_confidence": {"location": "likely", "owner": "likely"}} {"site_id": "CA-ON-equinix-brampton-tr6", "name": "TR6", "aliases": ["Equinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3)"], "operator": "Equinix", "owner": null, "tenants": [], "province": "ON", "municipality": "Brampton", "address": "30 Bramtree Court, Brampton, ON L6S 5Z7", "lat": 43.7445, "lon": -79.7163, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Colocation space 2,898 m² (31,194 sq ft); no MW figure published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.equinix.com/data-centers/americas-colocation/canada-colocation/toronto-data-centers/tr6", "title": "Equinix Toronto TR6", "date": "undated", "quote": "Address 30 Bramtree Court Brampton, Ontario L6S 5Z7 Canada ... Colocation Space 2,898 m2 (31,194 ft2)", "supports": ["name", "operator", "address", "status"], "kind": "proponent"}], "confidence": "high", "notes": "Formerly a Q9 site.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-equinix-brampton-tr7", "name": "TR7", "aliases": ["Equinix TR7 - Toronto, Brampton (formerly Q9 Brampton 4/5)"], "operator": "Equinix", "owner": null, "tenants": [], "province": "ON", "municipality": "Brampton", "address": "1895 Williams Parkway, Brampton, ON L6S 6E6", "lat": 43.7449, "lon": -79.7178, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Colocation space 7,968 m² (85,767 sq ft); no MW figure published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.equinix.com/data-centers/americas-colocation/canada-colocation/toronto-data-centers/tr7", "title": "Equinix Toronto TR7", "date": "undated", "quote": "Address 1895 Williams Parkway Brampton, Ontario L6S 6E6 Canada ... Colocation Space 7,968 m2 (85,767 ft2)", "supports": ["name", "operator", "address", "status"], "kind": "proponent"}], "confidence": "high", "notes": "Formerly a Q9 site.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-coreweave-cambridge", "name": "CoreWeave Cambridge (Ontario AI data centre)", "aliases": ["Ascent TOR1 / CoreWeave–Cohere AI centre", "Cambridge Hyperscale (Related Digital)", "CoreWeave CA-EAST-01A", "CoreWeave Ontario - AI Data Center"], "operator": "CoreWeave", "owner": "Joint venture of Related Digital, TowerBrook Capital Partners and Ascent (developer-owner; construction loan from CPP Investments and Deutsche Bank)", "tenants": ["Cohere", "OVHcloud"], "province": "ON", "municipality": "Cambridge", "address": null, "lat": 43.42763, "lon": -80.37128, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "operating", "status_date": "2025-08", "mw": 54, "mw_basis": "unstated", "mw_note": "CPP Investments (2025-07-31) funded construction of a 54 MW hyperscale expansion here, pre-leased to an unnamed GPU cloud provider. Ascent marketed the warehouse block at up to 30 MW in 2017.", "power_source": null, "opened": "2025", "expected_online": null, "approvals": [{"authority": "City of Cambridge", "instrument": "zoning application (convert warehouse portion to data centre)", "ref": null, "date": "2024-07", "outcome": "applied", "conditions": "none published", "url": "https://www.theglobeandmail.com/business/article-coreweave-ai-data-centre-cambridge-ontario-cohere/"}, {"authority": "ISED (Government of Canada)", "instrument": "Strategic Response Fund contribution to Cohere (up to C$240M, AI Compute Challenge) for compute at the CoreWeave facility", "ref": null, "date": "2025-03-20", "outcome": "approved", "conditions": "none published", "url": "https://ised-isde.canada.ca/site/strategic-environmental-assessment/en/strategic-response-fund-cohere-compute-expansion-project-public-statement"}], "ownership": "CoreWeave (United States) as operator", "sources": [{"url": "https://ised-isde.canada.ca/site/strategic-environmental-assessment/en/strategic-response-fund-cohere-compute-expansion-project-public-statement", "title": "Strategic Response Fund: Cohere compute expansion project, public statement", "date": "undated", "quote": "Cohere will act as an anchor tenant for a new AI compute facility built and operated by CoreWeave", "supports": ["operator", "tenants", "ai", "municipality"], "kind": "public_record"}, {"url": "https://www.theglobeandmail.com/business/article-coreweave-ai-data-centre-cambridge-ontario-cohere/", "title": "Globe and Mail on CoreWeave Cambridge (press)", "date": "2025-07-02", "quote": "The data centre in Cambridge, which is slated to be fully operational in August, was owned by BlackBerry Inc. BB-T until 2017", "supports": ["status", "status_date", "opened", "approvals"], "kind": "press"}, {"url": "https://www.cppinvestments.com/wp-content/uploads/attachments/News-release_Ontario-Data-Center-EN.pdf", "title": "CPP Investments commits CAD 225 million construction financing for Ontario data centre", "date": "2025-07-31", "quote": "providing funding to construct a 54 MW hyperscale expansion to a data centre in Cambridge, Ontario", "supports": ["mw", "owner"], "kind": "proponent"}, {"url": "https://docs.coreweave.com/platform/regions/ca-east.md", "title": "CoreWeave docs: CA-EAST", "date": "undated", "quote": "This is a General Access zone located in Ontario, Canada. It is available to all customers.", "supports": ["status", "ai"], "kind": "proponent"}, {"url": "https://cohere.com/about", "title": "Cohere, About", "date": "undated", "kind": "proponent", "quote": "Cohere was founded in 2019 in Toronto with a bold vision", "supports": ["tenant_countries"]}, {"url": "https://www.theglobeandmail.com/business/article-coreweave-ai-data-centre-cambridge-ontario-cohere/", "title": "Globe and Mail on CoreWeave Cambridge (press)", "date": "2025-07-02", "kind": "press", "quote": "French company OVHcloud is currently a tenant in the building", "supports": ["tenants", "tenant_countries"]}], "confidence": "low", "notes": "Operation rests on the Globe's report of a planned August 2025 opening and CoreWeave's listing of a generally available Ontario zone (CA-EAST-01A, GB200 and GB300 systems); CoreWeave does not say this zone is the Cambridge site. The street address (17 Vondrau Drive, the former Ascent TOR1) appears only in trackers and directories. CPP Investments says the 54 MW project 'has been pre-leased to a market-leading GPU-focused AI cloud compute provider', which matches ISED's description of a CoreWeave/Cohere facility in Cambridge. The joint-venture shares are not published; the United States is shown as owner's country after Related Digital, the lead name. CoreWeave is the lessee and operator, Cohere the anchor compute tenant.", "checked": "2026-10-25", "mw_figures": [{"mw": 54, "basis": "unstated", "stage": "building", "date": "2025-07-31", "source_idx": 2}], "ownership_country": "United States", "field_confidence": {"owner": "likely", "tenants": "likely"}, "tenant_countries": {"Cohere": "Canada", "OVHcloud": "France"}} {"site_id": "CA-ON-grandbridge-intermarket-cam", "name": "Intermarket CAM Data Center", "aliases": ["Intermarket CAM Data Center"], "operator": "GRANDBRIDGE ENERGY INC. (utility applicant)", "owner": null, "tenants": [], "province": "ON", "municipality": "Cambridge (probable)", "address": null, "lat": 43.36005, "lon": -80.3123, "coord_precision": "city", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-07", "mw": 29.5, "mw_basis": "requested", "mw_note": "IESO connection application size, proposed in service 2026-Q4.", "mw_figures": [{"mw": 29.5, "basis": "requested", "stage": "requested", "date": "2026-10-07", "source_idx": 0}], "power_source": "grid", "opened": null, "expected_online": null, "approvals": [{"authority": "IESO", "instrument": "connection assessment application (load)", "ref": "CAA 3007 (2025-862)", "date": "2025", "outcome": "pending", "conditions": "SIA status Active; proposed in-service 2026-Q4", "url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status", "title": "IESO Application Status (data file applicationstatusdata.json)", "date": "2026-10-07", "quote": "GRANDBRIDGE ENERGY INC. | Intermarket CAM Data Center | Southwest | New load facility | 29.5 MW | 2026-Q4 | Active", "supports": ["name", "mw", "status", "approvals"], "kind": "public_record"}], "confidence": "medium", "field_confidence": {"ai": "speculative", "location": "speculative"}, "notes": "Connection filed by the local utility GrandBridge Energy for an unnamed data-centre customer. It is placed in Cambridge from the 'CAM' in its name and the utility's territory; the location is not confirmed.", "checked": "2026-10-25"} {"site_id": "CA-ON-velocity1-fort-erie", "name": "Velocity1 Fort Erie Mega Site", "aliases": [], "operator": "Velocity1 Group (land marketer)", "owner": null, "tenants": [], "province": "ON", "municipality": "Fort Erie", "address": "~400 acres west of the QEW between Bowen and Gilmore roads, north of Garrison Road", "lat": 42.91308, "lon": -78.91861, "coord_precision": "city", "type": "unknown", "ai": "unknown", "status": "announced", "status_date": "2026-06-18", "mw": 90, "mw_basis": "unstated", "mw_note": "Marketed as consuming more than 65 million kWh a month, about 90 MW on average (estimate: 65 million kWh over 720 hours).", "mw_figures": [{"mw": 90, "basis": "unstated", "stage": "planned", "date": "2026-06-18", "source_idx": 0}], "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://forterieradio.ca/proposed-400-acre-fort-erie-data-centre-would-consume-87000-homes-worth-of-power/", "title": "Fort Erie Radio: Proposed 400-acre Fort Erie data centre", "date": "2026-06-18", "quote": "Velocity1 Group says the site could consume more than 65 million kilowatt-hours a month.", "supports": ["operator", "mw", "status", "address", "approvals"], "kind": "press"}], "confidence": "low", "field_confidence": {"location": "likely"}, "notes": "A 400-acre site west of the QEW, marketed to data-centre companies by a land company with no end user named. No planning application has been filed: the Town of Fort Erie said in June 2026 it had received no formal application or pre-consultation request.", "checked": "2026-10-25"} {"site_id": "CA-ON-napanee-data-park", "name": "Napanee Data Park", "aliases": ["Napanee Data Park"], "operator": "Napanee Environmental Complex, Inc. (applicant)", "owner": null, "tenants": [], "province": "ON", "municipality": "Greater Napanee", "address": null, "lat": 44.24739, "lon": -76.95055, "coord_precision": "city", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-07", "mw": 250.0, "mw_basis": "requested", "mw_note": "IESO connection application size, proposed in service 2028-Q1.", "mw_figures": [{"mw": 250.0, "basis": "requested", "stage": "requested", "date": "2026-10-07", "source_idx": 0}], "power_source": "grid", "opened": null, "expected_online": null, "approvals": [{"authority": "IESO", "instrument": "connection assessment application (load)", "ref": "CAA 3002 (2025-857)", "date": "2025", "outcome": "pending", "conditions": "SIA status Active; proposed in-service 2028-Q1", "url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status", "title": "IESO Application Status (data file applicationstatusdata.json)", "date": "2026-10-07", "quote": "Napanee Environmental Complex, Inc. | Napanee Data Park | East | New load facility | 250 MW | 2028-Q1 | Active", "supports": ["name", "mw", "status", "approvals"], "kind": "public_record"}, {"url": "https://www.greaternapanee.com/news/posts/proposed-zoning-by-law-amendment-plzaco-2026-004/", "title": "Town of Greater Napanee: Proposed Zoning By-law Amendment PLZACO 2026 004", "date": "2026-01-21", "kind": "public_record", "quote": "The Town is proposing an amendment to the permitted uses within the General Industrial M2 zone category to include a data processing centre", "supports": ["notes"]}], "confidence": "medium", "field_confidence": {"ai": "speculative", "location": "likely"}, "notes": "Only the project name ties this grid request to Greater Napanee; no site has been made public.", "checked": "2026-10-25"} {"site_id": "CA-ON-agilis-sudbury", "name": "Agilis Networks (Sudbury)", "aliases": ["Agilis Networks"], "operator": "Agilis Networks", "owner": null, "tenants": [], "province": "ON", "municipality": "Greater Sudbury", "address": "500 Regent Street, Sudbury, ON", "lat": 46.4817, "lon": -81.0064, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://agilisnet.com/", "title": "Agilis Networks home page", "date": "2025", "quote": "Hosted Services & Colocation", "supports": ["operator", "status"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/api/fac/7406", "title": "PeeringDB facility 7406 Agilis Networks", "date": "2025-09-26", "quote": "500 Regent Street, Sudbury, P3E 4P1", "supports": ["address"], "kind": "directory"}], "confidence": "low", "notes": "The operator offers colocation; the street address comes from PeeringDB only.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-ontario-guelph-gdc", "name": "Ministry of Government Services Data Centre (Guelph)", "aliases": ["Ontario Guelph Data Centre"], "operator": "Government of Ontario", "owner": null, "tenants": [], "province": "ON", "municipality": "Guelph", "address": "1000 Southgate Drive, Guelph, ON N1L 0G5", "lat": 43.4841, "lon": -80.1942, "coord_precision": "building", "type": "government", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": "2010", "expected_online": null, "approvals": [], "ownership": "Government of Ontario", "sources": [{"url": "https://www.openstreetmap.org/way/398917168", "title": "OpenStreetMap way/398917168", "date": "2026-09-30", "quote": "name=Ministry of Government Services Data Centre; operator=The Government of Ontario; telecom=data_center; addr 1000 Southgate Drive, Guelph", "supports": ["address", "name", "operator", "ownership", "ownership_country"], "kind": "directory"}, {"url": "https://www.infrastructureontario.ca/en/news-and-media/news/ministry-of-government-services-data-centre/construction-completed-on-ministry-of-government-services-data-centre/", "title": "Infrastructure Ontario: Construction completed on Ministry of Government Services Data Centre", "date": "2010-03-17", "kind": "public_record", "quote": "Construction of the new Ministry of Government Services Data Centre in Guelph, which will house data centre operations for the ministry", "supports": ["name", "operator", "opened", "ownership"]}, {"url": "https://www.auditor.on.ca/en/content/news/22_summaries/2022_summary_AR_OCCIO.pdf", "title": "Auditor General of Ontario, 2022 annual report summary: Office of the Corporate Chief Information Officer", "date": "2022-12", "kind": "public_record", "quote": "OPS's primary data centre, located in Guelph, which has the highest data centre rating, has been significantly underutilized", "supports": ["status", "notes"]}], "confidence": "medium", "notes": "The Ontario Public Service's primary data centre, completed in 2010; in 2022 the Auditor General found it only 30% used. No capacity figure is published.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"location": "likely", "owner": "likely"}} {"site_id": "CA-ON-rbc-guelph", "name": "RBC Guelph Data Centre", "aliases": ["RBC's Guelph Computer Centre"], "operator": "Royal Bank of Canada", "owner": null, "tenants": [], "province": "ON", "municipality": "Guelph", "address": "75 Southgate Drive, Guelph, ON N1G 3M5", "lat": 43.4969, "lon": -80.2087, "coord_precision": "building", "type": "enterprise", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.openstreetmap.org/way/208650151", "title": "OpenStreetMap way/208650151", "date": "2026-09-30", "quote": "name=RBC Guelph Data Centre; description=RBC's Guelph Computer Centre; operator=Royal Bank of Canada; telecom=data_center", "supports": ["name", "operator", "address"], "kind": "directory"}, {"url": "https://www.smithandandersen.com/work/rbc-data-centre", "title": "Smith + Andersen: RBC Data Centre (project page)", "date": "undated", "quote": "Smith + Andersen was first engaged as the mechanical consultants on 75 Southgate during the original construction of the RBC Data Centre in 1991.", "supports": ["name", "operator", "address", "status", "notes"], "kind": "press"}, {"url": "https://www.smithandandersen.com/work/rbc-data-centre", "title": "Smith + Andersen: RBC Data Centre (project page)", "date": "undated", "quote": "This data centre operates 24 hours a day, 365 days a year", "supports": ["status"], "kind": "press"}, {"url": "https://uptimeinstitute.com/uptime-institute-awards/datacenter/guelph-computer-centre/105", "title": "Uptime Institute: Guelph Computer Centre", "date": "undated", "quote": "Client: Royal Bank of Canada / Data Center: Guelph Computer Centre", "supports": ["operator", "name"], "kind": "directory"}], "confidence": "medium", "notes": "RBC's Guelph Computer Centre was built in 1991 and upgraded in 2008, according to its mechanical engineers (Smith + Andersen), who say it runs 24 hours a day; Uptime Institute lists it under Royal Bank of Canada.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-netaccess-hamilton-21-king", "name": "21 King Street West, Hamilton (HAM02)", "aliases": ["HCE Telecom Hamilton", "NetAccess Hamilton HAM02"], "operator": "NetAccess Systems / HCE Telecom", "owner": null, "tenants": [], "province": "ON", "municipality": "Hamilton", "address": "21 King St W, Hamilton, ON L8P 4W7", "lat": 43.2567, "lon": -79.8701, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.peeringdb.com/api/fac/6118", "title": "PeeringDB facility 6118 NetAccess Hamilton HAM02", "date": "2025-09-26", "quote": "21 King St W, Hamilton, L8P4W7", "supports": ["name", "address"], "kind": "directory"}, {"url": "https://www.peeringdb.com/api/fac/8053", "title": "PeeringDB facility 8053 HCE Telecom Hamilton", "date": "2025-09-26", "quote": "21 King St W, Hamilton, L8P4W7", "supports": ["aliases"], "kind": "directory"}, {"url": "https://netaccess.ca/", "title": "NetAccess Systems home page", "date": "undated", "quote": "21 King St W, Hamilton, ON", "supports": ["address"], "kind": "proponent"}], "confidence": "low", "notes": "NetAccess offers cloud and data-centre services from this office tower, so this may be an office suite rather than a colocation facility.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-drac-steelport-hamilton", "name": "Digital Research Alliance of Canada sovereign compute site (Hamilton)", "aliases": ["DRAC sovereign compute — Steelport"], "operator": "Digital Research Alliance of Canada", "owner": null, "tenants": [], "province": "ON", "municipality": "Hamilton", "address": null, "lat": 43.25608, "lon": -79.87286, "coord_precision": "city", "type": "research_hpc", "ai": "yes", "status": "announced", "status_date": "2026-06-21", "mw": null, "mw_basis": null, "mw_note": "A Hamilton news blog describes it as a research data centre of about 20 MW; the proponent has published no figure.", "mw_figures": [], "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "Digital Research Alliance of Canada (proponent; national non-profit)", "ownership_country": "Canada", "sources": [{"url": "https://blundervalley.ca/blog/hamilton-upcoming-moratorium-vote/", "title": "Blunder Valley: Hamilton upcoming moratorium vote", "date": "2026-06-21", "quote": "both the Digital Research Alliance of Canada (DRAC) and s2e Technologies have been scrambling to engage in a charm offensive", "supports": ["operator", "municipality", "status"], "kind": "press"}, {"url": "https://blundervalley.ca/blog/slate-800mw-plans/", "title": "Blunder Valley: Slate's 800MW plans", "date": "2026-09-24", "quote": "a ~20MW federally-funded \"research\" data centre that Slate has proposed to build in partnership with the Digital Research Alliance of Canada (DRAC)", "supports": ["mw_note", "notes"], "kind": "press"}, {"url": "https://alliancecan.ca/en/about/alliance", "title": "Digital Research Alliance of Canada: About the Alliance", "date": "undated", "quote": "The Digital Research Alliance of Canada (the Alliance) is a national not-for-profit membership-based organization", "supports": ["ownership", "ownership_country"], "kind": "proponent"}], "confidence": "low", "field_confidence": {"owner": "likely"}, "notes": "A Hamilton news blog reports that the Digital Research Alliance of Canada proposes this research data centre with Slate Asset Management on the former Stelco (Steelport) lands, separate from Slate's hyperscale plans.", "checked": "2026-10-25", "tenant_countries": {}} {"site_id": "CA-ON-s2e-mcmaster-frid", "name": "McMaster Innovation Park data centre (Frid Street)", "aliases": ["McMaster Hamilton Spectator Data Center", "s2e Technologies MIP data centre"], "operator": "s2e Technologies", "owner": null, "tenants": [], "province": "ON", "municipality": "Hamilton", "address": "44 Frid Street, Hamilton (former Hamilton Spectator building)", "lat": 43.25608, "lon": -79.87286, "coord_precision": "city", "type": "research_hpc", "ai": "yes", "status": "announced", "status_date": "2026-06-21", "mw": null, "mw_basis": null, "mw_note": null, "mw_figures": [], "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://blundervalley.ca/blog/hamilton-upcoming-moratorium-vote/", "title": "Blunder Valley: Hamilton upcoming moratorium vote", "date": "2026-06-21", "quote": "Both groups frame their projects as research-focused, not-for-profit, green, and built following industry \"best practices\".", "supports": ["status", "operator"], "kind": "press"}, {"url": "https://blundervalley.ca/blog/hamilton-upcoming-moratorium-vote/", "title": "Blunder Valley: Hamilton upcoming moratorium vote", "date": "2026-06-21", "kind": "press", "quote": "s2e Technologies, the developer hoping to partner with McMaster University to build a data centre in the old Hamilton Spectator building at 44 Frid St.", "supports": ["address", "operator", "status"]}], "confidence": "low", "field_confidence": {}, "notes": "No capacity, owner or home country for s2e is published.", "checked": "2026-10-25", "tenant_countries": {}} {"site_id": "CA-ON-slate-steelport-hamilton", "name": "Steelport hyperscale data centre", "aliases": ["Slate Asset Management Hamilton waterfront", "Steelport (386 Wilcox St)"], "operator": "Slate Asset Management", "owner": "Slate Asset Management (Steelport, former Stelco lands)", "tenants": [], "province": "ON", "municipality": "Hamilton", "address": "Former Stelco lands (Steelport), Hamilton harbourfront", "lat": 43.25608, "lon": -79.87286, "coord_precision": "city", "type": "ai_hpc", "ai": "yes", "status": "proposed", "status_date": "2026-09-24", "mw": 800, "mw_basis": "buildout", "mw_note": "'Up to an estimated 800MW' of hyperscale AI capacity, from Slate's November 2025 presentation to the federal government, as reported by Blunder Valley.", "mw_figures": [{"mw": 800, "basis": "buildout", "stage": "planned", "date": "2025-11", "source_idx": 0}], "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "City of Hamilton Committee of Adjustment", "instrument": "consent to sever a 76-hectare part of the former Stelco land (applied March 2026)", "ref": "not given", "date": "2026-06-04", "outcome": "refused", "conditions": "Reason not published; press reports link the refusal to community opposition.", "url": "https://blundervalley.ca/blog/slate-800mw-plans/"}, {"authority": "Ontario Land Tribunal", "instrument": "appeal of the severance refusal", "ref": "not given", "date": "2026-10", "outcome": "pending", "conditions": "Appeal reported as under way from October 2026.", "url": "https://blundervalley.ca/blog/slate-800mw-plans/"}], "ownership": null, "ownership_country": "Canada", "sources": [{"url": "https://blundervalley.ca/blog/slate-800mw-plans/", "title": "Blunder Valley: Slate met with feds to discuss 800MW hyperscale plans", "date": "2026-09-24", "quote": "Slate Asset Management briefed Canada's federal government on its plans to construct up to an \"estimated\" 800MW of hyperscale AI data centre capacity on Hamilton's waterfront.", "supports": ["operator", "mw", "ai", "status", "approvals"], "kind": "press"}, {"url": "https://blundervalley.ca/blog/slate-800mw-plans/", "title": "Blunder Valley, Slate met with feds to discuss 800MW hyperscale plans", "date": "2026-09-24", "kind": "press", "quote": "In March 2026, Slate applied to sever a portion of the former Stelco land, hoping to accelerate their development timeline.", "supports": ["owner"]}, {"url": "https://www.slateam.com/", "title": "Slate Asset Management homepage", "date": "undated", "kind": "proponent", "quote": "Best Sale/Acquisition of the Year (Toronto) 2023 – Winner, Steelport | Toronto, ON", "supports": ["owner", "ownership_country"]}, {"url": "https://thepublicrecord.ca/2026/05/slate-seeks-city-severance-approval-for-data-centre-campus/", "title": "The Public Record: Slate seeks city severance approval for data centre campus", "date": "2026-05-03", "kind": "press", "quote": "Slate is requesting a land severance to carve a 76-hectare (188-acre) parcel out of the larger 286-hectare (706-acre) industrial site", "supports": ["approvals", "address"]}, {"url": "https://www.slateam.com/contact/", "title": "Slate Asset Management: Contact", "date": "undated", "kind": "proponent", "quote": "Our Offices Locations Toronto Chicago New York London Oslo Atlanta Toronto 121 King St W, Suite 1600 Toronto, ON", "supports": ["ownership_country"]}], "confidence": "low", "field_confidence": {"owner": "likely"}, "notes": "In June 2026 the City of Hamilton refused Slate's application to sever part of the former Stelco land, which said the land may contain data centres; Slate has appealed to the Ontario Land Tribunal. Separately, council voted in July 2026 against a one-year moratorium on AI data centres. Slate is shown as owner because it applied to sever the land and lists Steelport as its own acquisition; who holds title is not confirmed. No tenant is named (a federal briefing mentions hyperscale plans only).", "checked": "2026-10-25", "tenant_countries": {}} {"site_id": "CA-ON-mikinak-dc", "name": "Mikinak Data Center (Phases 1 and 2)", "aliases": ["Mikinak Data Center", "Mikinak Phase 2 Data Center"], "operator": "Mikinak MCFN-RJEP Data Centre", "owner": null, "tenants": [], "province": "ON", "municipality": "IESO zone Southwest", "address": null, "lat": 43.25608, "lon": -79.87286, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-07", "mw": 400.0, "mw_basis": "requested", "mw_note": "Two IESO connection applications, 200 MW each: Phase 1 (in service 2028-Q2, marked committed) and Phase 2 (2028-Q4).", "mw_figures": [{"mw": 200.0, "basis": "requested", "stage": "requested", "date": "2026-10-07", "source_idx": 0}, {"mw": 200.0, "basis": "requested", "stage": "requested", "date": "2026-10-07", "source_idx": 0}], "power_source": "grid", "opened": null, "expected_online": null, "approvals": [{"authority": "IESO", "instrument": "connection assessment application (load)", "ref": "CAA 2864 (2025-836)", "date": "2025", "outcome": "pending", "conditions": "SIA status Active; proposed in-service 2028-Q2; Committed", "url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status"}, {"authority": "IESO", "instrument": "connection assessment application (load)", "ref": "CAA 3041 (2026-894)", "date": "2026", "outcome": "pending", "conditions": "SIA status Active; proposed in-service 2028-Q4", "url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status", "title": "IESO Application Status (data file applicationstatusdata.json)", "date": "2026-10-07", "quote": "Mikinak MCFN-RJEP Data Centre | Mikinak Data Center | Southwest | New load facility | 200 MW | 2028-Q2 | Active || Mikinak MCFN-RJEP Data Centre | Mikinak Phase 2 Data Center | Southwest | New load facility | 200 MW | 2028-Q4 | Active", "supports": ["name", "mw", "status", "approvals"], "kind": "public_record"}], "confidence": "medium", "field_confidence": {"ai": "speculative", "location": "speculative"}, "notes": "The applicant name suggests a partnership of the Mississaugas of the Credit First Nation and Red Jar Energy Partners, which no source confirms. The site is not published; the point stands for the IESO Southwest zone.", "checked": "2026-10-25", "queue_only": true} {"site_id": "CA-ON-bird-project-chisel", "name": "Project Chisel (1 and 2)", "aliases": ["Project Chisel", "Project Chisel 2"], "operator": "Bird Construction Group (applicant)", "owner": null, "tenants": [], "province": "ON", "municipality": "IESO zone Southwest", "address": null, "lat": 43.25608, "lon": -79.87286, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-07", "mw": 396.0, "mw_basis": "requested", "mw_note": "Two IESO connection applications from the same applicant, 198 MW each: Project Chisel (in service 2028-Q1) and Project Chisel 2 (2029-Q1).", "mw_figures": [{"mw": 198.0, "basis": "requested", "stage": "requested", "date": "2026-10-07", "source_idx": 0}, {"mw": 198.0, "basis": "requested", "stage": "requested", "date": "2026-10-07", "source_idx": 0}], "power_source": "grid", "opened": null, "expected_online": null, "approvals": [{"authority": "IESO", "instrument": "connection assessment application (load)", "ref": "CAA 2815 (2024-809)", "date": "2024", "outcome": "pending", "conditions": "SIA status Active; proposed in-service 2028-Q1", "url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status"}, {"authority": "IESO", "instrument": "connection assessment application (load)", "ref": "CAA 2851 (2025-825)", "date": "2025", "outcome": "pending", "conditions": "SIA status Active; proposed in-service 2029-Q1", "url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status", "title": "IESO Application Status (data file applicationstatusdata.json)", "date": "2026-10-07", "quote": "Bird Construction Group Limited | Project Chisel | Southwest | Load | 198 MW | 2028-Q1 | Active || Bird Construction Group Ltd | Project Chisel 2 | Southwest | New load facility | 198 MW | 2029-Q1 | Active", "supports": ["name", "mw", "status", "approvals"], "kind": "public_record"}], "confidence": "medium", "field_confidence": {"ai": "speculative", "location": "speculative"}, "notes": "IESO's application list does not state the use or the site, so it is not confirmed to be a data centre; the map point stands for the IESO Southwest zone.", "checked": "2026-10-25", "queue_only": true} {"site_id": "CA-ON-qts-project-ont1", "name": "Project ONT1", "aliases": ["Project ONT1"], "operator": "QTS Data Centers LLC (applicant)", "owner": null, "tenants": [], "province": "ON", "municipality": "IESO zone Southwest", "address": null, "lat": 43.25608, "lon": -79.87286, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-07", "mw": 450.0, "mw_basis": "requested", "mw_note": "IESO connection application size, proposed in service 2029-Q1.", "mw_figures": [{"mw": 450.0, "basis": "requested", "stage": "requested", "date": "2026-10-07", "source_idx": 0}], "power_source": "grid", "opened": null, "expected_online": null, "approvals": [{"authority": "IESO", "instrument": "connection assessment application (load)", "ref": "CAA 3012 (2026-866)", "date": "2026", "outcome": "pending", "conditions": "SIA status Active; proposed in-service 2029-Q1", "url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status", "title": "IESO Application Status (data file applicationstatusdata.json)", "date": "2026-10-07", "quote": "QTS DATA CENTERS LLC | Project ONT1 | Southwest | New load facility | 450 MW | 2029-Q1 | Active", "supports": ["name", "mw", "status", "approvals"], "kind": "public_record"}], "confidence": "medium", "field_confidence": {"ai": "speculative", "location": "speculative"}, "notes": "A data-centre tracker places the project in Essex County and calls it suspended, while IESO lists it as active in its Southwest zone; the point stands for that zone.", "checked": "2026-10-25"} {"site_id": "CA-ON-bird-project-rebel", "name": "Project Rebel", "aliases": ["Project Rebel"], "operator": "Bird Construction Group (applicant)", "owner": null, "tenants": [], "province": "ON", "municipality": "IESO zone Toronto", "address": null, "lat": 43.65348, "lon": -79.38393, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-07", "mw": 207.2, "mw_basis": "requested", "mw_note": "IESO connection application size, proposed in service 2028-Q2.", "mw_figures": [{"mw": 207.2, "basis": "requested", "stage": "requested", "date": "2026-10-07", "source_idx": 0}], "power_source": "grid", "opened": null, "expected_online": null, "approvals": [{"authority": "IESO", "instrument": "connection assessment application (load)", "ref": "CAA 2866 (2025-838)", "date": "2025", "outcome": "pending", "conditions": "SIA status Active; proposed in-service 2028-Q2", "url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status", "title": "IESO Application Status (data file applicationstatusdata.json)", "date": "2026-10-07", "quote": "Bird Construction Group | Project Rebel | Toronto | New load facility | 207.2 MW | 2028-Q2 | Active", "supports": ["name", "mw", "status", "approvals"], "kind": "public_record"}], "confidence": "medium", "field_confidence": {"ai": "speculative", "location": "speculative"}, "notes": "IESO's application list describes a new load facility without stating the use or the site, so it is not confirmed to be a data centre; the map point stands for the IESO Toronto zone.", "checked": "2026-10-25", "queue_only": true} {"site_id": "CA-ON-truenorth-bell-ai-sovereign", "name": "Bell AI - Sovereign Canadian Data Center", "aliases": ["Bell AI - Sovereign Canadian Data Center"], "operator": "TrueNorth Sustainable Infrastructure (applicant) / Bell", "owner": null, "tenants": [], "province": "ON", "municipality": "IESO zone West", "address": null, "lat": 42.98367, "lon": -81.24961, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "proposed", "status_date": "2026-10-07", "mw": 150.0, "mw_basis": "requested", "mw_note": "IESO connection application size, proposed in service 2027-Q2.", "mw_figures": [{"mw": 150.0, "basis": "requested", "stage": "requested", "date": "2026-10-07", "source_idx": 0}], "power_source": "grid", "opened": null, "expected_online": null, "approvals": [{"authority": "IESO", "instrument": "connection assessment application (load)", "ref": "CAA 3037 (2026-873)", "date": "2026", "outcome": "pending", "conditions": "SIA status Active; proposed in-service 2027-Q2", "url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status", "title": "IESO Application Status (data file applicationstatusdata.json)", "date": "2026-10-07", "quote": "TrueNorth Sustainable Infrastructure Inc. | Bell AI - Sovereign Canadian Data Center | West | New load facility | 150 MW | 2027-Q2 | Active", "supports": ["name", "mw", "status", "approvals"], "kind": "public_record"}], "confidence": "medium", "field_confidence": {}, "notes": "IESO's list gives no site beyond its West zone; the point stands for that zone.", "checked": "2026-10-25", "tenant_countries": {}} {"site_id": "CA-ON-n49-digital", "name": "N49 Digital", "aliases": ["N49 Digital"], "operator": "N49 Digital Ltd. (applicant)", "owner": null, "tenants": [], "province": "ON", "municipality": "IESO zone West", "address": null, "lat": 42.98367, "lon": -81.24961, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-07", "mw": 1000.0, "mw_basis": "requested", "mw_note": "IESO connection application size, proposed in service 2028-Q3.", "mw_figures": [{"mw": 1000.0, "basis": "requested", "stage": "requested", "date": "2026-10-07", "source_idx": 0}], "power_source": "grid", "opened": null, "expected_online": null, "approvals": [{"authority": "IESO", "instrument": "connection assessment application (load)", "ref": "CAA 3038 (2026-885)", "date": "2026", "outcome": "pending", "conditions": "SIA status Active; proposed in-service 2028-Q3", "url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status", "title": "IESO Application Status (data file applicationstatusdata.json)", "date": "2026-10-07", "quote": "N49 Digital Ltd. | N49 Digital | West | New load facility | 1000 MW | 2028-Q3 | Active", "supports": ["name", "mw", "status", "approvals"], "kind": "public_record"}], "confidence": "medium", "field_confidence": {"ai": "speculative", "location": "speculative"}, "notes": "IESO's list gives only the applicant name; no public project had been announced as of 2026-10-25, and it is not confirmed to be a data centre. The point stands for the IESO West zone.", "checked": "2026-10-25", "queue_only": true} {"site_id": "CA-ON-netflash-kitchener", "name": "Netflash Datacentre - Victoria St", "aliases": [], "operator": "Netflash Internet Solutions", "owner": null, "tenants": [], "province": "ON", "municipality": "Kitchener", "address": "1232 Victoria St N, Kitchener, ON", "lat": 43.4685, "lon": -80.4525, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://business.netflash.net/hosting/data-centre-services/", "title": "Netflash: Datacentre & Colocation Services", "date": "2022", "quote": "Datacentre & Colocation Services", "supports": ["name", "operator", "status"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/api/fac/5030", "title": "PeeringDB facility 5030 Netflash Datacentre - Victoria St, Kitchener", "date": "2026-01-27", "quote": "1232 Victoria St N, Kitchener", "supports": ["address"], "kind": "directory"}], "confidence": "low", "notes": "A small ISP facility; the operator's page gives no address, which comes from PeeringDB.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-rackanddata-kitchener", "name": "Rack & Data", "aliases": ["Rack and Data"], "operator": "Rack & Data", "owner": null, "tenants": [], "province": "ON", "municipality": "Kitchener", "address": "235 Ardelt Avenue, Kitchener, ON N2C 2M3", "lat": 43.4236, "lon": -80.4738, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://rackanddata.com/", "title": "Rack & Data home page", "date": "undated", "quote": "As a leading data center in Kitchener, Rack & Data was designed and built from the ground up", "supports": ["name", "operator", "status"], "kind": "proponent"}, {"url": "https://rackanddata.com/", "title": "Rack & Data home page", "date": "undated", "quote": "235 Ardelt Avenue Kitchener, Ontario N2C 2M3", "supports": ["address"], "kind": "proponent"}], "confidence": "high", "notes": "The operator markets AI hosting, but no AI tenant is named.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-qu-london-ldn1", "name": "LDN1", "aliases": ["Qu Data Centres LDN1", "Rogers London data centre"], "operator": "Qu Data Centres", "owner": "InfraRed Capital Partners (Qu Data Centres LP)", "tenants": [], "province": "ON", "municipality": "London", "address": null, "lat": 42.9837, "lon": -81.2497, "coord_precision": "city", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 5, "mw_basis": "unstated", "mw_note": "5 MW now, upgradeable to 20 MW; 51,796 sq ft.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://qudatacentres.com/locations/london-data-centre", "title": "Qu Data Centres: London Ontario Data Centre — LDN1", "date": "undated", "quote": "LDN1 provides 5 MW of power upgradeable to 20 MW, 580 tons of N+2 cooling, expandable raised floor, and AI workload support.", "supports": ["name", "operator", "municipality", "mw", "status"], "kind": "proponent"}, {"url": "https://www.newswire.ca/news-releases/infrared-capital-partners-announces-launch-of-qu-data-centres-a-canadian-digital-infrastructure-platform-878377786.html", "title": "InfraRed Capital Partners announces launch of Qu Data Centres (CNW)", "date": "2025-12-08", "quote": "The data centres were acquired from Rogers Communications, who will continue to sell data centre services and provide network connectivity into the facilities.", "supports": ["owner", "ownership", "notes"], "kind": "proponent"}, {"url": "https://www.newswire.ca/news-releases/infrared-capital-partners-announces-launch-of-qu-data-centres-a-canadian-digital-infrastructure-platform-878377786.html", "title": "InfraRed Capital Partners announces launch of Qu Data Centres (CNW)", "date": "2025-12-08", "kind": "proponent", "quote": "InfraRed is part of SLC Management, the institutional alternatives and traditional asset management business of Sun Life", "supports": ["ownership_country"]}, {"url": "https://qudatacentres.com/locations/london-data-centre", "title": "Qu Data Centres: London Ontario Data Centre — LDN1", "date": "undated", "kind": "proponent", "quote": "under 100% Canadian ownership", "supports": ["ownership_country"]}], "confidence": "medium", "notes": "Formerly a Rogers data centre, acquired by InfraRed Capital Partners in 2025. A tracker gives the address as 970 Green Valley Road, which no primary source confirms.", "checked": "2026-10-25", "mw_figures": [{"mw": 5, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 0}, {"mw": 20, "basis": "buildout", "stage": "planned", "date": "undated", "source_idx": 0}], "ownership_country": "Canada", "field_confidence": {"location": "likely", "owner": "confirmed"}} {"site_id": "CA-ON-redjar-millhaven", "name": "Millhaven Data Center", "aliases": ["Millhaven Data Center"], "operator": "Red Jar Energy Partners Inc. (applicant)", "owner": null, "tenants": [], "province": "ON", "municipality": "Loyalist Township (probable)", "address": null, "lat": 44.19483, "lon": -76.73788, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-07", "mw": 200.0, "mw_basis": "requested", "mw_note": "IESO connection application size, proposed in service 2028-Q4.", "mw_figures": [{"mw": 200.0, "basis": "requested", "stage": "requested", "date": "2026-10-07", "source_idx": 0}], "power_source": "grid", "opened": null, "expected_online": null, "approvals": [{"authority": "IESO", "instrument": "connection assessment application (load)", "ref": "CAA 3032 (2026-877)", "date": "2026", "outcome": "pending", "conditions": "SIA status Active; proposed in-service 2028-Q4", "url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status", "title": "IESO Application Status (data file applicationstatusdata.json)", "date": "2026-10-07", "quote": "RED JAR ENERGY PARTNERS INC. | Millhaven Data Center | East | New load facility | 200 MW | 2028-Q4 | Active", "supports": ["name", "mw", "status", "approvals"], "kind": "public_record"}], "confidence": "medium", "field_confidence": {"ai": "speculative", "location": "speculative"}, "notes": null, "checked": "2026-10-25"} {"site_id": "CA-ON-nuday-markham-dc1", "name": "Nuday DC1", "aliases": ["Nüday Networks"], "operator": "Nuday Networks Inc.", "owner": null, "tenants": [], "province": "ON", "municipality": "Markham", "address": "231 Amber St., Markham, ON L3R 3J7", "lat": 43.827, "lon": -79.3345, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://nuday.com/", "title": "Nuday Networks home page", "date": "undated", "quote": "Robust Colocation Data Center Located in Toronto – Canada’s High-Tech Capital", "supports": ["name", "operator", "status"], "kind": "proponent"}, {"url": "https://nuday.com/", "title": "Nuday Networks home page", "date": "undated", "quote": "Address: 231 Amber St. Markham, ON, L3R 3J7, Canada", "supports": ["address"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-pathway-markham-apple-creek", "name": "Pathway Communications (95 Apple Creek Blvd)", "aliases": [], "operator": "Pathway Communications", "owner": null, "tenants": [], "province": "ON", "municipality": "Markham", "address": "95 Apple Creek Blvd, Markham, ON L3R 1C7", "lat": 43.8574, "lon": -79.3565, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.pathcom.com/", "title": "Pathway Communications home page", "date": "undated", "quote": "Head Quarters: Markham (ISO 9001:2015 certified): 95 Apple Creek Blvd, Markham, Ontario L3R 1C7, Canada", "supports": ["address", "operator"], "kind": "proponent"}, {"url": "https://www.openstreetmap.org/node/4922135764", "title": "OpenStreetMap node/4922135764", "date": "2024-12-30", "quote": "name=Pathway Communications; telecom=data_center; addr 95 Apple Creek Blvd., Markham", "supports": ["name"], "kind": "directory"}], "confidence": "low", "notes": "Pathway offers data-centre and colocation services and gives this as its head office; that the data centre is in this building rests on an OpenStreetMap tag.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-qu-markham-tor3", "name": "TOR3", "aliases": ["Qu Data Centres TOR3", "Rogers Data Center (550 Cochrane)", "Rogers Markham TOR DC3"], "operator": "Qu Data Centres", "owner": "InfraRed Capital Partners (Qu Data Centres LP)", "tenants": [], "province": "ON", "municipality": "Markham", "address": "550 Cochrane Drive, Markham, ON", "lat": 43.84426, "lon": -79.36486, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 10, "mw_basis": "facility", "mw_note": "10 MW of power; 50,000 sq ft; Tier III certified.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "InfraRed Capital Partners, via Qu Data Centres LP", "sources": [{"url": "https://qudatacentres.com/locations/toronto-data-centre", "title": "Qu Data Centres: Markham Data Centre — TOR3", "date": "undated", "quote": "Qu Data Centres operates TOR3 in Markham — a 50,000 ft² Uptime Institute Tier III certified facility with 10 MW of power and up to 30 kW per rack.", "supports": ["name", "operator", "municipality", "mw", "status"], "kind": "proponent"}, {"url": "https://www.newswire.ca/news-releases/infrared-capital-partners-announces-launch-of-qu-data-centres-a-canadian-digital-infrastructure-platform-878377786.html", "title": "InfraRed Capital Partners announces launch of Qu Data Centres (CNW)", "date": "2025-12-08", "quote": "The data centres were acquired from Rogers Communications, who will continue to sell data centre services and provide network connectivity into the facilities.", "supports": ["owner", "ownership", "notes"], "kind": "proponent"}, {"url": "https://www.newswire.ca/news-releases/infrared-capital-partners-announces-launch-of-qu-data-centres-a-canadian-digital-infrastructure-platform-878377786.html", "title": "InfraRed Capital Partners announces launch of Qu Data Centres (CNW)", "date": "2025-12-08", "kind": "proponent", "quote": "InfraRed is part of SLC Management, the institutional alternatives and traditional asset management business of Sun Life", "supports": ["ownership_country"]}], "confidence": "medium", "notes": "Formerly a Rogers data centre. The street address (550 Cochrane Drive) comes from OpenStreetMap and a tracker; the operator markets it for AI workloads but names no AI tenant.", "checked": "2026-10-25", "mw_figures": [{"mw": 10, "basis": "facility", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": "Canada", "field_confidence": {"location": "likely", "owner": "confirmed"}} {"site_id": "CA-ON-cologix-markham-tor4", "name": "TOR4", "aliases": ["Cologix TOR4"], "operator": "Cologix", "owner": null, "tenants": [], "province": "ON", "municipality": "Markham", "address": "105 Clegg Road, Building B, Markham, ON", "lat": 43.8507, "lon": -79.3425, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 12, "mw_basis": "unstated", "mw_note": "Cologix's page gives both 11 MW ('offering 11 MW of power') and 12 MW ('Site capacity'). 50,000 sq ft on a 3.4-acre campus shared with TOR5.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/toronto/tor4/", "title": "Cologix TOR4", "date": "undated", "quote": "Designed to Tier III Uptime Standards, TOR4 is a 50K SQFT, purpose-built ScalelogixSM data center offering 11 MW of power for cloud providers and enterprise customers.", "supports": ["name", "operator", "address", "status", "mw"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/toronto/tor4/", "title": "Cologix TOR4", "date": "undated", "quote": "Site capacity: 12 MW", "supports": ["mw"], "kind": "proponent"}], "confidence": "high", "notes": "A separate building from TOR5 on the same 105 Clegg Road campus.", "checked": "2026-10-25", "mw_figures": [{"mw": 12, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}, {"mw": 11, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-cologix-markham-tor5", "name": "TOR5", "aliases": ["CORE Data Centres Markham", "Cologix Clegg Partner Site", "Cologix TOR5"], "operator": "Cologix", "owner": null, "tenants": [], "province": "ON", "municipality": "Markham", "address": "105 Clegg Road, Markham, ON", "lat": 43.8507, "lon": -79.3425, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 3, "mw_basis": "unstated", "mw_note": "Site capacity 3 MW; 2.2 MW UPS (N+1) of critical load installed; 3 MW expansion planned. CORE's Markham page cites 16 MW of utility supply from Alectra.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/toronto/tor5/", "title": "Cologix TOR5", "date": "undated", "quote": "TOR5 is a 40K+ SQFT facility offering 22K+ SQFT of customer-ready colocation space on 3.4 acres of secure land close to downtown Toronto.", "supports": ["name", "operator", "address", "status"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/toronto/tor5/", "title": "Cologix TOR5", "date": "undated", "quote": "2.2 MW UPS (N+1) of critical load installed; 3 MW expansion plans", "supports": ["mw", "mw_note"], "kind": "proponent"}, {"url": "https://coredatacentres.com/location/markham-data-centre/", "title": "CORE Data Centres: Markham Data Centre", "date": "undated", "quote": "16 MW power capacity in total from Alectra Utilities.", "supports": ["aliases", "notes"], "kind": "proponent"}], "confidence": "high", "notes": "Shares the 105 Clegg Road campus with TOR4. CORE Data Centres lists a Markham building with the same equipment, which suggests CORE owns or operates it, but neither company confirms it.", "checked": "2026-10-25", "mw_figures": [{"mw": 3, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}, {"mw": 2.2, "basis": "it", "stage": "built", "date": "undated", "source_idx": 1}, {"mw": 16, "basis": "grid_allocation", "stage": "allocated", "date": "undated", "source_idx": 2}], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-equinix-markham-tr5", "name": "TR5", "aliases": ["Equinix Markham TR5", "Equinix TR5 - Toronto"], "operator": "Equinix", "owner": null, "tenants": [], "province": "ON", "municipality": "Markham", "address": "8100 Warden Ave, Suite B, Markham, ON L6G 1B4", "lat": 43.8469, "lon": -79.3334, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Colocation space 833 m² (8,966 sq ft); no MW figure published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.equinix.com/data-centers/americas-colocation/canada-colocation/toronto-data-centers/tr5", "title": "Equinix Toronto TR5", "date": "undated", "quote": "Address 8100 Warden Ave Suite B Markham, Ontario L6G 1B4 Canada ... Colocation Space 833 m2 (8,966 ft2)", "supports": ["name", "operator", "address", "status"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-digitalrealty-markham-yyz10", "name": "YYZ10", "aliases": ["Digital Realty YYZ10 Toronto (371 Gough)"], "operator": "Digital Realty", "owner": null, "tenants": [], "province": "ON", "municipality": "Markham", "address": "371 Gough Road, Markham, ON L3R 4B6", "lat": 43.8383, "lon": -79.3235, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Building of 104,500 sq ft on a 10-acre site; no MW figure published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.digitalrealty.com/data-centers/americas/toronto/yyz10", "title": "Digital Realty Toronto YYZ10", "date": "undated", "quote": "This state-of-the-art data center in Markham, Canada’s high-tech capital, occupies a 10-acre site along established fiber routes.", "supports": ["name", "operator", "address", "status"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-csquare-markham-yyz2", "name": "YYZ2", "aliases": ["Centersquare Toronto (YYZ2)", "Cyxtera Toronto YYZ2", "YYZ2-A Toronto Data Center"], "operator": "Csquare (Centersquare)", "owner": null, "tenants": [], "province": "ON", "municipality": "Markham", "address": "4175 14th Avenue, Markham, ON", "lat": 43.8391, "lon": -79.3164, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 28.7, "mw_basis": "facility", "mw_note": "Utility capacity 28.7 MW; UPS capacity 4.3 MW; generator capacity 9 MW; 3,450 m² raised floor.", "power_source": "grid", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.csquare.com/data-centers/toronto/", "title": "Csquare Toronto data centers", "date": "undated", "quote": "Utility capacity: 28.7MW ▪ UPS capacity: 4.3MW ▪ Generator capacity: 9MW", "supports": ["mw", "mw_note", "status"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/api/fac/2658", "title": "PeeringDB facility 2658 Centersquare Toronto (YYZ2)", "date": "2025-09-26", "quote": "4175 14th Avenue, Markham", "supports": ["address"], "kind": "directory"}], "confidence": "high", "notes": "Formerly a Cyxtera site; the street address comes from PeeringDB.", "checked": "2026-10-25", "mw_figures": [{"mw": 28.7, "basis": "facility", "stage": "built", "date": "undated", "source_idx": 0}, {"mw": 4.3, "basis": "it", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-haltondc-milton", "name": "Halton Data Center (Milton1)", "aliases": ["Halton Datacenter - Milton1", "Milton1"], "operator": "Halton Data Center Inc.", "owner": "Halton Data Center Inc.", "tenants": [], "province": "ON", "municipality": "Milton", "address": "8250 Lawson Road, Milton, ON L9T 5C6", "lat": 43.5431, "lon": -79.8809, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://haltondc.com/", "title": "Halton Data Center home page", "date": "undated", "quote": "We own the building at 8250 Lawson Road in Milton, Ontario.", "supports": ["name", "operator", "address", "status", "owner"], "kind": "proponent"}], "confidence": "high", "notes": "The operator says it has run since 2003, while a tracker says 2012, so the opening year is left blank.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"location": "confirmed", "owner": "confirmed"}} {"site_id": "CA-ON-lli-milton-dc1", "name": "Ontario-Milton Data Centre (DC1)", "aliases": ["Milton TS: Ontario‐Milton Data Centre (DC1)"], "operator": "Logistics Land Investment, LLC (applicant)", "owner": null, "tenants": [], "province": "ON", "municipality": "Milton", "address": null, "lat": 43.51367, "lon": -79.88282, "coord_precision": "city", "type": "unknown", "ai": "unknown", "status": "paused", "status_date": "2026-10-07", "mw": 720.0, "mw_basis": "requested", "mw_note": "IESO connection application size, proposed in service 2032-Q4.", "mw_figures": [{"mw": 720.0, "basis": "requested", "stage": "requested", "date": "2026-10-07", "source_idx": 0}], "power_source": "grid", "opened": null, "expected_online": null, "approvals": [{"authority": "IESO", "instrument": "connection assessment application (load)", "ref": "CAA 2798 (2024-805)", "date": "2024", "outcome": "pending", "conditions": "SIA status On-Hold; proposed in-service 2032-Q4", "url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status", "title": "IESO Application Status (data file applicationstatusdata.json)", "date": "2026-10-07", "quote": "Logistics Land Investment, LLC | Milton TS: Ontario‐Milton Data Centre (DC1) | Southwest | Load | 720 MW | 2032-Q4 | On-Hold", "supports": ["name", "mw", "status", "approvals"], "kind": "public_record"}], "confidence": "medium", "field_confidence": {"ai": "speculative", "location": "confirmed"}, "notes": "IESO lists the application, at Milton transformer station, as on hold. A directory reports a suspended permit, which no public record confirms.", "checked": "2026-10-25"} {"site_id": "CA-ON-1111-mississauga-1800-argentia", "name": "11:11 Systems Mississauga (1800 Argentia)", "aliases": ["11:11 Systems Mississauga (TOR-1800)", "Sungard AS Mississauga"], "operator": "11:11 Systems", "owner": null, "tenants": [], "province": "ON", "municipality": "Mississauga", "address": "1800 Argentia Road, Mississauga, ON", "lat": 43.6033, "lon": -79.7354, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://1111systems.com/why-1111/cloud-regions/", "title": "11:11 Systems: Cloud Regions", "date": "undated", "quote": "including data centers in major cities like Atlanta, Chicago, Dallas, Los Angeles, New York City, San Jose, Scottsdale, and Toronto", "supports": ["operator", "status"], "kind": "proponent"}, {"url": "https://www.openstreetmap.org/way/33710942", "title": "OpenStreetMap way 33710942: 11:11 Systems", "date": "2024-12-21", "quote": "\"name\":\"11:11 Systems\",\"telecom\":\"data_center\", 1800 Argentia Road, Mississauga", "supports": ["address", "operator", "status"], "kind": "directory"}], "confidence": "low", "notes": "11:11 Systems confirms only that it has a Toronto-area data centre; this address comes from OpenStreetMap and an advocacy tracker, which describe the former Sungard facility (about 85,000 sq ft).", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}, "directory_only": true} {"site_id": "CA-ON-1111-mississauga-2330-argentia", "name": "11:11 Systems Mississauga (2330 Argentia)", "aliases": ["Sungard AS Mississauga (2330 Argentia)"], "operator": "11:11 Systems", "owner": null, "tenants": [], "province": "ON", "municipality": "Mississauga", "address": "2330 Argentia Road, Mississauga, ON", "lat": 43.5982, "lon": -79.7501, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://1111systems.com/why-1111/cloud-regions/", "title": "11:11 Systems: Cloud Regions", "date": "undated", "quote": "including data centers in major cities like Atlanta, Chicago, Dallas, Los Angeles, New York City, San Jose, Scottsdale, and Toronto", "supports": ["operator"], "kind": "proponent"}, {"url": "https://www.openstreetmap.org/way/33186030", "title": "OpenStreetMap way 33186030", "date": "undated", "kind": "directory", "quote": "addr:housenumber 2330; addr:street Argentia Road; name 11:11 Systems; telecom data_center", "supports": ["address", "name"]}], "confidence": "low", "notes": "Only an OpenStreetMap tag places an 11:11 Systems data centre at this address; directories place 11:11's Mississauga site (formerly Sungard) at 1800 Argentia Road, listed separately, so this may be a duplicate or a stale tag.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-3z-mississauga-sladeview", "name": "3Z Canada YYZ02 (Mississauga)", "aliases": [], "operator": "3Z Canada", "owner": null, "tenants": [], "province": "ON", "municipality": "Mississauga", "address": "3995 Sladeview Crescent, Mississauga, ON L5L 5X9", "lat": 43.52705, "lon": -79.7146, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.3zcanada.ca/", "title": "3Z Canada home page", "date": "undated", "quote": "3Z Canada, your Toronto Colocation Specialist, offers 3 exciting data center locations.", "supports": ["operator", "status"], "kind": "proponent"}, {"url": "https://www.3zcanada.ca/", "title": "3Z Canada home page", "date": "undated", "quote": "3995 Sladeview Crescent Mississauga, Ontario L5L 5X9, Canada", "supports": ["address"], "kind": "proponent"}, {"url": "https://www.3zcanada.ca/", "title": "3Z Canada home page", "date": "undated", "kind": "proponent", "quote": "Toronto YYZ01 151 Front St W, Toronto, ON Canada Mississauga YYZ02 3995 Sladeview Cres, Mississauga, ON, Canada Etobicoke YYZ03 10 Four Seasons Pl", "supports": ["name", "notes"]}], "confidence": "medium", "notes": "Small colocation provider; its other Toronto-area locations are YYZ01 at 151 Front Street West and YYZ03 at 10 Four Seasons Place, Etobicoke.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-cgi-mississauga-century", "name": "CGI (6820 Century Avenue)", "aliases": [], "operator": "CGI", "owner": null, "tenants": [], "province": "ON", "municipality": "Mississauga", "address": "6820 Century Avenue, Mississauga, ON", "lat": 43.6013, "lon": -79.7463, "coord_precision": "building", "type": "enterprise", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.openstreetmap.org/way/290916394", "title": "OpenStreetMap way/290916394", "date": "2024-12-21", "quote": "name=CGI; telecom=data_center; addr 6820 Century Avenue", "supports": ["name", "operator", "address"], "kind": "directory"}, {"url": "https://uptimeinstitute.com/uptime-institute-awards/list/datacenter/mississauga-data-centre/372", "title": "Uptime Institute awards: CGI, Mississauga Data Centre", "date": "undated", "kind": "directory", "quote": "PROJECT DETAILS Mississauga Data Centre Location: Mississauga Ontario, Ontario, Canada", "supports": ["name", "operator", "status", "notes"]}], "confidence": "low", "notes": "Uptime Institute lists a CGI 'Mississauga Data Centre'; only OpenStreetMap places it at 6820 Century Avenue.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-cogent-mississauga-2920-matheson-blvd", "name": "Cogent Mississauga", "aliases": [], "operator": "Cogent Communications", "owner": null, "tenants": [], "province": "ON", "municipality": "Mississauga", "address": "2920 Matheson Blvd E, 2nd Floor, Mississauga, ON L4W 5R6", "lat": 43.66608, "lon": -79.59116, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.peeringdb.com/api/fac/9195", "title": "PeeringDB facility 9195 Cogent Mississauga", "date": "2025-09-26", "quote": "2920 Matheson Blvd, Mississauga", "supports": ["name", "operator", "address"], "kind": "directory"}, {"url": "https://www.cogentco.com/cogent-toronto", "title": "Cogent Toronto (Cogent Communications)", "date": "undated", "kind": "proponent", "quote": "Mississauga Office & Data Center 2920 Matheson Blvd E, 2nd Floor Mississauga, ON L4W 5R6", "supports": ["name", "operator", "address", "status"]}, {"url": "https://www.cogentco.com/cogent-toronto", "title": "Cogent Toronto (Cogent Communications)", "date": "undated", "kind": "proponent", "quote": "our Toronto and Mississauga Data Centers offer secure, flexible, and scalable Colocation solutions", "supports": ["type", "status"]}], "confidence": "high", "notes": "A Cogent office and data centre on the second floor of an office building.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-cogent-mississauga-55-city-centre-drive", "name": "Cogent Mississauga 2", "aliases": [], "operator": "Cogent Communications", "owner": null, "tenants": [], "province": "ON", "municipality": "Mississauga", "address": "55 City Centre Drive, Mississauga, ON L5B 1M3", "lat": 43.59372, "lon": -79.63811, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.peeringdb.com/api/fac/17026", "title": "PeeringDB facility 17026 Cogent Mississauga 2", "date": "2026-03-25", "quote": "55 City Centre Drive, Mississauga", "supports": ["name", "operator", "address"], "kind": "directory"}, {"url": "https://www.cogentco.com/cogent-toronto", "title": "Cogent Toronto (Cogent Communications)", "date": "undated", "kind": "proponent", "quote": "Mississauga 2 Data Center 55 City Centre Drive Mississauga, ON L5B 1M3", "supports": ["name", "operator", "address", "status"]}, {"url": "https://www.cogentco.com/cogent-toronto", "title": "Cogent Toronto (Cogent Communications)", "date": "undated", "kind": "proponent", "quote": "our Toronto and Mississauga Data Centers offer secure, flexible, and scalable Colocation solutions", "supports": ["type", "status"]}], "confidence": "high", "notes": "A Cogent data centre in an office building; Cogent publishes no size or power figure.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-hut8-mississauga-gta1", "name": "GTA1 (Mississauga)", "aliases": ["Hut 8 GTA1", "Hut 8 Mississauga Data Center"], "operator": "Hut 8 Canada", "owner": null, "tenants": [], "province": "ON", "municipality": "Mississauga", "address": "4701 Tahoe Blvd, Mississauga, ON L4W 0B5", "lat": 43.63879, "lon": -79.60889, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://canada.hut8.com/", "title": "Hut 8 Canada home page", "date": "undated", "quote": "With five data centres in Vancouver, Kelowna, and the Greater Toronto Area, Hut 8 provides Tier III-grade infrastructure offering low-latency, high-availability colocation tailored for Canadian businesses.", "supports": ["operator", "status"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/api/fac/14569", "title": "PeeringDB facility 14569 Hut 8 GTA1", "date": "2025-09-26", "quote": "201-4701 Tahoe Blvd, Mississauga, L4W 0B5", "supports": ["address", "name"], "kind": "directory"}], "confidence": "medium", "notes": "A directory reports that Hut 8 acquired this site from TeraGo in 2022; the street address comes from PeeringDB.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-centrilogic-mississauga-tranmere", "name": "Greater Toronto (TME)", "aliases": ["CentriLogic Tranmere (TME)", "Centrilogic YYZ1"], "operator": "Centrilogic", "owner": null, "tenants": [], "province": "ON", "municipality": "Mississauga", "address": "7445 Tranmere Drive, Mississauga, ON L5S 1L4", "lat": 43.68905, "lon": -79.67696, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "28,000 sq ft with two 500 kW UPS units; the operator claims a PUE of 1.2.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.centrilogic.com/greater-toronto-ontario-data-center/", "title": "Centrilogic Greater Toronto, Ontario (GTA)", "date": "undated", "quote": "Our first of three data centers in Mississauga, Ontario, this highly secure, interconnected, and redundant facility is engineered and designed to Tier 3+ standards", "supports": ["name", "operator", "status", "mw_note"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/api/fac/5235", "title": "PeeringDB facility 5235 CentriLogic Tranmere (TME)", "date": "2025-09-26", "quote": "7445 Tranmere Drive, Mississauga, L5S 1L4", "supports": ["address"], "kind": "directory"}], "confidence": "medium", "notes": null, "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-centrilogic-mississauga-traders", "name": "Mississauga North (TRA)", "aliases": ["CentriLogic Traders (TRA)", "Mississauga, Ontario (North)"], "operator": "Centrilogic", "owner": null, "tenants": [], "province": "ON", "municipality": "Mississauga", "address": "215 Traders Boulevard East, Unit 11, Mississauga, ON L4Z 3K5", "lat": 43.62833, "lon": -79.66995, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "15,000 sq ft; no MW figure published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.centrilogic.com/mississauga-ontario-north-data-center/", "title": "Centrilogic Mississauga, Ontario (North)", "date": "undated", "quote": "Our third of three secure and redundant data center facilities in the heart of Mississauga, Ontario, Canada.", "supports": ["name", "operator", "status"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/api/fac/5234", "title": "PeeringDB facility 5234 CentriLogic Traders (TRA)", "date": "2025-09-26", "quote": "215 Traders Boulevard East Unit 11, Mississauga, L4Z 3K5", "supports": ["address"], "kind": "directory"}], "confidence": "medium", "notes": null, "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-centrilogic-mississauga-robertspeck", "name": "Mississauga South (MIS)", "aliases": ["CentriLogic Mississauga (MIS)", "Centrilogic YYZ1", "Mississauga, Ontario (South)"], "operator": "Centrilogic", "owner": null, "tenants": [], "province": "ON", "municipality": "Mississauga", "address": "2 Robert Speck Parkway, Mississauga, ON L4Z 1H8", "lat": 43.59638, "lon": -79.63688, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "10,627 sq ft; no MW figure published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.centrilogic.com/mississauga-ontario-south-data-center/", "title": "Centrilogic Mississauga, Ontario (South)", "date": "undated", "quote": "Our second of three secure and redundant data center facilities in the heart of Mississauga, Ontario, Canada.", "supports": ["name", "operator", "status"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/api/fac/5237", "title": "PeeringDB facility 5237 CentriLogic Mississauga (MIS)", "date": "2025-09-26", "quote": "2 Robert Speck Parkway, Mississauga, L4Z 1H8", "supports": ["address"], "kind": "directory"}], "confidence": "medium", "notes": "A suite in an office tower.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-prologis-tenth-line-mississauga", "name": "Prologis data centre, 0 Tenth Line West", "aliases": ["Prologis hyperscale — Meadowvale (OZ 25-21 W9)", "Tenth Line West Data Centre"], "operator": "Prologis Canada Holding 3 GP ULC", "owner": null, "tenants": [], "province": "ON", "municipality": "Mississauga", "address": "0 Tenth Line West, Mississauga", "lat": 43.58847, "lon": -79.64366, "coord_precision": "city", "type": "colocation", "ai": "unknown", "status": "proposed", "status_date": "2026-05-26", "mw": null, "mw_basis": null, "mw_note": null, "mw_figures": [], "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "City of Mississauga", "instrument": "zoning by-law amendment", "ref": "OZ 25-21 W9", "date": "2025-12", "outcome": "pending", "conditions": "Under review (city page updated 2026-05-26).", "url": "https://www.mississauga.ca/services-and-programs/planning-and-development/development-applications/active-development-applications/0-tenth-line-west-oz-25-21-w9/"}], "ownership": "Prologis (USA)", "ownership_country": "United States", "sources": [{"url": "https://www.mississauga.ca/services-and-programs/planning-and-development/development-applications/active-development-applications/0-tenth-line-west-oz-25-21-w9/", "title": "City of Mississauga: 0 Tenth Line West – OZ 25-21 W9", "date": "2026-05-26", "quote": "PROLOGIS Canada Holding 3 GP ULC. 0 Tenth Line West – OZ 25-21 W9 Development application includes a two storey Data Centre.", "supports": ["operator", "approvals", "status", "address"], "kind": "public_record"}, {"url": "https://data.sec.gov/submissions/CIK0001045609.json", "title": "SEC EDGAR company data: Prologis, Inc.", "date": "2026-10-25", "kind": "public_record", "quote": "Prologis, Inc. business address: Pier 1 Bay 1, San Francisco, CA 94111", "supports": ["ownership_country"]}], "confidence": "high", "field_confidence": {"owner": "likely", "location": "likely"}, "notes": "The City of Mississauga lists the application, which includes a two-storey data centre, as under review.", "checked": "2026-10-25"} {"site_id": "CA-ON-csquare-mississauga-yyz1", "name": "YYZ1", "aliases": ["Centersquare Toronto (YYZ1)", "Cyxtera Toronto YYZ1", "YYZ1-A Toronto Data Center"], "operator": "Csquare (Centersquare)", "owner": null, "tenants": [], "province": "ON", "municipality": "Mississauga", "address": "6800 Millcreek Drive, Mississauga, ON L5N 4J9", "lat": 43.5951, "lon": -79.7543, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 19.1, "mw_basis": "facility", "mw_note": "Utility capacity 19.1 MW; UPS capacity 3.2 MW; generator capacity 5.5 MW; 2,368 m² raised floor.", "power_source": "grid", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.csquare.com/data-centers/toronto/", "title": "Csquare Toronto data centers", "date": "undated", "quote": "Utility capacity: 19.1MW ▪ UPS capacity: 3.2MW ▪ Generator capacity: 5.5MW", "supports": ["mw", "mw_note", "status"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/api/fac/2657", "title": "PeeringDB facility 2657 Centersquare Toronto (YYZ1)", "date": "2025-09-26", "quote": "6800 Millcreek Drive, Mississauga, L5N 4J9", "supports": ["address"], "kind": "directory"}], "confidence": "high", "notes": "Formerly a Cyxtera site; the street address comes from PeeringDB.", "checked": "2026-10-25", "mw_figures": [{"mw": 19.1, "basis": "facility", "stage": "built", "date": "undated", "source_idx": 0}, {"mw": 3.2, "basis": "it", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-hive-buzz-oakville", "name": "BUZZ HPC Oakville AI campus", "aliases": ["Buzz High Performance Computing Inc."], "operator": "HIVE Digital Technologies / BUZZ High Performance Computing", "owner": "HIVE Digital Technologies Ltd. (not confirmed for this site)", "tenants": [], "province": "ON", "municipality": "Oakville", "address": null, "lat": 43.44744, "lon": -79.66667, "coord_precision": "city", "type": "ai_hpc", "ai": "yes", "status": "proposed", "status_date": "2026-10-07", "mw": 320.0, "mw_basis": "requested", "mw_note": "IESO connection application size, proposed in service 2028-Q1.", "mw_figures": [{"mw": 320.0, "basis": "requested", "stage": "requested", "date": "2026-10-07", "source_idx": 0}], "power_source": "grid", "opened": null, "expected_online": null, "approvals": [{"authority": "IESO", "instrument": "connection assessment application (load)", "ref": "CAA 2735 (2023-771)", "date": "2023", "outcome": "pending", "conditions": "SIA status Active; proposed in-service 2028-Q1; Committed", "url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status"}], "ownership": null, "ownership_country": "United States", "sources": [{"url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status", "title": "IESO Application Status (data file applicationstatusdata.json)", "date": "2026-10-07", "quote": "Bird Construction Group Limited | Buzz High Performance Computing Inc. | Toronto | Load | 320 MW | 2028-Q1 | Active", "supports": ["approvals", "mw", "name", "status", "status_date"], "kind": "public_record"}, {"url": "https://www.oakville.ca/town-hall/news-notices/2026-news-releases-archive/oakville-council-approves-interim-control-by-law-to-support-further-study-related-to-data-centres/", "title": "Oakville Council approves Interim Control By-law", "date": "2026-08-11", "quote": "Oakville Council passed an Interim Control By-law (ICBL) to temporarily restrict new development related to data centres", "supports": ["notes"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1720424/000106299326004434/form10q.htm", "title": "HIVE Digital Technologies 10-Q, quarter ended 2026-06-30", "date": "2026-08-14", "kind": "public_record", "quote": "On January 30, 2026, the Company closed the acquisition of real property located around Ontario's Toronto-Waterloo innovation corridor. | The Company's headquarters are in San Antonio, Texas, United States", "supports": ["owner", "ownership_country"]}, {"url": "https://data.sec.gov/submissions/CIK0001720424.json", "title": "SEC EDGAR company record, HIVE Digital Technologies Ltd.", "date": "undated", "quote": "\"city\":\"VANCOUVER\" | \"stateOrCountryDescription\":\"British Columbia, Canada\"", "supports": ["ownership_country"], "kind": "public_record"}], "confidence": "medium", "field_confidence": {"owner": "speculative"}, "notes": "The IESO connection application (applicant Bird Construction) is active, has a final report and is marked committed; IESO does not say it is for an Oakville site. Oakville's one-year interim control by-law of August 2026 restricts new data-centre development town-wide and names no project, and the Town says it has received no formal data-centre application. HIVE bought Ontario property in January and May 2026 and 15 City View Drive, Toronto, in September 2025, but none is named as the Oakville site. HIVE is incorporated in British Columbia with its registered office in Vancouver; its filings name San Antonio, Texas, as its headquarters.", "checked": "2026-10-25", "tenant_countries": {}} {"site_id": "CA-ON-purecolo-ottawa-ott02", "name": "OTT02 – Riverside (Hall R1)", "aliases": ["PureColo OTT02 (Ottawa DC2)", "PureColo Ottawa South"], "operator": "PureColo (Carrier Connect Data Solutions)", "owner": null, "tenants": [], "province": "ON", "municipality": "Ottawa", "address": "3755 Riverside Drive, Ottawa, ON", "lat": 45.34067, "lon": -75.69038, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 1, "mw_basis": "unstated", "mw_note": "1 MW of power; 10,000 sq ft with 3,000 sq ft of white space.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://purecolo.com/locations/ottawa-south/", "title": "PureColo Ottawa South Data Center", "date": "undated", "quote": "PureColo OTT02 – Riverside | Hall R1 Address 3755 Riverside Drive Ottawa, ON, Canada 10,000 sq ft Power: 1MW", "supports": ["name", "operator", "address", "mw", "status"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [{"mw": 1, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-purecolo-ottawa-ott01", "name": "OTT01 – March Road (Hall M1)", "aliases": ["DNSnetworks IDC3", "Hive Data Center, Ottawa", "PureColo OTT01 (Ottawa DC1)", "PureColo Ottawa West"], "operator": "PureColo (Carrier Connect Data Solutions)", "owner": null, "tenants": [], "province": "ON", "municipality": "Ottawa (Kanata)", "address": "390 March Road, Kanata, ON", "lat": 45.34025, "lon": -75.91018, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 1.5, "mw_basis": "unstated", "mw_note": "1.5 MW of power; 7,500 sq ft with 5,000 sq ft of white space.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://purecolo.com/locations/ottawa-m1/", "title": "PureColo Ottawa West Data Center", "date": "undated", "quote": "PureColo OTT01 – March Road | Hall M1 Address 390 March Road Kanata, ON, Canada 7,500 sq ft Power: 1.5MW", "supports": ["name", "operator", "address", "mw", "status"], "kind": "proponent"}, {"url": "https://purecolo.com/locations/ottawa-m1/", "title": "PureColo Ottawa West Data Center", "date": "undated", "kind": "proponent", "quote": "Hosting the Ottawa Gatineau Internet Exchange, our facility boasts multiple reliable Tier 1 fibre carriers", "supports": ["notes"]}], "confidence": "high", "notes": "PureColo says the site hosts the Ottawa Gatineau Internet Exchange. Directories also place DNSnetworks and 'Hive Data Center' (not HIVE Digital) at this address, which no primary source confirms.", "checked": "2026-10-25", "mw_figures": [{"mw": 1.5, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-qu-ottawa-ott3", "name": "OTT3", "aliases": ["Qu Data Centres OTT3", "Rogers OTT DC3"], "operator": "Qu Data Centres", "owner": "InfraRed Capital Partners (Qu Data Centres LP)", "tenants": [], "province": "ON", "municipality": "Ottawa (Kanata)", "address": null, "lat": 45.3, "lon": -75.9, "coord_precision": "city", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 2, "mw_basis": "unstated", "mw_note": "2 MW of redundant power, upgradeable to 10 MW.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://qudatacentres.com/locations/ottawa-data-centre", "title": "Qu Data Centres: Ottawa Data Centre Facilities", "date": "undated", "quote": "Facility OTT3 Location Kanata, Ottawa Building 28,000 ft² ... Power 2 MW redundant | Upgradeable to 10 MW", "supports": ["name", "operator", "municipality", "mw", "status"], "kind": "proponent"}, {"url": "https://www.newswire.ca/news-releases/infrared-capital-partners-announces-launch-of-qu-data-centres-a-canadian-digital-infrastructure-platform-878377786.html", "title": "InfraRed Capital Partners announces launch of Qu Data Centres (CNW)", "date": "2025-12-08", "quote": "The data centres were acquired from Rogers Communications, who will continue to sell data centre services and provide network connectivity into the facilities.", "supports": ["owner", "ownership", "notes"], "kind": "proponent"}, {"url": "https://www.newswire.ca/news-releases/infrared-capital-partners-announces-launch-of-qu-data-centres-a-canadian-digital-infrastructure-platform-878377786.html", "title": "InfraRed Capital Partners announces launch of Qu Data Centres (CNW)", "date": "2025-12-08", "kind": "proponent", "quote": "InfraRed is part of SLC Management, the institutional alternatives and traditional asset management business of Sun Life", "supports": ["ownership_country"]}], "confidence": "medium", "notes": "Formerly a Rogers data centre. A tracker gives the address as 436 Hazeldean Road, but the operator says Kanata North and Hazeldean Road is in Kanata South, so no address is shown.", "checked": "2026-10-25", "mw_figures": [{"mw": 2, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 0}, {"mw": 10, "basis": "buildout", "stage": "planned", "date": "undated", "source_idx": 0}], "ownership_country": "Canada", "field_confidence": {"location": "likely", "owner": "confirmed"}} {"site_id": "CA-ON-qu-ottawa-ott2", "name": "OTT2", "aliases": ["DNSnetworks IDC1", "Qu Data Centres OTT2", "Qu Datacentres - Baseline"], "operator": "Qu Data Centres", "owner": "InfraRed Capital Partners (Qu Data Centres LP)", "tenants": [], "province": "ON", "municipality": "Ottawa (Nepean)", "address": "2934 Baseline Road, Building B, Ottawa, ON", "lat": 45.3362, "lon": -75.7972, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 1.6, "mw_basis": "facility", "mw_note": "1,600 kVA utility supply, upgradeable (about 1.6 MW); 16,500 sq ft building with 8,800 sq ft of raised floor.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://qudatacentres.com/locations/ottawa-data-centre", "title": "Qu Data Centres: Ottawa Data Centre Facilities", "date": "undated", "quote": "OTT2 LOCATION Nepean, Ottawa BUILDING 16,500 ft² ... POWER 1,600kVA utility — upgradeable", "supports": ["name", "operator", "mw", "status"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/api/fac/17027", "title": "PeeringDB facility 17027 Qu Datacentres - Baseline", "date": "2026-03-26", "quote": "2934 Baseline Road Building B, Ottawa", "supports": ["address"], "kind": "directory"}, {"url": "https://www.newswire.ca/news-releases/infrared-capital-partners-announces-launch-of-qu-data-centres-a-canadian-digital-infrastructure-platform-878377786.html", "title": "InfraRed Capital Partners announces launch of Qu Data Centres (CNW)", "date": "2025-12-08", "quote": "The data centres were acquired from Rogers Communications, who will continue to sell data centre services and provide network connectivity into the facilities.", "supports": ["owner", "ownership", "notes"], "kind": "proponent"}, {"url": "https://www.newswire.ca/news-releases/infrared-capital-partners-announces-launch-of-qu-data-centres-a-canadian-digital-infrastructure-platform-878377786.html", "title": "InfraRed Capital Partners announces launch of Qu Data Centres (CNW)", "date": "2025-12-08", "kind": "proponent", "quote": "InfraRed is part of SLC Management, the institutional alternatives and traditional asset management business of Sun Life", "supports": ["ownership_country"]}], "confidence": "high", "notes": "Formerly a Rogers data centre. Directories also list DNSnetworks at this address, which no primary source confirms.", "checked": "2026-10-25", "mw_figures": [{"mw": 1.6, "basis": "facility", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": "Canada", "field_confidence": {"location": "likely", "owner": "confirmed"}} {"site_id": "CA-ON-truenorth-quinte-west-7-riverside", "name": "7 Riverside Drive data centre (former Saputo facility)", "aliases": ["7 Riverside Drive — former Saputo data centre"], "operator": "Not named in the city record", "owner": "1813239 Ontario Inc.", "tenants": [], "province": "ON", "municipality": "Quinte West", "address": "7 Riverside Drive, Trenton", "lat": 44.13368, "lon": -77.58726, "coord_precision": "address", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-09-17", "mw": null, "mw_basis": null, "mw_note": null, "mw_figures": [], "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "City of Quinte West", "instrument": "zoning by-law amendment SM to SM-14 to permit a data centre (and add a 'data centre' definition)", "ref": "D09/T09/26 (Staff Report 26-067PD)", "date": "2026-09-17", "outcome": "pending", "conditions": "Planning staff recommended approval to the Planning Advisory Committee; council decision not confirmed.", "url": "https://quintewest.civicweb.net/document/166041/Planning%20Advisory%20Committee%20-%2017%20Sep%202026.pdf?handle=174EC79304C2478388C07BE8F23ECD09"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://quintewest.civicweb.net/document/166041/Planning%20Advisory%20Committee%20-%2017%20Sep%202026.pdf?handle=174EC79304C2478388C07BE8F23ECD09", "title": "Quinte West Planning Advisory Committee agenda, 17 Sep 2026", "date": "2026-09-17", "quote": "in order to permit a data centre on the subject property", "supports": ["approvals", "status", "address", "owner"], "kind": "public_record"}], "confidence": "high", "field_confidence": {"owner": "confirmed", "location": "confirmed"}, "notes": "A tracker and a residents' petition link the site to TrueNorth Sustainable Infrastructure and Bell, which no primary source confirms.", "checked": "2026-10-25"} {"site_id": "CA-ON-udcs-richmondhill-dc1", "name": "Toronto DC1", "aliases": ["Richmond Hill DC1 Data Center", "Urbacon Data Centre Solutions Richmond Hill DC1"], "operator": "Urbacon Data Centre Solutions (UDCS)", "owner": null, "tenants": [], "province": "ON", "municipality": "Richmond Hill", "address": null, "lat": 43.8828, "lon": -79.4403, "coord_precision": "city", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 10, "mw_basis": "it", "mw_note": "10 MW critical power, 118,000 sq ft, Tier IV design.", "power_source": null, "opened": "2017", "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://udcsdatacentres.com/portfolio/item/toronto-dc1/", "title": "Urbacon Data Centre Solutions: Toronto DC1", "date": "undated", "quote": "Location • Richmond Hill, Ontario MEGAWATTS • 10MW of Critical Power Square Feet • 118,000 SF Completion Date • August, 2017", "supports": ["name", "municipality", "mw", "opened"], "kind": "proponent"}, {"url": "https://udcsdatacentres.com/portfolio/item/operating-facilities/", "title": "UDCS Operating Facilities", "date": "undated", "quote": "TORONTO'S PREMIER DATA CENTRES FULLY LEASED", "supports": ["status"], "kind": "proponent"}], "confidence": "medium", "notes": "The tenant is not named (the operator says 'fully leased'); the operator calls it Canada's first hyperscale lithium-ion data centre.", "checked": "2026-10-25", "mw_figures": [{"mw": 10, "basis": "it", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-udcs-richmondhill-dc2", "name": "Toronto DC2", "aliases": ["Design / Build Data Centre (DC2)", "Urbacon Data Centre Solutions DC2"], "operator": "Urbacon Data Centre Solutions (UDCS)", "owner": null, "tenants": [], "province": "ON", "municipality": "Richmond Hill", "address": null, "lat": 43.8828, "lon": -79.4403, "coord_precision": "city", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 12, "mw_basis": "it", "mw_note": "12 MW critical power; 105,000 sq ft on the DC2 page, 95,000 sq ft on the operator's portfolio page.", "power_source": null, "opened": "2020", "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://udcsdatacentres.com/portfolio/item/toronto-dc2/", "title": "Urbacon Data Centre Solutions: Toronto DC2", "date": "undated", "quote": "Location • Richmond Hill, Ontario MEGAWATTS • 12 MW of Critical Power Square Feet • 105,000 SF Completion Date • October, 2020", "supports": ["name", "municipality", "mw", "opened"], "kind": "proponent"}, {"url": "https://udcsdatacentres.com/portfolio/item/operating-facilities/", "title": "UDCS Operating Facilities", "date": "undated", "quote": "TORONTO'S PREMIER DATA CENTRES FULLY LEASED", "supports": ["status"], "kind": "proponent"}], "confidence": "medium", "notes": "A construction-industry listing shows a 3 MW 'Design / Build Data Centre (DC2)' in Richmond Hill under construction, probably a fit-out at this completed site; this is not confirmed.", "checked": "2026-10-25", "mw_figures": [{"mw": 12, "basis": "it", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-udcs-richmondhill-dc3", "name": "Toronto DC3", "aliases": ["Richmond Hill DC3 Data Center"], "operator": "Urbacon Data Centre Solutions (UDCS)", "owner": null, "tenants": [], "province": "ON", "municipality": "Richmond Hill", "address": null, "lat": 43.8828, "lon": -79.4403, "coord_precision": "city", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 18, "mw_basis": "it", "mw_note": "18 MW critical power, 111,000 sq ft.", "power_source": null, "opened": "2023", "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://udcsdatacentres.com/portfolio/item/toronto-dc3/", "title": "Urbacon Data Centre Solutions: Toronto DC3", "date": "undated", "quote": "Location • Richmond Hill, Ontario MEGAWATTS • 18MW of Critical Power Square Feet • 111,000 SF Completion Date • February, 2023", "supports": ["name", "municipality", "mw", "opened"], "kind": "proponent"}, {"url": "https://udcsdatacentres.com/portfolio/item/operating-facilities/", "title": "UDCS Operating Facilities", "date": "undated", "quote": "TORONTO'S PREMIER DATA CENTRES FULLY LEASED", "supports": ["status"], "kind": "proponent"}], "confidence": "medium", "notes": null, "checked": "2026-10-25", "mw_figures": [{"mw": 18, "basis": "it", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-redjar-algoma", "name": "Algoma Data Center", "aliases": ["Algoma Data Center"], "operator": "Red Jar Energy Partners / Algoma Steel", "owner": null, "tenants": [], "province": "ON", "municipality": "Sault Ste. Marie", "address": null, "lat": 46.51266, "lon": -84.33303, "coord_precision": "city", "type": "ai_hpc", "ai": "yes", "status": "proposed", "status_date": "2026-10-07", "mw": 400.0, "mw_basis": "requested", "mw_note": "IESO connection application size, proposed in service 2029-Q4.", "mw_figures": [{"mw": 400.0, "basis": "requested", "stage": "requested", "date": "2026-10-07", "source_idx": 0}], "power_source": "grid", "opened": null, "expected_online": null, "approvals": [{"authority": "IESO", "instrument": "connection assessment application (load)", "ref": "CAA 3019 (2026-881)", "date": "2026", "outcome": "pending", "conditions": "SIA status Active; proposed in-service 2029-Q4", "url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status", "title": "IESO Application Status (data file applicationstatusdata.json)", "date": "2026-10-07", "quote": "RED JAR ALGOMA DATA CENTER CORP. | Algoma Data Center | Northeast | New load facility | 400 MW | 2029-Q4 | Active", "supports": ["name", "mw", "status", "approvals"], "kind": "public_record"}, {"url": "https://www.ctvnews.ca/northern-ontario/video/2026/08/27/400mw-ai-data-centre-pitched-in-sault-ste-marie/", "title": "CTV News: 400MW AI data centre pitched in Sault Ste. Marie", "date": "2026-08-27", "quote": "Sault Ste. Marie is reviewing a proposed 400-megawatt AI data centre from Red Jar Energy Partners and Algoma Steel.", "supports": ["municipality", "operator", "ai"], "kind": "press"}, {"url": "https://www.ctvnews.ca/northern-ontario/article/sault-approves-motion-pausing-approval-of-data-centres/", "title": "CTV News: Sault approves motion pausing approval of data centres", "date": "2026-09-01", "kind": "press", "quote": "Sault Ste. Marie council l has voted to temporarily freeze approvals of large-scale data centres, until the city creates a framework on how to evaluate them.", "supports": ["notes"]}], "confidence": "medium", "field_confidence": {}, "notes": "The proponents are Red Jar Energy Partners and Algoma Steel. By 2026-09-01 Sault Ste.", "checked": "2026-10-25", "tenant_countries": {}} {"site_id": "CA-ON-protexxa-yates-ssm", "name": "Protexxa and Missanabie Cree data centre (Yates Avenue)", "aliases": ["Protexxa / Missanabie Cree Yates Avenue data centre"], "operator": "Protexxa Inc. / Missanabie Cree First Nation", "owner": "City of Sault Ste. Marie (land; Protexxa Inc. and Missanabie Cree First Nation seeking to buy)", "tenants": [], "province": "ON", "municipality": "Sault Ste. Marie", "address": "Yates Avenue (three city-owned parcels, 8.39 acres)", "lat": 46.51266, "lon": -84.33303, "coord_precision": "city", "type": "enterprise", "ai": "yes", "status": "proposed", "status_date": "2026-08-07", "mw": 5, "mw_basis": "facility", "mw_note": "Initial 5 MW, which the local utility (PUC) confirmed existing capacity can support; the utility says 10 MW or more will be available once a new transmission station is built.", "mw_figures": [{"mw": 5, "basis": "facility", "stage": "planned", "date": "2025-12-11", "source_idx": 0}], "power_source": "grid (PUC)", "opened": null, "expected_online": "2028", "approvals": [{"authority": "City of Sault Ste. Marie", "instrument": "sale of city-owned industrial land (council approval of the plan)", "ref": null, "date": "2025-12", "outcome": "approved", "conditions": "Buyer must erect a building of at least 100,000 sq ft within three years of purchase or the city may take the land back.", "url": "https://www.ctvnews.ca/northern-ontario/article/sault-mayor-says-concerns-about-ai-data-centre-are-exaggerated/"}], "ownership": null, "ownership_country": "Canada", "sources": [{"url": "https://www.sootoday.com/local-news/as-many-as-1000-new-jobs-possible-on-yates-avenue-11614008", "title": "SooToday: As many as 1,000 new jobs possible on Yates Avenue", "date": "2025-12-11", "quote": "The initial data centre will require five megawatts of power, which the PUC has confirmed existing power capacity can support", "supports": ["mw", "operator", "address", "approvals"], "kind": "press"}, {"url": "https://www.ctvnews.ca/northern-ontario/article/sault-mayor-says-concerns-about-ai-data-centre-are-exaggerated/", "title": "CTV News: Sault mayor says concerns about AI data centre are exaggerated (press)", "date": "2026-08-07", "quote": "In December, city council approved plans for the AI data centre to be built in the city's west end.", "supports": ["approvals", "expected_online", "notes", "status", "status_date"], "kind": "press"}], "confidence": "medium", "field_confidence": {"owner": "likely"}, "notes": "Council approved the plan and the land sale in December 2025, as reported by the press (SooToday, CTV News); the council record itself is not confirmed, and the closing of the sale had not been reported as of 2026-10-25. A petition and public opposition followed in summer 2026; the Missanabie Cree partner expects a phased launch in 2028-2029.", "checked": "2026-10-25", "tenant_countries": {}} {"site_id": "CA-ON-truenorth-st-clair-tech-centre", "name": "St. Clair Technology Centre", "aliases": ["St. Clair Technology Centre"], "operator": "TrueNorth Sustainable Infrastructure (applicant)", "owner": null, "tenants": [], "province": "ON", "municipality": "St. Clair Township (probable)", "address": null, "lat": 42.88859, "lon": -82.4533, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "proposed", "status_date": "2026-10-07", "mw": 200.0, "mw_basis": "requested", "mw_note": "IESO connection application size, proposed in service 2028-Q3.", "mw_figures": [{"mw": 200.0, "basis": "requested", "stage": "requested", "date": "2026-10-07", "source_idx": 0}], "power_source": "grid", "opened": null, "expected_online": null, "approvals": [{"authority": "IESO", "instrument": "connection assessment application (load)", "ref": "CAA 3061 (2026-913)", "date": "2026", "outcome": "pending", "conditions": "SIA status Active; proposed in-service 2028-Q3", "url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.ieso.ca/Sector-Participants/Connection-Process/Application-Status", "title": "IESO Application Status (data file applicationstatusdata.json)", "date": "2026-10-07", "quote": "TRUENORTH SUSTAINABLE INFRASTRUCTURE INC. | St. Clair Technology Centre | West | New load facility | 200 MW | 2028-Q3 | Active", "supports": ["name", "mw", "status", "approvals"], "kind": "public_record"}], "confidence": "medium", "field_confidence": {"ai": "speculative", "location": "speculative"}, "notes": "IESO's list does not state the use or site. It is placed at Corunna in St. Clair Township from the project name, and listed as a data centre because TrueNorth develops Bell AI Fabric sites; neither is confirmed.", "checked": "2026-10-25"} {"site_id": "CA-ON-adair-700-strathroy", "name": "700 Adair Boulevard data-centre-use rezoning", "aliases": [], "operator": "2752894 Ontario Inc. (applicant)", "owner": null, "tenants": [], "province": "ON", "municipality": "Strathroy-Caradoc", "address": "700 Adair Boulevard, Strathroy", "lat": 42.95495, "lon": -81.6225, "coord_precision": "city", "type": "unknown", "ai": "unknown", "status": "cancelled", "status_date": "2026-07-31", "mw": null, "mw_basis": null, "mw_note": "", "mw_figures": [], "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "Municipality of Strathroy-Caradoc", "instrument": "zoning by-law amendment adding 'Data Centre' as a permitted use", "ref": "ZBA19-2026", "date": "2026-07-31", "outcome": "withdrawn", "conditions": "The data-centre use was removed from the application after public opposition.", "url": "https://www.strathroy-caradoc.ca/news-public-notices/posts/notice-of-public-meeting-zba19-2026-700-adair-boulevard-strathroy/"}], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.strathroy-caradoc.ca/news-public-notices/posts/notice-of-public-meeting-zba19-2026-700-adair-boulevard-strathroy/", "title": "Strathroy-Caradoc: Notice of Public Meeting ZBA19-2026", "date": "2026-07-15", "quote": "The applicant does not have a specific development at this time, however, they are requesting that ‘Data Centre’ be added to the list of permitted uses for the site.", "supports": ["approvals", "status", "address", "operator"], "kind": "public_record"}, {"url": "https://www.ctvnews.ca/london/article/strathroy-caradoc-zoning-application-revised-data-centre-use-removed-following-public-backlash/", "title": "Strathroy-Caradoc zoning application revised: Data centre use removed following public backlash (CTV News)", "date": "2026-07-31", "kind": "press", "quote": "Strathroy-Caradoc has revised its zoning application, removing the data centre after public backlash.", "supports": ["status", "status_date", "approvals", "notes"]}], "confidence": "medium", "field_confidence": {"location": "confirmed"}, "notes": "A request to add 'Data Centre' as a permitted use on this property was dropped in July 2026 after public opposition; the applicant had said it had no specific development planned.", "checked": "2026-10-25"} {"site_id": "CA-ON-telehouse-toronto-151-front", "name": "151 Front Street West", "aliases": ["3Z Canada Toronto", "Amanah Toronto", "Bell Toronto (151 Front)", "Cologix TOR1", "Coloware YTZ1", "Digital Realty YYZ12", "Equinix TR1", "Neutral Data Toronto", "Telehouse Toronto (151 Front St West)", "eStruxture TOR-1"], "operator": "Telehouse Canada (KDDI)", "owner": "KDDI Canada, Inc.", "tenants": ["Equinix (TR1)", "Cologix (TOR1)", "Digital Realty (YYZ12)", "eStruxture (TOR-1)", "Coloware (YTZ1)", "3Z Canada"], "province": "ON", "municipality": "Toronto", "address": "151 Front Street West, Toronto, ON M5J 2N1", "lat": 43.64467, "lon": -79.38413, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 20, "mw_basis": "unstated", "mw_note": "Telehouse: 20 MW of power capacity, 205,000 sq ft of IT space, two 13.8 kV/20 MVA feeds. Tenant suites: Cologix TOR1 site capacity 5.915 MW; Equinix TR1 36,081 sq ft of colocation; Digital Realty YYZ12 15,500 sq ft.", "power_source": "grid (two 13.8kV feeds); cooling via Enwave Deep Lake Water Cooling", "opened": null, "expected_online": null, "approvals": [], "ownership": "KDDI Corporation (Japan), via KDDI Canada, Inc.", "sources": [{"url": "https://www.telehouse.ca/data-centres/151-front-street-west-toronto/", "title": "Telehouse Canada: 151 Front Street West Data Centre", "date": "undated", "quote": "With 205,000 square feet of IT space and 20MW of power capacity, the facility supports both established enterprise deployments and long-term growth strategies.", "supports": ["name", "operator", "address", "status", "mw", "power_source"], "kind": "proponent"}, {"url": "https://alliedreit.com/wp-content/uploads/2023/08/PressRelease_Aug16_EN.pdf", "title": "Allied Properties REIT press release: Allied completes sale of UDC portfolio to KDDI", "date": "2023-08-16", "quote": "The Portfolio was comprised of freehold interests in 151 Front Street West and 905 King Street West and a leasehold interest in 250 Front Street West.", "supports": ["owner", "ownership"], "kind": "proponent"}, {"url": "https://www.equinix.com/data-centers/americas-colocation/canada-colocation/toronto-data-centers/tr1", "title": "Equinix Toronto TR1", "date": "undated", "quote": "Address | 151 Front Street West | Toronto, Ontario M5J 2N1 | Canada", "supports": ["tenants", "aliases"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/toronto/tor1/", "title": "Cologix TOR1", "date": "undated", "quote": "Cologix operates seven discrete suites at 151 Front Street, Canada’s largest and most important carrier hotel.", "supports": ["tenants", "mw_note"], "kind": "proponent"}, {"url": "https://www.digitalrealty.com/data-centers/americas/toronto/yyz12", "title": "Digital Realty Toronto YYZ12", "date": "undated", "quote": "151 Front St Toronto, ON M5J 2N1", "supports": ["tenants"], "kind": "proponent"}, {"url": "https://www.estruxture.com/data-centers/toronto", "title": "eStruxture Toronto Data Centers", "date": "undated", "quote": "TOR-1: Toronto's premier carrier hotel at 151 Front St W, Toronto, ON, M5J 2N1", "supports": ["tenants"], "kind": "proponent"}, {"url": "https://coloware.com/", "title": "Coloware home page", "date": "undated", "quote": "PREMIUM TORONTO DATA CENTRE : 151 FRONT STREET WEST", "supports": ["tenants"], "kind": "proponent"}, {"url": "https://www.3zcanada.ca/", "title": "3Z Canada home page", "date": "undated", "quote": "151 Front Street West Toronto, Ontario M5J 2Z1, Canada", "supports": ["tenants"], "kind": "proponent"}, {"url": "https://www.telehouse.ca/data-centres/151-front-street-west-toronto/", "title": "Telehouse Canada: 151 Front Street West Data Centre", "date": "undated", "kind": "proponent", "quote": "Telehouse Canada, a leading data centre service provider and subsidiary of KDDI Corporation", "supports": ["ownership_country"]}, {"url": "https://www.kddi.com/english/corporate/kddi/profile/", "title": "KDDI Corporation: corporate profile", "date": "undated", "kind": "proponent", "quote": "Head office THE LINKPILLAR 1 NORTH, 2-21-1 Takanawa, Minato-ku, Tokyo 108-8618, Japan", "supports": ["ownership_country"]}], "confidence": "high", "notes": "A carrier hotel: the operators' suites inside are listed as tenants. Directories also list Neutral Data, Bell and Amanah here, which their own pages do not confirm.", "checked": "2026-10-25", "mw_figures": [{"mw": 20, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": "Japan", "field_confidence": {"location": "confirmed", "owner": "confirmed", "tenants": "confirmed"}} {"site_id": "CA-ON-amanah-toronto-1-yonge", "name": "1YongeColo", "aliases": [], "operator": "Amanah Tech Inc.", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto", "address": "1 Yonge Street, Suite 1201, Toronto, ON M5E 2A3", "lat": 43.6427, "lon": -79.3741, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.peeringdb.com/api/fac/3413", "title": "PeeringDB facility 3413 1YongeColo", "date": "2025-09-26", "quote": "1 Yonge Street 1201, Toronto, M5E 2A3", "supports": ["name", "operator", "address"], "kind": "directory"}, {"url": "https://www.amanah.com/", "title": "Amanah Tech: Toronto Colocation Data Centers", "date": "undated", "kind": "proponent", "quote": "Affordable colocation & dedicated servers at Canada's most carrier-dense facility 151 Front Street West.", "supports": ["notes"]}], "confidence": "low", "notes": "A colocation suite in an office tower, listed in PeeringDB. The operator's old website now leads to Amanah's site, which names only its 151 Front Street West facility, so this suite may have closed.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-telehouse-toronto-250-front", "name": "250 Front Street West", "aliases": ["Telehouse Toronto (250 Front St West)"], "operator": "Telehouse Canada (KDDI)", "owner": "KDDI Canada, Inc. (leasehold interest)", "tenants": [], "province": "ON", "municipality": "Toronto", "address": "250 Front Street West, Toronto, ON", "lat": 43.6447, "lon": -79.3887, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 10, "mw_basis": "unstated", "mw_note": "Telehouse: 10 MW of power capacity, 82,000 sq ft of IT space, dual 13.8 kV/10 MVA feeds, four 2.5 MW generators.", "power_source": "grid; cooling primarily Enwave Deep Lake Water Cooling", "opened": null, "expected_online": null, "approvals": [], "ownership": "KDDI Corporation (Japan), via KDDI Canada, Inc.", "sources": [{"url": "https://www.telehouse.ca/data-centres/250-front-street-west-toronto/", "title": "Telehouse Canada: 250 Front Street West Data Centre", "date": "undated", "quote": "Total IT space: 82,000 sq ft / 7,618 m² Power capacity: 10MW", "supports": ["name", "operator", "status", "mw"], "kind": "proponent"}, {"url": "https://alliedreit.com/wp-content/uploads/2023/08/PressRelease_Aug16_EN.pdf", "title": "Allied Properties REIT press release: Allied completes sale of UDC portfolio to KDDI", "date": "2023-08-16", "quote": "The Portfolio was comprised of freehold interests in 151 Front Street West and 905 King Street West and a leasehold interest in 250 Front Street West.", "supports": ["owner", "ownership"], "kind": "proponent"}, {"url": "https://www.telehouse.ca/data-centres/151-front-street-west-toronto/", "title": "Telehouse Canada: 151 Front Street West Data Centre", "date": "undated", "kind": "proponent", "quote": "Telehouse Canada, a leading data centre service provider and subsidiary of KDDI Corporation", "supports": ["ownership_country"]}, {"url": "https://www.kddi.com/english/corporate/kddi/profile/", "title": "KDDI Corporation: corporate profile", "date": "undated", "kind": "proponent", "quote": "Head office THE LINKPILLAR 1 NORTH, 2-21-1 Takanawa, Minato-ku, Tokyo 108-8618, Japan", "supports": ["ownership_country"]}], "confidence": "high", "notes": "KDDI holds a leasehold, not freehold, interest in this building, bought from Allied REIT in 2023.", "checked": "2026-10-25", "mw_figures": [{"mw": 10, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": "Japan", "field_confidence": {"location": "likely", "owner": "confirmed"}} {"site_id": "CA-ON-telehouse-toronto-905-king", "name": "905 King Street West", "aliases": ["Beanfield 905 King St", "Cologix TOR2", "Cologix TOR3", "Telehouse Toronto (905 King Street West)"], "operator": "Telehouse Canada (KDDI)", "owner": "KDDI Canada, Inc.", "tenants": ["Cologix (TOR2, TOR3)"], "province": "ON", "municipality": "Toronto", "address": "905 King Street West, Toronto, ON M6K 3G9", "lat": 43.6417, "lon": -79.4123, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 8, "mw_basis": "unstated", "mw_note": "Telehouse: 8 MW of power capacity, 69,000 sq ft of IT space. Tenant suites: Cologix TOR2 site capacity 1.6 MW (20,000 sq ft); Cologix TOR3 2 MW (20,000 sq ft).", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "KDDI Corporation (Japan), via KDDI Canada, Inc.", "sources": [{"url": "https://www.telehouse.ca/data-centres/905-king-street-west-toronto/", "title": "Telehouse Canada: 905 King Street West Data Centre", "date": "undated", "quote": "Total IT space: 69,000 sq ft / 6,410 m² Power capacity: 8MW", "supports": ["name", "operator", "status", "mw"], "kind": "proponent"}, {"url": "https://alliedreit.com/wp-content/uploads/2023/08/PressRelease_Aug16_EN.pdf", "title": "Allied Properties REIT press release: Allied completes sale of UDC portfolio to KDDI", "date": "2023-08-16", "quote": "The Portfolio was comprised of freehold interests in 151 Front Street West and 905 King Street West and a leasehold interest in 250 Front Street West.", "supports": ["owner", "ownership"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/toronto/tor3/", "title": "Cologix TOR3", "date": "undated", "quote": "A Tier III certified facility, TOR3 is Cologix’s third downtown Toronto data center, expanding our 905 King Street campus. The facility offers an additional 20K SQFT and 2 MW of power.", "supports": ["tenants", "mw_note"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/toronto/tor2/", "title": "Cologix TOR2", "date": "undated", "quote": "Site capacity: 1.6MW", "supports": ["mw_note"], "kind": "proponent"}, {"url": "https://www.telehouse.ca/data-centres/151-front-street-west-toronto/", "title": "Telehouse Canada: 151 Front Street West Data Centre", "date": "undated", "kind": "proponent", "quote": "Telehouse Canada, a leading data centre service provider and subsidiary of KDDI Corporation", "supports": ["ownership_country"]}, {"url": "https://www.kddi.com/english/corporate/kddi/profile/", "title": "KDDI Corporation: corporate profile", "date": "undated", "kind": "proponent", "quote": "Head office THE LINKPILLAR 1 NORTH, 2-21-1 Takanawa, Minato-ku, Tokyo 108-8618, Japan", "supports": ["ownership_country"]}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [{"mw": 8, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": "Japan", "field_confidence": {"location": "likely", "owner": "confirmed", "tenants": "confirmed"}} {"site_id": "CA-ON-cogent-toronto-245-consumers-rd", "name": "Cogent Toronto", "aliases": [], "operator": "Cogent Communications", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto", "address": "245 Consumers Road, Suite 300, Toronto, ON M2J 1R3", "lat": 43.76961, "lon": -79.33091, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.peeringdb.com/api/fac/9194", "title": "PeeringDB facility 9194 Cogent Toronto", "date": "2025-09-26", "quote": "245 Consumers Rd, Toronto", "supports": ["name", "operator", "address"], "kind": "directory"}, {"url": "https://www.cogentco.com/cogent-toronto", "title": "Cogent Toronto (Cogent Communications)", "date": "undated", "kind": "proponent", "quote": "Toronto Office & Data Center 245 Consumers Road, Suite 300 Toronto, ON M2J 1R3", "supports": ["name", "operator", "address", "status"]}, {"url": "https://www.cogentco.com/cogent-toronto", "title": "Cogent Toronto (Cogent Communications)", "date": "undated", "kind": "proponent", "quote": "our Toronto and Mississauga Data Centers offer secure, flexible, and scalable Colocation solutions", "supports": ["type", "status"]}], "confidence": "high", "notes": "A Cogent office and data centre in a suite of an office building.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-centrilogic-toronto-york", "name": "Downtown Toronto (YOR)", "aliases": ["CentriLogic York (YOR)", "Centrilogic TOR1"], "operator": "Centrilogic", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto", "address": "55 York Street, Toronto, ON M5J 1R7", "lat": 43.64623, "lon": -79.38251, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "16,000 sq ft; no MW figure published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.centrilogic.com/toronto-ontario-data-center/", "title": "Centrilogic Downtown Toronto, Ontario", "date": "undated", "quote": "Our data center facility in the heart of downtown Toronto provides customers with a full suite of hosting services", "supports": ["name", "operator", "status"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/api/fac/5233", "title": "PeeringDB facility 5233 CentriLogic York (YOR)", "date": "2025-09-26", "quote": "55 York Street, Toronto, M5J 1R7", "supports": ["address"], "kind": "directory"}], "confidence": "medium", "notes": "A floor suite in an office building; the street address comes from PeeringDB.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-beeches-leaside", "name": "Leaside Data Centre", "aliases": ["Leaside Innovation Centre"], "operator": "Beeches Development Inc.", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto", "address": "154 Wicksteed Ave, Toronto", "lat": 43.71192, "lon": -79.35571, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "proposed", "status_date": "2025-11-18", "mw": null, "mw_basis": null, "mw_note": null, "mw_figures": [], "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://urbantoronto.ca/database/projects/leaside-data-centre.34672", "title": "UrbanToronto: Leaside Data Centre", "date": "undated", "quote": "a proposed data centre designed by Studio Canoo Architecture for Beeches Development (operating as \"1458367 Ontario Inc\") on the northeast corner of Wicksteed Avenue and Clarke Street", "supports": ["name", "operator", "address", "status"], "kind": "press"}, {"url": "https://www.datacenterdynamics.com/en/news/canadian-developer-looks-to-build-data-center-in-toronto/", "title": "Canadian developer looks to build data center in Toronto (DCD)", "date": "2025-11-18", "kind": "press", "quote": "Ground could break on the seven-story facility next year if an anchor tenant is secured, according to the company.", "supports": ["status", "status_date", "notes"]}], "confidence": "low", "field_confidence": {"location": "likely"}, "notes": "A seven-storey, 87,000 sq ft data centre proposed by Beeches Development, which said in November 2025 that it had the approvals and would build once an anchor tenant signs; the City of Toronto application record is not confirmed, and the colocation type is assumed.", "checked": "2026-10-25"} {"site_id": "CA-ON-lumen-toronto-60-garamond", "name": "Lumen Toronto (60 Garamond Court)", "aliases": ["Level(3) Toronto", "Lumen Toronto 1"], "operator": "Lumen Technologies", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto", "address": "60 Garamond Court, Toronto, ON", "lat": 43.72733, "lon": -79.33271, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.peeringdb.com/api/fac/347", "title": "PeeringDB facility 347 Level(3) Toronto", "date": "2025-09-26", "quote": "60 Garamond Court, Toronto", "supports": ["name", "operator", "address"], "kind": "directory"}], "confidence": "low", "notes": "Listed only in directories; it may be a carrier network site rather than a colocation data centre.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-estruxture-toronto-tor2", "name": "TOR-2", "aliases": ["eStruxture TOR-2"], "operator": "eStruxture Data Centers", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto", "address": "145 King Street West, 8th Floor, Toronto, ON M5H 1J8", "lat": 43.6474, "lon": -79.3841, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "eStruxture Data Centers (Montréal-based); Fengate Asset Management (Toronto) expanded its equity stake in a 2024 investment that also brought in capital from investors co-led by Partners Group and Pantheon; shares not published", "sources": [{"url": "https://www.estruxture.com/data-centers/toronto", "title": "eStruxture Toronto Data Centers", "date": "undated", "quote": "TOR-2: A downtown Financial District location at 145 King W, Toronto, ON, M5H 1J8", "supports": ["name", "operator", "address", "status"], "kind": "proponent"}, {"url": "https://renx.ca/fengate-makes-18b-investment-in-estruxture-data-centers", "title": "RENX: Fengate makes $1.8B investment in eStruxture Data Centers (press)", "date": "2024-06-19", "quote": "eStruxture is the largest Canadian data centre provider with locations in Montreal, Toronto, Calgary and Vancouver. Headquartered in Montreal", "supports": ["ownership", "ownership_country"], "kind": "press"}, {"url": "https://renx.ca/fengate-makes-18b-investment-in-estruxture-data-centers", "title": "RENX: Fengate makes $1.8B investment in eStruxture Data Centers (press)", "date": "2024-06-19", "kind": "press", "quote": "The investment significantly expands Fengate's equity stake in eStruxture", "supports": ["ownership"]}], "confidence": "high", "notes": "A floor suite in an office tower (8th floor, per PeeringDB).", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"location": "confirmed", "owner": "likely"}} {"site_id": "CA-ON-estruxture-toronto-tor3", "name": "TOR-3", "aliases": ["eStruxture TOR-3"], "operator": "eStruxture Data Centers", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto", "address": "431 Horner Ave, Toronto (Etobicoke), ON M8W 4W3", "lat": 43.6014, "lon": -79.537, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "eStruxture Data Centers (Montréal-based); Fengate Asset Management (Toronto) expanded its equity stake in a 2024 investment that also brought in capital from investors co-led by Partners Group and Pantheon; shares not published", "sources": [{"url": "https://www.estruxture.com/data-centers/toronto", "title": "eStruxture Toronto Data Centers", "date": "undated", "quote": "TOR-3: 431 Horner Ave, Toronto, ON, M8W 4W3", "supports": ["name", "operator", "address", "status"], "kind": "proponent"}, {"url": "https://renx.ca/fengate-makes-18b-investment-in-estruxture-data-centers", "title": "RENX: Fengate makes $1.8B investment in eStruxture Data Centers (press)", "date": "2024-06-19", "quote": "eStruxture is the largest Canadian data centre provider with locations in Montreal, Toronto, Calgary and Vancouver. Headquartered in Montreal", "supports": ["ownership", "ownership_country"], "kind": "press"}, {"url": "https://renx.ca/fengate-makes-18b-investment-in-estruxture-data-centers", "title": "RENX: Fengate makes $1.8B investment in eStruxture Data Centers (press)", "date": "2024-06-19", "kind": "press", "quote": "The investment significantly expands Fengate's equity stake in eStruxture", "supports": ["ownership"]}], "confidence": "high", "notes": "The operator markets high-density power at this west-end site; no AI tenant is named.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"location": "confirmed", "owner": "likely"}} {"site_id": "CA-ON-estruxture-toronto-tor4", "name": "TOR-4", "aliases": ["eStruxture TOR-4 (Scarborough)"], "operator": "eStruxture Data Centers", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto", "address": "20 Pullman Court, Toronto (Scarborough), ON M1X 1E4", "lat": 43.8207, "lon": -79.2397, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "eStruxture Data Centers (Montréal-based); Fengate Asset Management (Toronto) expanded its equity stake in a 2024 investment that also brought in capital from investors co-led by Partners Group and Pantheon; shares not published", "sources": [{"url": "https://www.estruxture.com/data-centers/toronto", "title": "eStruxture Toronto Data Centers", "date": "undated", "quote": "TOR-4: 20 Pullman Court, Toronto, ON, M1X 1E4", "supports": ["name", "operator", "address", "status"], "kind": "proponent"}, {"url": "https://renx.ca/fengate-makes-18b-investment-in-estruxture-data-centers", "title": "RENX: Fengate makes $1.8B investment in eStruxture Data Centers (press)", "date": "2024-06-19", "quote": "eStruxture is the largest Canadian data centre provider with locations in Montreal, Toronto, Calgary and Vancouver. Headquartered in Montreal", "supports": ["ownership", "ownership_country"], "kind": "press"}, {"url": "https://renx.ca/fengate-makes-18b-investment-in-estruxture-data-centers", "title": "RENX: Fengate makes $1.8B investment in eStruxture Data Centers (press)", "date": "2024-06-19", "kind": "press", "quote": "The investment significantly expands Fengate's equity stake in eStruxture", "supports": ["ownership"]}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"location": "confirmed", "owner": "likely"}} {"site_id": "CA-ON-equinix-toronto-tr2", "name": "TR2", "aliases": ["Equinix TR2 - Toronto"], "operator": "Equinix", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto", "address": "45 Parliament Street, Toronto, ON M5A 0G7", "lat": 43.6509, "lon": -79.362, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Colocation space 10,124 m² (108,976 sq ft); no MW figure published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.equinix.com/data-centers/americas-colocation/canada-colocation/toronto-data-centers/tr2", "title": "Equinix Toronto TR2", "date": "undated", "quote": "Address 45 Parliament Street Toronto, Ontario M5A 0G7 Canada ... Colocation Space 10,124 m2 (108,976 ft2)", "supports": ["name", "operator", "address", "status"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-equinix-toronto-tr4", "name": "TR4", "aliases": ["Equinix TR4 - Toronto (formerly Q9 Toronto 2/3/4)"], "operator": "Equinix", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto", "address": "100 Wellington Street West, Suite 1000, Toronto, ON M5K 1J3", "lat": 43.6468, "lon": -79.3822, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Colocation space 3,611 m² (38,868 sq ft); no MW figure published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.equinix.com/data-centers/americas-colocation/canada-colocation/toronto-data-centers/tr4", "title": "Equinix Toronto TR4", "date": "undated", "quote": "Address 100 Wellington Street West Suite 1000 Toronto, Ontario M5K 1J3 Canada ... Colocation Space 3,611 m2 (38,868 ft2)", "supports": ["name", "operator", "address", "status"], "kind": "proponent"}], "confidence": "high", "notes": "Formerly a Q9 site, in an office tower suite.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-compass-toronto-etobicoke", "name": "Compass Toronto (Etobicoke) campus", "aliases": ["77 Fima Crescent", "Compass", "Compass Datacenters TO1"], "operator": "Compass Datacenters", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto (Etobicoke)", "address": "75-77 Fima Crescent, Toronto, ON", "lat": 43.60172, "lon": -79.52944, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 27, "mw_basis": "it", "mw_note": "In 2020 the first building was planned for 27 MW of critical IT load, the first 10 MW in Q3 2020 (Data Center Frontier). Compass's Toronto page (2023-10-16) gives 52 MW available across its two Toronto-area campuses together, not this campus alone.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.datacenterfrontier.com/featured/article/11429021/compass-buys-property-for-100-million-toronto-data-center-campus", "title": "Data Center Frontier: Compass Buys Property for $100 Million Toronto Data Center Campus (press)", "date": "2020-05-05", "quote": "The first building will be a tetrofit of an existing structure previously used for storage and logistics, and will support 27 megawatts of critical IT load.", "supports": ["operator", "mw", "municipality"], "kind": "press"}, {"url": "https://ckan0.cf.opendata.inter.prod-toronto.ca/api/3/action/datastore_search?resource_id=6d0229af-bc54-46de-9c2b-26759b01dd05&filters=%7B%22STREET_NAME%22%3A%22FIMA%22%7D", "title": "City of Toronto Open Data: Building Permits - Active Permits (77 Fima Cres)", "date": "2022-06-22", "quote": "Proposal for interior and exterior alterations of the existing data centre.", "supports": ["address", "status"], "kind": "public_record"}, {"url": "https://www.compassdatacenters.com/fr/toronto/", "title": "Compass Datacenters: Toronto (French page)", "date": "2023-10-16", "quote": "fournir une capacité supérieure aux 52 MW actuellement disponibles.", "supports": ["mw_note"], "kind": "proponent"}], "confidence": "medium", "notes": "City permits from 2020 cover converting warehouses at 75 and 77 Fima Crescent into a data centre, and a 2022 permit covers alterations to the existing data centre.", "checked": "2026-10-25", "mw_figures": [{"mw": 27, "basis": "it", "stage": "planned", "date": "2020-05-05", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-hive-toronto-cityview", "name": "HIVE Toronto facility (15 City View Drive)", "aliases": ["BUZZ HPC Toronto Airport site", "HIVE's Toronto Data Center", "Megawatt Mining Toronto"], "operator": "HIVE Digital Technologies", "owner": "HIVE Digital Technologies Ltd.", "tenants": [], "province": "ON", "municipality": "Toronto (Etobicoke)", "address": "15 City View Drive, Toronto, ON", "lat": 43.69256, "lon": -79.58262, "coord_precision": "address", "type": "crypto", "ai": "no", "status": "operating", "status_date": "2026-08-14", "mw": 5.5, "mw_basis": "facility", "mw_note": "1.0 MW in use of 5.5 MW available (HIVE 10-Q table); the same filing's text calls it the '7.2 MW Toronto Airport site'.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "HIVE Digital Technologies Ltd. (incorporated in British Columbia, headquartered in San Antonio, Texas), which bought the property on 2025-09-15", "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1720424/000106299326004434/form10q.htm", "title": "HIVE Digital Technologies 10-Q (period to 2026-06-30)", "date": "2026-08-14", "quote": "On September 15, 2025, the Company closed the acquisition of real property located at 15 City View Drive, Toronto, Ontario and shares of Megawatt Mining Corp.", "supports": ["address", "ownership", "operator"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1720424/000106299326004434/form10q.htm", "title": "HIVE Digital Technologies 10-Q (period to 2026-06-30)", "date": "2026-08-14", "quote": "Toronto, Canada owned facility | 65 PH/s | 66 PH/s | 71 PH/s | 1.0 MW | 5.5 MW", "supports": ["status", "status_date", "mw", "type"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1720424/000106299326004434/form10q.htm", "title": "HIVE Digital Technologies 10-Q (period to 2026-06-30)", "date": "2026-08-14", "quote": "The Company intends to spend approximately $35 million to transition the Toronto Facility to a Tier-III data center. $Nil expenditure has occurred", "supports": ["notes"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1720424/000106299326004434/form10q.htm", "title": "HIVE Digital Technologies 10-Q (period to 2026-06-30)", "date": "2026-08-14", "kind": "public_record", "quote": "The Company's headquarters are in San Antonio, Texas, United States, and its registered office is in Vancouver, British Columbia, Canada.", "supports": ["ownership", "ownership_country"]}], "confidence": "medium", "notes": "HIVE plans to spend about $35 million converting this bitcoin-mining site into a Tier III data centre, but had spent nothing as of its August 2026 filing. No GPUs are disclosed here.", "checked": "2026-10-25", "mw_figures": [{"mw": 5.5, "basis": "facility", "stage": "built", "date": "2026-08-14", "source_idx": 1}, {"mw": 7.2, "basis": "unstated", "stage": "built", "date": "2026-08-14", "source_idx": 2}], "ownership_country": "United States", "field_confidence": {"owner": "confirmed", "ai": "confirmed", "location": "confirmed"}} {"site_id": "CA-ON-microsoft-toronto-48-lowes-pl", "name": "Microsoft Toronto datacentre (48 Lowe's Place)", "aliases": ["48 Lowe's Place Data Centre", "YTO40"], "operator": "Microsoft", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto (Etobicoke)", "address": "48 Lowe's Place, Toronto, ON", "lat": 43.70871, "lon": -79.54822, "coord_precision": "address", "type": "hyperscale_cloud", "ai": "unknown", "status": "under_construction", "status_date": "2026-08-05", "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "City of Toronto", "instrument": "site plan approval", "ref": "22 110986 WET 01 SA", "date": "2024-11-14", "outcome": "pending", "conditions": "City Planning recommends approval subject to pre-approval conditions listed in a Notice of Approval Conditions issued 2024-11-14 (conditions not itemised on the city page); the Statement of Approval has not been issued.", "url": "https://www.toronto.ca/city-government/planning-development/application-details/?id=5056384&pid=826973&title=48-LOWE%27S-PL"}], "ownership": null, "sources": [{"url": "https://ontariodatacentres.ca/facilities.json", "title": "Ontario Data Centre Tracker facilities.json, entry microsoft-lowes-pl-toronto (secondary)", "date": "undated", "quote": "Notice of Approval Conditions issued November 14, 2024 under City of Toronto planning application 22 110986 WET 01 SA; Statement of Approval pending.", "supports": ["approvals", "operator"], "kind": "directory"}, {"url": "https://ontariodatacentres.ca/facilities.json", "title": "Ontario Data Centre Tracker facilities.json, entry microsoft-lowes-pl-toronto (secondary)", "date": "undated", "quote": "Construction confirmed underway as of June 2026 site visit.", "supports": ["status", "status_date"], "kind": "directory"}, {"url": "https://ckan0.cf.opendata.inter.prod-toronto.ca/api/3/action/datastore_search?resource_id=6d0229af-bc54-46de-9c2b-26759b01dd05&filters=%7B%22STREET_NAME%22%3A%22LOWE%27S%22%7D", "title": "City of Toronto Open Data: Building Permits - Active Permits (Lowe's Pl)", "date": "2023-02-27", "quote": "To demolish existing retail store building (Lowe's) for future development", "supports": ["notes"], "kind": "public_record"}, {"url": "https://local.microsoft.com/blog/etobicoke-construction-update/", "title": "Microsoft in your community: Etobicoke Construction Update", "date": "2026-08-05", "kind": "proponent", "quote": "Construction of the datacentre began on November 21, 2024. While construction of the building is expected to be completed in fall 2026", "supports": ["status", "status_date", "notes", "operator"]}, {"url": "https://www.toronto.ca/city-government/planning-development/application-details/?id=5056384&pid=826973&title=48-LOWE%27S-PL", "title": "City of Toronto Application Information Centre: 48 Lowe's Pl, 22 110986 WET 01 SA", "date": "2024-11-14", "kind": "public_record", "quote": "Application Status: NOAC Issued ... To construct a two-storey data centre (communications/technology facility)", "supports": ["approvals", "address"]}, {"url": "https://canada.constructconnect.com/?p=260195", "title": "Daily Commercial News: Microsoft data centre proposed for Etobicoke (press)", "date": "2022-03-23", "kind": "press", "quote": "Site Plan Control on behalf of 3288212 Nova Scotia Limited, referred to as Microsoft", "supports": ["operator", "address"]}], "confidence": "medium", "notes": "Microsoft says construction of its Etobicoke datacentre began on 2024-11-21 (its page also says May 2024), with the building due in fall 2026 and equipment testing through fall 2027; it is not yet operational. Microsoft's page gives no street address; the 2022 site-plan application for this address was filed for Microsoft.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-udcs-toronto-dc7", "name": "Toronto DC7", "aliases": ["Humberline Drive Data Centre", "Urbacon Data Centre", "Urbacon Data Centre Solutions DC7"], "operator": "Urbacon Data Centre Solutions (UDCS)", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto (Etobicoke)", "address": "310 Humberline Drive, Toronto, ON", "lat": 43.7415, "lon": -79.62004, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 22, "mw_basis": "it", "mw_note": "22 MW critical power, 220,000 sq ft, fully leased.", "power_source": null, "opened": "2021", "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://udcsdatacentres.com/portfolio/item/toronto-dc7/", "title": "Urbacon Data Centre Solutions: Toronto DC7", "date": "undated", "quote": "Location • Toronto, Ontario MEGAWATTs • 22MW of Critical Power Square Feet • 220,000 SF Completion Date • June, 2021", "supports": ["name", "mw", "opened"], "kind": "proponent"}, {"url": "https://udcsdatacentres.com/portfolio/item/operating-facilities/", "title": "UDCS Operating Facilities", "date": "undated", "quote": "TORONTO'S PREMIER DATA CENTRES FULLY LEASED", "supports": ["status"], "kind": "proponent"}, {"url": "https://ckan0.cf.opendata.inter.prod-toronto.ca/api/3/action/datastore_search?resource_id=6d0229af-bc54-46de-9c2b-26759b01dd05&filters=%7B%22STREET_NAME%22%3A%22HUMBERLINE%22%7D", "title": "City of Toronto Open Data: Building Permits - Active Permits (310 Humberline Dr)", "date": "2021-03-24", "quote": "Tenant improvement work for designated office and storage areas - PHASE 1 - DC7 Phase 2C", "supports": ["address"], "kind": "public_record"}], "confidence": "medium", "notes": "City of Toronto permits for 'DC7' give the address 310 Humberline Drive, including a data-centre addition to an existing industrial building. A construction-industry listing shows a 2 MW Phase Two expansion under construction, probably a fit-out here.", "checked": "2026-10-25", "mw_figures": [{"mw": 22, "basis": "it", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-whipcord-toronto-75-horner", "name": "Whipcord Edge Ontario Data Centre (TDC01)", "aliases": ["Canada15Edge Data Center", "Whipcord Edge TDC01", "Whipcord TDC01"], "operator": "Whipcord Edge Data Centers", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto (Etobicoke)", "address": "75 Horner Ave, Unit 14, Toronto, ON M8Z 4X5", "lat": 43.6125, "lon": -79.5153, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.whipcord.com/canadian-data-centres-main", "title": "Canadian Data Centres by Whipcord Edge", "date": "undated", "quote": "Whipcord Edge operates Canadian data centres in Alberta and Ontario, built to SOC 2 Type II standards", "supports": ["operator", "status"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/api/fac/12766", "title": "PeeringDB facility 12766 Whipcord TDC01", "date": "2025-09-26", "quote": "75 Horner Ave. Unit 14, Etobicoke, M8Z 4X5", "supports": ["address"], "kind": "directory"}], "confidence": "medium", "notes": "Whipcord names an Ontario data centre without an address; the address comes from PeeringDB, which also lists Canada15Edge in the same building.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-unknown-toronto-15-fenmar", "name": "15 Fenmar Drive data centre", "aliases": ["Compass Toronto YYZ2", "Fenmar Drive Data Centre"], "operator": "not confirmed (a directory names Compass Datacenters)", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto (North York)", "address": "15 Fenmar Drive, Toronto, ON", "lat": 43.75797, "lon": -79.5344, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "under_construction", "status_date": "2022-11-01", "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "City of Toronto", "instrument": "building permit (new building)", "ref": "22 109961 BLD", "date": "2022-11-01", "outcome": "approved", "conditions": "none published", "url": "https://ckan0.cf.opendata.inter.prod-toronto.ca/api/3/action/datastore_search?resource_id=6d0229af-bc54-46de-9c2b-26759b01dd05&filters=%7B%22STREET_NAME%22%3A%22FENMAR%22%7D"}, {"authority": "City of Toronto", "instrument": "site plan approval", "ref": "21 210103 WET 07 SA", "date": null, "outcome": "approved", "conditions": "Not published; cited in the building permit description.", "url": "https://ckan0.cf.opendata.inter.prod-toronto.ca/api/3/action/datastore_search?resource_id=6d0229af-bc54-46de-9c2b-26759b01dd05&filters=%7B%22STREET_NAME%22%3A%22FENMAR%22%7D"}], "ownership": null, "sources": [{"url": "https://ckan0.cf.opendata.inter.prod-toronto.ca/api/3/action/datastore_search?resource_id=6d0229af-bc54-46de-9c2b-26759b01dd05&filters=%7B%22STREET_NAME%22%3A%22FENMAR%22%7D", "title": "City of Toronto Open Data: Building Permits - Active Permits (15 Fenmar Dr, permit 22 109961 BLD)", "date": "2022-11-01", "quote": "Proposal to construct a new 2 storey industrial building for the use of a data center. See also 21 211757 DEM and 21 210103 WET 07 SA.", "supports": ["address", "status", "approvals"], "kind": "public_record"}], "confidence": "low", "notes": "The 2022 building permit (est. C$25 million) was at inspection stage in October 2026, so construction has started; completion is not recorded and it may already operate. Directories call it Compass YYZ2, and a construction listing shows a 3 MW 'Fenmar Drive Data Centre' at schematic design; neither is confirmed.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-edgeconnex-toronto-tor01", "name": "TOR-01", "aliases": ["EdgeConneX Toronto (EDCTOR01)", "EdgeConnex TOR01"], "operator": "EdgeConneX", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto (North York)", "address": "565 Gordon Baker Rd, North York, ON M2H 3B4", "lat": 43.8095, "lon": -79.3427, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "38,900 sq ft building with 18,000 sq ft of raised floor; no MW figure published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.edgeconnex.com/locations/americas/toronto-on/", "title": "EdgeConneX Toronto Data Center TOR-01", "date": "undated", "quote": "Size 38,900 sq ft facility", "supports": ["name", "operator", "status"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/api/fac/5110", "title": "PeeringDB facility 5110 EdgeConneX Toronto (EDCTOR01)", "date": "2025-09-26", "quote": "565 Gordon Baker Rd, North York, M2H 3B4", "supports": ["address"], "kind": "directory"}], "confidence": "high", "notes": "The street address comes from PeeringDB.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-serverfarm-toronto-tor1", "name": "TOR1", "aliases": ["Serverfarm TOR1 Toronto"], "operator": "Serverfarm", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto (North York)", "address": "300 Bartor Rd, North York, ON M9M 2G6", "lat": 43.72933, "lon": -79.52704, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 14, "mw_basis": "it", "mw_note": "Utility supply 21 MVA; IT 14 MW; Building 1 78,300 sq ft, Building 2 70,000 sq ft. A 2023 City of Toronto permit (22 190775) covers a two-storey data-hall addition (est. C$25M).", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.serverfarmllc.com/toronto-data-center/", "title": "Serverfarm TOR1 – Toronto Data Center", "date": "undated", "quote": "Utility 21MVA IT 14MW Building 1 78,300 sq ft Building 2 70,000 sq ft", "supports": ["name", "operator", "mw", "mw_note", "status"], "kind": "proponent"}, {"url": "https://ckan0.cf.opendata.inter.prod-toronto.ca/api/3/action/datastore_search?resource_id=6d0229af-bc54-46de-9c2b-26759b01dd05&filters=%7B%22STREET_NAME%22%3A%22BARTOR%22%7D", "title": "City of Toronto Open Data: Building Permits - Active Permits (300 Bartor Rd)", "date": "2023-07-13", "quote": "New two-story addition to an existing data center building. Space to be utilized as data hall server rooms and supporting electrical and mechanical infrastructu", "supports": ["address", "mw_note"], "kind": "public_record"}, {"url": "https://www.peeringdb.com/api/fac/5440", "title": "PeeringDB facility 5440 Serverfarm TOR1 Toronto", "date": "2025-09-26", "kind": "directory", "quote": "300 Bartor Rd, North York", "supports": ["address"]}], "confidence": "high", "notes": "Serverfarm announced the 14 MW addition in June 2020.", "checked": "2026-10-25", "mw_figures": [{"mw": 14, "basis": "it", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-yondr-toronto-3125-steeles", "name": "Yondr Toronto", "aliases": ["Yondr Data Centre (2135 Steeles Avenue East)", "Yondr Toronto AI Data Center", "Yondr Toronto — 125 Steeles Avenue East"], "operator": "Yondr", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto (North York)", "address": "3125 Steeles Avenue East, Toronto, ON", "lat": 43.8138, "lon": -79.34828, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "under_construction", "status_date": "2025-05-30", "mw": 27, "mw_basis": "unstated", "mw_note": "Yondr announced a 27 MW facility on a 4.5-acre site, due online in mid-2026 (trade press quoting Yondr, December 2024).", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "City of Toronto", "instrument": "building permit (new building)", "ref": "24 224440 BLD", "date": "2025-05-30", "outcome": "approved", "conditions": "none published", "url": "https://ckan0.cf.opendata.inter.prod-toronto.ca/api/3/action/datastore_search?resource_id=6d0229af-bc54-46de-9c2b-26759b01dd05&filters=%7B%22STREET_NAME%22%3A%22STEELES%22%2C%22STREET_NUM%22%3A%223125%22%7D"}], "ownership": null, "sources": [{"url": "https://ckan0.cf.opendata.inter.prod-toronto.ca/api/3/action/datastore_search?resource_id=6d0229af-bc54-46de-9c2b-26759b01dd05&filters=%7B%22STREET_NAME%22%3A%22STEELES%22%2C%22STREET_NUM%22%3A%223125%22%7D", "title": "City of Toronto Open Data: Building Permits - Active Permits (3125 Steeles Ave E, permit 24 224440 BLD)", "date": "2025-05-30", "quote": "Proposed three-storey Data Centre with three Data Halls and adjacent facility support spaces, Generator yard at the south side of the building", "supports": ["address", "status", "approvals"], "kind": "public_record"}, {"url": "https://ckan0.cf.opendata.inter.prod-toronto.ca/api/3/action/datastore_search?resource_id=6d0229af-bc54-46de-9c2b-26759b01dd05&filters=%7B%22STREET_NAME%22%3A%22STEELES%22%2C%22STREET_NUM%22%3A%223125%22%7D", "title": "City of Toronto Open Data: Building Permits - Active Permits (3125 Steeles Ave E, sign permit 26 202927 DST)", "date": "2026-07-20", "quote": "1 Wall Sign***** YONDR *****", "supports": ["operator"], "kind": "public_record"}, {"url": "https://www.yondrgroup.com/locations/", "title": "Yondr Group: Locations", "date": "undated", "quote": "Americas Northern Virginia Toronto Dallas", "supports": ["operator", "municipality"], "kind": "proponent"}, {"url": "https://datacentrereview.com/2024/12/yondr-expands-with-toronto-data-centre/", "title": "Data Centre Review: Yondr expands with Toronto data centre", "date": "2024-12-11", "kind": "press", "quote": "The 27 MW facility, which is scheduled to go online in mid 2026", "supports": ["mw", "mw_note"]}], "confidence": "medium", "notes": "City of Toronto data show the new-building permit (issued 2025-05-30, at inspection stage) and Yondr sign permits (2026) at 3125 Steeles Ave E; the operator link rests on the sign permits.", "checked": "2026-10-25", "mw_figures": [{"mw": 27, "basis": "unstated", "stage": "building", "date": "2024-12-11", "source_idx": 3}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-torontohydro-toronto-715-milner", "name": "715 Milner Avenue data centre (warehouse conversion)", "aliases": [], "operator": "Toronto Hydro", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto (Scarborough)", "address": "715 Milner Avenue, Toronto, ON", "lat": 43.79597, "lon": -79.20813, "coord_precision": "address", "type": "enterprise", "ai": "unknown", "status": "under_construction", "status_date": "2026-09-18", "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "City of Toronto", "instrument": "building permit (alteration: warehouse to data centre)", "ref": "25 242242 BLD", "date": "2026-01-08", "outcome": "approved", "conditions": "none published", "url": "https://ckan0.cf.opendata.inter.prod-toronto.ca/api/3/action/datastore_search?resource_id=6d0229af-bc54-46de-9c2b-26759b01dd05&filters=%7B%22STREET_NAME%22%3A%22MILNER%22%2C%22STREET_NUM%22%3A%22715%22%7D"}], "ownership": null, "sources": [{"url": "https://ckan0.cf.opendata.inter.prod-toronto.ca/api/3/action/datastore_search?resource_id=6d0229af-bc54-46de-9c2b-26759b01dd05&filters=%7B%22STREET_NAME%22%3A%22MILNER%22%2C%22STREET_NUM%22%3A%22715%22%7D", "title": "City of Toronto Open Data: Building Permits - Active Permits (715 Milner Ave, permit 25 242242 BLD)", "date": "2026-01-08", "quote": "Proposal to convert warehouse into a new data center and to install 2 new emergency generators on site to support new Data Center.", "supports": ["address", "status", "approvals", "type"], "kind": "public_record"}, {"url": "https://ckan0.cf.opendata.inter.prod-toronto.ca/api/3/action/datastore_search?resource_id=6d0229af-bc54-46de-9c2b-26759b01dd05&filters=%7B%22STREET_NAME%22%3A%22MILNER%22%2C%22STREET_NUM%22%3A%22715%22%7D", "title": "City of Toronto building permits (open data), 715 Milner Ave", "date": "2026-01-08", "quote": "CURRENT_USE: Toronto Hydro Warehouse; PROPOSED_USE: Toronto Hydro Data Center (permit 25 242242 BLD)", "supports": ["operator", "type", "notes"], "kind": "public_record"}, {"url": "https://ckan0.cf.opendata.inter.prod-toronto.ca/api/3/action/datastore_search?resource_id=6d0229af-bc54-46de-9c2b-26759b01dd05&filters=%7B%22STREET_NAME%22%3A%22MILNER%22%2C%22STREET_NUM%22%3A%22715%22%7D", "title": "City of Toronto building permits (open data), 715 Milner Ave", "date": "2026-09-18", "quote": "25 242242 STS, Drain and Site Service, STATUS: Inspection, ISSUED_DATE: 2026-09-18", "supports": ["status", "status_date"], "kind": "public_record"}], "confidence": "high", "notes": "Toronto Hydro is converting its warehouse into a data centre with two emergency generators, under a City of Toronto building permit (est. C$10 million) issued 2026-01-08 and revised 2026-07-23; the related plumbing and drain permits (the drain permit issued 2026-09-18) were at inspection stage in October 2026.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-stack-toronto-tor01a", "name": "TOR01A", "aliases": ["STACK TOR01 Campus", "Stack Infrastructure TOR01"], "operator": "STACK Infrastructure", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto (Scarborough)", "address": "3650 Danforth Ave, Toronto, ON", "lat": 43.69792, "lon": -79.26624, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 8, "mw_basis": "it", "mw_note": "TOR01A is the 8 MW building; STACK gives the campus 56 MW of total critical capacity with two planned 24 MW expansions (TOR01B and C), backed by contracted Toronto Hydro power.", "power_source": "grid (Toronto Hydro; STACK claims 100% renewable)", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.stackinfra.com/locations/americas/toronto/tor01/", "title": "STACK TOR01 – Toronto", "date": "undated", "quote": "STACK’s TOR01 campus offers scalable, high-performance infrastructure solutions across 19 acres with a total critical capacity of 56MW.", "supports": ["name", "operator", "mw", "mw_note", "status"], "kind": "proponent"}, {"url": "https://www.stackinfra.com/wp-content/uploads/2025/08/TOR01-Campus-Brochure.pdf", "title": "STACK TOR01 Campus brochure (PDF created 2025-06-02)", "date": "2025-06", "quote": "the campus includes an 8MW data center and two additional 24MW expansions and is backed by contracted power from Toronto Hydro.", "supports": ["mw", "power_source"], "kind": "proponent"}], "confidence": "medium", "notes": "The street address (3650 Danforth Ave) comes from the City of Toronto application as cited by an Ontario tracker; STACK gives no opening date, and operation rests on STACK describing TOR01A as the existing 8 MW building of its campus. TOR01B and C have conditional site-plan approval (2025-09-23, per the tracker) and STACK says the future phase is designed for AI workloads, but no building permit for them appears in city data.", "checked": "2026-10-25", "mw_figures": [{"mw": 8, "basis": "it", "stage": "built", "date": "undated", "source_idx": 0}, {"mw": 56, "basis": "buildout", "stage": "planned", "date": "2025-06", "source_idx": 1}], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-google-toronto-region", "name": "Google Cloud Toronto region (northamerica-northeast2)", "aliases": [], "operator": "Google", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto (region)", "address": null, "lat": 43.65, "lon": -79.38, "coord_precision": "city", "type": "hyperscale_cloud", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cloud.google.com/compute/docs/regions-zones", "title": "Google Cloud: Regions and zones", "date": "undated", "quote": "northamerica-northeast2-a Toronto, Ontario, North America", "supports": ["name", "status"], "kind": "proponent"}], "confidence": "low", "notes": "Google publishes only the cloud region (zones in Toronto), not its buildings; this point stands for the region and is not a distinct building.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-ibm-toronto-region", "name": "IBM Cloud Toronto (ca-tor): TOR01, TOR04, TOR05", "aliases": ["IBM Cloud TOR01", "IBM Cloud TOR04", "IBM Cloud TOR05"], "operator": "IBM", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto (region)", "address": null, "lat": 43.65, "lon": -79.38, "coord_precision": "city", "type": "hyperscale_cloud", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cloud.ibm.com/docs/overview?topic=overview-locations", "title": "IBM Cloud docs: Locations", "date": "undated", "quote": "Toronto (ca-tor) ca-tor-tor01-a ca-tor-tor04-a ca-tor-tor05-a", "supports": ["name", "status"], "kind": "proponent"}], "confidence": "low", "notes": "IBM lists three Toronto data centres (TOR01, TOR04, TOR05) but not their buildings, which are probably leased colocation space; this point stands for the region, not a building.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-microsoft-toronto-canada-central", "name": "Microsoft Azure Canada Central region (Toronto, existing sites undisclosed)", "aliases": ["Azure Canada Central"], "operator": "Microsoft", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto (region)", "address": null, "lat": 43.65, "lon": -79.38, "coord_precision": "city", "type": "hyperscale_cloud", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://news.ontario.ca/en/release/1007259/ontario-welcomes-microsofts-ai-infrastructure-expansion", "title": "Ontario Newsroom: Ontario Welcomes Microsoft’s AI Infrastructure Expansion", "date": "2026-04-07", "quote": "Over the last ten years, Microsoft’s Azure Canada Central data centre region has supported the specific needs of Ontario’s leading industries", "supports": ["name", "status", "operator"], "kind": "public_record"}], "confidence": "low", "notes": "Microsoft does not publish its operating Toronto-region buildings, so this point stands for the Azure region; some of them may sit inside colocation sites listed separately here.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-oracle-toronto-region", "name": "Oracle Cloud Canada Southeast (Toronto) ca-toronto-1", "aliases": ["OCI YYZ"], "operator": "Oracle", "owner": null, "tenants": [], "province": "ON", "municipality": "Toronto (region)", "address": null, "lat": 43.65, "lon": -79.38, "coord_precision": "city", "type": "hyperscale_cloud", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://docs.oracle.com/en-us/iaas/Content/General/Concepts/regions.htm", "title": "Oracle Cloud Infrastructure: Regions and Availability Domains", "date": "undated", "quote": "Canada Southeast (Toronto) ca-toronto-1 Toronto, Canada YYZ", "supports": ["name", "status"], "kind": "proponent"}], "confidence": "low", "notes": "Oracle publishes only the cloud region, not its building (probably leased colocation space); this point stands for the region.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-hut8-vaughan-gta2", "name": "GTA2 (Vaughan)", "aliases": ["Hut 8 GTA2", "Hut 8 Vaughan Data Centre"], "operator": "Hut 8 Canada", "owner": null, "tenants": [], "province": "ON", "municipality": "Vaughan", "address": "27 Buttermill Ave, Vaughan, ON", "lat": 43.79847, "lon": -79.52969, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 1, "mw_basis": "unstated", "mw_note": "1 MW of designed capacity (1,000 kVA power capacity); UPS 625 kW; cooling supports over 1 MW of IT load; three generators totalling 1,125 kW.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://canada.hut8.com/centers/vaughan", "title": "Hut 8 Canada: Vaughan Data Centre", "date": "undated", "quote": "GTA2 in Vaughan, Ontario has 1 MW of designed capacity. It is a Tier I site with 42U cabinets and A + B power to every cabinet.", "supports": ["name", "mw", "status"], "kind": "proponent"}, {"url": "https://canada.hut8.com/centers/vaughan", "title": "Hut 8 Canada: Vaughan Data Centre", "date": "undated", "quote": "The facility is located at 27 Buttermill Ave, Vaughan, ON — just off Highway 400, north of Steeles Ave.", "supports": ["address"], "kind": "proponent"}, {"url": "https://canada.hut8.com/", "title": "Hut 8 Canada home page", "date": "undated", "quote": "With five data centres in Vancouver, Kelowna, and the Greater Toronto Area, Hut 8 provides Tier III-grade infrastructure offering low-latency, high-availability colocation tailored for Canadian businesses.", "supports": ["operator", "status"], "kind": "proponent"}, {"url": "https://canada.hut8.com/centers/vaughan", "title": "Hut 8 Canada: Vaughan Data Centre (specifications)", "date": "undated", "kind": "proponent", "quote": "1000 kVA power capacity ... UPS system 625 kW", "supports": ["mw_note", "mw_figures"]}], "confidence": "high", "notes": "Formerly a TeraGo colocation site. The operator markets GPU-ready racks, but no AI tenant is named.", "checked": "2026-10-25", "mw_figures": [{"mw": 1, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 0}, {"mw": 0.625, "basis": "it", "stage": "built", "date": "undated", "source_idx": 3}], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-microsoft-vaughan-langstaff", "name": "Microsoft Vaughan datacentre (Phase 1)", "aliases": ["Microsoft Vaughan", "Microsoft YT011 / YT012 — Langstaff campus", "YT011", "YT012", "YTO11"], "operator": "Microsoft", "owner": null, "tenants": [], "province": "ON", "municipality": "Vaughan", "address": "6100 Langstaff Road, Vaughan, ON", "lat": 43.79113, "lon": -79.62803, "coord_precision": "address", "type": "hyperscale_cloud", "ai": "unknown", "status": "under_construction", "status_date": "2026-08-05", "mw": null, "mw_basis": null, "mw_note": "An Ontario data-centre tracker reports that Vaughan planning documents (DA.22.008) describe Phase 1 as a 48 MW facility; the figure is not confirmed in a Microsoft or City document, so none is shown.", "power_source": null, "opened": null, "expected_online": null, "approvals": [{"authority": "City of Vaughan", "instrument": "site plan / development application (Phase 1)", "ref": "DA.22.008", "date": null, "outcome": "approved", "conditions": "The Ontario Data Centre Tracker gives no approval date or conditions for DA.22.008; Microsoft reports Phase 1 construction began on 2024-05-08.", "url": "https://ontariodatacentres.ca/facilities.json"}, {"authority": "City of Vaughan", "instrument": "site plan / development application (Phase 2)", "ref": "DA.24.070", "date": "2025-06-27", "outcome": "pending", "conditions": "Notice of Approval Conditions dated 2025-06-27; final approval not confirmed (as reported by the Ontario Data Centre Tracker).", "url": "https://ontariodatacentres.ca/facilities.json"}], "ownership": null, "sources": [{"url": "https://local.microsoft.com/blog/vaughan-construction-update/", "title": "Microsoft in your community: Vaughan Construction Update", "date": "2026-08-05", "quote": "The first phase of development of the datacentre began on May 8, 2024, and construction of the building was completed on July 2, 2026.", "supports": ["name", "operator", "municipality", "status"], "kind": "proponent"}, {"url": "https://local.microsoft.com/blog/vaughan-construction-update/", "title": "Microsoft in your community: Vaughan Construction Update", "date": "2026-08-05", "quote": "The datacentre is not yet operational.", "supports": ["status", "notes"], "kind": "proponent"}, {"url": "https://ontariodatacentres.ca/facilities.json", "title": "Ontario Data Centre Tracker facilities.json, entry microsoft-yto11 (secondary)", "date": "undated", "quote": "Phase 1 (File DA.22.008) is a two-storey data centre with ancillary office space. Planning documents describe Phase 1 as a 48 MW facility.", "supports": ["address", "approvals", "mw_note"], "kind": "directory"}], "confidence": "high", "notes": "Microsoft says the Phase 1 building was completed on 2026-07-02, with equipment installation and testing through early 2028, and that it is not yet operational. The street address and the Vaughan approvals come from an Ontario tracker citing city files; Phase 2 has not started.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-scinet-vaughan", "name": "SciNet data centre (Trillium, Killarney)", "aliases": ["Killarney", "SciNet GTA hub", "Trillium"], "operator": "SciNet (University of Toronto)", "owner": "University of Toronto", "tenants": ["Vector Institute (Killarney)", "Digital Research Alliance of Canada (Trillium national system)"], "province": "ON", "municipality": "Vaughan", "address": null, "lat": 43.79415, "lon": -79.5268, "coord_precision": "city", "type": "research_hpc", "ai": "yes", "status": "operating", "status_date": "2026-06-08", "mw": 4, "mw_basis": "facility", "mw_note": "'Four megawatts of power coming in' (BetaKit, 2026-06-08); Trillium draws about 1,700 kW (SciNet); Killarney's draw is not stated.", "power_source": "grid", "opened": null, "expected_online": null, "approvals": [], "ownership": "University of Toronto (Canada), publicly funded", "sources": [{"url": "https://scinethpc.ca/trillium/", "title": "SciNet: The Trillium supercomputer", "date": "undated", "quote": "About 1700 kW power consumption.", "supports": ["mw_note", "owner", "operator"], "kind": "proponent"}, {"url": "https://docs.alliancecan.ca/wiki/Trillium", "title": "Alliance docs: Trillium", "date": "2025-08-07", "quote": "Trillium is a large parallel cluster built by Lenovo Canada and hosted by SciNet at the University of Toronto.", "supports": ["status", "tenants"], "kind": "proponent"}, {"url": "https://docs.alliancecan.ca/wiki/Killarney", "title": "Alliance docs: Killarney", "date": "2025-06-09", "quote": "Killarney is located at the University of Toronto and is managed by the Vector Institute and SciNet.", "supports": ["tenants", "ai"], "kind": "proponent"}, {"url": "https://betakit.com/inside-the-gta-facility-housing-one-of-canadas-most-powerful-supercomputers/", "title": "Inside the GTA facility housing one of Canada’s most powerful supercomputers (BetaKit, press)", "date": "2026-06-08", "quote": "AI research hub the Vector Institute locates most of its graphics processing units (GPUs) here.", "supports": ["mw", "status_date", "ai", "tenants"], "kind": "press"}, {"url": "https://en.wikipedia.org/wiki/SciNet_Consortium", "title": "SciNet Consortium (Wikipedia)", "date": "undated", "quote": "the datacentre facility is housed in a warehouse in Vaughan about 30 km north of the campus.", "supports": ["municipality"], "kind": "directory"}, {"url": "https://alliancecan.ca/en/about/alliance", "title": "Digital Research Alliance of Canada: About the Alliance", "date": "undated", "quote": "The Digital Research Alliance of Canada (the Alliance) is a national not-for-profit membership-based organization", "supports": ["tenant_countries"], "kind": "proponent"}, {"url": "https://vectorinstitute.ai/about/", "title": "Vector Institute: About", "date": "undated", "quote": "operating from Toronto's Schwartz Reisman Innovation Campus", "supports": ["tenant_countries"], "kind": "proponent"}], "confidence": "medium", "notes": "The exact location is withheld for security; Vaughan comes from Wikipedia, while BetaKit says only the Greater Toronto Area. Hosts Trillium (the Alliance national system, 252 GPUs) and Killarney (Vector Institute, 672 L40S and 80 H100 GPUs), with a federally funded GPU upgrade reported under way; the Vector Institute is based in Toronto.", "checked": "2026-10-25", "mw_figures": [{"mw": 4, "basis": "facility", "stage": "built", "date": "2026-06-08", "source_idx": 3}, {"mw": 1.7, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": "Canada", "field_confidence": {"owner": "confirmed", "tenants": "confirmed"}, "tenant_countries": {"Vector Institute (Killarney)": "Canada", "Digital Research Alliance of Canada (Trillium national system)": "Canada"}} {"site_id": "CA-ON-digitalrealty-vaughan-tor1", "name": "TOR1", "aliases": ["Digital Realty TOR1", "Digital Realty YYZ11 Toronto (1 Century)"], "operator": "Digital Realty", "owner": null, "tenants": [], "province": "ON", "municipality": "Vaughan", "address": "1 Century Place, Vaughan, ON L4L 8R2", "lat": 43.7774, "lon": -79.544, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "Building of 577,000 sq ft over four storeys; no MW on the operator's page. An advocacy group's report gives 46 MW, which no primary source confirms.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.digitalrealty.com/data-centers/americas/toronto/tor1", "title": "Digital Realty Toronto TOR1", "date": "undated", "quote": "Total building size:577,000 ft² (53,600 m²)", "supports": ["name", "operator", "address", "status", "mw_note"], "kind": "proponent"}], "confidence": "high", "notes": "Digital Realty now calls it TOR1; PeeringDB still lists it as YYZ11.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "confirmed"}} {"site_id": "CA-ON-uwaterloo-nibi", "name": "Nibi (University of Waterloo, SHARCNET)", "aliases": ["Graham successor"], "operator": "SHARCNET / University of Waterloo", "owner": "University of Waterloo (SHARCNET)", "tenants": ["Digital Research Alliance of Canada (national system)"], "province": "ON", "municipality": "Waterloo", "address": null, "lat": 43.4702, "lon": -80.54524, "coord_precision": "area", "type": "research_hpc", "ai": "yes", "status": "operating", "status_date": "2025-07-31", "mw": null, "mw_basis": "unstated", "mw_note": "134,400 CPU cores and 288 NVIDIA H100 GPUs, plus AMD GPU nodes; power draw not published.", "power_source": "grid", "opened": "2025", "expected_online": null, "approvals": [], "ownership": "public (university / Alliance-funded)", "sources": [{"url": "https://docs.alliancecan.ca/wiki/Nibi", "title": "Alliance docs: Nibi", "date": "2025-07-31", "quote": "Built by Hypertec, the cluster is hosted and operated by SHARCNET at University of Waterloo.", "supports": ["operator", "municipality", "status", "status_date", "opened", "ai"], "kind": "proponent"}, {"url": "https://alliancecan.ca/en/about/alliance", "title": "Digital Research Alliance of Canada: About the Alliance", "date": "undated", "quote": "The Digital Research Alliance of Canada (the Alliance) is a national not-for-profit membership-based organization", "supports": ["tenant_countries"], "kind": "proponent"}], "confidence": "medium", "notes": "The host institution is shown as owner, but who holds title to the hardware is not published.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"owner": "likely", "tenants": "confirmed"}, "tenant_countries": {"Digital Research Alliance of Canada (national system)": "Canada"}} {"site_id": "CA-ON-qscale-wilmot", "name": "QScale Ontario expansion (Wilmot shortlist)", "aliases": ["QScale Toronto"], "operator": "QScale", "owner": null, "tenants": [], "province": "ON", "municipality": "Wilmot Township", "address": null, "lat": 43.39577, "lon": -80.6352, "coord_precision": "city", "type": "ai_hpc", "ai": "yes", "status": "announced", "status_date": "2025-08-07", "mw": null, "mw_basis": null, "mw_note": "", "mw_figures": [], "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "Infrastructure at Goldman Sachs Alternatives (QScale's owner since May 2026)", "ownership_country": "United States", "sources": [{"url": "https://kitchener.citynews.ca/2025/08/07/quebec-ai-data-company-considers-expansion-into-wilmot-waterloo-region/", "title": "CityNews Kitchener: AI data company considers expansion into Waterloo Region", "date": "2025-08-07", "quote": "QScale can confirm that the Region of Waterloo / Wilmot Township has been shortlisted as one of the potential locations for our Ontario expansion", "supports": ["operator", "municipality", "status"], "kind": "press"}, {"url": "https://www.qscale.com/news/goldman-sachs-alternatives-to-acquire-qscale", "title": "Goldman Sachs Alternatives to Acquire QScale", "date": "2026-05-13", "kind": "proponent", "quote": "Infrastructure at Goldman Sachs Alternatives has closed the acquisition of the company in partnership with QScale's founders and management team", "supports": ["ownership", "ownership_country"]}], "confidence": "low", "field_confidence": {"owner": "confirmed"}, "notes": "QScale said in August 2025 that the Region of Waterloo and Wilmot Township were shortlisted, among several sites, for its Ontario expansion; no site had been named and no later update published as of 2026-10-25.", "checked": "2026-10-25", "tenant_countries": {}} {"site_id": "CA-ON-mnsi-windsor-goyeau", "name": "Goyeau Data Centre", "aliases": [], "operator": "MNSi Telecom (Managed Network Systems Inc.)", "owner": null, "tenants": [], "province": "ON", "municipality": "Windsor", "address": "1163 Goyeau Street, Windsor, ON", "lat": 42.3066, "lon": -83.0303, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.peeringdb.com/api/fac/2396", "title": "PeeringDB facility 2396 Goyeau Data Centre", "date": "2025-09-26", "quote": "1163 Goyeau Street, Windsor, N9A 1H9", "supports": ["name", "operator", "address"], "kind": "directory"}], "confidence": "low", "notes": "Listed only in PeeringDB; MNSi's website does not mention a data centre.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"location": "likely"}} {"site_id": "CA-ON-spur-agtech-woolwich", "name": "SPUR Ag Tech Innovation Centre", "aliases": ["SPUR Ag Tech Innovation Centre — Woolwich"], "operator": "SPUR Innovation", "owner": null, "tenants": [], "province": "ON", "municipality": "Woolwich Township", "address": "1001 Kramp Road, Woolwich", "lat": 43.50564, "lon": -80.36986, "coord_precision": "address", "type": "ai_hpc", "ai": "yes", "status": "announced", "status_date": null, "mw": 40, "mw_basis": "buildout", "mw_note": "40 MW planned at build-out, starting from the existing 1 MW feed, with a 200,000 sq ft greenhouse on a 14-acre site (company page).", "mw_figures": [{"mw": 40, "basis": "buildout", "stage": "planned", "date": "undated", "source_idx": 0}], "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://spuric.com/agtech", "title": "SPUR Ag Tech Innovation Centre", "date": "undated", "quote": "A 14-acre ecological data centre at 1001 Kramp Road in Woolwich, in the heart of Waterloo Region. A 40 MW AI data centre", "supports": ["name", "address", "mw", "ai", "operator"], "kind": "proponent"}, {"url": "https://spuric.com/agtech", "title": "SPUR Ag Tech Innovation Centre", "date": "undated", "kind": "proponent", "quote": "40 MW Data Centre Build-Out", "supports": ["mw", "mw_basis", "mw_note"]}], "confidence": "low", "field_confidence": {"owner": "speculative"}, "notes": "SPUR names no landholder, parent company or tenant.", "checked": "2026-10-25", "tenant_countries": {}} {"site_id": "CA-PE-atc-charlottetown", "name": "Atlantic Technology Centre colocation data centre", "aliases": [], "operator": "Atlantic Technology Centre (Government of Prince Edward Island)", "owner": null, "tenants": [], "province": "PE", "municipality": "Charlottetown", "address": "176 Great George Street, Charlottetown, PE C1A 4K9", "lat": 46.23706, "lon": -63.12808, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "Government of Prince Edward Island", "sources": [{"url": "https://atlantictechnologycentre.ca/about-the-centre/", "title": "Atlantic Technology Centre: About the centre", "date": "undated", "quote": "The colocation data centre at the Atlantic Technology Centre has 2500 sq ft of environmentally controlled rack space", "supports": ["name", "operator", "status"], "kind": "proponent"}, {"url": "https://atlantictechnologycentre.ca/", "title": "Atlantic Technology Centre homepage", "date": "undated", "quote": "176 Great George Street, Charlottetown, Prince Edward Island, Canada", "supports": ["address", "municipality"], "kind": "proponent"}, {"url": "https://archivenews.princeedwardisland.ca/atlantic-technology-centre-opens-its-doors", "title": "Government of PEI: Atlantic Technology Centre Opens its Doors", "date": "2002-09-08", "quote": "the Atlantic Technology Centre (ATC), was officially opened today by the Honourable Pat Binns, Premier of Prince Edward Island", "supports": ["ownership", "ownership_country"], "kind": "public_record"}], "confidence": "medium", "notes": "Leasing inquiries go to a Government of Prince Edward Island address and the province opened the building in 2002, so the provincial government is shown as operator and owner; neither is confirmed in a current record. Small: 2,500 sq ft of rack space.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"location": "confirmed", "owner": "likely"}} {"site_id": "CA-QC-argo-baiecomeau", "name": "Argo Baie-Comeau", "aliases": ["Argo Blockchain Baie-Comeau"], "operator": "Argo Blockchain plc", "owner": "Argo Blockchain plc", "tenants": [], "province": "QC", "municipality": "Baie-Comeau", "address": null, "lat": 49.21184, "lon": -68.18014, "coord_precision": "city", "type": "crypto", "ai": "no", "status": "operating", "status_date": "2026-04-30", "mw": 15, "mw_basis": "facility", "mw_note": "15 MW is the maximum power capacity on site; Argo says it could expand to 23 MW if the municipality awards a contract for the expansion.", "power_source": "hydro grid (Hydro-Québec)", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1841675/000110465926051793/arbk-20251231x20f.htm", "title": "Argo Blockchain plc Form 20-F FY2025", "date": "2026-04-30", "quote": "After selling the Mirabel facility in March 2024, Argo continues to own and operate its data center in Baie Comeau, Quebec.", "supports": ["status", "status_date", "operator", "type"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1841675/000110465926051793/arbk-20251231x20f.htm", "title": "Argo Blockchain plc Form 20-F FY2025", "date": "2026-04-30", "quote": "The Baie Comeau site is over 40,000 square feet and has 15 MW of 99% renewable power capacity", "supports": ["mw", "power_source"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1841675/000110465926051793/arbk-20251231x20f.htm", "title": "Argo Blockchain plc Form 20-F for 2025", "date": "2026-04-30", "kind": "public_record", "quote": "For owned facilities, this reflects the maximum power capacity accessible on site.", "supports": ["mw_basis"]}, {"url": "https://www.sec.gov/Archives/edgar/data/1841675/000110465926051793/arbk-20251231x20f.htm", "title": "Argo Blockchain plc Form 20-F for 2025", "date": "2026-04-30", "kind": "public_record", "quote": "Growler currently owns approximately 88.59% of our outstanding ordinary shares.", "supports": ["ownership"]}], "confidence": "high", "notes": "Argo owns the site and held 4,162 mining machines there at the end of 2025; its 2025 annual report announces no AI conversion. No permits or utility filings found.", "checked": "2026-10-25", "mw_figures": [{"mw": 15, "basis": "facility", "stage": "built", "date": "2026-04-30", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "confirmed", "ai": "confirmed", "location": "confirmed"}} {"site_id": "CA-QC-keel-baiecomeau", "name": "Baie-Comeau", "aliases": ["Bitfarms Baie-Comeau", "Keel Infrastructure Baie-Comeau"], "operator": "Keel Infrastructure (formerly Bitfarms)", "owner": null, "tenants": [], "province": "QC", "municipality": "Baie-Comeau", "address": null, "lat": 49.21184, "lon": -68.18014, "coord_precision": "city", "type": "crypto", "ai": "no", "status": "operating", "status_date": "2026-03-27", "mw": 22, "mw_basis": "facility", "mw_note": "Energized capacity 22 MW (Keel 10-K, March 2026). The same report also mentions a Baie-Comeau expansion.", "power_source": "hydro grid (City of Baie-Comeau municipal network, supplied by Hydro-Québec)", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1812477/000121390026037514/ea0282809-10k_bitfarms.htm", "title": "Bitfarms Ltd 10-K FY2025, Item 2 Properties", "date": "2026-03-31", "quote": "Baie-Comeau, Québec, Canada | 22 MW | Leased", "supports": ["mw", "mw_basis", "operator", "power_source"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1812477/000181247726000023/keel-20260630.htm", "title": "Keel Infrastructure 10-Q (period to 2026-06-30)", "date": "2026-08-10", "quote": "We maintain our legacy Bitcoin Mining operations in Canada to maximize the value of those assets as we work to transition our Québec sites to HPC and AI.", "supports": ["status", "type"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1812477/000121390026037514/ea0282809-10k_bitfarms.htm", "title": "Bitfarms 10-K (properties as of 2026-03-27)", "date": "2026-03-31", "quote": "All of the Québec Sites are currently being used for Bitcoin Mining operations", "supports": ["status", "status_date"], "kind": "public_record"}], "confidence": "high", "notes": "A bitcoin-mining site; Keel says it is moving its Québec sites toward HPC and AI, but has announced no plan for this one. No permits or utility filings found.", "checked": "2026-10-25", "mw_figures": [{"mw": 22, "basis": "facility", "stage": "built", "date": "2026-03-31", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "confirmed", "ai": "confirmed", "location": "likely"}} {"site_id": "CA-QC-compass-montreal-ii", "name": "Montreal II", "aliases": ["ROOT MTL-R2", "Root Data Center MTL-R2"], "operator": "Compass Datacenters", "owner": null, "tenants": [], "province": "QC", "municipality": "Baie-D'Urfé", "address": null, "lat": 45.42414, "lon": -73.91393, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": "2023-10-16", "mw": null, "mw_basis": null, "mw_note": "Compass said in 2023 that its two Montréal campuses together supply more than 35 MW; no per-site figure.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.compassdatacenters.com/fr/montreal/", "title": "Compass Datacenters: Montréal (operator page, FR)", "date": "2023-10-16", "quote": "Montréal abrite actuellement deux campus qui fournissent plus de 35 MW d’énergie 100 % verte fournie par HydroQuebec.", "supports": ["operator", "status", "municipality"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/7498", "title": "PeeringDB facility 7498 (Root Data Center MTL-R2)", "date": "undated", "quote": "19701 Clark Graham Ave", "supports": ["aliases", "municipality"], "kind": "directory"}, {"url": "https://www.datacenterfrontier.com/cloud/article/11429512/compass-acquires-root-to-enter-montreal-data-center-market", "title": "Compass Acquires ROOT to Enter Montreal Data Center Market", "date": "2019-07-23", "kind": "press", "quote": "Compass has completed the acquisition of ROOT Data Center, which owns and operates facilities in Montreal.", "supports": ["aliases", "notes"]}, {"url": "https://www.datacenterfrontier.com/colocation/article/55329299/centersquare-launches-1-billion-expansion-to-scale-an-ai-ready-north-american-data-center-platform", "title": "Centersquare Launches $1 Billion Expansion to Scale an AI-Ready North American Data Center Platform", "date": "2025-11-19", "kind": "press", "quote": "The company also acquired eight additional colocation data centers in Dallas, Tulsa, Nashville, Raleigh, Toronto, and Montréal", "supports": ["notes"]}], "confidence": "medium", "notes": "Compass's current markets page no longer lists Montréal and a directory lists this site under Centersquare, so the current operator is not confirmed.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "likely"}} {"site_id": "CA-QC-vantage-qc6", "name": "Montreal III (QC6 / QC61)", "aliases": ["QC6", "QC61", "Vantage Montreal III"], "operator": "Vantage Data Centers", "owner": null, "tenants": [], "province": "QC", "municipality": "Baie-D'Urfé", "address": null, "lat": 45.41979, "lon": -73.92299, "coord_precision": "city", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": "2026-01-07", "mw": 30, "mw_basis": "it", "mw_note": "30 MW of critical IT load (operator page); the site also has a dedicated 45 MW substation, which is a supply rating, not the data centre's load.", "power_source": null, "opened": 2025, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://vantage-dc.com/data-center-locations/north-america/montreal-iii-canada/", "title": "Vantage: Montreal III (QC6) Data Center", "date": "undated", "quote": "30MW | of critical IT load | Situated on the island of Montreal with direct access to Highway 40, our 8-acre Montreal III data center", "supports": ["name", "operator", "mw", "status"], "kind": "proponent"}, {"url": "https://www.datacenterdynamics.com/en/news/vantage-completes-latest-data-center-in-montr%C3%A9al-canada/", "title": "DCD: Vantage completes latest data center in Montréal, Canada (press)", "date": "2026-01-07", "quote": "From the first shovel in the ground in January 2022 to delivering all phases in December 2025", "supports": ["status", "opened", "status_date"], "kind": "press"}, {"url": "https://www.datacenterdynamics.com/en/news/vantage-completes-latest-data-center-in-montr%C3%A9al-canada/", "title": "DCD: Vantage completes latest data center in Montréal, Canada (press)", "date": "2026-01-07", "kind": "press", "quote": "online listings place the facility at 21525 Clark Graham Avenue in Baie-D'Urfe", "supports": ["municipality", "notes"]}], "confidence": "medium", "notes": "Vantage delivered all phases in December 2025, per DCD. Vantage places the site on the island of Montréal near Highway 40 and Dorval airport; the Baie-D'Urfé address comes from online listings cited by DCD, so the point marks the town.", "checked": "2026-10-25", "mw_figures": [{"mw": 30, "basis": "it", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "speculative"}} {"site_id": "CA-QC-ovhcloud-beauharnois-bhs", "name": "Beauharnois (BHS) campus", "aliases": ["BHS1", "BHS2", "BHS3", "BHS5", "OVHcloud Beauharnois"], "operator": "OVHcloud", "owner": "OVHcloud (OVH Groupe SA)", "tenants": [], "province": "QC", "municipality": "Beauharnois", "address": null, "lat": 45.30861, "lon": -73.89401, "coord_precision": "building", "type": "hyperscale_cloud", "ai": "partial", "status": "operating", "status_date": "2022-06-10", "mw": null, "mw_basis": null, "mw_note": null, "power_source": "hydro grid", "opened": 2012, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://corporate.ovhcloud.com/en/newsroom/news/ovhcloud-10-year-anniversary-canada/", "title": "OVHcloud celebrates its 10th anniversary in Canada (news release)", "date": "2022-06-10", "quote": "Opened in January 2012 in a former aluminum smelter that has been completely revitalized, \"BHS\" now hosts nearly 90,000 servers", "supports": ["name", "operator", "opened", "status"], "kind": "proponent"}, {"url": "https://corporate.ovhcloud.com/en/newsroom/news/ovhcloud-10-year-anniversary-canada/", "title": "OVHcloud celebrates its 10th anniversary in Canada (news release)", "date": "2022-06-10", "quote": "powered by both Quebec's hydroelectricity", "supports": ["power_source"], "kind": "proponent"}, {"url": "https://www.ovhcloud.com/en-ca/public-cloud/regions-availability/", "title": "OVHcloud Public Cloud regions availability (en-ca)", "date": "undated", "quote": "* Metal Instances, GPU, Storage optimized : BHS5", "supports": ["ai", "status"], "kind": "proponent"}, {"url": "https://corporate.ovhcloud.com/en/company/history/", "title": "OVHcloud, History", "date": "undated", "kind": "proponent", "quote": "the company acquired a dilapidated industrial site in Roubaix, in the north of France, to host the its head office and first data centers.", "supports": ["ownership_country"]}, {"url": "https://corporate.ovhcloud.com/en/newsroom/news/ovhcloud-10-year-anniversary-canada/", "title": "OVHcloud celebrates its 10th anniversary in Canada (news release)", "date": "2022-06-10", "kind": "proponent", "quote": "The Beauharnois site also houses one of the group's two production plants.", "supports": ["notes"]}], "confidence": "high", "notes": "One campus in a former aluminium smelter, opened in January 2012; OVHcloud's pages name buildings BHS1, BHS3 and BHS5 and offer GPU instances in BHS5, and the site also houses one of OVHcloud's two server production plants. GPU users are not named, and who holds title is not published.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "France", "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-QC-google-beauharnois", "name": "Google Beauharnois data center", "aliases": ["Google Beauharnois datacentre"], "operator": "Google", "owner": null, "tenants": [], "province": "QC", "municipality": "Beauharnois", "address": null, "lat": 45.31398, "lon": -73.87583, "coord_precision": "city", "type": "hyperscale_cloud", "ai": "unknown", "status": "approved", "status_date": "2021-05-10", "mw": null, "mw_basis": null, "mw_note": "Hydro-Québec's 2021 release gives no MW, only a potential US$600 million (about C$735 million) investment.", "mw_figures": [], "power_source": "hydro grid", "opened": null, "expected_online": null, "approvals": [{"authority": "Gouvernement du Québec / Hydro-Québec", "instrument": "land acquisition and government approvals (conditions not specified)", "ref": "none published", "date": "2021-05-10", "outcome": "pending", "conditions": "Google: 'Upon completion of various conditions and receipt of government approvals'", "url": "https://blog.google/intl/en-ca/company-news/inside-google/googles-ongoing-commitment-to-quebec/"}, {"authority": "Gouvernement du Québec", "instrument": "exclusion from the agricultural zone (62.4 ha of Hydro-Québec land)", "ref": "none published", "date": "2021-05-10", "outcome": "approved", "conditions": "Compensation for farmland agreed with the UPA and the CMM: neighbouring Hydro-Québec land of about the same size to be zoned agricultural and transferred to the Fiducie agricole UPA-Fondaction.", "url": "https://news.hydroquebec.com/news/press-releases/all-quebec/future-data-center-in-beauharnois.html"}], "ownership": null, "ownership_country": "United States", "sources": [{"url": "https://news.hydroquebec.com/news/press-releases/all-quebec/future-data-center-in-beauharnois.html", "title": "Hydro-Québec: Project to expand Google’s activities in Québec - Future data center in Beauharnois", "date": "2021-05-10", "quote": "These projects includes a potential investment of US$600 million (approximately C$735 million) to set up a data center in Beau", "supports": ["municipality", "operator", "status", "status_date"], "kind": "public_record"}, {"url": "https://blog.google/intl/en-ca/company-news/inside-google/googles-ongoing-commitment-to-quebec/", "title": "Google: Google's ongoing commitment to Québec", "date": "2021-05-10", "quote": "Upon completion of various conditions and receipt of government approvals, Google will be able to use the property for a future data center facility.", "supports": ["approvals", "operator"], "kind": "proponent"}, {"url": "https://news.hydroquebec.com/news/press-releases/all-quebec/future-data-center-in-beauharnois.html", "title": "Hydro-Québec: Project to expand Google's activities in Québec, future data center in Beauharnois", "date": "2021-05-10", "kind": "public_record", "quote": "the government has applied an exclusion from an agriculture zone to lands covering an area of 62.4 hectares and belonging to Hydro-Québec.", "supports": ["status", "approvals"]}, {"url": "https://data.sec.gov/submissions/CIK0001652044.json", "date": "undated", "kind": "public_record", "quote": "\"name\":\"Alphabet Inc.\" | \"city\":\"MOUNTAIN VIEW\",\"stateOrCountry\":\"CA\"", "supports": ["ownership_country"], "title": "SEC EDGAR company record, Alphabet Inc. (Mountain View, California, United States)"}], "confidence": "medium", "field_confidence": {"owner": "likely", "location": "likely"}, "notes": "In 2021 the Québec government excluded 62.4 hectares of Hydro-Québec land from the agricultural zone for this project; Google's purchase still depended on further conditions and approvals. No construction had been reported as of 2026-10-25.", "checked": "2026-10-25"} {"site_id": "CA-QC-estruxture-mtl-3", "name": "MTL-3", "aliases": [], "operator": "eStruxture Data Centers", "owner": null, "tenants": [], "province": "QC", "municipality": "Boucherville", "address": "1350 Rue Nobel, Boucherville, QC J4B 5H3", "lat": 45.56699, "lon": -73.42662, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 1.2, "mw_basis": "unstated", "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.estruxture.com/data-centers/montreal", "title": "eStruxture: Montreal data centers (operator locations page)", "date": "undated", "quote": "MTL-3 | 1350 Rue Nobel Boucherville, QC, J4B 5H3", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://www.estruxture.com/data-centers/montreal/mtl-3", "title": "eStruxture MTL-3 facility page", "date": "undated", "quote": "with a total capacity of 1.2MW", "supports": ["mw"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [{"mw": 1.2, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-keel-cowansville", "name": "Cowansville", "aliases": ["Bitfarms Cowansville", "Keel Infrastructure Cowansville"], "operator": "Keel Infrastructure (formerly Bitfarms)", "owner": null, "tenants": [], "province": "QC", "municipality": "Cowansville", "address": null, "lat": 45.20761, "lon": -72.74792, "coord_precision": "city", "type": "crypto", "ai": "no", "status": "operating", "status_date": "2026-08-10", "mw": 17, "mw_basis": "facility", "mw_note": "Energized capacity 17 MW (Keel 10-K, March 2026).", "power_source": "hydro grid (Hydro-Québec)", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1812477/000121390026037514/ea0282809-10k_bitfarms.htm", "title": "Bitfarms Ltd 10-K FY2025, Item 2 Properties", "date": "2026-03-31", "quote": "Cowansville, Québec, Canada | 17 MW | Leased", "supports": ["mw", "mw_basis", "operator"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1812477/000181247726000023/keel-20260630.htm", "title": "Keel Infrastructure 10-Q (period to 2026-06-30)", "date": "2026-08-10", "quote": "We maintain our legacy Bitcoin Mining operations in Canada to maximize the value of those assets as we work to transition our Québec sites to HPC and AI.", "supports": ["status", "status_date", "type"], "kind": "public_record"}], "confidence": "high", "notes": "A bitcoin-mining site; Keel says it is moving its Québec sites toward HPC and AI, but has announced no plan for this one. No permits or utility filings found.", "checked": "2026-10-25", "mw_figures": [{"mw": 17, "basis": "facility", "stage": "built", "date": "2026-03-31", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "confirmed", "ai": "confirmed", "location": "likely"}} {"site_id": "CA-QC-microsoft-donnacona", "name": "Donnacona datacentre", "aliases": [], "operator": "Microsoft", "owner": null, "tenants": [], "province": "QC", "municipality": "Donnacona", "address": null, "lat": 46.67653, "lon": -71.73008, "coord_precision": "city", "type": "hyperscale_cloud", "ai": "unknown", "status": "under_construction", "status_date": "2026-04-30", "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://local.microsoft.com/blog/donnacona-datacentre-construction-update/", "title": "Microsoft: Donnacona datacentre construction update (modified 2026-04-30)", "date": "2026-04-30", "quote": "Construction of the datacentre building was completed in November 2025 and all work for the superstructure will be internal going forward.", "supports": ["name", "operator", "status"], "kind": "proponent"}, {"url": "https://local.microsoft.com/blog/donnacona-datacentre-construction-update/", "title": "Microsoft: Donnacona datacentre construction update (modified 2026-04-30)", "date": "2026-04-30", "quote": "Substation construction, along with soundwall installation, is expected to be completed in the second half of 2026.", "supports": ["expected_online"], "kind": "proponent"}, {"url": "https://local.microsoft.com/blog/donnacona-datacentre-construction-update/", "title": "Microsoft: Donnacona datacentre construction update (modified 2026-04-30)", "date": "2026-04-30", "kind": "proponent", "quote": "Microsoft began the first phase of construction of the Donnacona datacentre in February, 2024.", "supports": ["notes"]}], "confidence": "high", "notes": "Construction began in February 2024 and the building was completed in November 2025; substation and sound-wall work is due in the second half of 2026, and Microsoft gives no operating date.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "speculative"}} {"site_id": "CA-QC-hydroquebec-drummondville-dc", "name": "Centre de données d'Hydro-Québec (Drummondville)", "aliases": [], "operator": "Hydro-Québec", "owner": null, "tenants": [], "province": "QC", "municipality": "Drummondville", "address": "425 Rue Luneau, Drummondville", "lat": 45.8839, "lon": -72.52789, "coord_precision": "building", "type": "enterprise", "ai": "unknown", "status": "operating", "status_date": "2021-03-31", "mw": 1.6, "mw_basis": "unstated", "mw_note": "1.6 MW in 2021, to be raised gradually to 4.5 MW (Économie Matin, 2021).", "power_source": null, "opened": 2016, "expected_online": null, "approvals": [], "ownership": "Hydro-Québec (Government of Québec)", "sources": [{"url": "https://www.economiematin.fr/?p=51001", "title": "Économie Matin: Québec – France, des partenariats économiques toujours renforcés (press)", "date": "2021-03-31", "quote": "Dans ce nouveau data-center, installé à Drummondville, à 100 km de Montréal, sont stockées toutes les informations de plus de 4 millions de clients", "supports": ["municipality", "operator", "ownership", "ownership_country", "status"], "kind": "press"}, {"url": "https://www.economiematin.fr/?p=51001", "title": "Économie Matin (press)", "date": "2021-03-31", "quote": "Pomerleau a construit l’édifice, livré en 2016", "supports": ["opened"], "kind": "press"}, {"url": "https://www.economiematin.fr/?p=51001", "title": "Économie Matin (press)", "date": "2021-03-31", "quote": "d’une capacité qui sera progressivement portée de 1,6 à 4,5 MW", "supports": ["mw", "mw_note"], "kind": "press"}, {"url": "https://www.economiematin.fr/?p=51001", "title": "Économie Matin: Québec – France, des partenariats économiques toujours renforcés (press)", "date": "2021-03-31", "kind": "press", "quote": "ont également été choisies par Hydro-Québec [...] pour financer, concevoir, construire et exploiter son nouveau centre de gestion de données", "supports": ["notes"]}], "confidence": "medium", "notes": "Hydro-Québec chose Pomerleau and Veolia to finance, design, build and run the building, and who holds title is not published. The latest source is a 2021 press report, so current capacity is not confirmed, and the address comes from OpenStreetMap only.", "checked": "2026-10-25", "mw_figures": [{"mw": 1.6, "basis": "unstated", "stage": "built", "date": "2021-03-31", "source_idx": 2}, {"mw": 4.5, "basis": "unstated", "stage": "planned", "date": "2021-03-31", "source_idx": 2}], "ownership_country": "Canada", "field_confidence": {"location": "likely", "owner": "speculative"}} {"site_id": "CA-QC-cologix-mtl9", "name": "MTL9", "aliases": [], "operator": "Cologix", "owner": null, "tenants": [], "province": "QC", "municipality": "Drummondville", "address": "2525 Rue Canadien, Drummondville", "lat": 45.8793, "lon": -72.54606, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 6.1, "mw_basis": "unstated", "mw_note": "Cologix's overview headline gives 25 MW and 120,000 sq ft, probably the planned build-out; the site page gives a current site capacity of 6.1 MW.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/montreal/", "title": "Cologix: Montréal Data Centers (operator locations page)", "date": "undated", "quote": "MTL9 | Hyperscale Capacity with 120K SQFT, 25 MW | 2525 Rue Canadien, Drummondville, Québec", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/montreal/mtl9/", "title": "Cologix MTL9 facility page", "date": "undated", "quote": "Site capacity: 6.1 MW", "supports": ["mw"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [{"mw": 6.1, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}, {"mw": 25, "basis": "unstated", "stage": "planned", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-keel-farnham", "name": "Farnham", "aliases": ["Bitfarms Farnham", "Keel Infrastructure Farnham"], "operator": "Keel Infrastructure (formerly Bitfarms)", "owner": null, "tenants": [], "province": "QC", "municipality": "Farnham", "address": null, "lat": 45.2831, "lon": -72.97497, "coord_precision": "city", "type": "crypto", "ai": "no", "status": "operating", "status_date": "2026-08-10", "mw": 10, "mw_basis": "facility", "mw_note": "Energized capacity 10 MW (Keel 10-K, March 2026).", "power_source": "hydro grid (Hydro-Québec)", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1812477/000121390026037514/ea0282809-10k_bitfarms.htm", "title": "Bitfarms Ltd 10-K FY2025, Item 2 Properties", "date": "2026-03-31", "quote": "Farnham, Québec, Canada | 10 MW | Leased", "supports": ["mw", "mw_basis", "operator"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1812477/000181247726000023/keel-20260630.htm", "title": "Keel Infrastructure 10-Q (period to 2026-06-30)", "date": "2026-08-10", "quote": "We maintain our legacy Bitcoin Mining operations in Canada to maximize the value of those assets as we work to transition our Québec sites to HPC and AI.", "supports": ["status", "status_date", "type", "notes"], "kind": "public_record"}], "confidence": "high", "notes": "A bitcoin-mining site; Keel says it is moving its Québec sites toward HPC and AI, but has announced no plan for this one. Leased site; no permits or utility filings found.", "checked": "2026-10-25", "mw_figures": [{"mw": 10, "basis": "facility", "stage": "built", "date": "2026-03-31", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "confirmed", "ai": "confirmed", "location": "likely"}} {"site_id": "CA-QC-equinix-ot1", "name": "OT1", "aliases": ["Equinix OT1"], "operator": "Equinix", "owner": null, "tenants": [], "province": "QC", "municipality": "Gatineau", "address": "200 Avenue Lepine, Gatineau, Quebec J8L 0B3", "lat": 45.57535, "lon": -75.39812, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.equinix.com/data-centers/americas-colocation/canada-colocation/ottawa-data-centers/ot1", "title": "Equinix OT1 IBX data center page", "date": "undated", "quote": "Address | 200 Avenue Lepine | Gatineau, Quebec J8L 0B3 | Colocation Space\t1,988 m2 (21,399 ft2)", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://www.sec.gov/Archives/edgar/data/1101239/000156459020045402/d80601d991.htm", "title": "Equinix 8-K Ex.99.1: Equinix Completes US$780 Million Acquisition of 13 Bell Data Centers in Canada", "date": "2020-10-01", "quote": "one in each of the following metros: Kamloops (KA1), Montreal (MT1), Ottawa (OT1)3, Saint John (SJ1), Vancouver (VA1) and Winnipeg (WI1).", "supports": ["notes"], "kind": "public_record"}, {"url": "https://data.sec.gov/submissions/CIK0001101239.json", "date": "undated", "kind": "public_record", "quote": "\"name\":\"EQUINIX INC\" | \"city\":\"REDWOOD CITY\",\"stateOrCountry\":\"CA\"", "supports": ["ownership_country"], "title": "SEC EDGAR company record, EQUINIX INC (Redwood City, California, United States)"}], "confidence": "high", "notes": "Marketed as Ottawa but located in Gatineau (Buckingham sector); Equinix bought it from Bell in 2020, in a closing separate from the other Bell sites. It may be the 'Bell Gatineau Data Centre' that Urbacon lists as built in 2012 with 5.4 MW of critical power, which no primary source confirms.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "United States", "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-ssc-edc-gatineau", "name": "SSC Enterprise Data Centre (EDC Gatineau)", "aliases": ["EDC Gatineau"], "operator": "Shared Services Canada", "owner": null, "tenants": [], "province": "QC", "municipality": "Gatineau", "address": null, "lat": 45.42777, "lon": -75.71098, "coord_precision": "city", "type": "government", "ai": "unknown", "status": "operating", "status_date": "2024-06-30", "mw": null, "mw_basis": null, "mw_note": "Contracted power capacity 1,750 kVA, consumption 1,192 kVA; 13,315 sq ft (SSC open data, June 2024).", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "Government of Canada (Shared Services Canada)", "sources": [{"url": "https://open.canada.ca/data/dataset/3335c550-9b1d-40ac-8877-e7cfb9198925", "title": "SSC open data: Percentage of Time the New Consolidated Data Centre Facilities are Available (enterprise-data-centres-en-june-2024.csv)", "date": "2024-06-30", "kind": "public_record", "quote": "EDC Gatineau,Contracted Power Capacity (kVA),1750", "supports": ["mw_note", "name", "operator", "ownership", "ownership_country", "status"]}], "confidence": "medium", "notes": "The latest SSC data are from June 2024. The building address is not published, and SSC does not say whether it owns the building or leases space.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"location": "likely", "owner": "likely"}} {"site_id": "CA-QC-sato-joliette", "name": "Center One", "aliases": ["SATO AI Factory 1 - Québec", "SATO Quebec"], "operator": "SATO Technologies Corp. (Canada Computational Unlimited Inc.)", "owner": null, "tenants": [], "province": "QC", "municipality": "Joliette", "address": null, "lat": 46.02398, "lon": -73.44199, "coord_precision": "city", "type": "unknown", "ai": "no", "status": "operating", "status_date": "2026-08-26", "mw": null, "mw_basis": null, "mw_note": "SATO describes Center One as a 20 MW hydro-powered facility and does not say whether this is IT load or total power.", "power_source": "hydro grid", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.stockwatch.com/News/Item/Z-C!SATO-3856630/C/SATO", "title": "SATO Technologies Corp. reports second quarter 2026 results (Stockwatch copy of release)", "date": "2026-08-26", "quote": "The company continued discussions with several parties regarding the potential use of Center One for AI and HPC data centre operations.", "supports": ["status", "status_date", "name", "notes"], "kind": "proponent"}, {"url": "https://www.stockwatch.com/News/Item/Z-C!SATO-3856630/C/SATO", "title": "SATO Technologies Corp. reports second quarter 2026 results (Stockwatch copy of release)", "date": "2026-08-26", "kind": "proponent", "quote": "repurpose a portion of Center One, its 20-megawatt hydro-powered facility in Joliette, Que., into high-density AI compute capacity", "supports": ["mw", "mw_basis", "mw_note", "power_source", "municipality"]}, {"url": "https://www.stockwatch.com/News/Item/Z-C!SATO-3856630/C/SATO", "title": "SATO Technologies Corp. reports second quarter 2026 results (Stockwatch copy of release)", "date": "2026-08-26", "kind": "proponent", "quote": "currently operates one data centre tailored to provide computing power for bitcoin mining, and is advancing the conversion of its Joliette, Que., facility", "supports": ["type"]}], "confidence": "medium", "notes": "Bitcoin mining continues, with up to about half the fleet down-clocked in Q2 2026; SATO is in talks about AI and HPC use of part of Center One but has no definitive agreement.", "checked": "2026-10-25", "mw_figures": [{"mw": 20, "basis": "unstated", "stage": "built", "date": "2026-08-26", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely", "ai": "confirmed", "location": "likely"}} {"site_id": "CA-QC-estruxture-mtl-4", "name": "MTL-4", "aliases": [], "operator": "eStruxture Data Centers", "owner": null, "tenants": [], "province": "QC", "municipality": "Kirkland", "address": "17500 Trans Canada Hwy, Kirkland, QC H9J 3A3", "lat": 45.44577, "lon": -73.86945, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 16.5, "mw_basis": "unstated", "mw_note": "The same page also says 'a total capacity of 16MW'.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.estruxture.com/data-centers/montreal", "title": "eStruxture: Montreal data centers (operator locations page)", "date": "undated", "quote": "MTL-4 | 17500 Trans Canada Hwy Kirkland, QC, H9J 3A3", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://www.estruxture.com/data-centers/montreal/mtl-4", "title": "eStruxture MTL-4 facility page", "date": "undated", "quote": "with a scalable total capacity of 16.5MW", "supports": ["mw"], "kind": "proponent"}], "confidence": "high", "notes": "PeeringDB lists 'Aptum MTL2' at this address, probably an earlier operator.", "checked": "2026-10-25", "mw_figures": [{"mw": 16.5, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-microsoft-ancienne-lorette", "name": "Microsoft L'Ancienne-Lorette datacentre", "aliases": ["L'Ancienne-Lorette Data Center", "Microsoft Ancienne Lorette"], "operator": "Microsoft", "owner": null, "tenants": [], "province": "QC", "municipality": "L'Ancienne-Lorette", "address": null, "lat": 46.80637, "lon": -71.35847, "coord_precision": "city", "type": "hyperscale_cloud", "ai": "unknown", "status": "under_construction", "status_date": "2026-05-04", "mw": null, "mw_basis": null, "mw_note": null, "mw_figures": [], "power_source": "hydro grid", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": "United States", "sources": [{"url": "https://news.microsoft.com/en-ca/2023/11/22/microsoft-expands-digital-footprint-in-quebec-with-usd500-million-investment-in-infrastructure-and-skilling-initiatives/", "title": "Microsoft expands digital footprint in Québec (USD 500M)", "date": "2023-11-22", "quote": "future datacentre locations, which are intended to start construction in the coming months in L’Ancienne-Lorette, Donnacona, Saint-Augustin-de-Desmaures, and Lévis", "supports": ["operator", "municipality", "status"], "kind": "proponent"}, {"url": "https://local.microsoft.com/blog/lancienne-lorette-datacentre-construction-update/", "title": "Microsoft: L'Ancienne-Lorette datacentre construction update (modified 2026-05-04)", "date": "2026-05-04", "quote": "Construction of the datacentre began on June 17, 2024.", "supports": ["name", "operator", "municipality", "status"], "kind": "proponent"}, {"url": "https://local.microsoft.com/blog/lancienne-lorette-datacentre-construction-update/", "title": "Microsoft: L'Ancienne-Lorette datacentre construction update (modified 2026-05-04)", "date": "2026-05-04", "quote": "Construction is currently anticipated to be completed by early 2027.", "supports": ["expected_online", "status_date"], "kind": "proponent"}, {"url": "https://data.sec.gov/submissions/CIK0000789019.json", "date": "undated", "kind": "public_record", "quote": "\"name\":\"MICROSOFT CORP\" | \"city\":\"REDMOND\",\"stateOrCountry\":\"WA\"", "supports": ["ownership_country"], "title": "SEC EDGAR company record, MICROSOFT CORP (Redmond, Washington, United States)"}], "confidence": "medium", "field_confidence": {"location": "likely"}, "notes": "Microsoft says construction began on 2024-06-17 and should finish by early 2027. Municipal permits are not confirmed.", "checked": "2026-10-25"} {"site_id": "CA-QC-hive-lachute", "name": "HIVE Canada 1.0 (Lachute)", "aliases": ["HIVE Canada 1.0", "Hive Digital Technologies Lachute"], "operator": "HIVE Digital Technologies", "owner": null, "tenants": [], "province": "QC", "municipality": "Lachute", "address": null, "lat": 45.65605, "lon": -74.34014, "coord_precision": "city", "type": "crypto", "ai": "no", "status": "operating", "status_date": "2026-08-14", "mw": 34.5, "mw_basis": "facility", "mw_note": "34.5 MW available, 29.8 MW in use (HIVE 10-Q, quarter to 2026-06-30).", "power_source": "hydro grid (Hydro-Québec)", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1720424/000106299326004434/form10q.htm", "title": "HIVE Digital Technologies 10-Q (period to 2026-06-30)", "date": "2026-08-14", "quote": "Quebec, Canada leased facility | 1,318 PH/s | 1,513 PH/s | 1,525 PH/s | 29.8 MW | 34.5 MW", "supports": ["status", "status_date", "mw", "mw_basis", "type"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1720424/000106299326004434/form10q.htm", "title": "HIVE Digital Technologies Form 10-Q, quarter ended 2026-06-30", "date": "2026-08-14", "kind": "public_record", "quote": "The Company's headquarters are in San Antonio, Texas, United States, and its registered office is in Vancouver, British Columbia, Canada.", "supports": ["ownership_country"]}, {"url": "https://www.sec.gov/Archives/edgar/data/1720424/000106299326004434/form10q.htm", "title": "HIVE Digital Technologies Form 10-Q, quarter ended 2026-06-30", "date": "2026-08-14", "kind": "public_record", "quote": "Purchase of $0.1 million in data center equipment for Lachute (Québec) Facility", "supports": ["municipality", "name"]}], "confidence": "high", "notes": "A leased bitcoin-mining site.", "checked": "2026-10-25", "mw_figures": [{"mw": 34.5, "basis": "facility", "stage": "built", "date": "2026-08-14", "source_idx": 0}, {"mw": 29.8, "basis": "facility", "stage": "built", "date": "2026-08-14", "source_idx": 0}], "ownership_country": null, "field_confidence": {"ai": "confirmed", "location": "likely"}} {"site_id": "CA-QC-cologix-mtl10", "name": "MTL10", "aliases": [], "operator": "Cologix", "owner": null, "tenants": [], "province": "QC", "municipality": "Longueuil", "address": "530 Rue Bériault Street, Longueuil", "lat": 45.56553, "lon": -73.47536, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 27, "mw_basis": "unstated", "mw_note": "Cologix's overview gives 35 MW of critical power and 180,000 sq ft; the site page gives a site capacity of 27 MW.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/montreal/", "title": "Cologix: Montréal Data Centers (operator locations page)", "date": "undated", "quote": "MTL10 | Montréal Data Center with 180K SQFT and 35 MW | 530 Rue Bériault Street, Longueuil, Québec", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/montreal/mtl10/", "title": "Cologix MTL10 facility page", "date": "undated", "quote": "Site capacity: 27 MW", "supports": ["mw"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [{"mw": 27, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}, {"mw": 35, "basis": "it", "stage": "planned", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-qscale-levis-q01a", "name": "Q01 Campus, Building A", "aliases": ["QScale Campus 1", "QScale Q01 (Lévis)", "QScale Q01 campus — Lévis"], "operator": "QScale", "owner": "Infrastructure at Goldman Sachs Alternatives (with QScale founders and management)", "tenants": ["Hewlett Packard Enterprise", "Micrologic"], "province": "QC", "municipality": "Lévis", "address": "2280 rue Albert-Dion, Lévis, QC G7A 5M9", "lat": 46.67614, "lon": -71.32511, "coord_precision": "address", "type": "ai_hpc", "ai": "yes", "status": "operating", "status_date": "2025-07-31", "mw": null, "mw_basis": null, "mw_note": "No figure is published for Building A alone. The 142 MW Hydro-Québec reservation covers the whole Q01 campus, Buildings A and B (The Logic, 2025-07-31; QScale's campus page also says 142 MW). For the campus, QScale's page gives 114 MW of protected customer IT load and The Logic reported 110 MW of power for servers in July 2025; Building B adds 60 MW of IT (QScale, 2026-06-04). These campus figures do not reconcile and are not this building's own.", "power_source": "hydro grid (Hydro-Québec)", "opened": "2023", "expected_online": null, "approvals": [{"authority": "Hydro-Québec", "instrument": "power reservation", "ref": null, "date": null, "outcome": "approved", "conditions": "142 MW for the whole Q01 campus (A and B), as reported by The Logic; conditions not published.", "url": "https://thelogic.co/?p=1790471"}], "ownership": "Infrastructure at Goldman Sachs Alternatives (since 2026-05-13)", "sources": [{"url": "https://www.qscale.com/news/hewlett-packard-enterprise-hpe-q01-campus", "title": "HPE first anchor tenant at Q01 Campus", "date": "2023-05-22", "quote": "Hewlett Packard Enterprise (NYSE: HPE), the global leader in supercomputing, is the first anchor tenant at the Q01 Campus.", "supports": ["tenants", "opened", "ai"], "kind": "proponent"}, {"url": "https://www.qscale.com/news/320m-financing-growth", "title": "QScale $320M financing", "date": "2024-11-20", "quote": "specifically support the development of phases 3 and 4 of the QScale Q01 Campus.", "supports": ["status"], "kind": "proponent"}, {"url": "https://thelogic.co/?p=1790471", "title": "The Logic on QScale (press)", "date": "2025-07-31", "quote": "The facility currently has 110 megawatts of power for servers across the facility", "supports": ["mw", "status_date", "approvals", "tenants"], "kind": "press"}, {"url": "https://www.qscale.com/q01-campus", "title": "QScale Q01 Campus page", "date": "undated", "quote": "114 MW of protected customer IT load", "supports": ["mw_note", "address"], "kind": "proponent"}, {"url": "https://www.qscale.com/news/goldman-sachs-alternatives-to-acquire-qscale", "title": "Goldman Sachs Alternatives completes QScale acquisition", "date": "2026-05-13", "quote": "Infrastructure at Goldman Sachs Alternatives has closed the acquisition of the company", "supports": ["ownership"], "kind": "proponent"}, {"url": "https://data.sec.gov/submissions/CIK0000886982.json", "title": "SEC EDGAR company record, Goldman Sachs Group Inc", "date": "undated", "kind": "public_record", "quote": "\"city\":\"NEW YORK\",\"stateOrCountry\":\"NY\"", "supports": ["ownership_country"]}, {"url": "https://data.sec.gov/submissions/CIK0001645590.json", "title": "SEC EDGAR company record, Hewlett Packard Enterprise Co", "date": "undated", "kind": "public_record", "quote": "\"city\":\"SPRING\",\"stateOrCountry\":\"TX\"", "supports": ["tenant_countries"]}, {"url": "https://thelogic.co/briefing/quebec-data-centre-firm-qscale-sells-to-goldman-sachs/", "title": "The Logic: Quebec data centre firm QScale sells to Goldman Sachs (press)", "date": "2026-05-14", "quote": "The cloud arm of Hewlett Packard Enterprise is its anchor customer.", "supports": ["tenants"], "kind": "press"}], "confidence": "medium", "notes": "Phase 1 was ready at the end of 2022 and HPE became the anchor tenant in 2023; HPE was still named the anchor customer in May 2026. Micrologic was last named as a user in July 2025, and QScale does not publish a full customer list.", "checked": "2026-10-25", "mw_figures": [{"mw": 142, "basis": "grid_allocation", "stage": "allocated", "date": "2025-07-31", "source_idx": 2}], "ownership_country": "United States", "field_confidence": {"owner": "confirmed", "tenants": "likely"}, "tenant_countries": {"Hewlett Packard Enterprise": "United States", "Micrologic": "Canada"}} {"site_id": "CA-QC-qscale-levis-q01b", "name": "Q01 Campus, Building B", "aliases": ["Q01-Building-B"], "operator": "QScale", "owner": "Infrastructure at Goldman Sachs Alternatives (with QScale founders and management)", "tenants": [], "province": "QC", "municipality": "Lévis", "address": "2280 rue Albert-Dion, Lévis, QC G7A 5M9", "lat": 46.67614, "lon": -71.32511, "coord_precision": "address", "type": "ai_hpc", "ai": "yes", "status": "under_construction", "status_date": "2026-06-04", "mw": 60, "mw_basis": "it", "mw_note": "'The $700-million build will add 60 MW of IT capacity' (QScale, 2026-06-04); no in-service date stated. This is part of, not in addition to, the campus's 142 MW reservation.", "power_source": "hydro grid (Hydro-Québec)", "opened": null, "expected_online": null, "approvals": [], "ownership": "Infrastructure at Goldman Sachs Alternatives", "sources": [{"url": "https://www.qscale.com/news/q01-building-b-60mw-ai-ready-infrastructure", "title": "QScale begins construction of its second building at the Q01 Campus", "date": "2026-06-04", "quote": "construction of its second building (Q01‑Building‑B) at its flagship Q01 Campus in Lévis is now well underway. The $700-million build will add 60 MW of IT capacity", "supports": ["status", "status_date", "mw", "mw_basis", "ai"], "kind": "proponent"}, {"url": "https://www.qscale.com/news/goldman-sachs-alternatives-to-acquire-qscale", "title": "Goldman Sachs Alternatives to Acquire QScale", "date": "2026-05-13", "kind": "proponent", "quote": "Infrastructure at Goldman Sachs Alternatives has closed the acquisition of the company in partnership with QScale's founders and management team, who are reinvesting alongside Goldman Sachs Alternatives", "supports": ["owner"]}, {"url": "https://data.sec.gov/submissions/CIK0000886982.json", "title": "SEC EDGAR company record, Goldman Sachs Group Inc", "date": "undated", "kind": "public_record", "quote": "\"city\":\"NEW YORK\",\"stateOrCountry\":\"NY\"", "supports": ["ownership_country"]}], "confidence": "high", "notes": "Shares the Q01 campus with Building A and falls under the campus's 142 MW Hydro-Québec reservation.", "checked": "2026-10-25", "mw_figures": [{"mw": 60, "basis": "it", "stage": "building", "date": "2026-06-04", "source_idx": 0}], "ownership_country": "United States", "field_confidence": {"owner": "confirmed"}, "tenant_countries": {}} {"site_id": "CA-QC-microsoft-levis", "name": "Lévis datacentre", "aliases": [], "operator": "Microsoft", "owner": null, "tenants": [], "province": "QC", "municipality": "Lévis (Charny)", "address": null, "lat": 46.80331, "lon": -71.17788, "coord_precision": "city", "type": "hyperscale_cloud", "ai": "unknown", "status": "under_construction", "status_date": "2026-04-30", "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://local.microsoft.com/blog/levis-datacenter-project-updates/", "title": "Microsoft: Lévis datacentre project updates (modified 2026-04-30)", "date": "2026-04-30", "quote": "Microsoft began construction of the first phase of the Lévis datacentre in April 2024.", "supports": ["name", "operator", "municipality", "status"], "kind": "proponent"}, {"url": "https://local.microsoft.com/blog/levis-datacenter-project-updates/", "title": "Microsoft: Lévis datacentre project updates (modified 2026-04-30)", "date": "2026-04-30", "quote": "Work on the Lévis datacentre project is progressing. Generator testing has been completed.", "supports": ["status_date"], "kind": "proponent"}], "confidence": "high", "notes": "Construction of the first phase began in April 2024 and generator testing is complete; civil works continue until autumn 2026, with no operating date stated.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "speculative"}} {"site_id": "CA-QC-keel-magog", "name": "Magog", "aliases": ["Bitfarms Magog", "Keel Infrastructure Magog"], "operator": "Keel Infrastructure (formerly Bitfarms)", "owner": null, "tenants": [], "province": "QC", "municipality": "Magog", "address": null, "lat": 45.2658, "lon": -72.14807, "coord_precision": "city", "type": "crypto", "ai": "no", "status": "operating", "status_date": "2026-08-10", "mw": 10, "mw_basis": "facility", "mw_note": "Energized capacity 10 MW (Keel 10-K, March 2026).", "power_source": "hydro grid (Hydro-Magog municipal network)", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1812477/000121390026037514/ea0282809-10k_bitfarms.htm", "title": "Bitfarms Ltd 10-K FY2025, Item 2 Properties", "date": "2026-03-31", "quote": "Magog, Québec, Canada | 10 MW | Leased", "supports": ["mw", "mw_basis", "operator", "power_source"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1812477/000181247726000023/keel-20260630.htm", "title": "Keel Infrastructure 10-Q (period to 2026-06-30)", "date": "2026-08-10", "quote": "We maintain our legacy Bitcoin Mining operations in Canada to maximize the value of those assets as we work to transition our Québec sites to HPC and AI.", "supports": ["status", "status_date", "type"], "kind": "public_record"}], "confidence": "high", "notes": "A bitcoin-mining site; Keel says it is moving its Québec sites toward HPC and AI, but has announced no plan for this one. Hydro-Québec supplies the Magog municipal network that serves it; a new lease was signed in November 2024.", "checked": "2026-10-25", "mw_figures": [{"mw": 10, "basis": "facility", "stage": "built", "date": "2026-03-31", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "confirmed", "ai": "confirmed", "location": "likely"}} {"site_id": "CA-QC-whitefiber-montreal-mtl1", "name": "MTL-1", "aliases": ["Enovum Data Centers - MTL01", "Enovum Datacenters MTL01", "Enovum MTL-1 (Bit Digital)", "WhiteFiber Enovum MTL1"], "operator": "WhiteFiber (Enovum Data Centers)", "owner": "Leased from Bedford Storage Limited Partnership (2020 lease)", "tenants": [], "province": "QC", "municipality": "Montréal", "address": "3195 chemin de Bedford, Montréal, QC", "lat": 45.5086, "lon": -73.6351, "coord_precision": "building", "type": "ai_hpc", "ai": "partial", "status": "operating", "status_date": "2026-08-12", "mw": 4, "mw_basis": "facility", "mw_note": "4 MW gross (WhiteFiber 10-Q, August 2026).", "power_source": "hydro grid (Hydro-Québec)", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/2042022/000121390026088026/ea0300877-10q_whitefiber.htm", "title": "WhiteFiber 10-Q (period to 2026-06-30)", "date": "2026-08-12", "quote": "MTL-1, our 4 MW (gross) Tier-3 high-performance computing (“HPC”) data center in Montreal, Canada, which was fully operational and fully leased to customers", "supports": ["status", "status_date", "mw", "mw_basis", "type", "ai"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/2042022/000121390026034341/ea0278305-10k_white.htm", "title": "WhiteFiber 10-K FY2025", "date": "2026-03-26", "quote": "the lease of MTL-1, our 4 MW (gross) Tier-3 high-performance computing (\"HPC\") data center in Montreal", "supports": ["operator"], "kind": "public_record"}, {"url": "https://data.sec.gov/submissions/CIK0001710350.json", "title": "SEC EDGAR company record, Bit Digital, Inc", "date": "undated", "kind": "public_record", "quote": "\"city\":\"NEW YORK\",\"stateOrCountry\":\"NY\" | \"stateOfIncorporation\":\"E9\"", "supports": ["ownership_country"]}, {"url": "https://www.sec.gov/Archives/edgar/data/2042022/000121390026034341/ea0278305-10k_white.htm", "title": "WhiteFiber 10-K FY2025, exhibit list", "date": "2026-03-26", "kind": "public_record", "quote": "Lease dated March 16, 2020 by and between Bedford Storage Limited Partnership and NWorks Management Corp.", "supports": ["owner"]}, {"url": "https://www.sec.gov/Archives/edgar/data/2042022/000121390026034341/ea0278305-10k_white.htm", "title": "WhiteFiber 10-K FY2025", "date": "2026-03-26", "kind": "public_record", "quote": "We maintain a 64,642 square foot data center (MTL-1) located at 3195 Chem de Bedford Road, Montreal", "supports": ["address", "notes"]}, {"url": "https://www.sec.gov/Archives/edgar/data/2042022/000121390026034341/ea0278305-10k_white.htm", "title": "WhiteFiber 10-K FY2025", "date": "2026-03-26", "kind": "public_record", "quote": "Currently, we provide HPC data center services at our leased MTL-1 and MTL-3 facilities", "supports": ["status"]}], "confidence": "medium", "notes": "WhiteFiber leases the building (64,642 sq ft, lease since 2020 running to 2036) and runs it as an HPC colocation site; it was fully leased to customers, none named, when WhiteFiber bought its operator Enovum in October 2024. WhiteFiber (69.6% held by Bit Digital) and Bit Digital are Cayman Islands companies headquartered in New York.", "checked": "2026-10-25", "mw_figures": [{"mw": 4, "basis": "facility", "stage": "built", "date": "2026-08-12", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-QC-estruxture-mtl-1", "name": "MTL-1", "aliases": [], "operator": "eStruxture Data Centers", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal", "address": "800 Rue du Square Victoria, Montréal, QC H4Z 1A1", "lat": 45.50139, "lon": -73.56192, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 5, "mw_basis": "unstated", "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.estruxture.com/data-centers/montreal", "title": "eStruxture: Montreal data centers (operator locations page)", "date": "undated", "quote": "MTL-1 | 800 Rue du Square Victoria Montreal, QC, H4Z 1A1", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://www.estruxture.com/data-centers/montreal/mtl-1", "title": "eStruxture MTL-1 facility page", "date": "undated", "quote": "with a total capacity of 5MW", "supports": ["mw"], "kind": "proponent"}], "confidence": "high", "notes": "PeeringDB lists 'Netelligent-1' at this address, probably an earlier operator name.", "checked": "2026-10-25", "mw_figures": [{"mw": 5, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-estruxture-mtl-2", "name": "MTL-2", "aliases": [], "operator": "eStruxture Data Centers", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal", "address": "7001 Rue Saint-Jacques, Montréal, QC H4B 3A2", "lat": 45.45769, "lon": -73.63205, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 30, "mw_basis": "unstated", "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.estruxture.com/data-centers/montreal", "title": "eStruxture: Montreal data centers (operator locations page)", "date": "undated", "quote": "MTL-2 | 7001 Rue Saint-Jacques Montreal, QC, H4B 3A2", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://www.estruxture.com/data-centers/montreal/mtl-2", "title": "eStruxture MTL-2 facility page", "date": "undated", "quote": "with a total capacity of 30MW", "supports": ["mw"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [{"mw": 30, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-estruxture-mtl-5", "name": "MTL-5", "aliases": [], "operator": "eStruxture Data Centers", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal", "address": "1080 Beaver Hall, Montréal, QC H2Z 1S8", "lat": 45.50247, "lon": -73.56548, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": null, "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.estruxture.com/data-centers/montreal", "title": "eStruxture: Montreal data centers (operator locations page)", "date": "undated", "quote": "MTL-5 | 1080 Beaver Hall Montreal, QC, H2Z 1S8", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://betakit.com/estruxture-secures-600-million-to-fund-aptum-acquisition-fast-track-canadian-expansion/", "title": "BetaKit: eStruxture secures $600 million to fund Aptum acquisition (press)", "date": "2021-05-05", "quote": "acquiring all eight of Aptum's Canadian data centres—including five in Toronto, two in Montréal, and one in Vancouver", "supports": ["notes"], "kind": "press"}], "confidence": "high", "notes": "A suite (1512) in an office building. PeeringDB lists 'Aptum MTL1' in the same suite; eStruxture bought Aptum's two Montréal data centres in 2021.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-cologix-mtl1", "name": "MTL1", "aliases": [], "operator": "Cologix", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal", "address": "625 Boulevard René-Lévesque West, Montréal", "lat": 45.50258, "lon": -73.56714, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 0.07, "mw_basis": "unstated", "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/montreal/", "title": "Cologix: Montréal Data Centers (operator locations page)", "date": "undated", "quote": "MTL1 | Cologix in Downtown Montréal | 625 Boulevard René-Lévesque West, Montréal, Québec", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/montreal/mtl1/", "title": "Cologix MTL1 facility page", "date": "undated", "quote": "Site capacity: 70kW", "supports": ["mw"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [{"mw": 0.07, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-cologix-mtl11", "name": "MTL11", "aliases": [], "operator": "Cologix", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal", "address": "875 Rue Saint-Antoine, Montréal", "lat": 45.49891, "lon": -73.56456, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 1, "mw_basis": "unstated", "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/montreal/", "title": "Cologix: Montréal Data Centers (operator locations page)", "date": "undated", "quote": "MTL11 | Robust Connectivity at our Second Downtown Montréal Carrier Hotel | 875 Rue Saint-Antoine, Montréal, Québec", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/montreal/mtl11/", "title": "Cologix MTL11 facility page", "date": "undated", "quote": "Site capacity: 1 MW", "supports": ["mw"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [{"mw": 1, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-cologix-mtl3", "name": "MTL3", "aliases": [], "operator": "Cologix", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal", "address": "1250 Boulevard René-Lévesque West, Montréal", "lat": 45.49719, "lon": -73.57047, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 3.2, "mw_basis": "unstated", "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/montreal/", "title": "Cologix: Montréal Data Centers (operator locations page)", "date": "undated", "quote": "MTL3 | The Downtown Montréal Carrier Hotel | 1250 Boulevard René-Lévesque West, Montréal, Québec", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/montreal/mtl3/", "title": "Cologix MTL3 facility page", "date": "undated", "quote": "Site capacity: 3.2 MW", "supports": ["mw"], "kind": "proponent"}], "confidence": "high", "notes": "Downtown carrier hotel; Cologix's central meet-me room for Montréal.", "checked": "2026-10-25", "mw_figures": [{"mw": 3.2, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-cologix-mtl7", "name": "MTL7", "aliases": [], "operator": "Cologix", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal", "address": "1155 Boulevard Robert-Bourassa, Montréal", "lat": 45.50234, "lon": -73.56779, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 3.1, "mw_basis": "facility", "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/montreal/", "title": "Cologix: Montréal Data Centers (operator locations page)", "date": "undated", "quote": "MTL7 | The Downtown Carrier Hotel Annex | 1155 Boulevard Robert-Bourassa, Montréal, Québec", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/montreal/mtl7/", "title": "Cologix MTL7 facility page", "date": "undated", "quote": "Site capacity: 3.1 MW", "supports": ["address", "mw", "mw_basis", "name", "status"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [{"mw": 3.1, "basis": "facility", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-ets-rorqual", "name": "Rorqual (École de technologie supérieure)", "aliases": ["Calcul Quebec - HPC", "Calcul Québec ÉTS", "Narval/Béluga successor"], "operator": "Calcul Québec / École de technologie supérieure", "owner": "École de technologie supérieure (host institution)", "tenants": ["Digital Research Alliance of Canada (national system)"], "province": "QC", "municipality": "Montréal", "address": "École de technologie supérieure, Montréal", "lat": 45.49452, "lon": -73.56286, "coord_precision": "address", "type": "research_hpc", "ai": "yes", "status": "operating", "status_date": "2026-04-01", "mw": null, "mw_basis": null, "mw_note": "Alliance states no figure.", "power_source": "hydro grid (Hydro-Québec)", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://docs.alliancecan.ca/wiki/Rorqual", "title": "Alliance docs: Rorqual", "date": "undated", "quote": "Rorqual est une grappe hétérogène et polyvalente conçue pour une grande variété de calculs scientifiques. Construite par Dell Canada et CDW Canada, Rorqual est située à l'École de technologie supérieure.", "supports": ["name", "operator", "status", "ai", "location"], "kind": "proponent"}, {"url": "https://alliancecan.ca/en/about/alliance", "title": "Digital Research Alliance of Canada: About the Alliance", "date": "undated", "quote": "The Digital Research Alliance of Canada (the Alliance) is a national not-for-profit membership-based organization", "supports": ["tenant_countries"], "kind": "proponent"}, {"url": "https://docs.alliancecan.ca/wiki/Rorqual/en", "title": "Rorqual (Alliance documentation, English)", "date": "2026-04-01", "kind": "proponent", "quote": "Availability: June 19, 2025", "supports": ["status", "opened"]}, {"url": "https://www.calculquebec.ca/en/?p=2119", "title": "Calcul Québec: Launch event of supercomputer Béluga at ÉTS", "date": "2019-04-26", "kind": "proponent", "quote": "gathered at the École de technologie supérieure (ÉTS), where the supercomputer", "supports": ["notes"]}], "confidence": "medium", "notes": "Alliance national system with 372 NVIDIA H100 GPUs (93 four-GPU nodes in Alliance's node table), available since June 2025 at ÉTS, which has hosted Calcul Québec's Béluga supercomputer since 2019. The host institution is shown as owner, but who holds title to the hardware is not published.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"owner": "likely", "tenants": "confirmed"}, "tenant_countries": {"Digital Research Alliance of Canada (national system)": "Canada"}} {"site_id": "CA-QC-ssc-edc-montreal", "name": "SSC Enterprise Data Centre (EDC Montreal)", "aliases": ["EDC Montreal"], "operator": "Shared Services Canada", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal", "address": null, "lat": 45.50318, "lon": -73.56981, "coord_precision": "city", "type": "government", "ai": "unknown", "status": "operating", "status_date": "2024-06-30", "mw": null, "mw_basis": null, "mw_note": "Contracted power capacity 1,450 kVA, consumption 623 kVA; 10,772 sq ft (SSC open data, June 2024).", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": "Government of Canada (Shared Services Canada)", "sources": [{"url": "https://open.canada.ca/data/dataset/3335c550-9b1d-40ac-8877-e7cfb9198925", "title": "SSC open data: Percentage of Time the New Consolidated Data Centre Facilities are Available (enterprise-data-centres-en-june-2024.csv)", "date": "2024-06-30", "kind": "public_record", "quote": "EDC Montreal,Contracted Power Capacity (kVA),1450", "supports": ["mw_note", "name", "operator", "ownership", "ownership_country", "status"]}], "confidence": "medium", "notes": "The latest SSC data are from June 2024. The building address is not published, and SSC does not say whether it owns the building or leases space.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"location": "likely", "owner": "likely"}} {"site_id": "CA-QC-smartdc-montreal", "name": "Smartdc Montreal", "aliases": ["SmartDC MTL-1", "Ubisoft Montreal data center"], "operator": "Smartdc (i3D.net)", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal", "address": "4101 rue Molson, Montréal", "lat": 45.54171, "lon": -73.56494, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": "2023-11-09", "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.smartdc.net/smartdc-new-data-center-paris-montreal/", "title": "Smartdc expands internationally with new data centers in Paris and Montreal", "date": "2023-11-09", "quote": "took over the management of two previously internal Ubisoft data centers— in Montreal, Canada and Paris, France.", "supports": ["operator", "status", "aliases"], "kind": "proponent"}, {"url": "https://www.smartdc.net/data-centers/locations/montreal/", "title": "Smartdc: Montreal location page", "date": "undated", "quote": "Situated in close proximity to downtown Montreal, the data center provides accessibility for large-scale power capacity and carrier-neutral connectivity options", "supports": ["name", "municipality"], "kind": "proponent"}, {"url": "https://www.smartdc.net/data-centers/locations/montreal/", "date": "undated", "kind": "proponent", "quote": "Smartdc Montreal 4101 rue Molson 2nd floor, suite 200 H1Y 3L1 Montreal", "supports": ["address", "location"], "title": "Smartdc, Montreal data centre"}], "confidence": "medium", "notes": null, "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "likely"}} {"site_id": "CA-QC-cologix-mtl4", "name": "MTL4", "aliases": [], "operator": "Cologix", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal (Anjou)", "address": "7171 Rue Jean-Talon East, Montréal", "lat": 45.59899, "lon": -73.56958, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 2.3, "mw_basis": "unstated", "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/montreal/", "title": "Cologix: Montréal Data Centers (operator locations page)", "date": "undated", "quote": "MTL4 | Cologix North Side Enterprise-Grade Facility | 7171 Rue Jean-Talon East, Montréal, Québec", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/montreal/mtl4/", "title": "Cologix MTL4 facility page", "date": "undated", "quote": "Site capacity: 2.3 MW", "supports": ["mw"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [{"mw": 2.3, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-leaseweb-mtl-02", "name": "MTL-02 (MNE)", "aliases": ["Leaseweb MTL-02"], "operator": "Leaseweb Canada", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal (LaSalle)", "address": "7207 Boulevard Newman, LaSalle, QC H8N 2K3", "lat": 45.44343, "lon": -73.61804, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": 2011, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.leaseweb.com/en/why-leaseweb/platform/data-centers/mtl-02", "title": "Leaseweb: Montréal MTL-02 Data Center", "date": "undated", "quote": "Montreal MTL-02(MNE) Data Center | 7207 Boulevard Newman, LaSalle, QC H8N 2K3, Canada", "supports": ["name", "operator", "address", "municipality", "status"], "kind": "proponent"}, {"url": "https://www.leaseweb.com/en/why-leaseweb/platform/data-centers/mtl-02", "title": "Leaseweb: Montréal MTL-02 Data Center", "date": "undated", "quote": "Opened in 2011, this is our Montreal flagship data center", "supports": ["opened"], "kind": "proponent"}], "confidence": "high", "notes": "Leaseweb's flagship Montréal data centre, opened in 2011.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "likely"}} {"site_id": "CA-QC-compass-montreal-i", "name": "Montreal I", "aliases": ["ROOT MTL-R1", "Root Data Center MTL-R1"], "operator": "Compass Datacenters", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal (LaSalle)", "address": null, "lat": 45.4389, "lon": -73.6437, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": "2023-10-16", "mw": null, "mw_basis": null, "mw_note": "Compass said in 2023 that its two Montréal campuses together supply more than 35 MW; no per-site figure.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.compassdatacenters.com/fr/montreal/", "title": "Compass Datacenters: Montréal (operator page, FR)", "date": "2023-10-16", "quote": "Montréal abrite actuellement deux campus qui fournissent plus de 35 MW d’énergie 100 % verte fournie par HydroQuebec.", "supports": ["operator", "status", "municipality"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/2217", "title": "PeeringDB facility 2217 (Root Data Center MTL-R1)", "date": "undated", "quote": "2711 Dollard Ave", "supports": ["aliases", "municipality"], "kind": "directory"}, {"url": "https://www.datacenterfrontier.com/cloud/article/11429512/compass-acquires-root-to-enter-montreal-data-center-market", "title": "Compass Acquires ROOT to Enter Montreal Data Center Market", "date": "2019-07-23", "kind": "press", "quote": "Compass has completed the acquisition of ROOT Data Center, which owns and operates facilities in Montreal.", "supports": ["aliases", "notes"]}, {"url": "https://www.datacenterfrontier.com/colocation/article/55329299/centersquare-launches-1-billion-expansion-to-scale-an-ai-ready-north-american-data-center-platform", "title": "Centersquare Launches $1 Billion Expansion to Scale an AI-Ready North American Data Center Platform", "date": "2025-11-19", "kind": "press", "quote": "The company also acquired eight additional colocation data centers in Dallas, Tulsa, Nashville, Raleigh, Toronto, and Montréal", "supports": ["notes"]}], "confidence": "medium", "notes": "Compass's current markets page no longer lists Montréal, and Centersquare reported in November 2025 that it had bought colocation data centres in several cities including Montréal without naming them; a directory identifies this site as one of them, which no primary source confirms.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "likely"}} {"site_id": "CA-QC-cologix-mtl5", "name": "MTL5", "aliases": [], "operator": "Cologix", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal (Saint-Laurent)", "address": "2351 Boulevard Alfred-Nobel, Montréal", "lat": 45.48425, "lon": -73.7606, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 0.415, "mw_basis": "unstated", "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/montreal/", "title": "Cologix: Montréal Data Centers (operator locations page)", "date": "undated", "quote": "MTL5 | Value Data Center With Easy Access to Airport | 2351 Boulevard Alfred-Nobel, Montréal, Québec", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/montreal/mtl5/", "title": "Cologix MTL5 facility page", "date": "undated", "quote": "Site capacity: 415 kW", "supports": ["mw"], "kind": "proponent"}], "confidence": "high", "notes": "Cologix and PeeringDB give 2351, used here.", "checked": "2026-10-25", "mw_figures": [{"mw": 0.415, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-cologix-mtl6", "name": "MTL6", "aliases": [], "operator": "Cologix", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal (Saint-Laurent)", "address": "2341 Boulevard Alfred-Nobel, Montréal", "lat": 45.48252, "lon": -73.76015, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 0.415, "mw_basis": "unstated", "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/montreal/", "title": "Cologix: Montréal Data Centers (operator locations page)", "date": "undated", "quote": "MTL6 | Cologix at Montréal’s Technoparc | 2341 Boulevard Alfred-Nobel, Montréal, Québec", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/montreal/mtl6/", "title": "Cologix MTL6 facility page", "date": "undated", "quote": "Site capacity: 415 kW", "supports": ["mw"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [{"mw": 0.415, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-cologix-mtl8", "name": "MTL8", "aliases": [], "operator": "Cologix", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal (Saint-Laurent)", "address": "7350 Frederick-Banting Street, Montréal", "lat": 45.48108, "lon": -73.76992, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 21, "mw_basis": "unstated", "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/montreal/", "title": "Cologix: Montréal Data Centers (operator locations page)", "date": "undated", "quote": "MTL8 | High-Capacity Growth at Montréal’s Technoparc | 7350 Frederick-Banting Street, Montréal, Québec", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/montreal/mtl8/", "title": "Cologix MTL8 facility page", "date": "undated", "quote": "Site capacity: 21 MW", "supports": ["mw"], "kind": "proponent"}], "confidence": "high", "notes": "206,000 sq ft (operator page).", "checked": "2026-10-25", "mw_figures": [{"mw": 21, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-vantage-qc1", "name": "Montreal I (QC1)", "aliases": ["QC1", "Vantage Montreal I"], "operator": "Vantage Data Centers", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal (Saint-Laurent)", "address": "2900 Avenue Marie Curie, Saint-Laurent, QC", "lat": 45.48646, "lon": -73.7554, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 11, "mw_basis": "it", "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://vantage-dc.com/data-center-locations/north-america/montreal-i-canada/", "title": "Vantage: Montreal I (QC1) Data Center", "date": "undated", "quote": "our five-acre purpose-built Montreal data center offering 11MW of critical IT load in its 60,000 square feet of space", "supports": ["name", "operator", "municipality", "status", "mw"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/5682", "title": "PeeringDB facility 5682", "date": "undated", "quote": "2900 Avenue Marie Curie", "supports": ["address"], "kind": "directory"}], "confidence": "high", "notes": "PeeringDB lists the reseller Hive Data Center Inc. (not HIVE Digital) at this address, probably a tenant.", "checked": "2026-10-25", "mw_figures": [{"mw": 11, "basis": "it", "stage": "built", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "likely"}} {"site_id": "CA-QC-cologix-mtl12", "name": "MTL12", "aliases": [], "operator": "Cologix", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal (Verdun)", "address": "3000 René-Lévesque Boulevard, Verdun", "lat": 45.46697, "lon": -73.54132, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 2.493, "mw_basis": "unstated", "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/montreal/", "title": "Cologix: Montréal Data Centers (operator locations page)", "date": "undated", "quote": "MTL12 | Cologix at Nun's Island | 3000 René-Lévesque Boulevard, Verdun, Québec", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/montreal/mtl12/", "title": "Cologix MTL12 facility page", "date": "undated", "quote": "Site capacity: 2.493 MW", "supports": ["mw"], "kind": "proponent"}], "confidence": "high", "notes": "Adjacent to MTL2 on Nuns' Island.", "checked": "2026-10-25", "mw_figures": [{"mw": 2.493, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "likely"}} {"site_id": "CA-QC-cologix-mtl2", "name": "MTL2", "aliases": [], "operator": "Cologix", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal (Verdun)", "address": "3000 Boulevard René-Lévesque, Verdun", "lat": 45.46697, "lon": -73.54132, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 1.125, "mw_basis": "unstated", "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://cologix.com/data-centers/montreal/", "title": "Cologix: Montréal Data Centers (operator locations page)", "date": "undated", "quote": "MTL2 | Cologix at Nun’s Island | 3000 Boulevard René-Lévesque, Verdun, Québec", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://cologix.com/data-centers/montreal/mtl2/", "title": "Cologix MTL2 facility page", "date": "undated", "quote": "Site capacity: 1.125 MW", "supports": ["mw"], "kind": "proponent"}], "confidence": "high", "notes": null, "checked": "2026-10-25", "mw_figures": [{"mw": 1.125, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-leaseweb-mtl-01", "name": "MTL-01 (MCO)", "aliases": ["Leaseweb MTL-01", "iWeb"], "operator": "Leaseweb Canada", "owner": null, "tenants": [], "province": "QC", "municipality": "Montréal (Verdun, Nuns' Island)", "address": "20 Place du Commerce, Nuns' Island, Montréal", "lat": 45.46793, "lon": -73.5381, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": 1998, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.leaseweb.com/en/why-leaseweb/platform/data-centers/mtl-01", "title": "Leaseweb: Montréal MTL-01 Data Center", "date": "undated", "quote": "Montreal MTL-01(MCO) Data Center | 20 Place du commerce, Nuns' Island,", "supports": ["name", "operator", "address", "municipality", "status"], "kind": "proponent"}, {"url": "https://www.leaseweb.com/en/why-leaseweb/platform/data-centers/mtl-01", "title": "Leaseweb: Montréal MTL-01 Data Center", "date": "undated", "quote": "designed and constructed to meet the strict requirements of security and redundancy of Laurentian Bank in 1998", "supports": ["opened"], "kind": "proponent"}], "confidence": "high", "notes": "Built in 1998 for Laurentian Bank; about 13,200 sq ft of colocation space (operator).", "checked": "2026-10-25", "mw_figures": [], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-vantage-qc4", "name": "Montreal II (QC4) campus", "aliases": ["QC4", "Vantage Montreal II"], "operator": "Vantage Data Centers", "owner": null, "tenants": [], "province": "QC", "municipality": "Pointe-Claire", "address": "2800 Route Transcanadienne, Pointe-Claire, QC", "lat": 45.47507, "lon": -73.80085, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 50, "mw_basis": "buildout", "mw_note": "Three facilities totalling 50 MW of critical IT load at full build (the same page also says 48 MW once fully developed); the built share is not stated.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://vantage-dc.com/data-center-locations/north-america/montreal-ii-canada/", "title": "Vantage: Montreal II (QC4) Data Center Campus", "date": "undated", "quote": "this 10-acre site will include three facilities totaling 50MW of critical IT load and 320,000 gross square feet of space", "supports": ["name", "operator", "municipality", "status", "mw"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/8256", "title": "PeeringDB facility 8256", "date": "undated", "quote": "2800 Route Transcanadienne", "supports": ["address"], "kind": "directory"}], "confidence": "high", "notes": "PeeringDB lists Hive Data Center and DNSnetworks at this address, probably resellers inside the campus.", "checked": "2026-10-25", "mw_figures": [{"mw": 50, "basis": "buildout", "stage": "planned", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "likely"}} {"site_id": "CA-QC-vantage-qc2", "name": "Quebec City (QC2) campus: QC21-QC23", "aliases": ["QC2", "QC21", "QC22", "QC23", "Vantage Québec City"], "operator": "Vantage Data Centers", "owner": null, "tenants": [], "province": "QC", "municipality": "Québec", "address": "2675 Boulevard du Parc-Technologique, Québec, QC", "lat": 46.79612, "lon": -71.30702, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "86 MW of critical IT load across four data centres at full build, including QC24 (32 MW, under construction, listed separately).", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://vantage-dc.com/data-center-locations/north-america/quebec-city-canada/", "title": "Vantage: Quebec City (QC2) Data Center Campus", "date": "undated", "quote": "Our eco-friendly campus in Quebec City spans 30 acres and features four state-of-the-art data centers, offering a combined 86MW of critical IT load", "supports": ["name", "operator", "municipality", "status", "mw_note"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/5681", "title": "PeeringDB facility 5681", "date": "undated", "quote": "2675 Boulevard du Parc Technologique", "supports": ["address"], "kind": "directory"}, {"url": "https://vantage-dc.com/news/vantage-data-centers-invests-500-million-cad-to-drive-economic-growth-sustainability-and-innovation-in-quebec/", "title": "Vantage Data Centers invests $500 million CAD ... in Quebec (news release)", "date": "2025-02-27", "quote": "QC24, the fourth and final facility on the company’s growing Quebec City campus", "supports": ["notes"], "kind": "proponent"}], "confidence": "high", "notes": "Vantage entered Québec City by acquiring 4Degrees Colocation. The operating QC21 to QC23 share of the campus figure (about 54 MW by subtraction) is not stated by Vantage.", "checked": "2026-10-25", "mw_figures": [{"mw": 86, "basis": "buildout", "stage": "planned", "date": "undated", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "likely"}} {"site_id": "CA-QC-ulaval-tamia", "name": "tamIA (Université Laval)", "aliases": ["Mila tamIA cluster"], "operator": "Université Laval, co-managed with Mila and Calcul Québec", "owner": "Université Laval (host institution)", "tenants": [], "province": "QC", "municipality": "Québec", "address": null, "lat": 46.78117, "lon": -71.27414, "coord_precision": "area", "type": "research_hpc", "ai": "yes", "status": "operating", "status_date": "2026-08-10", "mw": null, "mw_basis": "unstated", "mw_note": "MW not stated.", "power_source": "hydro grid (Hydro-Québec)", "opened": 2025, "expected_online": null, "approvals": [], "ownership": "Université Laval (public university)", "sources": [{"url": "https://docs.alliancecan.ca/wiki/TamIA", "title": "Alliance docs: tamIA", "date": "undated", "quote": "tamIA est située à l'Université Laval et est co-gérée avec Mila et Calcul Québec.", "supports": ["operator", "municipality", "status", "ai"], "kind": "proponent"}, {"url": "https://docs.alliancecan.ca/wiki/TamIA", "title": "Alliance docs: tamIA", "date": "2026-08-10", "kind": "proponent", "quote": "Disponibilité : 31 mars 2025", "supports": ["opened", "status_date"]}, {"url": "https://docs.alliancecan.ca/wiki/TamIA", "title": "Alliance docs: tamIA", "date": "2026-08-10", "kind": "proponent", "quote": "12 | 64 | 1024GB | 2 x Intel Xeon Gold 6448Y 2,1 GHz, 32C | 1 x SSD de 7.68TB | 8 x NVIDIA HGX H200 SXM 141GB HBM3 700W", "supports": ["notes"]}, {"url": "https://docs.alliancecan.ca/wiki/TamIA", "title": "Alliance docs: tamIA", "date": "2026-08-10", "kind": "proponent", "quote": "53 | 48 | 512GB | 2 x Intel Xeon Gold 6442Y 2,6 GHz, 24C | 1 x SSD de 7.68TB | 4 x NVIDIA HGX H100 SXM 80GB HBM3 700W", "supports": ["notes"]}], "confidence": "medium", "notes": "An AI cluster for Canadian researchers, in service since March 2025, with 12 nodes of eight NVIDIA H200 GPUs and 53 nodes of four H100 GPUs; its power draw is not published. The host university is shown as owner, but who holds title to the hardware is not published.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"owner": "likely"}, "tenant_countries": {}} {"site_id": "CA-QC-telus-rimouski", "name": "TELUS Sovereign AI Factory, Rimouski", "aliases": ["Sovereign AI Factory", "Telus - Super Internet Data Center (SIDC)", "Telus Rimouski Sovereign AI Factory"], "operator": "TELUS", "owner": "TELUS Corporation", "tenants": ["OpenText", "Accenture"], "province": "QC", "municipality": "Rimouski", "address": null, "lat": 48.45016, "lon": -68.52997, "coord_precision": "city", "type": "enterprise", "ai": "yes", "status": "operating", "status_date": "2026-07-31", "mw": null, "mw_basis": null, "mw_note": null, "power_source": "hydro grid", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.telus.com/en/about/news-and-events/media-releases/telus-opens-canadas-first-fully-sovereign-ai-factory", "title": "TELUS opens Canada's first fully Sovereign AI Factory", "date": "2025-09-24", "quote": "TELUS today announced the opening of Canada’s first fully sovereign AI factory, in Rimouski, Quebec", "supports": ["name", "operator", "ai"], "kind": "proponent"}, {"url": "https://www.telus.com/en/about/news-and-events/media-releases/telus-to-launch-sovereign-ai-factories-in-kamloops-and-rimouski-propelling-canada-to-the-forefront-of-ai-innovation", "title": "TELUS to launch Sovereign AI Factories in Kamloops and Rimouski", "date": "2025-04-15", "quote": "Located within TELUS’ state-of-the-art data centres in Rimouski and Kamloops", "supports": ["type", "notes"], "kind": "proponent"}, {"url": "https://www.sec.gov/Archives/edgar/data/0000868675/000110465926088973/tu-20260630xex99d2.htm", "title": "TELUS Q2 2026 report (6-K exhibit)", "date": "2026-07-31", "quote": "Our Sovereign AI Factory in Rimouski is now operating at full capacity.", "supports": ["status", "status_date"], "kind": "public_record"}, {"url": "https://top500.org/site/51104", "title": "TOP500 site: Sovereign AI Factory", "date": "2026-06", "quote": "Sovereign AI Factory - HPE Cray XD670, Xeon Platinum 8562Y+ 32C 2.8GHz, NVIDIA H200 SXM5 141 GB, Infiniband NDR400", "supports": ["ai"], "kind": "directory"}, {"url": "https://www.sec.gov/Archives/edgar/data/868675/000110465926088973/tu-20260630xex99d2.htm", "title": "TELUS Q2 2026 MD&A (6-K exhibit 99.2)", "date": "2026-07-31", "kind": "public_record", "quote": "Our Sovereign AI Factory in Rimouski is now operating at full capacity.", "supports": ["owner", "operator"]}, {"url": "https://data.sec.gov/submissions/CIK0000868675.json", "title": "SEC EDGAR company record, TELUS Corp", "date": "undated", "kind": "public_record", "quote": "\"city\":\"VANCOUVER\" | \"stateOrCountryDescription\":\"British Columbia, Canada\"", "supports": ["ownership_country"]}, {"url": "https://rcrwireless.com/20250926/ai-infrastructure/telus-ai-factory", "title": "RCR Wireless, Telus launches Canada's first sovereign AI factory", "date": "2025-09-26", "kind": "press", "quote": "Accenture will deploy sector-specific AI solutions for regulated industries, while OpenText will use the platform to deliver enterprise AI services through its Aviator platform to Canadian customers.", "supports": ["tenants"]}, {"url": "https://data.sec.gov/submissions/CIK0001002638.json", "title": "SEC EDGAR company record, Open Text Corp", "date": "undated", "kind": "public_record", "quote": "\"street1\":\"275 FRANK TOMPA DRIVE\",\"street2\":\"WATERLOO\" | \"stateOrCountryDescription\":\"Ontario, Canada\"", "supports": ["tenant_countries"]}, {"url": "https://data.sec.gov/submissions/CIK0001467373.json", "title": "SEC EDGAR company record, Accenture plc", "date": "undated", "kind": "public_record", "quote": "\"city\":\"DUBLIN\" | \"stateOrCountryDescription\":\"Ireland\"", "supports": ["tenant_countries"]}], "confidence": "medium", "notes": "The AI Factory sits inside TELUS's existing Rimouski data centre and was at full capacity by mid-2026. TOP500 (June 2026) lists an HPE Cray XD670 with NVIDIA H200 GPUs (22.74 PFlop/s); press reports about 500 H200, which no primary source confirms.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "Canada", "field_confidence": {"owner": "likely", "tenants": "likely", "location": "likely"}, "tenant_countries": {"OpenText": "Canada", "Accenture": "Ireland"}} {"site_id": "CA-QC-keel-sainthyacinthe", "name": "Saint-Hyacinthe", "aliases": ["Bitfarms Saint-Hyacinthe", "Keel Infrastructure Saint-Hyacinthe"], "operator": "Keel Infrastructure (formerly Bitfarms)", "owner": null, "tenants": [], "province": "QC", "municipality": "Saint-Hyacinthe", "address": null, "lat": 45.62748, "lon": -72.94064, "coord_precision": "city", "type": "crypto", "ai": "no", "status": "operating", "status_date": "2026-08-10", "mw": 15, "mw_basis": "facility", "mw_note": "Energized capacity 15 MW (Keel 10-K, March 2026).", "power_source": "hydro grid (Hydro-Québec)", "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1812477/000121390026037514/ea0282809-10k_bitfarms.htm", "title": "Bitfarms Ltd 10-K FY2025, Item 2 Properties", "date": "2026-03-31", "quote": "Saint-Hyacinthe, Québec, Canada | 15 MW | Leased", "supports": ["mw", "mw_basis", "operator"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1812477/000181247726000023/keel-20260630.htm", "title": "Keel Infrastructure 10-Q (period to 2026-06-30)", "date": "2026-08-10", "quote": "We maintain our legacy Bitcoin Mining operations in Canada to maximize the value of those assets as we work to transition our Québec sites to HPC and AI.", "supports": ["status", "status_date", "type"], "kind": "public_record"}], "confidence": "high", "notes": "A bitcoin-mining site; Keel says it is moving its Québec sites toward HPC and AI, but has announced no plan for this one. No permits or utility filings found.", "checked": "2026-10-25", "mw_figures": [{"mw": 15, "basis": "facility", "stage": "built", "date": "2026-03-31", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "confirmed", "ai": "confirmed", "location": "likely"}} {"site_id": "CA-QC-whitefiber-stjerome-mtl3", "name": "MTL-3", "aliases": ["Cerebras Saint-Jérôme", "Enovum Data Centers - MTL03", "Enovum MTL-3 (St-Jérôme)", "WhiteFiber Enovum MTL3"], "operator": "WhiteFiber (Enovum Data Centers)", "owner": "WhiteFiber, Inc. (about 69.6% owned by Bit Digital, Inc.)", "tenants": ["Cerebras"], "province": "QC", "municipality": "Saint-Jérôme", "address": "500 boulevard Monseigneur-Dubois, Saint-Jérôme, QC J7Y 3L8", "lat": 45.78556, "lon": -74.01838, "coord_precision": "address", "type": "ai_hpc", "ai": "yes", "status": "operating", "status_date": "2026-08-12", "mw": 7, "mw_basis": "facility", "mw_note": "7 MW gross; Cerebras 5 MW IT load (WhiteFiber 10-K and 10-Q); expansion is subject to utility approvals.", "power_source": "hydro grid (Hydro-Québec)", "opened": "2025", "expected_online": null, "approvals": [], "ownership": "WhiteFiber Inc. (property bought 2026-05-08)", "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/2042022/000121390026088026/ea0300877-10q_whitefiber.htm", "title": "WhiteFiber 10-Q (period to 2026-06-30)", "date": "2026-08-12", "quote": "The increase was primarily due to the MTL-3 site becoming fully operational and generating revenues beginning November 2025.", "supports": ["status", "status_date", "opened"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/2042022/000121390026088026/ea0300877-10q_whitefiber.htm", "title": "WhiteFiber 10-Q (period to 2026-06-30)", "date": "2026-08-12", "quote": "being developed into a 7 MW (gross) Tier-3 data center. It will support current contracted capacity, with Cerebras (5 MW IT Load)", "supports": ["mw", "mw_basis", "tenants", "ai"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/2042022/000121390026034341/ea0278305-10k_white.htm", "title": "WhiteFiber 10-K FY2025", "date": "2026-03-26", "quote": "On April 10, 2025, we entered into a lease for a new data center site (MTL-3) at 500 Bd Monseigneur — Dubois, Saint-Jerome", "supports": ["address", "power_source"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/2042022/000121390026088026/ea0300877-10q_whitefiber.htm", "title": "WhiteFiber, Inc. 10-Q, quarter ended 2026-06-30", "date": "2026-08-12", "kind": "public_record", "quote": "On May 8, 2026, the Company acquired the land and building comprising its MTL-3 facility in Saint-Jérôme, Québec | The site has commenced billing its customer, Cerebras, as of November 1, 2025 | As of the date of this Form 10-Q, Bit Digital owns approximately 69.6% of WhiteFiber.", "supports": ["owner", "tenants"]}, {"url": "https://data.sec.gov/submissions/CIK0002042022.json", "title": "SEC EDGAR company record, WhiteFiber, Inc.", "date": "undated", "kind": "public_record", "quote": "\"city\":\"NEW YORK\",\"stateOrCountry\":\"NY\" | \"stateOfIncorporation\":\"E9\"", "supports": ["ownership_country"]}, {"url": "https://data.sec.gov/submissions/CIK0001710350.json", "title": "SEC EDGAR company record, Bit Digital, Inc", "date": "undated", "kind": "public_record", "quote": "\"city\":\"NEW YORK\",\"stateOrCountry\":\"NY\" | \"stateOfIncorporation\":\"E9\"", "supports": ["ownership_country"]}, {"url": "https://data.sec.gov/submissions/CIK0002021728.json", "title": "SEC EDGAR company record, Cerebras Systems Inc.", "date": "undated", "kind": "public_record", "quote": "\"city\":\"SUNNYVALE\",\"stateOrCountry\":\"CA\"", "supports": ["tenant_countries"]}], "confidence": "high", "notes": "Fully operational since November 2025, with Cerebras contracted for 5 MW of IT load over five years; WhiteFiber bought the property in May 2026 for C$24.2 million. WhiteFiber and its parent Bit Digital are Cayman Islands companies headquartered in New York, so the United States is shown.", "checked": "2026-10-25", "mw_figures": [{"mw": 7, "basis": "facility", "stage": "built", "date": "2026-08-12", "source_idx": 1}, {"mw": 5, "basis": "it", "stage": "built", "date": "2026-08-12", "source_idx": 1}], "ownership_country": "United States", "field_confidence": {"owner": "confirmed", "tenants": "confirmed"}, "tenant_countries": {"Cerebras": "United States"}} {"site_id": "CA-QC-equinix-mt1", "name": "MT1", "aliases": ["Equinix MT1"], "operator": "Equinix", "owner": null, "tenants": [], "province": "QC", "municipality": "Saint-Laurent (Montréal)", "address": "6205 Vanden Abeele Street, Saint Laurent, Quebec H4S 1S1", "lat": 45.48897, "lon": -73.74558, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.equinix.com/data-centers/americas-colocation/canada-colocation/montreal-data-centers/mt1", "title": "Equinix MT1 IBX data center page", "date": "undated", "quote": "Address | 6205 Vanden Abeele Street | Saint Laurent, Quebec H4S 1S1 | Colocation Space\t5,846 m2 (62,926 ft2)", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://www.sec.gov/Archives/edgar/data/1101239/000156459020045402/d80601d991.htm", "title": "Equinix 8-K Ex.99.1: Equinix Completes US$780 Million Acquisition of 13 Bell Data Centers in Canada", "date": "2020-10-01", "quote": "one in each of the following metros: Kamloops (KA1), Montreal (MT1), Ottawa (OT1)3, Saint John (SJ1), Vancouver (VA1) and Winnipeg (WI1).", "supports": ["notes"], "kind": "public_record"}, {"url": "https://data.sec.gov/submissions/CIK0001101239.json", "date": "undated", "kind": "public_record", "quote": "\"name\":\"EQUINIX INC\" | \"city\":\"REDWOOD CITY\",\"stateOrCountry\":\"CA\"", "supports": ["ownership_country"], "title": "SEC EDGAR company record, EQUINIX INC (Redwood City, California, United States)"}], "confidence": "high", "notes": "Equinix bought this site from Bell in 2020.", "checked": "2026-10-25", "mw_figures": [], "ownership_country": "United States", "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-nordik-shawinigan-ndc1", "name": "NDC1", "aliases": ["Nordik NDC1"], "operator": "Nordik Data Centers", "owner": null, "tenants": [], "province": "QC", "municipality": "Shawinigan", "address": "4155 rue Burrill, Shawinigan, Québec, G9N 0C3", "lat": 46.56349, "lon": -72.77631, "coord_precision": "address", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 5, "mw_basis": "unstated", "mw_note": "5 MW infrastructure (operator); more than 46,000 sq ft of buildings in phase 1.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://nordikdatacenters.com/", "title": "Nordik Data Centers homepage", "date": "undated", "quote": "La phase 1 du projet Nordik Data CENTERS (NDC1 ) offre plus de 46 000 pc de bâtiments prêt à accueillir et protéger vos données", "supports": ["name", "operator", "status"], "kind": "proponent"}, {"url": "https://nordikdatacenters.com/", "title": "Nordik Data Centers homepage", "date": "undated", "quote": "UNE INFRASTRUCTURE DE 5 MW | Addresse: 4155 rue Burrill, Shawinigan, Québec, G9N 0C3, Canada", "supports": ["mw", "address", "municipality"], "kind": "proponent"}, {"url": "https://nordikdatacenters.com/", "title": "Nordik Data Centers homepage", "date": "undated", "kind": "proponent", "quote": "Une initiative de l’entreprise Watts Illimités.", "supports": ["notes"]}], "confidence": "low", "notes": "The operator's undated site describes the 46,000 sq ft phase 1 building as ready to receive customers and names none, so operation is not confirmed; the park is an initiative of Watts Illimités.", "checked": "2026-10-25", "mw_figures": [{"mw": 5, "basis": "unstated", "stage": "built", "date": "undated", "source_idx": 1}], "ownership_country": null, "field_confidence": {"owner": "likely", "location": "likely"}} {"site_id": "CA-QC-keel-sherbrooke-bunker", "name": "Bunker (Sherbrooke)", "aliases": ["Bitfarms Bunker", "Keel Infrastructure Sherbrooke 3 Bunker"], "operator": "Keel Infrastructure (formerly Bitfarms)", "owner": null, "tenants": [], "province": "QC", "municipality": "Sherbrooke", "address": null, "lat": 45.40327, "lon": -71.88904, "coord_precision": "city", "type": "crypto", "ai": "no", "status": "operating", "status_date": "2026-08-10", "mw": 48, "mw_basis": "facility", "mw_note": "Energized capacity 48 MW (Keel 10-K, March 2026).", "power_source": "hydro grid (Hydro-Sherbrooke municipal network)", "opened": null, "expected_online": null, "approvals": [{"authority": "Ville de Sherbrooke / Hydro-Sherbrooke", "instrument": "approval to transfer 96 gross MW from three Sherbrooke mining sites to a new HPC/AI campus and change use from Bitcoin mining to HPC/AI", "ref": null, "date": "2026-07-15", "outcome": "approved", "conditions": "Subject to review and approval by Québec's Ministry of Economy, Innovation and Energy (MEIE).", "url": "https://www.sec.gov/Archives/edgar/data/1812477/000181247726000023/keel-20260630.htm"}], "ownership": null, "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1812477/000121390026037514/ea0282809-10k_bitfarms.htm", "title": "Bitfarms Ltd 10-K FY2025, Item 2 Properties", "date": "2026-03-31", "quote": "Bunker, Sherbrooke, Québec, Canada | 48 MW | Leased", "supports": ["mw", "mw_basis", "operator"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1812477/000181247726000023/keel-20260630.htm", "title": "Keel Infrastructure 10-Q (period to 2026-06-30)", "date": "2026-08-10", "quote": "allow us to consolidate the power from three of our current Bitcoin Mining sites into a single 96 gross MW campus, without requesting additional power.", "supports": ["status", "status_date", "approvals", "notes"], "kind": "public_record"}], "confidence": "high", "notes": "One of three Sherbrooke mining sites whose combined 96 MW Keel plans to move to a new HPC/AI campus (approved by Sherbrooke and Hydro-Sherbrooke in July 2026, pending provincial review); the release does not name the three, but these sites' capacities (48, 30 and 18 MW) add up to 96 MW.", "checked": "2026-10-25", "mw_figures": [{"mw": 48, "basis": "facility", "stage": "built", "date": "2026-03-31", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "confirmed", "ai": "confirmed", "location": "likely"}} {"site_id": "CA-QC-keel-sherbrooke-garlock", "name": "Garlock (Sherbrooke)", "aliases": ["Bitfarms Garlock", "Keel Infrastructure Sherbrooke 2 Garlock"], "operator": "Keel Infrastructure (formerly Bitfarms)", "owner": null, "tenants": [], "province": "QC", "municipality": "Sherbrooke", "address": null, "lat": 45.40327, "lon": -71.88904, "coord_precision": "city", "type": "crypto", "ai": "no", "status": "operating", "status_date": "2026-08-10", "mw": 18, "mw_basis": "facility", "mw_note": "Energized capacity 18 MW (Keel 10-K, March 2026).", "power_source": "hydro grid (Hydro-Sherbrooke municipal network)", "opened": null, "expected_online": null, "approvals": [{"authority": "Ville de Sherbrooke / Hydro-Sherbrooke", "instrument": "approval to transfer 96 gross MW from three Sherbrooke mining sites to a new HPC/AI campus and change of use", "ref": null, "date": "2026-07-15", "outcome": "approved", "conditions": "Subject to review and approval by Québec's Ministry of Economy, Innovation and Energy (MEIE).", "url": "https://www.sec.gov/Archives/edgar/data/1812477/000181247726000023/keel-20260630.htm"}], "ownership": null, "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1812477/000121390026037514/ea0282809-10k_bitfarms.htm", "title": "Bitfarms Ltd 10-K FY2025, Item 2 Properties", "date": "2026-03-31", "quote": "Garlock, Sherbrooke, Québec, Canada | 18 MW | Leased", "supports": ["mw", "mw_basis", "operator"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1812477/000181247726000023/keel-20260630.htm", "title": "Keel Infrastructure 10-Q (period to 2026-06-30)", "date": "2026-08-10", "quote": "We maintain our legacy Bitcoin Mining operations in Canada to maximize the value of those assets as we work to transition our Québec sites to HPC and AI.", "supports": ["status", "status_date", "type", "approvals"], "kind": "public_record"}], "confidence": "high", "notes": "One of three Sherbrooke mining sites whose combined 96 MW Keel plans to move to a new HPC/AI campus (approved by Sherbrooke and Hydro-Sherbrooke in July 2026, pending provincial review); the release does not name the three, but these sites' capacities (48, 30 and 18 MW) add up to 96 MW. Building sold and leased back in March 2024.", "checked": "2026-10-25", "mw_figures": [{"mw": 18, "basis": "facility", "stage": "built", "date": "2026-03-31", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "confirmed", "ai": "confirmed", "location": "likely"}} {"site_id": "CA-QC-keel-sherbrooke-hpc", "name": "Keel Infrastructure Sherbrooke HPC/AI campus", "aliases": ["Bitfarms Sherbrooke AI/HPC Campus", "Keel / Backbone — Sherbrooke 96 MW HPC/AI campus", "Keel Infrastructure Sherbrooke HPC"], "operator": "Keel Infrastructure (formerly Bitfarms), via Backbone Hosting Solutions", "owner": "Keel Infrastructure Corp. (formerly Bitfarms Ltd.), land under purchase agreement", "tenants": [], "province": "QC", "municipality": "Sherbrooke", "address": null, "lat": 45.40327, "lon": -71.88904, "coord_precision": "city", "type": "crypto_to_ai", "ai": "yes", "status": "approved", "status_date": "2026-07-15", "mw": null, "mw_basis": null, "mw_note": "96 MW of existing Hydro-Sherbrooke capacity, to be transferred from three operating Keel bitcoin-mining sites in Sherbrooke; it is not new supply, so it is counted at those sites and no separate figure is shown here.", "mw_figures": [], "power_source": "hydro grid (Hydro-Sherbrooke)", "opened": null, "expected_online": null, "approvals": [{"authority": "City of Sherbrooke / Hydro-Sherbrooke", "instrument": "agreement for transfer and operation of 96 MW of existing capacity and change of use to HPC/AI", "ref": "not given", "date": "2026-07-15", "outcome": "approved", "conditions": "Subject to review and approval by Québec's Ministry of Economy, Innovation and Energy (MEIE).", "url": "https://investor.bitfarms.com/news-releases/news-release-details/keel-infrastructure-advances-sherbrooke-quebec-data-center"}, {"authority": "MEIE", "instrument": "review of energy capacity transfer to the new site", "ref": "none published", "date": null, "outcome": "pending", "conditions": "not stated in the sources cited", "url": "https://investor.bitfarms.com/news-releases/news-release-details/keel-infrastructure-advances-sherbrooke-quebec-data-center"}, {"authority": "City of Sherbrooke", "instrument": "land purchase subject to municipal approvals", "ref": "none", "date": null, "outcome": "pending", "conditions": "Land purchase subject to municipal approvals; closing expected in Q1 2027.", "url": "https://investor.bitfarms.com/news-releases/news-release-details/keel-infrastructure-advances-sherbrooke-quebec-data-center"}], "ownership": null, "ownership_country": "United States", "sources": [{"url": "https://investor.bitfarms.com/news-releases/news-release-details/keel-infrastructure-advances-sherbrooke-quebec-data-center", "title": "Keel Infrastructure advances Sherbrooke, Québec data center project (news release)", "date": "2026-07-15", "quote": "transfer and operation of 96 MW of existing capacity", "supports": ["mw", "approvals", "status", "status_date", "ai"], "kind": "proponent"}, {"url": "https://www.sec.gov/Archives/edgar/data/1812477/000181247726000023/keel-20260630.htm", "title": "Keel Infrastructure Corp. 10-Q, quarter ended 2026-06-30", "date": "2026-08-10", "kind": "public_record", "quote": "On July 15, 2026, we received approval from the City of Sherbrooke to enter into an agreement with Hydro-Sherbrooke for the transfer and operation of 96 gross MW of existing capacity, and to enter into a purchase agreement for a parcel of land", "supports": ["owner", "operator"]}, {"url": "https://data.sec.gov/submissions/CIK0001812477.json", "title": "SEC EDGAR company record, Keel Infrastructure Corp.", "date": "undated", "kind": "public_record", "quote": "\"name\":\"Keel Infrastructure Corp.\" | \"stateOfIncorporation\":\"DE\" | \"city\":\"NEW YORK\" | {\"name\":\"Bitfarms Ltd\",\"from\":\"2020-06-15T00:00:00.000Z\",\"to\":\"2026-03-31T00:00:00.000Z\"}", "supports": ["ownership_country", "owner"]}, {"url": "https://www.sec.gov/Archives/edgar/data/1812477/000181247726000023/keel-20260630.htm", "title": "Keel Infrastructure Corp. 10-Q, quarter ended 2026-06-30", "date": "2026-08-10", "kind": "public_record", "quote": "On April 1, 2026, we completed our previously announced redomiciliation from Canada to the United States", "supports": ["ownership_country", "notes"]}], "confidence": "medium", "field_confidence": {"owner": "likely"}, "notes": "Keel plans to move 96 MW from three of its Sherbrooke mining sites to this new HPC/AI campus; the transfer still needs provincial (MEIE) approval, and the land purchase agreement, which the City allowed Keel to sign, remains subject to municipal approvals and is expected to close in Q1 2027. Keel (formerly Bitfarms, an Ontario company) moved its legal home to the United States in April 2026 and is based in New York; no tenant is named.", "checked": "2026-10-25", "tenant_countries": {}} {"site_id": "CA-QC-keel-sherbrooke-leger", "name": "Leger (Sherbrooke)", "aliases": ["Bitfarms Leger", "Keel Infrastructure Sherbrooke 1 Leger"], "operator": "Keel Infrastructure (formerly Bitfarms)", "owner": null, "tenants": [], "province": "QC", "municipality": "Sherbrooke", "address": null, "lat": 45.40327, "lon": -71.88904, "coord_precision": "city", "type": "crypto", "ai": "no", "status": "operating", "status_date": "2026-08-10", "mw": 30, "mw_basis": "facility", "mw_note": "Energized capacity 30 MW (Keel 10-K, March 2026).", "power_source": "hydro grid (Hydro-Sherbrooke municipal network)", "opened": null, "expected_online": null, "approvals": [{"authority": "Ville de Sherbrooke / Hydro-Sherbrooke", "instrument": "approval to transfer 96 gross MW from three Sherbrooke mining sites to a new HPC/AI campus and change of use", "ref": null, "date": "2026-07-15", "outcome": "approved", "conditions": "Subject to review and approval by Québec's Ministry of Economy, Innovation and Energy (MEIE).", "url": "https://www.sec.gov/Archives/edgar/data/1812477/000181247726000023/keel-20260630.htm"}], "ownership": null, "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1812477/000121390026037514/ea0282809-10k_bitfarms.htm", "title": "Bitfarms Ltd 10-K FY2025, Item 2 Properties", "date": "2026-03-31", "quote": "Leger, Sherbrooke, Québec, Canada | 30 MW | Leased", "supports": ["mw", "mw_basis", "operator"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1812477/000181247726000023/keel-20260630.htm", "title": "Keel Infrastructure 10-Q (period to 2026-06-30)", "date": "2026-08-10", "quote": "We maintain our legacy Bitcoin Mining operations in Canada to maximize the value of those assets as we work to transition our Québec sites to HPC and AI.", "supports": ["status", "status_date", "type", "approvals"], "kind": "public_record"}], "confidence": "high", "notes": "One of three Sherbrooke mining sites whose combined 96 MW Keel plans to move to a new HPC/AI campus (approved by Sherbrooke and Hydro-Sherbrooke in July 2026, pending provincial review); the release does not name the three, but these sites' capacities (48, 30 and 18 MW) add up to 96 MW.", "checked": "2026-10-25", "mw_figures": [{"mw": 30, "basis": "facility", "stage": "built", "date": "2026-03-31", "source_idx": 0}], "ownership_country": null, "field_confidence": {"owner": "confirmed", "ai": "confirmed", "location": "likely"}} {"site_id": "CA-QC-equinix-mt2", "name": "MT2", "aliases": ["Equinix MT2", "Ericsson Global ICT Center"], "operator": "Equinix", "owner": null, "tenants": [], "province": "QC", "municipality": "Vaudreuil-Dorion", "address": "3500 Rue F.-X.-Tessier, Vaudreuil-Dorion, Quebec J7V5V5", "lat": 45.41176, "lon": -74.05038, "coord_precision": "building", "type": "colocation", "ai": "unknown", "status": "operating", "status_date": null, "mw": 11, "mw_basis": "it", "mw_note": "About 11 MW of critical power in 2018, when GI Partners bought the building from Ericsson, designed to expand to more than 50 MW; Equinix publishes only its colocation space (3,515 m²).", "power_source": null, "opened": "2016", "expected_online": null, "approvals": [], "ownership": null, "sources": [{"url": "https://www.equinix.com/data-centers/americas-colocation/canada-colocation/montreal-data-centers/mt2", "title": "Equinix MT2 IBX data center page", "date": "undated", "quote": "Address | 3500 Rue F.-X.-Tessier | Vaudreuil-Dorion, Quebec J7V5V5 | Colocation Space\t3,515 m2 (37,832 ft2)", "supports": ["name", "operator", "municipality", "address", "status"], "kind": "proponent"}, {"url": "https://www.gipartners.com/news/gi-partners-announces-data-center-acquisition-in-montreal-quebec", "title": "GI Partners announces data center acquisition in Montréal, Québec", "date": "2018-01-09", "kind": "proponent", "quote": "The facility currently has approximately 11 megawatts of critical, redundant power (turnkey)", "supports": ["mw", "mw_note"]}, {"url": "https://www.gipartners.com/news/gi-partners-announces-data-center-acquisition-in-montreal-quebec", "title": "GI Partners announces data center acquisition in Montréal, Québec", "date": "2018-01-09", "kind": "proponent", "quote": "GI acquired the data center from Ericsson (NASDAQ: ERIC). The property, completed in December 2016", "supports": ["opened", "notes"]}, {"url": "https://data.sec.gov/submissions/CIK0001101239.json", "date": "undated", "kind": "public_record", "quote": "\"name\":\"EQUINIX INC\" | \"city\":\"REDWOOD CITY\",\"stateOrCountry\":\"CA\"", "supports": ["ownership_country"], "title": "SEC EDGAR company record, EQUINIX INC (Redwood City, California, United States)"}], "confidence": "high", "notes": "Formerly the Ericsson ICT Data Center, completed in December 2016 and sold to GI Partners in 2018.", "checked": "2026-10-25", "mw_figures": [{"mw": 11, "basis": "it", "stage": "built", "date": "2018-01-09", "source_idx": 1}], "ownership_country": "United States", "field_confidence": {"owner": "likely", "location": "confirmed"}} {"site_id": "CA-QC-cdw-waswanipi-edge", "name": "Waswanipi edge data centre expansion", "aliases": ["Waswanipi data-centre activity"], "operator": "Corporation de développement Waswanipi (CDW)", "owner": null, "tenants": [], "province": "QC", "municipality": "Waswanipi", "address": null, "lat": 49.69345, "lon": -76.14959, "coord_precision": "city", "type": "enterprise", "ai": "unknown", "status": "announced", "status_date": "2026-04-02", "mw": 5, "mw_basis": "unstated", "mw_note": "The expanded centre would need more than 5 MW (CDW filing to the Régie de l'énergie).", "mw_figures": [{"mw": 5, "basis": "unstated", "stage": "planned", "date": "2026-04-02", "source_idx": 0}], "power_source": "hydro grid", "opened": null, "expected_online": null, "approvals": [{"authority": "Régie de l'énergie", "instrument": "intervention in Hydro-Québec data-centre (CD) and crypto rate case", "ref": "R-4333-2026", "date": "2026-04-02", "outcome": "applied", "conditions": "CDW argues the expansion, needing over 5 MW, would fall under Hydro-Québec's new higher data-centre rate.", "url": "https://www.regie-energie.qc.ca/fr/participants/dossiers/R-4333-2026/doc/R-4333-2026-C-CDW-0009-DemInterv-Sujets-2026_04_02.pdf"}], "ownership": "Waswanipi Cree First Nation development corporation", "ownership_country": "Canada", "sources": [{"url": "https://www.regie-energie.qc.ca/fr/participants/dossiers/R-4333-2026/doc/R-4333-2026-C-CDW-0009-DemInterv-Sujets-2026_04_02.pdf", "title": "R-4333-2026, CDW, liste des sujets", "date": "2026-04-02", "quote": "le nouveau centre de données agrandi de Waswanipi (de par sa taille requérant une puissance de plus de 5 MW) deviendrait assujetti au nouveau tarif élevé CB", "supports": ["operator", "mw", "status", "approvals"], "kind": "public_record"}], "confidence": "medium", "field_confidence": {"location": "likely"}, "notes": "A small edge data centre already operates in Waswanipi; this entry is the planned expansion to over 5 MW. The Régie filing is an intervention in a rate case, not a project approval.", "checked": "2026-10-25"} {"site_id": "CA-SK-prairie-data-corman-park", "name": "1 Plant Technology Road", "aliases": ["Prairie Data Center — Corman Park"], "operator": "undisclosed (Colliers lease listing)", "owner": null, "tenants": [], "province": "SK", "municipality": "RM of Corman Park No. 344", "address": "1 Plant Technology Road, RM of Corman Park", "lat": 52.26062, "lon": -106.79022, "coord_precision": "area", "type": "unknown", "ai": "unknown", "status": "announced", "status_date": null, "mw": null, "mw_basis": null, "mw_note": "", "mw_figures": [], "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://thestarphoenix.com/news/saskatchewan-news/idea-of-data-centre-outside-saskatoon-concerns-some-residents/", "title": "StarPhoenix: Idea of data centre outside Saskatoon concerns some residents", "date": "2026-06-30", "quote": "Colliers has listed for lease an industrial building at 1 Plant Technology Road in the Rural Municipality of Corman Park.", "supports": ["address", "status", "name", "notes"], "kind": "press"}, {"url": "https://thestarphoenix.com/news/saskatchewan-news/idea-of-data-centre-outside-saskatoon-concerns-some-residents/", "title": "StarPhoenix: Idea of data centre outside Saskatoon concerns some residents", "date": "2026-06-30", "kind": "press", "quote": "the RM hasn’t received an application for a data centre at this time", "supports": ["status", "notes"]}], "confidence": "low", "field_confidence": {"location": "likely"}, "notes": "A marketing listing only: Colliers offers this former cannabis facility for lease as a possible data centre, and in June 2026 the RM said it had received no application. The point marks the rural municipality, not the site, which is across Highway 16 from Saskatoon's south end.", "checked": "2026-10-25"} {"site_id": "CA-SK-bell-sherwood", "name": "Bell AI Fabric Sherwood campus", "aliases": ["Bell AI Fabric Saskatchewan AI Hub", "Bell Saskatchewan Campus", "Sherwood Data Centre"], "operator": "Bell Canada (Bell AI Fabric)", "owner": "Bell Canada (BCE Inc.)", "tenants": ["Cerebras", "CoreWeave"], "province": "SK", "municipality": "RM of Sherwood No. 159", "address": "NW 33-16-19-W2M", "lat": 50.39315, "lon": -104.56675, "coord_precision": "area", "type": "ai_hpc", "ai": "yes", "status": "under_construction", "status_date": "2026-10-01", "mw": 300, "mw_basis": "facility", "mw_note": "300 MW of utility power (BCE, 2026-03-16), split Cerebras 160 MW and CoreWeave 140 MW per press; 1,200 MW at full build-out (Government of Saskatchewan).", "power_source": "grid (SaskPower, first 300 MW); expansion would be self-generated gas", "opened": null, "expected_online": "2027-H1", "approvals": [{"authority": "RM of Sherwood", "instrument": "rezoning", "ref": "Bylaw 01/26", "date": "2026-02-09", "outcome": "approved", "conditions": "none published", "url": "https://www.saskatchewan.ca/-/media/news-release-backgrounders/2026/oct/26-6088-bell-ai-fabric-rm-of-sherwood-campus.pdf"}, {"authority": "RM of Sherwood", "instrument": "development permit and development agreement", "ref": "DP 26-005; Res. 2026/0111", "date": "2026-04-20", "outcome": "approved", "conditions": "haul route Park Street (Range Road 2194) to be upgraded (applicant executive summary)", "url": "https://rmofsherwood.ca/app/uploads/2026/06/Regular-Council-Meeting-Minutes-April-20-2026.pdf"}, {"authority": "SaskPower", "instrument": "power supply agreement", "ref": null, "date": "2026-03", "outcome": "approved", "conditions": "first 300 MW from existing generating assets", "url": "https://www.saskatchewan.ca/-/media/news-release-backgrounders/2026/oct/26-6088-bell-ai-fabric-rm-of-sherwood-campus.pdf"}], "ownership": "BCE Inc. (Canada)", "sources": [{"url": "https://www.saskatchewan.ca/government/news-and-media/2026/october/01/bell-ai-fabric", "title": "Government of Saskatchewan release, Bell AI Fabric", "date": "2026-10-01", "quote": "structural steel is rising, all four buildings in the first phase are taking shape and more than 500 people are working on site.", "supports": ["status", "status_date", "expected_online"], "kind": "public_record"}, {"url": "https://www.bce.ca/cs-assets/Bell-AI-Fabric.pdf-blt3f7cbf3754b033a2", "title": "BCE Bell AI Fabric investor deck", "date": "2026-03-16", "quote": "Tenants are Cerebras and CoreWeave, who will supply and fund compute", "supports": ["tenants", "mw", "operator"], "kind": "proponent"}, {"url": "https://www.saskatchewan.ca/-/media/news-release-backgrounders/2026/oct/26-6088-bell-ai-fabric-rm-of-sherwood-campus.pdf", "title": "Backgrounder: Bell AI Fabric RM of Sherwood campus", "date": "2026-09", "quote": "SaskPower supplies the first 300 MW from existing generating assets under the March 2026 agreement.", "supports": ["power_source", "approvals"], "kind": "public_record"}, {"url": "https://rmofsherwood.ca/advanced-notification-of-development-agreement-for-dp-26-005-proposed-data-centre-at-nw-33-16-19-w2m/", "title": "RM of Sherwood DP 26-005 notice", "date": "2026-04-02", "quote": "Advanced Notification of Development Agreement for DP 26-005 – Proposed Data Centre at NW 33 16 19 W2M", "supports": ["address", "approvals"], "kind": "public_record"}, {"url": "https://www.sec.gov/Archives/edgar/data/718940/000071894026000009/a2026-q2xmda.htm", "title": "BCE Inc. Q2 2026 MD&A (6-K)", "date": "2026-08-06", "kind": "public_record", "quote": "Bird Construction Inc. has been selected as the lead construction partner for the facility, which will provide capacity to customers Cerebras and CoreWeave", "supports": ["tenants"]}, {"url": "https://data.sec.gov/submissions/CIK0000718940.json", "title": "SEC EDGAR company record, BCE Inc.", "date": "undated", "kind": "public_record", "quote": "\"city\":\"VERDUN\" | \"country\":\"Quebec, Canada\"", "supports": ["ownership_country"]}, {"url": "https://data.sec.gov/submissions/CIK0002021728.json", "title": "SEC EDGAR company record, Cerebras Systems Inc.", "date": "undated", "kind": "public_record", "quote": "\"city\":\"SUNNYVALE\",\"stateOrCountry\":\"CA\"", "supports": ["tenant_countries"]}, {"url": "https://data.sec.gov/submissions/CIK0001769628.json", "title": "SEC EDGAR company record, CoreWeave, Inc.", "date": "undated", "kind": "public_record", "quote": "\"city\":\"LIVINGSTON\",\"stateOrCountry\":\"NJ\"", "supports": ["tenant_countries"]}, {"url": "https://rmofsherwood.ca/app/uploads/2026/06/Regular-Council-Meeting-Minutes-April-20-2026.pdf", "title": "RM of Sherwood Regular Council minutes, 20 April 2026", "date": "2026-04-20", "quote": "THAT the Development Agreement with Bell Canada be accepted as presented", "supports": ["approvals"], "kind": "public_record"}], "confidence": "high", "notes": "Tenants are Cerebras and CoreWeave; chip counts are not disclosed. The point is approximate (from a third-party map) and not confirmed on imagery.", "checked": "2026-10-25", "mw_figures": [{"mw": 300, "basis": "facility", "stage": "building", "date": "2026-03-16", "source_idx": 1}, {"mw": 1200, "basis": "buildout", "stage": "planned", "date": "2026-10-01", "source_idx": 0}], "ownership_country": "Canada", "field_confidence": {"owner": "confirmed", "tenants": "confirmed"}, "tenant_countries": {"Cerebras": "United States", "CoreWeave": "United States"}} {"site_id": "CA-SK-ksp-regina", "name": "KSP Technology data center", "aliases": [], "operator": "KSP Technology", "owner": null, "tenants": [], "province": "SK", "municipality": "Regina", "address": "101-2825 Saskatchewan Dr, Regina, SK S4T 1H3", "lat": 50.4452, "lon": -104.6189, "coord_precision": "city", "type": "unknown", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_figures": [], "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.ksptechnology.com/", "title": "KSP Technology", "date": "undated", "quote": "Locally hosted in our own secure data center with full control over security & compliance", "supports": ["name", "operator", "status", "type"], "kind": "proponent"}, {"url": "https://www.ksptechnology.com/", "title": "KSP Technology", "date": "undated", "quote": "Address: 101-2825 Saskatchewan Dr. Regina, SK S4T 1H3", "supports": ["address", "municipality"], "kind": "proponent"}], "confidence": "low", "field_confidence": {"location": "speculative", "ai": "likely"}, "notes": "KSP Technology, a managed IT provider, says client data is hosted in its 'own secure data center' and sells no colocation, so the site type is left unknown. The address is the company's head office; the data centre's own location is not published.", "checked": "2026-10-25"} {"site_id": "CA-SK-spyr-regina-2002-victoria", "name": "SPYR Data Centre", "aliases": ["2002 Victoria Avenue"], "operator": "SPYR Network Ltd.", "owner": null, "tenants": [], "province": "SK", "municipality": "Regina", "address": "2002 Victoria Ave, Regina, SK S4P 0R7", "lat": 50.44745, "lon": -104.60974, "coord_precision": "address", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_figures": [], "mw_note": "", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://spyr.ca/data", "title": "SPYR Data Centre", "date": "undated", "quote": "Colocation & Data Centre in Regina, Saskatchewan", "supports": ["name", "operator", "municipality", "type", "status"], "kind": "proponent"}, {"url": "https://spyr.ca/data", "title": "SPYR Data Centre", "date": "undated", "quote": "2002 Victoria Ave, Regina, SK S4P 0R7", "supports": ["address"], "kind": "proponent"}], "confidence": "high", "field_confidence": {"location": "confirmed", "ai": "likely"}, "notes": "The address is the company's contact address; SPYR does not say the racks are in that building.", "checked": "2026-10-25"} {"site_id": "CA-SK-sasktel-regina-central", "name": "SaskTel Regina Central", "aliases": [], "operator": "SaskTel (Saskatchewan Telecommunications)", "owner": null, "tenants": [], "province": "SK", "municipality": "Regina", "address": null, "lat": 50.4452, "lon": -104.6189, "coord_precision": "city", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_figures": [], "mw_note": "Spec sheet (June 2019): 7,100 sq ft; no MW published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.sasktel.com/business/cloud/colocation", "title": "Colocation | Business | SaskTel", "date": "undated", "quote": "There are four Colocation Data Centre facilities located within Saskatchewan.", "supports": ["operator", "type", "status"], "kind": "proponent"}, {"url": "https://www.sasktel.com/wps/wcm/connect/9ca81047-dd0b-4ce5-98ad-99ea46d8ad79/data-centre-regina-central-june32019.pdf?MOD=AJPERES&CVID=mIM9MUL", "title": "SaskTel Colocation - Regina Central facility specifications", "date": "2019-06-06", "quote": "7,100 sq ft floor space | Traditional telco building hardened to withstand harsh weather conditions", "supports": ["name", "municipality", "mw_note"], "kind": "proponent"}], "confidence": "medium", "field_confidence": {"location": "likely", "ai": "likely"}, "notes": "A colocation room in a hardened telecom building, kept because SaskTel sells it as one of its four colocation data centres. No address is published; the point marks Regina.", "checked": "2026-10-25"} {"site_id": "CA-SK-sasktel-saskatoon-central", "name": "SaskTel Saskatoon Central", "aliases": [], "operator": "SaskTel (Saskatchewan Telecommunications)", "owner": null, "tenants": [], "province": "SK", "municipality": "Saskatoon", "address": null, "lat": 52.1332, "lon": -106.67, "coord_precision": "city", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_figures": [], "mw_note": "Spec sheet (June 2019): 4,900 sq ft; no MW published.", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.sasktel.com/business/cloud/colocation", "title": "Colocation | Business | SaskTel", "date": "undated", "quote": "There are four Colocation Data Centre facilities located within Saskatchewan.", "supports": ["operator", "type", "status"], "kind": "proponent"}, {"url": "https://www.sasktel.com/wps/wcm/connect/a8d92672-fe3a-417c-855a-a8d1546db435/data-centre-saskatoon-central-june32019.pdf?MOD=AJPERES&CVID=mIM9T0h", "title": "SaskTel Colocation - Saskatoon Central facility specifications", "date": "2019-06-06", "quote": "4,900 sq ft floor space | Traditional telco building hardened to withstand harsh weather conditions", "supports": ["name", "municipality", "mw_note"], "kind": "proponent"}], "confidence": "medium", "field_confidence": {"location": "likely", "ai": "likely"}, "notes": "A colocation room in a hardened telecom building, kept because SaskTel sells it as one of its four colocation data centres. No address is published; the point marks Saskatoon.", "checked": "2026-10-25"} {"site_id": "CA-SK-sasktel-saskatoon-north", "name": "SaskTel Saskatoon North", "aliases": [], "operator": "SaskTel (Saskatchewan Telecommunications)", "owner": null, "tenants": [], "province": "SK", "municipality": "Saskatoon", "address": "745 66th Street East, Saskatoon, SK S7P 0E4", "lat": 52.19383, "lon": -106.65542, "coord_precision": "address", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_figures": [], "mw_note": "Spec sheet (June 2019): 9,650 sq ft, expandable to 30,000 sq ft; two 2.5 MW generators and two 1.35 MW UPS units (equipment, not capacity).", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.sasktel.com/business/cloud/colocation", "title": "Colocation | Business | SaskTel", "date": "undated", "quote": "There are four Colocation Data Centre facilities located within Saskatchewan. Click on each location for detailed specifications:", "supports": ["operator", "type", "status"], "kind": "proponent"}, {"url": "https://www.sasktel.com/wps/wcm/connect/a2ee2804-f677-4616-a530-6ca18021406e/data-centre-saskatoon-north-tier-3-12june2019.pdf?MOD=AJPERES&CVID=mJckue0", "title": "SaskTel Colocation - Saskatoon North facility specifications", "date": "2019-06-12", "quote": "9,650 sq ft floor space | Expandable to 30,000 sq ft | N+1 redundancy (2 Generators 2.5 MW each)", "supports": ["name", "municipality", "mw_note"], "kind": "proponent"}, {"url": "https://www.peeringdb.com/fac/9522", "title": "PeeringDB: SaskTel Saskatoon North", "date": "2025-09-26", "quote": "745 66th street east", "supports": ["address"], "kind": "directory"}], "confidence": "high", "field_confidence": {"location": "likely", "ai": "likely"}, "notes": "One of SaskTel's two Tier III data centres; the address comes from a peering directory.", "checked": "2026-10-25"} {"site_id": "CA-SK-sasktel-white-city", "name": "SaskTel White City", "aliases": [], "operator": "SaskTel (Saskatchewan Telecommunications)", "owner": null, "tenants": [], "province": "SK", "municipality": "White City", "address": null, "lat": 50.6, "lon": -104.3667, "coord_precision": "city", "type": "colocation", "ai": "no", "status": "operating", "status_date": null, "mw": null, "mw_basis": null, "mw_figures": [], "mw_note": "Spec sheet (June 2019): 8,100 sq ft, expandable to 30,000 sq ft; 0.5 MW UPS (equipment, not capacity).", "power_source": null, "opened": null, "expected_online": null, "approvals": [], "ownership": null, "ownership_country": null, "sources": [{"url": "https://www.sasktel.com/business/cloud/colocation", "title": "Colocation | Business | SaskTel", "date": "undated", "quote": "With four facilities, including two Tier III data centers, we ensure your business can grow economically while maintaining top-notch security and availability.", "supports": ["operator", "type", "status"], "kind": "proponent"}, {"url": "https://www.sasktel.com/wps/wcm/connect/4c47cd95-8077-4c24-8c48-3a0e8e548627/data-centre-white-city-tier-3-12june2019.pdf?MOD=AJPERES&CVID=mJckkt0", "title": "SaskTel Colocation - White City facility specifications", "date": "2019-06-12", "quote": "8,100 sq ft floor space | Expandable to 30,000 sq ft", "supports": ["name", "municipality", "mw_note"], "kind": "proponent"}], "confidence": "high", "field_confidence": {"location": "likely", "ai": "likely"}, "notes": "No street address is published; the point marks White City.", "checked": "2026-10-25"}